J-3_Cat-B,_WI-RAPPAHANNOCK.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USNS RAPPAHANNOCK (TAO-204), ROH
Solicitation number
N3220518R4001
Issued by

About this file

J-3 Contractor Price Breakdown - Category B Items

View the file

Other files

File Type Posted
N18R400100005.docx DOCX document
WI_Index_FY19__ROH-RevA.doc DOC document
J-2_CAT_A-RevA.xlsx XLSX spreadsheet
ESP_PROGRAM_Intermediate_Hull_Survey_5.pdf PDF
0612-RevB_A_STATEROOM_REPAIRS.doc DOC document
RFC_006_Response.doc DOC document
RFC_007_Response.doc DOC document
RFC_008_Response.doc DOC document
RFC_009_Response.doc DOC document
0021-RevB_A_CLEAN-GAS_FREE_TNKS,_VOIDS_N_COFFERDAMS.doc DOC document
N18R40010004.docx DOCX document
0111-RevB_A_ABS_INTERMEDIATE_TANK_SURVEY.doc DOC document
0618-RevB_A_Smoke_Stack_Indicator.docx DOCX document
0903-RevB_A_UNDERWATER_HULL_PRESERVATION.doc DOC document
RFC-004_-_Response.doc DOC document
RFC-005_-_Response.doc DOC document
0102-RevB_A_Tank_Preservation.doc DOC document
18R40010003.docx DOCX document
RFC-003_-_Response.doc DOC document
18R40010002.docx DOCX document
RFC-002_Response.doc DOC document
18R40010001.docx DOCX document
RFC-001_Response.doc DOC document
CDRL,_WI-0012.pdf PDF
CDRL,_WI-0011.pdf PDF
J-7,_RAPP,_18C4001.pdf PDF
CDRL,_WI-0015.pdf PDF
J-13,_RAPP,_Past_Perf_Questionaire.docx DOCX document
J-8_RFC.doc DOC document
J-15_Non-Mariner_Maint_KTR_Vetting_Sheet.pdf PDF
J-4,_GFM.xlsx XLSX spreadsheet
CDRL,_WI-0018.pdf PDF
CDRL,_WI-0010.pdf PDF
CDRL,_WI-0017.pdf PDF
CDRL,_WI-0014.pdf PDF
CDRL,_WI-0024.pdf PDF
J-11_Dry_Dock_Eval_Form_RAPPAHANNOCK,_ROH.docx DOCX document
CDRL,_WI-0023.pdf PDF
J-9,_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
CDRL,_WI-0016.pdf PDF
CDRL,_WI-004.pdf PDF
CDRL,_WI-0019.pdf PDF
J-10_Interport_Differentials.docx DOCX document
Solicitation,_N3220518R4001__RAPPAHANNOCK.docx DOCX document
J-12_Past_Perf_Data.docx DOCX document
CDRL,_WI-0020.pdf PDF
J-5_Sub-Contracting_Plan.docx DOCX document
CDRL,_WI-006.pdf PDF
CDRL,_WI-001.pdf PDF
J-2_Cat-A,_WI-RAPPAHANNOCK.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat B Items

GENERAL REQUIREMENTQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
025PHYSICAL SECURITY AT CONTRACTOR'S FACILITY
7.11COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
7.11COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
Sub-Total
030CONTINUATION OF SERVICESQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Overhaul Management Team15DAYS
7.2General Services For The Ship15DAYS
7.3Telephone Services15DAYS
7.4Project Planning and Monitoring15DAYS
7.5Fire Protection and Ship's Safety15DAYS
7.6Shipboard Access and Security15DAYS
7.7Gas Free Certificates15DAYS
Sub-Total
115KINGPOST SUPPORT BRACKETSQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Relocate high level alarm and sounding tubes inboard 12", as necessary, to allow the installation of the underdeck stiffeners, using reference 2.1 and 2.2 as guidance. Final location is to be approved by ABS surveyor and MSC Representative.
Sub-Total
530TANK DECK CARGO FUEL PP REPAIRSQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1This item describes the requirement to inspect and repair as needed various cargo fuel (DFM) pipe sections located on the main deck and pump room.
Sub-Total
915DRYDOCK CONTINUATIONQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Submit unit price per day up to a maximum of TEN (10) days to continue all services in accordance with parent item if directed10DAYS
Sub-Total
916ZINC ANODE REPLACEMENT
7.1This item covers the replacement of any zinc anodes found to be deteriorated by the MSC Port Engineer, Chief Engineer, USCG or ABS Representatives.
Sub-Total
TOTAL

&"Times New Roman,Regular"&10USNS RAPPAHANNOCK (TAO-204)

&"Times New Roman,Bold"&14
CATEGORY "B" ITEMS&"Times New Roman,Regular"&10N3220518R4001

ATTACHMENT J-3

File details come from the government source that posted it.