Attachment_D_Price_Proposal_Form.pdf

PDF 27 KB Posted

Attached to
Skeeter Lane Housing Conversion and Welcome Center Construction
Solicitation number
N40085-17-R-4601
Issued by

About this file

Price Proposal Form

View the file

Other files

File Type Posted
Amendment_03.pdf PDF
Attachemnt_M__H238-1366574-LifeSafety.pdf PDF
N4008517R4601_Amendment_2.pdf PDF
Attachment_H_1366573Spec1of1.pdf PDF
N40085-17-R-4601.pdf PDF
N4008517R4601_Amendment_1.pdf PDF
Attachment_K_1366574Dwgs1of1.pdf PDF
ATTACHMENT_G_Past_Performance_Questionaire.docx DOCX document
Attachment_E_Visit_Access_Request.xls XLS spreadsheet
ATTACHMENT_F_Construction_Data_Sheet.docx DOCX document
Attachment_B_Directions_to_Wallops_housing_from_Norfolk_area_.docx_(2).docx DOCX document
Attachment_C_Site_Visit_Log.xlsx XLSX spreadsheet
VA140_1-8-2016.txt TXT text file
Attachment_J_1366574Spec1of1.pdf PDF
Attachment_A_PPI_Template.xlsx XLSX spreadsheet
Attachment_I_1366573Dwgs1of1.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1602 Skeeter Lane Conversion & Renovation H-238 Construct Housing Welcome Center N40085-17-R-4601

PRICE PROPOSAL FORM FOR P-1602 & H-238 – 30 NOVEMBER 2016 WON 1366573 & 1366574

PRICE PROPOSAL FORM

30 NOVEMBER 2016

The proposed price shall be the lump sum price for the following items:

CLIN 0001 - BASE PRICE - Skeeter Lane Housing Conversion & Renovation (P-1602):

Price for the entire work for the Skeeter Lane Housing Conversion and Renovation project complete, in accordance with the requirements of the RFP, including drawings and specifications, but excluding work described in CLINs 0002, 0003, 0004, 0005, 0006, and 0007.

TOTAL PRICE FOR CLIN 0001 – Base Price: $ ________________

CLIN 0002 – OPTION 1 – Cementitious Siding (P-1602): Price for upgrading the Skeeter Lane Housing Conversion and Renovation project siding, soffit, fascia, and associated trim components from vinyl to cementitious, complete in accordance with the requirements of the RFP, including drawings and specifications.

TOTAL PRICE FOR CLIN 0002: $ ________________

CLIN 0003 – OPTION 2 – Stranded Bamboo Wood Flooring (P-1602): Price for upgrading all resilient flooring, designated as RF1, in the Skeeter Lane Housing Conversion and Renovation project drawings, from luxury vinyl tile to stranded bamboo wood, complete in accordance with the requirements of the RFP, including drawings and specifications.

TOTAL PRICE FOR CLIN 0003: $ ________________

CLIN 0004 – OPTION 3 – Quartz Kitchen Countertop (P-1602): Price for upgrading all kitchen countertops, designated as SS1, in the Skeeter Lane Housing Conversion and Renovation project drawings, from solid surface – acrylic to solid surface – quartz, complete in accordance with the requirements of the RFP, including drawings and specifications.

TOTAL PRICE FOR CLIN 0004: $ ________________

CLIN 0005 – OPTION 4 – Solid Surface Grade D Bath Vanity Top (P-1602): Price for upgrading all bath vanity tops, designated as SS2, in the Skeeter Lane Housing Conversion and Renovation project drawings, from solid surface – Grade B to solid surface – Grade D, complete in accordance with the requirements of the RFP, including drawings and specifications.

TOTAL PRICE FOR CLIN 0005: $ ________________

CLIN 0006 – OPTION 5 – Construct Housing Welcome Center (H-238): Price for the entire work for construction of the Housing Welcome Center complete, in accordance with the requirements of the RFP including drawings and specifications. Price includes all supporting elements such as conduit, junction boxes, pull wire, CAT-V cable, and wall jacks to support the installation of Audio/Visual (A/V) equipment, but excluding work described in CLIN 0007.

TOTAL PRICE FOR CLIN 0006: $ _________________

H-238 Construct Housing Welcome Center N40085-17-R-4601

PRICE PROPOSAL FORM FOR P-1602 & H-238 – 30 NOVEMBER 2016 WON 1366573 & 1366574

CLIN 0007 – OPTION 6 – Cementitious Siding (H-238): Price for upgrading the entire Welcome Center siding, soffit, fascia, and associated trim components from vinyl to cementitious, complete in accordance with the requirements of the RFP, including drawings and specifications.

TOTAL PRICE FOR CLIN 0007: $ ________________

TOTAL PRICE FOR ALL CLINS 0002-0007 – OPTIONS $ ________________

TOTAL PRICE FOR ALL CLINS 0001-0007 (BASE PRICE + OPTIONS): $ _________________

CONTRACT LINE CLIN NOTES

General

1. Offerors shall enter unit prices and/or extended totals in spaces provided. If there is a mathematical discrepancy between the unit price and the total, the unit price will be held to be the intended price and the total recomputed accordingly. If an Offeror provides the total amount but fails to enter the unit price, the total divided by the specified quantity will be held to be the Offerors intended price.

2. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with

FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.

Evaluation of options will not obligate the Government to exercise the option(s).

For purposes of award, the Government will evaluate offers based on the Grand Total Price (the sum of CLINs 0001-0007).

3. In accordance with FAR 52.215-1, the Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is sufficiently overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that a lack of balance poses an unacceptable risk to the Government.

4. The Government reserves the unilateral right to award CLINs 0002, 0003, 0004, and 0005 to the contractor at the proposed price within 30 calendar days after contract award. The Government reserves the unilateral right to award CLINs 0006 and 0007 to the contractor at the proposed price within 180 calendar days after contract award. A firm fixed proposed price is required for CLINs 0001–0007. No provision is made for economic price adjustment. If options are exercised, the contract completion date remains 504 calendar days after award of the contract for Skeeter Lane Housing and Conversion (P-1602) and 210 calendar days after award of the contract for Construct Housing Welcome Center (H-238).

5. If CLINs 0002, 0003, 0004, 0005, 0006, and 0007 are exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all CLINs.

6. Failure to enter a price for any of the CLINs will result in the proposal being rejected as unacceptable.

H-238 Construct Housing Welcome Center N40085-17-R-4601

PRICE PROPOSAL FORM FOR P-1602 & H-238 – 30 NOVEMBER 2016 WON 1366573 & 1366574

AMENDMENTS ACKNOWLEDGED:

Amendment No. Date Amendment

No.

Date Amendment

No.

Date

Offeror:

Signature: _______________________ Date: ________

AMENDMENTS ACKNOWLEDGED:

File details come from the government source that posted it. Updated .