J-2_Category_A_Items.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- USS EMORY S. LAND (AS 39) Mid-Term Availability Federal contract opportunity
- Solicitation number
- N3220518R4552
About this file
J-2 Contractor Price Breakdown - Category "A" Items (REVISED)
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | LABOR PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | NSP | ||||||||||
| 002 | Technical Representative Rev 08Nov17 | NSP | ||||||||||
| 003 | Approach Berth and Moorings Rev 08Nov17 | NSP | ||||||||||
| 004 | Testing and Quality Assurance Rev 08Nov17 | NSP | ||||||||||
| 005 | Electrical Safety Procedure Requirements | NSP | ||||||||||
| 006 | Heavy Weather Plan | NSP | ||||||||||
| 010 | Furnish Office for OMT Rev May16 | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status Monitoring | - 0 | $ - 0 | $0 | ||||||||
| 014 | Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program Rev 28Se | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ship Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Redelivery, REV MAY16 | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access Rev Aug15 | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids and Cofferdams (SC | - 0 | $ - 0 | $0 | ||||||||
| 022 | Machinery Space Turn-Over,Dock Trials and Sea Tria | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal Rev May16 | - 0 | $ - 0 | $0 | ||||||||
| 024 | Physical Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 031 | AS Class Maintenance Controlled Work Spaces, Work | NSP | ||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | Tank Inspections (ABS) Excluding Fuel Tanks (VR18- | - 0 | $ - 0 | $0 | ||||||||
| 102 | 03 Level Weather Deck Structural Repair(ABS)(VR13- | - 0 | $ - 0 | $0 | ||||||||
| 103 | Watertight Door Repair (ABS) (VR18-0012) | - 0 | $ - 0 | $0 | ||||||||
| 104 | 01 Level Weather Deck Structural Repair (ABS)(SCS) | - 0 | $ - 0 | $0 | ||||||||
| 105 | 04 Level Weather Deck Structural Repair (ABS)(SCS) | - 0 | $ - 0 | $0 | ||||||||
| 106 | 02 Level Weather Deck Structural Repair (ABS)(VR18 | - 0 | $ - 0 | $0 | ||||||||
| 107 | 05 Level Weather Deck Structural Repair (ABS)(VR18 | - 0 | $ - 0 | $0 | ||||||||
| 108 | NR 2 Chill Water Pump Foundation Replace(ABS)(VR16 | - 0 | $ - 0 | $0 | ||||||||
| 109 | Port and Stbd 02 Level Drain Trough(ABS)(SCS)(VR14 | - 0 | $ - 0 | $0 | ||||||||
| 110 | NR6 & NR7 Fire Pump Foundation Replace (VR16-0064) | - 0 | $ - 0 | $0 | ||||||||
| 111 | Potable Water and Priming Pump and Motor FDN(VR17- | - 0 | $ - 0 | $0 | ||||||||
| 112 | Elevator Doors and Frame Replace (ABS)(VR18-0011) | - 0 | $ - 0 | $0 | ||||||||
| 113 | 02 Level Tie Downs Replace(SCS)(VR17-0028) | - 0 | $ - 0 | $0 | ||||||||
| 114 | Remove and Replace Cleats (VR17-0086) | - 0 | $ - 0 | $0 | ||||||||
| 115 | Ultrasonic Gauging (SCS)(ABS)(VR18-0025) | - 0 | $ - 0 | $0 | ||||||||
| 116 | 03 Level Captain’s Porch Deck Preserve (VR18-0001) | - 0 | $ - 0 | $0 | ||||||||
| 117 | Forward Superstructure and Forward Running Lights Stand Preserv | - 0 | $ - 0 | $0 | ||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | NR 1 and 2 Boiler Main Steam Stop Valves Replace ( | - 0 | $ - 0 | $0 | ||||||||
| 202 | Coffin Feed Pumps 5-Year Servicing(VR17-0034)(ABS) | - 0 | $ - 0 | $0 | ||||||||
| 203 | Boiler Exhaust Plenums Repair (VR17-0006) | - 0 | $ - 0 | $0 | ||||||||
| 204 | NR 1 & NR 2 Boiler Safety Valves Actuator Panel Re | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | ECPC Emergency and IC Swbd Cleaning(VR17-0104) | - 0 | $ - 0 | $0 | ||||||||
| 302 | Group Control Centers Grooming and Circuit BRK(VR1 | - 0 | $ - 0 | $0 | ||||||||
| 303 | NR 3 and NR 4 SSTG Turbine Inspection (ABS)(VR16-0 | - 0 | $ - 0 | $0 | ||||||||
| 304 | Switchboard Cleaning (Annually)(VR17-0104) | - 0 | $ - 0 | $0 | ||||||||
| 305 | NR 1 Rotor and 2 SSTG High Speed Coupling Replace | - 0 | $ - 0 | $0 | ||||||||
| 306 | Thermographic Survey (VR17-0060) | - 0 | $ - 0 | $0 | ||||||||
| 307 | Viking Plug Receptacle Replace (VR17-0053) | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | Magnetic Compass Survey and Calibration(VR18-0014) | - 0 | $ - 0 | $0 | ||||||||
| 402 | Fathometer System PM(VR18-0017) | - 0 | $ - 0 | $0 | ||||||||
| 403 | Gyro Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 404 | OE82 Antenna Group PM | - 0 | $ - 0 | $0 | ||||||||
| 405 | Radar Magnetron Replace(VR18-0018) | - 0 | $ - 0 | $0 | ||||||||
| 406 | Radars and ECDIS Services(VR18-0013) | - 0 | $ - 0 | $0 | ||||||||
| 407 | Annual GMDSS ABS Cert and Survey (VR17-0106) | - 0 | $ - 0 | $0 | ||||||||
| 409 | Relocation of Furuno Radar (T-ALT AS-15-011R) | - 0 | $ - 0 | $0 | ||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | NR 2 AC Plant Compressor Repair (VR16-0044) | - 0 | $ - 0 | $0 | ||||||||
| 502 | NR 1 AND NR 2 Potable Water Pmp and Motor Repair ( | - 0 | $ - 0 | $0 | ||||||||
| 503 | Potable Water Priming Pump and Motor (VR17-0005) | - 0 | $ - 0 | $0 | ||||||||
| 504 | Anchor Windlass and Steering Servicing (annual)(VR | - 0 | $ - 0 | $0 | ||||||||
| 505 | NR 6 AND NR 7 Fire Pump and Motor Repair (VR16-006 | - 0 | $ - 0 | $0 | ||||||||
| 506 | Sewage Piping Repair (VR16-0052) | - 0 | $ - 0 | $0 | ||||||||
| 507 | Number 1 CHT Inlet Piping Replace (VR17-0007,0109) | - 0 | $ - 0 | $0 | ||||||||
| 508 | AC Plant SW Circulating Pump and Motor Repair(VR17 | - 0 | $ - 0 | $0 | ||||||||
| 509 | EDG SW Booster Pump Repair(VR17-0027) | - 0 | $ - 0 | $0 | ||||||||
| 510 | EDG Inspection (VR17-0026) | - 0 | $ - 0 | $0 | ||||||||
| 511 | 600 PSI Aux BHD Steam Valve Repair | - 0 | $ - 0 | $0 | ||||||||
| 512 | Number One AC Compressor Motor Repair (VR17-005) | - 0 | $ - 0 | $0 | ||||||||
| 513 | Number Two FOSP Repair (VR17-0061) | - 0 | $ - 0 | $0 | ||||||||
| 514 | Main Exhaust Gland Fan and Motor Repair (VR17-0069 | - 0 | $ - 0 | $0 | ||||||||
| 515 | Number One HPAC 3rd Stage Pipe Replace(VR17-0094) | - 0 | $ - 0 | $0 | ||||||||
| 516 | NR 1 and NR 2 CHT Piping UT Gauging and Replace | - 0 | $ - 0 | $0 | ||||||||
| 517 | Fuel Fill and Transfer Piping 1-43-3 Replace | - 0 | $ - 0 | $0 | ||||||||
| 518 | Dehumidifier Installation | - 0 | $ - 0 | $0 | ||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | Supply Provision Deck Grating Replace (VR15-0010, | - 0 | $ - 0 | $0 | ||||||||
| 602 | SCBA Equipment (5 Yrs) Inspect and Test (VR17-0014 | - 0 | $ - 0 | $0 | ||||||||
| 603 | PRC Deck Replace "SPECIAL CONTROL SPACES" (VR16-00 | - 0 | $ - 0 | $0 | ||||||||
| 604 | Port and Stbd RHIB Davit Annual Certifcation(VR17- | - 0 | $ - 0 | $0 | ||||||||
| 605 | Miscellaneous Insulation Repair (VR17-0001) | - 0 | $ - 0 | $0 | ||||||||
| 606 | 5 Ton Crane Annual Inspection and Certification (V | - 0 | $ - 0 | $0 | ||||||||
| 607 | Port Side Liferaft Cradles Repair (VR17-0019) | - 0 | $ - 0 | $0 | ||||||||
| 608 | AC Plant Piping Lagging and Insulation Replace(VR1 | - 0 | $ - 0 | $0 | ||||||||
| 609 | Steam Piping Insulation Repair (VR18-0010) | - 0 | $ - 0 | $0 | ||||||||
| 610 | Terrazzo Deck Repair(VR16-0068) | - 0 | $ - 0 | $0 | ||||||||
| 611 | Battle Lantern Battery Replace(VR14-0123) | - 0 | $ - 0 | $0 | ||||||||
| 612 | Annual Fire Fighting Inspection and Certification( | - 0 | $ - 0 | $0 | ||||||||
| 613 | Inspect, Service and Certify Rescue Boats(VR17-007 | - 0 | $ - 0 | $0 | ||||||||
| 614 | SCBA Compressor Servicing (ABS)(VR17-0100) | - 0 | $ - 0 | $0 | ||||||||
| 615 | Cargo Elevator and Dumbwaiter Industrial Assist | - 0 | $ - 0 | $0 | ||||||||
| 617 | PRC Deck Repair (SCS) | - 0 | $ - 0 | $0 | ||||||||
| 618 | Terrazzo Deck Repair (VR16-0068) | - 0 | $ - 0 | $0 | ||||||||
| 619 | Mast Ladder and Climber Safety Rail Repair (VR17-0110) | - 0 | $ - 0 | $0 | ||||||||
| 620 | No 2 and 6 Elevator Motors Overhaul | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Vent Plenum Replacement 01-26-2 (VR17-0006) | - 0 | $ - 0 | $0 | ||||||||
| 802 | Laundry Exhaust Duct Cleaning(VR18-0019) | - 0 | $ - 0 | $0 | ||||||||
| 803 | Galley Exhaust Duct Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 804 | HVAC Cleaning (VR18-0021) | - 0 | $ - 0 | $0 | ||||||||
| 805 | NSF Main Deck Port & Stbd Vent Ducting Preserve (V | - 0 | $ - 0 | $0 | ||||||||
| 806 | Fan Room (05-38-2-Q) Structural Repair (VR17-0003) | - 0 | $ - 0 | $0 | ||||||||
| 807 | Fan Room 04-53-3-Q Refurbishment(VR18-0022) | - 0 | $ - 0 | $0 | ||||||||
| 808 | Fan Room (1-43-3) Refurbishment (VR17-0029) | - 0 | $ - 0 | $0 | ||||||||
| 809 | Misc Vent Ducting Replace (VR17-0082)(VR18-0002) | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 901 | Underwater Hull Cleaning, UWILD, and Shaft Alignme | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
| USS EMORY S. LAND (AS 39) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N3220518R4552 |
ATTACHMENT J-2
File details come from the government source that posted it.