Attachment_D_Price_Proposal_Form.pdf
PDF 27 KB Posted
- Solicitation number
- N40085-17-R-4601
About this file
Price Proposal Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| Attachemnt_M__H238-1366574-LifeSafety.pdf | ||
| N4008517R4601_Amendment_2.pdf | ||
| Attachment_H_1366573Spec1of1.pdf | ||
| N40085-17-R-4601.pdf | ||
| N4008517R4601_Amendment_1.pdf | ||
| Attachment_K_1366574Dwgs1of1.pdf | ||
| ATTACHMENT_G_Past_Performance_Questionaire.docx | DOCX document | |
| Attachment_E_Visit_Access_Request.xls | XLS spreadsheet | |
| ATTACHMENT_F_Construction_Data_Sheet.docx | DOCX document | |
| Attachment_B_Directions_to_Wallops_housing_from_Norfolk_area_.docx_(2).docx | DOCX document | |
| Attachment_C_Site_Visit_Log.xlsx | XLSX spreadsheet | |
| VA140_1-8-2016.txt | TXT text file | |
| Attachment_J_1366574Spec1of1.pdf | ||
| Attachment_A_PPI_Template.xlsx | XLSX spreadsheet | |
| Attachment_I_1366573Dwgs1of1.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-1602 Skeeter Lane Conversion & Renovation H-238 Construct Housing Welcome Center N40085-17-R-4601
PRICE PROPOSAL FORM FOR P-1602 & H-238 – 30 NOVEMBER 2016 WON 1366573 & 1366574
PRICE PROPOSAL FORM
30 NOVEMBER 2016
The proposed price shall be the lump sum price for the following items:
CLIN 0001 - BASE PRICE - Skeeter Lane Housing Conversion & Renovation (P-1602):
Price for the entire work for the Skeeter Lane Housing Conversion and Renovation project complete, in accordance with the requirements of the RFP, including drawings and specifications, but excluding work described in CLINs 0002, 0003, 0004, 0005, 0006, and 0007.
TOTAL PRICE FOR CLIN 0001 – Base Price: $ ________________
CLIN 0002 – OPTION 1 – Cementitious Siding (P-1602): Price for upgrading the Skeeter Lane Housing Conversion and Renovation project siding, soffit, fascia, and associated trim components from vinyl to cementitious, complete in accordance with the requirements of the RFP, including drawings and specifications.
TOTAL PRICE FOR CLIN 0002: $ ________________
CLIN 0003 – OPTION 2 – Stranded Bamboo Wood Flooring (P-1602): Price for upgrading all resilient flooring, designated as RF1, in the Skeeter Lane Housing Conversion and Renovation project drawings, from luxury vinyl tile to stranded bamboo wood, complete in accordance with the requirements of the RFP, including drawings and specifications.
TOTAL PRICE FOR CLIN 0003: $ ________________
CLIN 0004 – OPTION 3 – Quartz Kitchen Countertop (P-1602): Price for upgrading all kitchen countertops, designated as SS1, in the Skeeter Lane Housing Conversion and Renovation project drawings, from solid surface – acrylic to solid surface – quartz, complete in accordance with the requirements of the RFP, including drawings and specifications.
TOTAL PRICE FOR CLIN 0004: $ ________________
CLIN 0005 – OPTION 4 – Solid Surface Grade D Bath Vanity Top (P-1602): Price for upgrading all bath vanity tops, designated as SS2, in the Skeeter Lane Housing Conversion and Renovation project drawings, from solid surface – Grade B to solid surface – Grade D, complete in accordance with the requirements of the RFP, including drawings and specifications.
TOTAL PRICE FOR CLIN 0005: $ ________________
CLIN 0006 – OPTION 5 – Construct Housing Welcome Center (H-238): Price for the entire work for construction of the Housing Welcome Center complete, in accordance with the requirements of the RFP including drawings and specifications. Price includes all supporting elements such as conduit, junction boxes, pull wire, CAT-V cable, and wall jacks to support the installation of Audio/Visual (A/V) equipment, but excluding work described in CLIN 0007.
TOTAL PRICE FOR CLIN 0006: $ _________________
H-238 Construct Housing Welcome Center N40085-17-R-4601
PRICE PROPOSAL FORM FOR P-1602 & H-238 – 30 NOVEMBER 2016 WON 1366573 & 1366574
CLIN 0007 – OPTION 6 – Cementitious Siding (H-238): Price for upgrading the entire Welcome Center siding, soffit, fascia, and associated trim components from vinyl to cementitious, complete in accordance with the requirements of the RFP, including drawings and specifications.
TOTAL PRICE FOR CLIN 0007: $ ________________
TOTAL PRICE FOR ALL CLINS 0002-0007 – OPTIONS $ ________________
TOTAL PRICE FOR ALL CLINS 0001-0007 (BASE PRICE + OPTIONS): $ _________________
CONTRACT LINE CLIN NOTES
General
1. Offerors shall enter unit prices and/or extended totals in spaces provided. If there is a mathematical discrepancy between the unit price and the total, the unit price will be held to be the intended price and the total recomputed accordingly. If an Offeror provides the total amount but fails to enter the unit price, the total divided by the specified quantity will be held to be the Offerors intended price.
2. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with
FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
For purposes of award, the Government will evaluate offers based on the Grand Total Price (the sum of CLINs 0001-0007).
3. In accordance with FAR 52.215-1, the Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is sufficiently overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that a lack of balance poses an unacceptable risk to the Government.
4. The Government reserves the unilateral right to award CLINs 0002, 0003, 0004, and 0005 to the contractor at the proposed price within 30 calendar days after contract award. The Government reserves the unilateral right to award CLINs 0006 and 0007 to the contractor at the proposed price within 180 calendar days after contract award. A firm fixed proposed price is required for CLINs 0001–0007. No provision is made for economic price adjustment. If options are exercised, the contract completion date remains 504 calendar days after award of the contract for Skeeter Lane Housing and Conversion (P-1602) and 210 calendar days after award of the contract for Construct Housing Welcome Center (H-238).
5. If CLINs 0002, 0003, 0004, 0005, 0006, and 0007 are exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all CLINs.
6. Failure to enter a price for any of the CLINs will result in the proposal being rejected as unacceptable.
H-238 Construct Housing Welcome Center N40085-17-R-4601
PRICE PROPOSAL FORM FOR P-1602 & H-238 – 30 NOVEMBER 2016 WON 1366573 & 1366574
AMENDMENTS ACKNOWLEDGED:
Amendment No. Date Amendment
No.
Date Amendment
No.
Date
Offeror:
Signature: _______________________ Date: ________
AMENDMENTS ACKNOWLEDGED:
File details come from the government source that posted it. Updated .