- Award of Solicitation N40192-19-R-2830, 8(a) Multiple Award Construction Contract (8(a) MACC), Various Locations, Guam Federal contract opportunity
- Solicitation number
- N4019219R2830
About this file
This award notice announces the selection of five contractors for indefinite delivery indefinite quantity construction contracts on Guam under solicitation N4019219R2830. The U.S. Navy's Naval Facilities Engineering Command Marianas will award the contracts to eligible 8(a) small businesses located within the SBA Hawaii District Office service area or with a bona fide place of business there. Each contract has a minimum $10,000 guarantee and maximum aggregate value of $75 million over five years. Work includes new construction, renovation, repair and maintenance projects at federal and military facilities on Guam. The solicitation was open only to eligible 8(a) firms. The pre-proposal conference was January 15, 2019 and proposals were due February 12, 2019.
_Amendment0004_01FEB19.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| _Amendment0005_05FEB19.pdf | ||
| _Amendment0003_24JAN19.pdf | ||
| _Amendment0002_18JAN19.pdf | ||
| _Amendment0001_20DEC18.pdf | ||
| _RFP_Part_C_Seed_Project_14DEC18.pdf | ||
| _RFP_Part_A_Proposal_Forms_and_Documents_14DEC18.pdf | ||
| _RFP_Part_D_Attachments_14DEC18.pdf | ||
| _RFP_Part_B_Technical_Specifications_14DEC18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5566574
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
8(a) Multiple Aw ard Construction Contract (8(a) MACC), Various Locations, Guam
See Continuation Page 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4019219R2830
X 9B. DATED (SEE ITEM 11)
14-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Feb-2019
CODE
COMMANDING OFFICER - NAVFAC MARIANAS
MAR MCON
PSC 455, BOX 195
FPO AP 96540-2937
N40192 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4019219R2830
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
A. In accordance with FAR 52.252-3 Alterations in Solicitation (APR 1984), portions of this solicitation are altered as follows:
1. In RFP Part C Seed Project, add the following to UFGS Specification Section 01 11 00 Summary of Work, Paragraph 1.2.1 Project Description and Scope of Work, Subparagraph B.1:
“e. Provide temporary portable AC for cooling the living/dining rooms and all bedrooms during construction when there is no cooling during installation.”
2. In RFP Part C Seed Project, replace UFGS Specification Section 23 05 93 Testing, Adjusting, and Balancing for HVAC in its entirety with the specification section provided herein as Enclosure (1).
Revisions applicable to this amendment are marked and/or underlined.
B. Notice 3 is provided in response to a request for information and is provided herein as Enclosure (2). Notice 3 is provided for INFORMATION ONLY. The solicitation remains unchanged unless it is amended in writing.
C. The date for receipt of proposals remains unchanged at February 12, 2019 at 4:30pm local time.
D. Offerors shall acknowledge this amendment in Block 19 of the Standard Form 1442 with their proposals.
(End of Summary of Changes)
WON 1589351 Replace A/C System, Phase II 59 Units Apra View (H-05-19) Apra View Housing, NBG
SECTION 23 05 93 Page 1
PART 1 GENERAL
1.1 REFERENCES
SECTION 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
11/15
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL (AMCA)
AMCA 203 (1990; R 2011) Field Performance Measurements of Fan Systems
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 62.1 (2010) Ventilation for Acceptable Indoor Air Quality
ASSOCIATED AIR BALANCE COUNCIL (AABC)
AABC MN-1 (2002; 6th ed) National Standards for Total System Balance
AABC MN-4 (1996) Test and Balance Procedures
NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
NEBB MASV (2006) Procedural Standards for Measurements and Assessment of Sound and Vibration
NEBB PROCEDURAL STANDARDS (2015) Procedural Standards for TAB (Testing, Adjusting and Balancing) Environmental Systems
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1780 (2002) HVAC Systems - Testing, Adjusting and Balancing, 3rd Edition
SMACNA 1858 (2004) HVAC Sound And Vibration Manual - First Edition
SMACNA 1972 CD (2012) HVAC Air Duct Leakage Test Manual - 2nd Edition
1.2 DEFINITIONS
a. AABC: Associated Air Balance Council
b. COTR: Contracting Officer's Technical Representative
RFP Amendment 0004 Enclosure (1)
SECTION 23 05 93 Page 2
c. DALT: Duct air leakage test
d. DALT'd: Duct air leakage tested
e. HVAC: Heating, ventilating, and air conditioning; or heating, ventilating, and cooling
f. NEBB: National Environmental Balancing Bureau
g. Out-of-tolerance data: Pertains only to field acceptance testing of
Final DALT or TAB report. When applied to DALT work, this phase means "a leakage rate measured during DALT field acceptance testing which exceeds the leakage rate allowed by Appendix D REQUIREMENTS FOR DUCT AIR LEAK TESTING." When applied to TAB work this phase means "a measurement taken during TAB field acceptance testing which does not fall within the range of plus 5 to minus 5 percent of the original measurement reported on the TAB Report for a specific parameter."
h. Season of maximum heating load: The time of year when the outdoor temperature at the project site remains within plus or minus 17.5 degrees Celsius of the project site's winter outdoor design temperature, throughout the period of TAB data recording.
i. Season of maximum cooling load: The time of year when the outdoor temperature at the project site remains within plus or minus 3 degrees Celsius of the project site's summer outdoor design temperature, throughout the period of TAB data recording.
j. Season 1, Season 2: Depending upon when the project HVAC is completed and ready for TAB, Season 1 is defined, thereby defining Season 2.
Season 1 could be the season of maximum heating load, or the season of maximum cooling load.
k. Sound measurements terminology: Defined in AABC MN-1, NEBB MASV, or
SMACNA 1858 (TABB).
l. TAB: Testing, adjusting, and balancing (of HVAC systems)
m. TAB'd: HVAC Testing/Adjusting/Balancing procedures performed
n. TAB Agency: TAB Firm
o. TAB team field leader: TAB team field leader
p. TAB team supervisor: TAB team engineer
q. TAB team technicians: TAB team assistants
r. TABB: Testing Adjusting and Balancing Bureau
1.2.1 Similar Terms
In some instances, terminology differs between the Contract and the TAB Standard primarily because the intent of this Section is to use the industry standards specified, along with additional requirements listed herein to produce optimal results.
The following table of similar terms is provided for clarification only.
SECTION 23 05 93 Page 3
Contract requirements take precedent over the corresponding AABC, NEBB, or TABB requirements where differences exist.
SIMILAR TERMS
Contract Term AABC Term NEBB Term TABB Term
TAB Standard National Procedural International Standards for Standards for Standards for Testing and Testing, Environmental Balancing Adjusting and Systems Balance Heating, Balancing of Ventilating, and Environmental Air Conditioning Systems Systems
TAB Specialist TAB Engineer TAB Supervisor TAB Supervisor
Systems Readiness Construction Field Readiness Field Readiness Check Phase Inspection Check & Check & Prelim.
Preliminary Field Field Procedures Procedures
1.3 WORK DESCRIPTION
The work includes duct air leakage testing (DALT) and testing, adjusting, and balancing (TAB) of new and existing heating, ventilating, and cooling (HVAC) air and water distribution systems including equipment and performance data, ducts, and piping which are located within, on, under, between, and adjacent to buildings.
Perform TAB in accordance with the requirements of the TAB procedural standard recommended by the TAB trade association that approved the TAB Firm's qualifications. Comply with requirements of AABC MN-1, NEBB PROCEDURAL STANDARDS, or SMACNA 1780 (TABB) as supplemented and modified by this specification section. All recommendations and suggested practices contained in the TAB procedural standards are considered mandatory.
Conduct DALT and TAB of the indicated existing systems and equipment and submit the specified DALT and TAB reports for approval. Conduct DALT testing in compliance with the requirements specified in SMACNA 1972 CD, except as supplemented and modified by this section. Conduct DALT and TAB work in accordance with the requirements of this section.
1.3.1 Air Distribution Systems
Test, adjust, and balance systems (TAB) in compliance with this section.
Obtain Contracting Officer's written approval before applying insulation to exterior of air distribution systems as specified under Section 23 07 00
THERMAL INSULATION FOR MECHANICAL SYSTEMS.
1.3.2 TAB SCHEMATIC DRAWINGS
Show the following information on TAB Schematic Drawings:
1. A unique number or mark for each piece of equipment or terminal.
SECTION 23 05 93 Page 4
2. Air quantities at air terminals.
3. Air quantities and temperatures in air handling unit schedules.
7. Ductwork Construction and Leakage Testing Table that defines the DALT test requirements, including each applicable HVAC duct system ID or mark, duct pressure class, duct seal class, and duct leakage test pressure. This table is included in the file for Graphics for Unified Facilities Guide Specifications:
http://www.wbdg.org/FFC/NAVGRAPH/graphtoc.pdf
The Testing, Adjusting, and Balancing (TAB) Specialist must review the Contract Plans and Specifications and advise the Contracting Officer of any deficiencies that would prevent the effective and accurate TAB of the system, including records of existing conditions, and systems readiness check. The TAB Specialist must provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper system operation.
Submit three copies of the TAB Schematic Drawings and Report Forms to the Contracting Officer, no later than 21 days prior to the start of TAB field measurements.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Independent TAB Agency and Personnel Qualifications; G
TAB Design Review Report; G
SD-02 Shop Drawings
TAB Schematic Drawings and Report Forms; G
SD-03 Product Data
Equipment and Performance Data; G
TAB Related HVAC Submittals; G
A list of the TAB Related HVAC Submittals, no later than 7 days after the approval of the TAB team engineer .
SD-06 Test Reports
Prerequisite HVAC Work Checkout List For Proportional Balancing; G
Certified Final TAB Report for Proportional Balancing; G
SECTION 23 05 93 Page 5
Prerequisite HVAC Work Checkout List ; G
Certified Final TAB Report for ; G
SD-07 Certificates
Independent TAB Agency and Personnel Qualifications; G
TAB Submittal and Work Schedule; G
TAB Pre-Field Engineering Report; G
Instrument Calibration Certificates; G
TAB Procedures Summary; G Advance Notice of TAB Field Work for Proportional Balancing; G
1.5 QUALITY ASSURANCE
1.5.1 Independent TAB Agency and Personnel Qualifications
To secure approval for the proposed agency, submit information certifying that the TAB agency is a first tier subcontractor who is not affiliated with any other company participating in work on this contract, including design, furnishing equipment, or construction. Further, submit the following, for the agency, to Contracting Officer for approval:
a. Independent AABC or NEBB or TABB TAB agency:
TAB agency: AABC registration number and expiration date of current certification; or NEBB certification number and expiration date of current certification; or TABB certification number and expiration date of current certification.
TAB team supervisor: Name and copy of AABC or NEBB or TABB TAB supervisor certificate and expiration date of current certification.
TAB team field leader: Name and documented evidence that the team field leader has satisfactorily performed full-time supervision of TAB work in the field for not less than 3 years immediately preceding this contract's bid opening date.
TAB team field technicians: Names and documented evidence that each field technician has satisfactorily assisted a TAB team field leader in performance of TAB work in the field for not less than one year immediately preceding this contract's bid opening date.
Current certificates: Registrations and certifications are current, and valid for the duration of this contract. Renew Certifications which expire prior to completion of the TAB work, in a timely manner so that there is no lapse in registration or certification. TAB agency or TAB team personnel without a current registration or current certification are not to perform TAB work on this contract.
SECTION 23 05 93 Page 6
b. TAB Team Members: TAB team approved to accomplish work on this contract are full-time employees of the TAB agency. No other personnel is allowed to do TAB work on this contract.
c. Replacement of TAB team members: Replacement of members may occur if each new member complies with the applicable personnel qualifications and each is approved by the Contracting Officer.
1.5.1.1 TAB Standard
Perform TAB in accordance with the requirements of the standard under which the TAB Firm's qualifications are approved, i.e., AABC MN-1, NEBB PROCEDURAL STANDARDS, or SMACNA 1780 unless otherwise specified herein. All recommendations and suggested practices contained in the TAB Standard are considered mandatory. Use the provisions of the TAB Standard, including checklists, report forms, etc., as nearly as practical, to satisfy the Contract requirements. Use the TAB Standard for all aspects of TAB, including qualifications for the TAB Firm and Specialist and calibration of TAB instruments. Where the instrument manufacturer calibration recommendations are more stringent than those listed in the TAB Standard, adhere to the manufacturer's recommendations.
All quality assurance provisions of the TAB Standard such as performance guarantees are part of this contract. For systems or system components not covered in the TAB Standard, TAB procedures must be developed by the TAB Specialist. Where new procedures, requirements, etc., applicable to the Contract requirements have been published or adopted by the body responsible for the TAB Standard used (AABC, NEBB, or TABB), the requirements and recommendations contained in these procedures and requirements are considered mandatory, including the latest requirements of
ASHRAE 62.1.
1.5.1.2 Qualifications
a. TAB Firm
The TAB Firm must be either a member of AABC or certified by the NEBB or the TABB and certified in all categories and functions where measurements or performance are specified on the plans and specifications, including TAB of environmental systems.
Certification must be maintained for the entire duration of duties specified herein. If, for any reason, the firm loses subject certification during this period, the Contractor must immediately notify the Contracting Officer and submit another TAB Firm for approval. Any firm that has been the subject of disciplinary action by either the AABC, the NEBB, or the TABB within the five years preceding Contract Award is not be eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this Section and in other related Sections to be performed by the TAB Firm will be considered invalid if the TAB Firm loses its certification prior to Contract completion and must be performed by an approved successor.
These TAB services are to assist the prime Contractor in performing the quality oversight for which it is responsible. The TAB Firm must be a prime subcontractor of the Contractor and be financially and corporately independent of the mechanical subcontractor, reporting directly to and paid by the Contractor.
SECTION 23 05 93 Page 7
b. TAB Specialist
The TAB Specialist must be either a member of AABC,an experienced technician of the Firm certified by the NEBB, or a Supervisor certified by the TABB. The certification must be maintained for the entire duration of duties specified herein. If, for any reason, the Specialist loses subject certification during this period, immediately notify the Contracting Officer and submit another TAB Specialist for approval. Any individual that has been the subject of disciplinary action by either the AABC, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this Section and in other related Sections performed by the TAB Specialist will be considered invalid if the TAB Specialist loses its certification prior to Contract completion and must be performed by the approved successor.
c. TAB Specialist Responsiblities
TAB Specialist responsibilities include all TAB work specified herein and in related sections under his direct guidance. The TAB specialist is required to be onsite on a daily basis to direct TAB efforts. The TAB Specialist must participate in the commissioning process.
1.5.1.3 TAB Related HVAC Submittals
The TAB Specialist must prepare a list of the submittals from the Contract Submittal Register that relate to the successful accomplishment of all HVAC TAB. Accompany the submittals identified on this list with a letter of approval signed and dated by the TAB Specialist when submitted to the Government. Ensure that the location and details of ports, terminals, connections, etc., necessary to perform TAB are identified on the submittals.
1.5.2 Responsibilities
The Contractor is responsible for ensuring compliance with the requirements of this section. The following delineation of specific work responsibilities is specified to facilitate TAB execution of the various work efforts by personnel from separate organizations. This breakdown of specific duties is specified to facilitate adherence to the schedule listed in the paragraph TAB SUBMITTAL AND WORK SCHEDULE.
1.5.2.1 Contractor
a. TAB personnel: Ensure that the DALT work and the TAB work is accomplished by a group meeting the requirements specified in the paragraph TAB PERSONNEL QUALIFICATION REQUIREMENTS.
b. Pre-DALT/TAB meeting: Attend the meeting with the TAB Supervisor, and ensure that a representative is present for the sheetmetal contractor, mechanical contractor, electrical contractor, and automatic temperature controls contractor.
c. HVAC documentation: Furnish one complete set of the following HVAC-related documentation to the TAB agency:
(1) Contract drawings and specifications
(2) Approved submittal data for equipment
SECTION 23 05 93 Page 8
(3) Construction work schedule
(4) Up-to-date revisions and change orders for the previously listed items
d. Submittal and work schedules: Ensure that the schedule for submittals and work required by this section and specified in the paragraph TAB SUBMITTAL AND WORK SCHEDULE is met.
e. Coordination of supporting personnel:
Provide the technical personnel, such as factory representatives or HVAC controls installer required by the TAB field team to support the DALT and the TAB field measurement work.
Provide equipment mechanics to operate HVAC equipment and ductwork mechanics to provide the field designated test ports to enable TAB field team to accomplish the DALT and the TAB field measurement work.
Ensure these support personnel are present at the times required by the TAB team, and cause no delay in the DALT and the TAB field work.
Conversely, ensure that the HVAC controls installer has required support from the TAB team field leader to complete the controls check out.
f. Deficiencies: Ensure that the TAB Agency supervisor submits all
Design/Construction deficiency notifications directly to the Contracting officer within 3 days after the deficiency is encountered.
Further, ensure that all such notification submittals are complete with explanation, including documentation, detailing deficiencies.
g. Prerequisite HVAC work: Complete check out and debugging of HVAC equipment, ducts, and controls prior to the TAB engineer arriving at the project site to begin the TAB work. Debugging includes searching for and eliminating malfunctioning elements in the HVAC system installations, and verifying all adjustable devices are functioning as designed. Include as prerequisite work items, the deficiencies pointed out by the TAB team supervisor in the design review report.
h. Prior to the TAB field team's arrival, ensure completion of the applicable inspections and work items listed in the TAB team supervisor's pre-field engineering report. Do not allow the TAB team to commence TAB field work until all of the following are completed.
(1) HVAC system installations are fully complete.
(2) HVAC prerequisite checkout work lists specified in the paragraph
PRE-FIELD TAB ENGINEERING REPORT are completed, submitted, and approved. Ensure that the TAB Agency gets a copy of the approved prerequisite HVAC work checklist.
(3) DALT field checks for all systems are completed.
(4) HVAC system filters are clean for both Season 1 and Season 2 TAB field work.
i. Advance notice: Furnish to the Contracting Officer with advance written notice for the commencement of the DALT field work and for the
SECTION 23 05 93 Page 9 commencement of the TAB field work.
j. Insulation work: For required DALT work , ensure that insulation is not installed on ducts to be DALT'd until DALT work on the subject ducts is complete.Later, ensure that openings in duct and machinery insulation coverings for TAB test ports are marked, closed and sealed.
1.5.2.2 TAB Agency
Provide the services of a TAB team which complies with the requirements of the paragraph INDEPENDENT TAB AGENCY PERSONNEL QUALIFICATIONS. The work to be performed by the TAB agency is limited to testing, adjusting, and balancing of HVAC air and water systems to satisfy the requirements of this specification section.
1.5.2.3 TAB Team Supervisor
a. Overall management: Supervise and manage the overall TAB team work effort, including preliminary and technical DALT and TAB procedures and TAB team field work.
b. PreTAB meeting: Attend meeting with Contractor.
c. Design review report: Review project specifications and accompanying drawings to verify that the air systems and water systems are designed in such a way that the TAB engineer can accomplish the work in compliance with the requirements of this section. Verify the presence and location of permanently installed test ports and other devices needed, including gauge cocks, thermometer wells, flow control devices, circuit setters, balancing valves, and manual volume dampers.
d. Support required: Specify the technical support personnel required from the Contractor other than the TAB agency; such as factory representatives for temperature controls or for complex equipment.
Inform the Contractor in writing of the support personnel needed and when they are needed. Furnish the notice as soon as the need is anticipated, either with the design review report, or the pre-field engineering report, the during the DALT or TAB field work.
f. Pre-field engineering report: Utilizing the following HVAC-related documentation; contract drawings and specifications, approved submittal data for equipment, up-to-date revisions and change orders; prepare this report.
g. Prerequisite HVAC work checklist: Ensure the Contractor gets a copy of this checklist at the same time as the pre-field engineering report is submitted.
h. Technical assistance for DALT work.
(1) Technical assistance: Provide immediate technical assistance to TAB field team.
j. Technical Assistance for TAB Work: Provide immediate technical assistance to the TAB field team for the TAB work.
(1) TAB field visit: Near the end of the TAB field work effort, visit the contract site to inspect the HVAC installation and the
SECTION 23 05 93 Page 10 progress of the TAB field work. Conduct site visit full-time for a minimum of one8 hour workday duration. Review the TAB final report data and certify the TAB final report.
k. Certified TAB report: Certify the TAB report. This certification includes the following work:
(1) Review: Review the TAB field data report. From this field report, prepare the certified TAB report.
(2) Verification: Verify adherence, by the TAB field team, to the TAB plan prescribed by the pre-field engineering report and verify adherence to the procedures specified in this section.
l. Design/Construction deficiencies: Within 3 working days after the TAB
Agency has encountered any design or construction deficiencies, the TAB Supervisor must submit written notification directly to the Contracting Officer, with a separate copy to the Contractor, of all such deficiencies. Provide in this submittal a complete explanation, including supporting documentation, detailing deficiencies. Where deficiencies are encountered that are believed to adversely impact successful completion of TAB, the TAB Agency must issue notice and request direction in the notification submittal.
m. TAB Field Check: The TAB team supervisor must attend and supervise TAB field check.
1.5.2.4 TAB Team Field Leader
a. Field manager: Manage, in the field, the accomplishment of the work specified in Part 3, EXECUTION.
b. Full time: Be present at the contract site when DALT field work or TAB field work is being performed by the TAB team; ensure day-to-day TAB team work accomplishments are in compliance with this section.
c. Prerequisite HVAC work: Do not bring the TAB team to the contract site until a copy of the prerequisite HVAC Checklist, with all work items certified by the Contractor to be working as designed, reaches the office of the TAB Agency.
1.5.3 Project/Site Conditions
1.5.3.1 TAB Services to Obtain Existing Conditions
Conduct TAB of the indicated existing systems and equipment and submit the specified DALT and TAB reports for approval. Conduct this TAB work in accordance with the requirements of this section.
1.5.4 Sequencing and Scheduling
1.5.4.1 Projects with Phased Construction
This specification section is structured as though the HVAC construction, and thereby the TAB work, will be completed in a single phase. When the construction is completed in phases, the TAB work must be planned, completed, and accepted for each construction phase.
a. Phasing of Work
SECTION 23 05 93 Page 11
This specification section is structured as though the HVAC construction, and thereby the TAB work, is going to be completed in a single phase. All elements of the TAB work are addressed on this premise. When a contract is to be completed in construction phases, the TAB work must be planned for, completed and approved by the Contracting Officer with each phase. An example of this case would be one contract that requires the rehabilitation of the HVAC in each of several separated buildings. At the completion of the final phase, compile all approved reports and submit as one document.
1.5.4.2 TAB Submittal and Work Schedule
Comply with additional requirements specified in Appendix C: TAB SUBMITTAL AND WORK SCHEDULE included at the end of this section.
Submit this schedule, and TAB Schematic Drawings, adapted for this particular contract, to the Contracting Officer (CO) for review and approval. Include with the submittal the planned calendar dates for each submittal or work item. Resubmit an updated version for CO approval every 90 calendar days. Compliance with the following schedule is the Contractor's responsibility.
Qualify TAB Personnel: Within 45 calendar days after date of contract award, submit TAB agency and personnel qualifications.
TAB Meeting: Within 30 calendar days after the date of approval of the TAB agency and personnel, meet with the COTR.
Design Review Report: Within 60 calendar days after the date of the TAB agency personnel qualifications approval, submit design review report.
Pre-Field TAB Engineering Report: Within 21 calendar days after approval of the TAB agency Personnel Qualifications, submit the Pre-Field TAB Engineering Report.
Prerequisite HVAC Work Check Out List and Advanced Notice For TAB Field Work: At a minimum of 115 calendar days prior to CCD, submit prerequisite HVAC work check out list certified as complete, and submit advance notice of commencement of TAB field work.
TAB Field Work: At a minimum of 90 calendar days prior to CCD, accomplish TAB field work.
Submit TAB Report: Within 15 calendar days after completion of TAB field work, submit TAB report.
TAB Field Check: 30 calendar days after TAB report is approved by the Contracting Officer, conduct field check.
Complete TAB Work: Prior to CCD, complete all TAB work .
a. TAB Design Review Report
Submit typed report describing omissions and deficiencies in the HVAC system's design that would preclude the TAB team from accomplishing the duct leakage testing work and the TAB work requirements of this section. Provide a complete explanation including supporting documentation detailing the design deficiency. State that no
SECTION 23 05 93 Page 12 deficiencies are evident if that is the case.
1.5.4.3 TAB Pre-Field Engineering Report
Submit report containing the following information:
a. Step-by-step TAB procedure:
(1) Strategy: Describe the method of approach to the TAB field work from start to finish. Include in this description a complete methodology for accomplishing each seasonal TAB field work session.
(2) Air System Diagrams: Use the contract drawings and duct fabrication drawings if available to provide air system diagrams in the report showing the location of all terminal outlet supply, return, exhaust and transfer registers, grilles and diffusers. Use a key numbering system on the diagrams which identifies each outlet contained in the outlet airflow report sheets. Show intended locations of all traverses and static pressure readings.
(3) Procedural steps: Delineate fully the intended procedural steps to be taken by the TAB field team to accomplish the required TAB work of each air distribution system and each water distribution system. Include intended procedural steps for TAB work for subsystems and system components.
b. Pre-field data: Submit AABC or NEBB or SMACNA 1780 data report forms with the following pre-field information filled in:
(1) Design data obtained from system drawings, specifications, and approved submittals.
(2) Notations detailing additional data to be obtained from the contract site by the TAB field team.
(3) Designate the actual data to be measured in the TAB field work.
(4) Provide a list of the types of instruments, and the measuring range of each, which are anticipated to be used for measuring in the TAB field work. By means of a keying scheme, specify on each TAB data report form submitted, which instruments will be used for measuring each item of TAB data. If the selection of which instrument to use, is to be made in the field, specify from which instruments the choice will be made. Place the instrument key number in the blank space where the measured data would be entered.
c. Prerequisite HVAC work checkout list: Provide a list of inspections and work items which are to be completed by the Contractor. This list must be acted upon and completed by the Contractor and then submitted and approved by the Contracting Officer prior to the TAB team coming to the contract site.
At a minimum, a list of the applicable inspections and work items listed in the NEBB PROCEDURAL STANDARDS, Section III, "Preliminary TAB Procedures" under paragraphs titled, "Air Distribution System Inspection" and "Hydronic Distribution System Inspection" must be provided for each separate system to be TAB'd.
SECTION 23 05 93 Page 13
1.5.5 Subcontractor Special Requirements
Perform all work in this section in accordance with the paragraph SUBCONTRACTOR SPECIAL REQUIREMENTS in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, stating that all contract requirements of this section must be accomplished directly by a first tier subcontractor. No work may be performed by a second tier subcontractor.
1.5.6 Instrument Calibration Certificates
It is the responsibility of the TAB firm to provide instrumentation that meets the minimum requirements of the standard under which the TAB Firm's qualifications are approved for use on a project. Instrumentation must be in proper operating condition and must be applied in accordance with the instrumentation's manufacturer recommendations.
All instrumentation must bear a valid NIST traceable calibration certificate during field work and during government acceptance testing.
All instrumentation must be calibrated within no later than one year of the date of TAB work or government acceptance testing field work.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 WORK DESCRIPTIONS OF PARTICIPANTS
Comply with requirements of this section as specified in Appendix A WORK
DESCRIPTIONS OF PARTICIPANTS.
3.2 TAB MEETING
Meet with the Contracting Officer's technical representative (COTR)and the designing engineer of the HVAC systems to develop a mutual understanding relative to the details of the DALT work and TAB work requirements. Ensure that the TAB supervisor is present at this meeting. Requirements to be discussed include required submittals, work schedule, and field quality control.
3.3 TAB PROCEDURES
3.3.1 TAB Field Work
Test, adjust, and balance the HVAC systems until measured flow rates (air and water flow) are within plus or minus 5 percent of the design flow rates as specified or indicated on the contract documents.
That is, comply with the the requirements of AABC MN-1 or SMACNA 1780 (TABB) and SMACNA 1858 (TABB),except as supplemented and modified by this section.
Provide instruments and consumables required to accomplish the TAB work.
Calibrate and maintain instruments in accordance with manufacturer's written procedures.
Test, adjust, and balance the HVAC systems until measured flow rates (air
SECTION 23 05 93 Page 14 and water flow) are within plus or minus 5 percent of the design flow rates as specified or indicated on the contract documents. Conduct TAB work, including measurement accuracy, and sound measurement work in conformance with the AABC MN-1 and AABC MN-4, or NEBB TABES and NEBB MASV, or SMACNA 1780 (used by TABB) and SMACNA 1858 sound measurement procedures, except as supplemented and modified by this section.
3.3.2 Preliminary Procedures
Use the approved pre-field engineering report as instructions and procedures for accomplishing TAB field work. TAB engineer is to locate, in the field, test ports required for testing. It is the responsibility of the sheet metal contractor to provide and install test ports as required by the TAB engineer.
3.3.3 TAB Air Distribution Systems
3.3.3.1 Units With Coils
Report heating and cooling performance capacity tests for hot water, chilled water, DX and steam coils for the purpose of verifying that the coils meet the indicated design capacity. Submit the following data and calculations with the coil test reports:
a. For air handlers with capacities greater than 26,370 Watts cooling, such as factory manufactured units, central built-up units and rooftop units, conduct capacity tests in accordance with AABC MN-4, procedure 3.5, "Coil Capacity Testing."
Do not determine entering and leaving wet and dry bulb temperatures by single point measurement, but by the average of multiple readings in compliance with paragraph 3.5-5, "Procedures", (in subparagraph d.) of AABC MN-4, Procedure 3.5, "Coil Capacity Testing."
Submit part-load coil performance data from the coil manufacturer converting test conditions to design conditions; use the data for the purpose of verifying that the coils meet the indicated design capacity in compliance with AABC MN-4, Procedure 3.5, "Coil Capacity Testing," paragraph 3.5.7, "Actual Capacity Vs. Design Capacity" (in subparagraph c.).
b. For units with capacities of 26370 Watts or less, such as fan coil units, duct mounted reheat coils associated with VAV terminal units, and unitary units, such as through-the-wall heat pumps:
Determine the apparent coil capacity by calculations using single point measurement of entering and leaving wet and dry bulb temperatures;
submit the calculations with the coil reports.
3.3.3.2 Air Handling Units
Air handling unit systems including fans (air handling unit fans, exhaust fans and winter ventilation fans), coils, ducts, plenums, mixing boxes, terminal units, variable air volume boxes, and air distribution devices for supply air, return air, outside air, mixed air relief air, and makeup air.
SECTION 23 05 93 Page 15
3.3.3.3 Heating and Ventilating Units
Heating and ventilating unit systems including fans, coils, ducts, plenums, roof vents, registers, diffusers, grilles, and louvers for supply air, return air, outside air, and mixed air.
3.3.3.4 Fan Coils
Fan coil unit systems including fans, coils, ducts, plenums, and air distribution devices for supply air, return air, and outside air.
3.3.4 TAB Water Distribution Systems
3.3.5 TAB Reports
Additional requirements for TAB Reports are specified in Appendix B REPORTS - DALT and TAB
3.3.6 Quality Assurance - COTR TAB Field Acceptance Testing
3.3.6.1 TAB Field Acceptance Testing
During the field acceptance testing, verify, in the presence of the COTR, random selections of data (water, air quantities, air motion, sound level readings) recorded in the TAB Report. Points and areas for field acceptance testing are to be selected by the COTR. Measurement and test procedures are the same as approved for TAB work for the TAB Report.
Field acceptance testing includes verification of TAB Report data recorded for the following equipment groups:
Group 1: All chillers, boilers, return fans, computer room units, and air handling units (rooftop and central stations).
Group 2: 25 percent of the VAV terminal boxes and associated diffusers and registers.
Group 3: 25 percent of the supply diffusers, registers, grilles associated with constant volume air handling units.
Group 4: 25 percent of the return grilles, return registers, exhaust grilles and exhaust registers.
Group 5: 25 percent of the supply fans, exhaust fans, and pumps.
Further, if any data on the TAB Report for Groups 2 through 5 is found not to fall within the range of plus 5 to minus 5 percent of the TAB Report data, additional group data verification is required in the presence of the COTR. Verify TAB Report data for one additional piece of equipment in that group. Continue this additional group data verification until out-of-tolerance data ceases to be found.
3.3.6.2 Additional COTR TAB Field Acceptance Testing
If any of the acceptance testing measurements for a given equipment group
SECTION 23 05 93 Page 16 is found not to fall within the range of plus 5 to minus 5 percent of the TAB Report data, terminate data verification for all affected data for that group. The affected data for the given group will be disapproved. Make the necessary corrections and prepare a revised TAB Report. Reschedule acceptance testing of the revised report data with the COTR.
3.3.6.3 Prerequisite for Approval
Compliance with the field acceptance testing requirements of this section is a prerequisite for the final Contracting Officer approval of the TAB Report submitted.
3.4 MARKING OF SETTINGS
Upon the final TAB work approval, permanently mark the settings of HVAC adjustment devices including valves, gauges, splitters, and dampers so that adjustment can be restored if disturbed at any time. Provide permanent markings clearly indicating the settings on the adjustment devices which result in the data reported on the submitted TAB report.
3.5 MARKING OF TEST PORTS
The TAB team is to permanently and legibly mark and identify the location points of the duct test ports. If the ducts have exterior insulation, make these markings on the exterior side of the duct insulation. Show the location of test ports on the as-built mechanical drawings with dimensions given where the test port is covered by exterior insulation.
3.6 APPENDICES
Appendix A WORK DESCRIPTIONS OF PARTICIPANTS Appendix B REPORTS - DALT and TAB Appendix C TAB SUBMITTAL AND WORK SCHEDULE Appendix D REQUIREMENTS FOR DUCT AIR LEAK TESTING
-- End of Section --
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
Solicitation N40192-19-R-2830
01 February 2019
NOTICE 3
PRE-PROPOSAL REQUESTS FOR INFORMATION AND RESPONSES
SOLICITATION N40192-19-R-2830
8(a) MULTIPLE AWARD CONSTRUCTION CONTRACT, VARIOUS LOCATIONS, GUAM
QUESTION (Q)32: Reference RFP Part A, Section 00210 Evaluation Factors for Award, Paragraph 2.4.c(5) Factor 5 – Price. Are Offerors required to submit a detailed cost breakdown in addition to the Price Proposal Schedule in Exhibit D?
Answer (A)32: No, a detailed cost breakdown is not required or desired.
Q33: Reference RFP Part A, Section 00210 Evaluation Factors for Award, Paragraph 2.4.c(4) Factor 4 – Technical Approach to the Seed Project and RFP Part C Seed Project. Are Offerors required to provide temporary air-conditioning units for all rooms while performing the removal and installation of the new system?
A33: Yes, provide temporary portable AC for cooling the living/dining rooms and all bedrooms during construction when there is no cooling during installation. Refer to RFP Amendment 0004.
Q34: Reference RFP Part C Seed Project. The sample unit displayed a 60 AMP NEMA 4X disconnect switch. Are Offerors required to install the same type/capacity of disconnect switch for this project?
A34: Replace NEMA4X disconnect switches in accordance with the ACCU’s manufacturer’s electrical ratings requirements as required for each building unit type of equipment. For the 4-ton ACCUs, it’s anticipated that a 60 AMP NEMA 4X safety disconnect switch will be required along with the panel circuit breakers and wiring for the ACCU based on the manufacturer’s electrical ratings. This will be incorporated into the electrical shop drawings as required.
Q35: Reference RFP Part C, UFGS Specification Section 23 05 93, Testing, Adjusting, and Balancing for HVAC, Paragraph 1.3 Work Description. The work description is requiring Duct Air Leakage Testing (DALT) for new and existing HVAC ductwork system. DALT is normally performed on new duct system. If DALT is to be performed on the existing ductwork, all ceiling outlets will need to be removed, caped sealed and will require 24 hours for the seal to dry. In addition, branch duct will need to be exposed requiring ceiling boards to be removed, and duct insulation exposed along duct joints to determine location of leak if DALT does not meet SMACNA Leakage test tolerance. This is best to perform if building is not occupied due to the amount of work required on the removal of ceiling boards and capping of duct inlet. Please confirm inclusion of DALT so the contractor can consider the cost impact.
A35: Due to the highly intrusive nature of DALT testing and the down time required to perform this scope of work, DALT will be removed from the specifications and only certified Testing, Adjusting, and Balancing (TAB) is required for all units in compliance with only the TAB requirements specified in UFGS Section 23 05 93. Refer to RFP Amendment 0004.
RFP N40192-19-R-2830
Notice 3
Q36: There is a possibility that the new AC system cannot be completed on the same day. We would like to clarify if the contractor is required to provide temporary portable air-conditioner.
Please confirm.
A36: See response to Question 33.
Q37: As the seed project for this solicitation is a Design Bid Build project, we would like to clarify if the Drawings CAD File will be provided by the Government for Shop Drawing and As-built plan preparation. Please confirm.
A37:Yes, CAD dwg files will be provided to the contractor awarded the seed project for contractor shop drawings and as-builts.
Q38: Reference RFP Part A, Section 00100 Instructions to Offerors, Paragraph 3.2 Proposal Parts. Should the RFP Part A Documents (SF1442, Contractual Agreements, and Reps and Certs) be included in Volume I, Technical Proposal or Volume II, Price Proposal?
A38: See response to Question 31 in RFI Notice 2.
Q39: Reference RFP Part A, Factor 4, Technical Approach to the Seed Project, Paragraph (a)(iii) Construction Schedule and Phasing Plan. ‐ Please confirm if MS Office, Excel format is acceptable for submission of the construction schedule.
A39: No, the electronic copy of the construction schedule should be in Adobe Acrobat PDF format.
Q40: Reference RFP, Part C, Seed Project, Section 23.05.93, under 1.3 Work Description ‐ Can the Government please clarify if duct air leakage testing (DALT) is to be performed under this RFP as it is stated in the specifications but not in the scope of work.
A40: See response to Question 35.
Q41: Reference RFP Part C Seed Project. Are Offerors required to perform a Duct Air Leak Test (DALT) for the Seed project?
A41: See response to Question 35.
| N4019219R2830_Amend 0004_01FEB19 |
| Encl (1)_RFP Part C Seed Project Specification Section 23 05 93 Testing, Adjusting, and Balancing for HVAC (REVISED) |
| Encl (2)_RFI Notice 3 |