Question_5.docx
DOCX document 23 KB Posted
- Attached to
- USS EMORY S. LAND (AS 39) Mid-Term Availability Federal contract opportunity
- Solicitation number
- N3220518R4552
About this file
Request for specification clarification 005 - answered
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4552
USS EMORY S LAND (AS 39) MTA
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 101
PARAGRAPH / SECTION NO: 3.2.1, 7.1, 7.3, & 7.4
TITLE: Tank Inspections (ABS) Excluding Fuel Tanks
QUESTION:
Q#1: Paragraph 7.1 directs contractors to “Perform a joint survey of all tanks, voids in reference 3.2.1” in this list is FO tank 8-110-3-F, but this contradicts the item title.
Please clarify if this tank is to be included.
Q#2: Paragraph 7.3 directs contractors to hydro test tanks. 7.4 directs contractors to perform a close up survey. Please clarify if this survey is to be accomplish in boundary tanks while hydro is being accomplished or in the same tank that was tested after the hydro was accomplished and if the “close up survey” will require scaffolding.
ANSWER:
See attached revised specification.
ATTACHMENT J – 8