Bid Abstract N4008521B2512.pdf

PDF 282 KB Posted

Attached to
NCTCS Cutler Electrical Ductbank Relocation Federal contract opportunity
Solicitation number
N4008521B2512
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an abstract of offers for a construction solicitation. The solicitation was issued on June 7, 2021 by the Naval Facilities Engineering Command Mid-Atlantic Public Works Department located in Portsmouth, New Hampshire for the NCTCS Cutler Electrical Ductbank Relocation project at the NCTAMS LANT DET CUTLER facility in Cutler, Maine. The project consists of constructing an electric and communications ductbank, manholes, and conductors from Buildings B103 to B100 and between B100 and an existing manhole, along with associated work. The base bid and four options include the base electrical ductbank relocation, deleting or modifying ductbanks and manholes, milling and overlaying roads, and extending fiber optic. Five offers were received by August 27, 2021 from construction companies in Massachusetts and Maine, ranging in total price from $6.45 million to $9.61 million.

View the file

Other files for this federal contract opportunity

Other files attached to NCTCS Cutler Electrical Ductbank Relocation, newest first.
File Type Posted
CX101 - Relabel base bid note 1.pdf PDF
Amendment 0005.pdf PDF
Amendment 004.pdf PDF
Amendment 003.pdf PDF
PPI RESPONSE PART 2_8-6-21.pdf PDF
Amendment 0002.pdf PDF
PPI RESPONSE PART 1_8-4-21.pdf PDF
SV Sign-In Sheet_21B2512.pdf PDF
Amendment 0001.pdf PDF
Final Site4ROD.pdf PDF
N4008521B2512 - Solicitation Document.pdf PDF
Specifications_FINAL SUBMISSION_04-09-2020.pdf PDF
1583439_Drawings.pdf PDF
09-eOMSI WORKBOOK REV 6_MASTER - Ductbank.pdf PDF
SECNAV 5512-1.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 PAGES

X

7A.

ITEM

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE D. UNIT PRICE

CLIN

0001 Cutler Electrical Ductbank Relocation 1 EA $6,319,387.00

CLIN

0002 Option 1: Delete DB to B100, Construct 6 way DB 1 EA -$147,659.00

CLIN

0003 Option 2: Delete DB to B100, Construct 2 way DB 1 EA -$66,460.00

CLIN

0004 Option 3: Mill & Overlay Road between B100 & B103 1 EA $285,730.00

CLIN

0005 Option 4: Extend Fiber Optic 1 EA $58,925.00

Total BID EA $6,449,923.00

$350,715.00

$29,150.00

$7,447,000.00 $7,941,615.00

$7,447,000.00 $7,595,000.00

-$250,000.00

-$190,000.00

$375,000.00

$65,000.00

-$19,125.00

-$14,125.00

6. NUMBER OF AMENDMENTS ISSUED: 5 C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED 5 of 5 C. AMENDMENTS ACKNOWLEDGED 5 of 5

E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT

5. PROJECT TITLE

NCTCS Cutler Electrical Ductbank Relocation, Cutler ME

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

P&S Construction, Inc.

North Chelmsford, MA 01863

KOBO Utility Construction Corp.

Sandwich, MA 02563

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY 20% of Bid Price: YES B. BID SECURITY 20% of Bid Price: YES

4. ISSUING OFFICE

NAVFAC MID ATLANTIC

PWD-ME FEAD PORTSMOUTH B59 PORTSMOUTH NAVAL SHIPYARD

PORTSMOUTH, NH 03801-2032

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Brad Beisswanger, Contracting Officer

SIGNATURE DATE SIGNED

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

N4008521B2512

2. DATE ISSUED

6/7/2021

3. DATE OPENED

8/27/2021

PAGE OF

2 2 PAGES

7A.

ITEM

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE D. UNIT PRICE

CLIN

0001 Cutler Electrical Ductbank Relocation 1 EA $9,328,444.00

CLIN

0002 Option 1: Delete DB to B100, Construct 6 way DB 1 EA -$72,216.00

CLIN

0003 Option 2: Delete DB to B100, Construct 2 way DB 1 EA -$27,471.00

CLIN

0004 Option 3: Mill & Overlay Road between B100 & B103 1 EA $335,533.00

CLIN

0005 Option 4: Extend Fiber Optic 1 EA $45,575.00

Total BID EA $9,609,865.00 $8,234,000.00 $0.00

-$154,000.00

$430,000.00

$50,000.00

-$212,000.00

$8,120,000.00

6. NUMBER OF AMENDMENTS ISSUED: 5 C. AMENDMENT ACKNOWLEDGED 5 of 5 C. AMENDMENT ACKNOWLEDGED _ of 5

E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT

C. AMENDMENT ACKNOWLEDGED 5 of 5

5. PROJECT TITLE

NCTCS Cutler Electrical Ductbank Relocation, Cutler ME NO. 4 NO. 5

Tantara Worcester, MA 01610

Contractor City, State Zip

B. BID SECURITY 20% of Bid Price: YES

Black Horse Group Mashpee, MA 02649

NO. 3

9. OFFERS

B. BID SECURITY 20% of Bid Price: YES B. BID SECURITY 20% of Bid Price: YES / NO

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

N4008521B2512

2. DATE ISSUED

6/7/2021

3. DATE OPENED

8/27/2021

PAGE OF

4. ISSUING OFFICE

NAVFAC MID ATLANTIC

PWD-ME FEAD PORTSMOUTH B59 PORTSMOUTH NAVAL SHIPYARD

PORTSMOUTH, NH 03801-2032

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Brad Beisswanger, Contracting Officer

SIGNATURE DATE SIGNED

Page 1 of 3
Page 2 of 3
2021-08-31T06:49:08-0400
BEISSWANGER.BRAD.1032776945
2021-08-31T06:49:36-0400
BEISSWANGER.BRAD.1032776945

File details come from the government source that posted it. Updated .