Bid Abstract N4008521B2512.pdf
PDF 282 KB Posted
- Attached to
- NCTCS Cutler Electrical Ductbank Relocation Federal contract opportunity
- Solicitation number
- N4008521B2512
About this file
This document is an abstract of offers for a construction solicitation. The solicitation was issued on June 7, 2021 by the Naval Facilities Engineering Command Mid-Atlantic Public Works Department located in Portsmouth, New Hampshire for the NCTCS Cutler Electrical Ductbank Relocation project at the NCTAMS LANT DET CUTLER facility in Cutler, Maine. The project consists of constructing an electric and communications ductbank, manholes, and conductors from Buildings B103 to B100 and between B100 and an existing manhole, along with associated work. The base bid and four options include the base electrical ductbank relocation, deleting or modifying ductbanks and manholes, milling and overlaying roads, and extending fiber optic. Five offers were received by August 27, 2021 from construction companies in Massachusetts and Maine, ranging in total price from $6.45 million to $9.61 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CX101 - Relabel base bid note 1.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 004.pdf | ||
| Amendment 003.pdf | ||
| PPI RESPONSE PART 2_8-6-21.pdf | ||
| Amendment 0002.pdf | ||
| PPI RESPONSE PART 1_8-4-21.pdf | ||
| SV Sign-In Sheet_21B2512.pdf | ||
| Amendment 0001.pdf | ||
| Final Site4ROD.pdf | ||
| N4008521B2512 - Solicitation Document.pdf | ||
| Specifications_FINAL SUBMISSION_04-09-2020.pdf | ||
| 1583439_Drawings.pdf | ||
| 09-eOMSI WORKBOOK REV 6_MASTER - Ductbank.pdf | ||
| SECNAV 5512-1.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 PAGES
X
7A.
ITEM
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE D. UNIT PRICE
CLIN
0001 Cutler Electrical Ductbank Relocation 1 EA $6,319,387.00
CLIN
0002 Option 1: Delete DB to B100, Construct 6 way DB 1 EA -$147,659.00
CLIN
0003 Option 2: Delete DB to B100, Construct 2 way DB 1 EA -$66,460.00
CLIN
0004 Option 3: Mill & Overlay Road between B100 & B103 1 EA $285,730.00
CLIN
0005 Option 4: Extend Fiber Optic 1 EA $58,925.00
Total BID EA $6,449,923.00
$350,715.00
$29,150.00
$7,447,000.00 $7,941,615.00
$7,447,000.00 $7,595,000.00
-$250,000.00
-$190,000.00
$375,000.00
$65,000.00
-$19,125.00
-$14,125.00
6. NUMBER OF AMENDMENTS ISSUED: 5 C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED 5 of 5 C. AMENDMENTS ACKNOWLEDGED 5 of 5
E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT
5. PROJECT TITLE
NCTCS Cutler Electrical Ductbank Relocation, Cutler ME
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
9. OFFERS
NO. 1 NO. 2
P&S Construction, Inc.
North Chelmsford, MA 01863
KOBO Utility Construction Corp.
Sandwich, MA 02563
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY 20% of Bid Price: YES B. BID SECURITY 20% of Bid Price: YES
4. ISSUING OFFICE
NAVFAC MID ATLANTIC
PWD-ME FEAD PORTSMOUTH B59 PORTSMOUTH NAVAL SHIPYARD
PORTSMOUTH, NH 03801-2032
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Brad Beisswanger, Contracting Officer
SIGNATURE DATE SIGNED
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER
N4008521B2512
2. DATE ISSUED
6/7/2021
3. DATE OPENED
8/27/2021
PAGE OF
2 2 PAGES
7A.
ITEM
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE D. UNIT PRICE
CLIN
0001 Cutler Electrical Ductbank Relocation 1 EA $9,328,444.00
CLIN
0002 Option 1: Delete DB to B100, Construct 6 way DB 1 EA -$72,216.00
CLIN
0003 Option 2: Delete DB to B100, Construct 2 way DB 1 EA -$27,471.00
CLIN
0004 Option 3: Mill & Overlay Road between B100 & B103 1 EA $335,533.00
CLIN
0005 Option 4: Extend Fiber Optic 1 EA $45,575.00
Total BID EA $9,609,865.00 $8,234,000.00 $0.00
-$154,000.00
$430,000.00
$50,000.00
-$212,000.00
$8,120,000.00
6. NUMBER OF AMENDMENTS ISSUED: 5 C. AMENDMENT ACKNOWLEDGED 5 of 5 C. AMENDMENT ACKNOWLEDGED _ of 5
E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT
C. AMENDMENT ACKNOWLEDGED 5 of 5
5. PROJECT TITLE
NCTCS Cutler Electrical Ductbank Relocation, Cutler ME NO. 4 NO. 5
Tantara Worcester, MA 01610
Contractor City, State Zip
B. BID SECURITY 20% of Bid Price: YES
Black Horse Group Mashpee, MA 02649
NO. 3
9. OFFERS
B. BID SECURITY 20% of Bid Price: YES B. BID SECURITY 20% of Bid Price: YES / NO
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER
N4008521B2512
2. DATE ISSUED
6/7/2021
3. DATE OPENED
8/27/2021
PAGE OF
4. ISSUING OFFICE
NAVFAC MID ATLANTIC
PWD-ME FEAD PORTSMOUTH B59 PORTSMOUTH NAVAL SHIPYARD
PORTSMOUTH, NH 03801-2032
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Brad Beisswanger, Contracting Officer
SIGNATURE DATE SIGNED
| Page 1 of 3 |
| Page 2 of 3 |
| 2021-08-31T06:49:08-0400 | |
| BEISSWANGER.BRAD.1032776945 |
| 2021-08-31T06:49:36-0400 | |
| BEISSWANGER.BRAD.1032776945 |
File details come from the government source that posted it. Updated .