N32205-15-R-1009
USNS RAPPAHANNOCK (T-AO 204)
REQUEST FOR SPECIFICATION CLARIFICATION - #013
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 904
PARAGRAPH / SECTION NO: WI# 904, Para 7.1.10
TITLE: FREEBOARD PRESERVATION
In review of work items 904 we note the requirement for the temporary removal and storage of the flight deck safety nets. This Offeror questions the requirement for net removal where there is no requirement for net frame repairs or preservation thereof in the work package. If net removal is to preclude Grit & Overspray contamination the Offeror should be allowed to either remove said net frames and nets without removing them from the net frames, or protect the net frames and nets from contamination.
7.1.10 Detach, remove, and provide temporary storage for twenty-nine (29) Flight Deck safety nets, two (2) filler nets, and two (2) corner nets. Prior to removal, contractor shall properly identify and label all nets with respect to their shipboard location. Save and set aside all associated hardware and lashing. In way of all removals, Contractor shall provide and install a temporary safety rail/barrier. Upon completion of all work, reinstall all removals in their parent locations on board the vessel.
Note; disturbing these nets will require subsequent load testing once re-installed into their parent locations. The requirement of paragraph 7.1.10 will add significant cost to this work item that can be mitigated by using other means to protect the nets and frames from contamination.
QUESTION:
Recommend paragraph 7.1.10 be revised to exclude net removal from the net frames, and require protection of nets and frames from contamination.
ANSWER:
The contractor shall perform work in accordance with the Work Item as stated. No changes will be made as a result of this request for specification clarification.
ATTACHMENT J - 8