Request for specification clarification 005 - answered

View the file

Other files for this federal contract opportunity

Other files attached to USS EMORY S. LAND (AS 39) Mid-Term Availability, newest first.
File Type Posted
N3220518R4552-0006.docx DOCX document
Question_14.doc DOC document
Question_10.doc DOC document
Question_13.doc DOC document
N3220518P4552-0005.docx DOCX document
Question_11.doc DOC document
Question_12.doc DOC document
Question_7.docx DOCX document
Question_9.docx DOCX document
J-2_Category_A_Items.xlsx XLSX spreadsheet
N3220518P4552-0004.docx DOCX document
Question_6.docx DOCX document
Question_8.docx DOCX document
Question_2.docx DOCX document
N3220518P4552-0003.docx DOCX document
Question_4.docx DOCX document
Question_3.docx DOCX document
J-2_Category_A_Items.xlsx XLSX spreadsheet
N3220518P4552-0002.docx DOCX document
J-2_Category_A_Items.xlsx XLSX spreadsheet
BLANK_BAR_CNIC_3-page_Access_Registration_Form.pdf PDF
N3220518P4552-0001.docx DOCX document
EPIC.xlsx XLSX spreadsheet
Question_1.docx DOCX document
N3220518R4552.docx DOCX document
J___A_FOR_ESL_MTA_Redacted.pdf PDF
Attachments.zip ZIP file
SYNOPSIS_N3220518R4552.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220518R4552

USS EMORY S LAND (AS 39) MTA

REQUEST FOR SPECIFICATION CLARIFICATION

SPECIFICATION ITEM NO.: 101

PARAGRAPH / SECTION NO: 3.2.1, 7.1, 7.3, & 7.4

TITLE: Tank Inspections (ABS) Excluding Fuel Tanks

QUESTION:

Q#1: Paragraph 7.1 directs contractors to “Perform a joint survey of all tanks, voids in reference 3.2.1” in this list is FO tank 8-110-3-F, but this contradicts the item title.

Please clarify if this tank is to be included.

Q#2: Paragraph 7.3 directs contractors to hydro test tanks. 7.4 directs contractors to perform a close up survey. Please clarify if this survey is to be accomplish in boundary tanks while hydro is being accomplished or in the same tank that was tested after the hydro was accomplished and if the “close up survey” will require scaffolding.

ANSWER:

See attached revised specification.

ATTACHMENT J – 8