Amendment_0012.pdf
PDF 34 KB Posted
- Solicitation number
- N32205-15-R-1009
About this file
Amendment 0012
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is hereby issued to:
1) Extend the time for f inal proposal revisions 4 September 2015 at 10:00 AM EST. Final proposal revisions may be submitted electronically via email to the Contract Specialist, Mark Draluck at the email address of mark.draluck@navy.mil so long as hard copy proposals follow in accordance w ith the "Requirements for Submission of Final Proposal Revisions." Final proposals must be received by 10:00 AM EST on 4 September 2015. If a final proposal revision is not received by this deadline, than the Government w ill only consider the initial submitted proposal for aw ard consideration.
2) Revise J-3 attachment, "Contractor Price Breakdow n - Category B Items"
3) Revise Work Items (WIs) 303 through 306, 610, 901, and 903
4) Update attachment J-4, "Government Furnished Material List"
5) All other terms and conditions remain the same
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32205-15-R-1009
X 9B. DATED (SEE ITEM 11)
12-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2015
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET, BLDG SP64
NAVAL STATION NORFOLK
NORFOLK VA 23511-2419
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N32205-15-R-1009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
The following have been added by full text:
FRP
REQUIREMENTS FOR SUBMISSION OF FINAL PROPOSAL REVISIONS
The offeror may submit a final revised technical and price proposal in response to the request for final proposal revision submission. In the event that the offeror does not submit a final proposal revisions in part or entirety, the initial proposal will be considered for award in its entirety or those applicable parts not resubmitted. Therefore, an initial acceptable or unacceptable rating and/or evaluated price will be carried over for that factor. The final proposal revisions shall be submitted in the following format:
(a) General: Both hard copy (hard copy as defined in L-2 paragraph (a) including electronic CD-ROM) and electronic files via email must be submitted with your final proposal revisions. These submissions shall be divided into two (2) binders/CDs/emails as follows: (1) Price/Past Performance and all outstanding Amendments, signed and completed, and (2) Technical. Hard copy submissions may be submitted at a later date so long as emailed submissions are received prior to the submission deadline. One (1) hard copy and one (1) electronic CD-ROM copy is required.
(b) Offerors shall submit their final proposal revisions to the following address:
Mark.draluck@navy.mil for email submission
For hard copy submission:
Military Sealift Command Attn: Mark Draluck (N104-1) 471 C Street Naval Station Norfolk, VA 23511-2419
Volume I: Price / Past Performance / and Subcontracting (as applicable for the final proposal revision submission)
Price In submission of final proposal revisions, offerors shall follow the price submission guidance from L-2, “Requirements for Submission of Proposals”
The revisions to the price proposal must be accompanied by a complete cost breakdown setting forth the revisions and the basis thereof.
Past Performance Offerors shall provide a written narrative addressing concerns provided during discussions, if any.
Other Business Issues Offerors shall provide a written narrative addressing concerns provided during discussions, if any.
Volume II: Technical Proposal
N32205-15-R-1009
Final proposal revisions shall address concerns stated during discussions, if any. Failure to adequately address concerns in accordance with the discussions conducted and evaluation notices issued may be grounds for an Unacceptable factor rating in accordance with M-3.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .