J-3 Contractor Price Breakdown - Category B Items
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | ||||||||||||
| 7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | ||||||||||||
| 7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | ||||||||||||
| 7.12 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | ||||||||||||
| Sub-Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Overhaul Management Team | 15 | DAYS | ||||||||||||
| 7.2 | General Services For The Ship | 15 | DAYS | ||||||||||||
| 7.3 | Telephone Services | 15 | DAYS | ||||||||||||
| 7.4 | Project Planning and Monitoring | 15 | DAYS | ||||||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | DAYS | ||||||||||||
| 7.6 | Shipboard Access and Security | 15 | DAYS | ||||||||||||
| 7.7 | Gas Free Certificates | 15 | DAYS | ||||||||||||
| Sub-Total | |||||||||||||||
| 115 | KINGPOST SUPPORT BRACKETS | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Relocate high level alarm and sounding tubes inboard 12", as necessary, to allow the installation of the underdeck stiffeners, using reference 2.1 and 2.2 as guidance. Final location is to be approved by ABS surveyor and MSC Representative. | ||||||||||||||
| Sub-Total | |||||||||||||||
| 530 | TANK DECK CARGO FUEL PP REPAIRS | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | This item describes the requirement to inspect and repair as needed various cargo fuel (DFM) pipe sections located on the main deck and pump room. | ||||||||||||||
| Sub-Total | |||||||||||||||
| 915 | DRYDOCK CONTINUATION | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Submit unit price per day up to a maximum of TEN (10) days to continue all services in accordance with parent item if directed | 10 | DAYS | ||||||||||||
| Sub-Total | |||||||||||||||
| 916 | ZINC ANODE REPLACEMENT | ||||||||||||||
| 7.1 | This item covers the replacement of any zinc anodes found to be deteriorated by the MSC Port Engineer, Chief Engineer, USCG or ABS Representatives. | ||||||||||||||
| Sub-Total | |||||||||||||||
| TOTAL |
&"Times New Roman,Regular"&10USNS RAPPAHANNOCK (TAO-204)
| &"Times New Roman,Bold"&14 | |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220518R4001 |