Question_2.docx
DOCX document 30 KB Posted
- Attached to
- USS EMORY S. LAND (AS 39) Mid-Term Availability Federal contract opportunity
- Solicitation number
- N3220518R4552
About this file
Request for specification clarification 002 - answered
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4552
USS EMORY S LAND (AS 39) MTA
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 405_____________________
PARAGRAPH / SECTION NO: All_________________
TITLE: Radar Magnetron Replace
QUESTION:
The first Line Item related to the radars is Item 405 which specifies the magnetrons are to be replaced yet the radars are not identified. We are then instructed to work in conjunction with Item 406.
The second item related to the radars is Item 406 which identifies the 10cm radar as a FAR-2127BB. The 2127BB is not a 10cm radar. It is a 3cm radar. Specifically, it is a 25KW X-Band radar. We would like to assume the other two radars specified as FAR-2117 are as stated, a pair of 12KW X-Band radars. Further, Part 7.1.2 specifies removal of the arrays from the antenna pedestals for preservation work. It is our experience that the arrays rarely come apart from the antenna pedestal without significant damage due to the use of aluminum chassis, stainless crews and little or no corrosion inhibitor during assembly. Finally, 7.1.4 calls for replacement of gear box oil and transmission drive belts. In nearly 40 years’ experience with Furuno radars, I have no recollection of an oil filled gear box or transmission drive belt in a Furuno radar. Furuno uses direct drive gear trains Respectfully, the spec writer appears to using a very old template for some other radar model in this instance.
Request an extension of the offer due date to March 21, 2018 due to the significant number of subcontractors on this project and other proposals currently in process.
ANSWER:
See amendment 3 for revised work item 0405 and 0406.
ATTACHMENT J - 8