N3319122R4012 Bulgaria Schools Attach 6 - Safety Checklist.docx

DOCX document 20 KB Posted

Attached to
D-B Renovate Four Schools, Bulgaria
Solicitation number
N3319122R4012
Issued by

About this file

This document contains an attachment to a solicitation for a design-build renovation project of four schools in Bulgaria. The attachment outlines safety checklist requirements for the contractor, including providing a site safety and health officer meeting specified qualifications within 30 days of award. The contractor must also provide a safety plan, personal protective equipment for all personnel, and monitor subcontractor performance if subcontractors are used. Requirements include steel-toed shoes, helmets, vests, gloves, eye and ear protection, and shoring for excavation as needed. Hard hats are required for all personnel on site, and the contractor must provide five additional hard hats for authorized visitors. The contractor's price must include all costs associated with meeting the safety requirements of the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6

Safety Checklist Form

The contractor shall comply with local safety regulations, unless the U.S. Safety Regulations included in the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) are more strict and not in conflict with the local regulations. In this case, U.S Safety Regulations shall apply. The EM 385-1-1 can be downloaded from the following website: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf

Safety Checklist Requirements

Within 30 days of award of the contract, the contractor will provide a safety plan to monitor personnel performance during construction, and identify one competent employee in accordance with EM 385-1-1 to ensure execution of the safety plan.

The contractor will provide a full-time, on-site Site Safety and Health Officer (SSHO) that meets the requirements of the EM 385 Section 01.A.17, specifically:

- Five (5) years of continuous general industry or construction safety experience in supervising/managing general industry or construction (managing safety programs or processes or conducting hazard analyses and developing controls). Documentation for validation is required within 30 days of contract award.

- Completion of 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by internet or phone). Documentation for validation and proof of completed training is required within 30 days of contract award.

The contractor will provide a plan to monitor all subcontractor performance during construction if subcontractors will be used. The contractor and subcontractors must also comply with EM 385-1-1.

The contractor shall provide all necessary and required Personal Protective Equipment (PPE), which shall be used as required by the specific risk.

Steel toed shoes

Helmets

Vests and gloves

Eye and ear protection

Shoring for excavation, as needed

The use of helmets or "hard hats" is absolutely required for all personnel entering the job site. In addition the contractor shall have a minimum of 5 new hard hats to be used by any authorized visitor to the job site.

The contractor's price shall include the cost for any and all safety requirements for this project.

As a certified agent of this Company, I acknowledge and agree to the safety factor requirements.

Company Name:

Contractor's Printed Name:

Contractor's Signature:

Date:

File details come from the government source that posted it. Updated .