Request for Spec Clarification 12.docx

DOCX document 29 KB Posted

Attached to
USNS RAPPAHANNOCK REGULAR OVERHAUL AND DRY DOCKING (ROH/DD)
Solicitation number
N32205-15-R-1009
Issued by

About this file

Request for Spec Clarification 12

View the file

Other files

File Type Posted
Copy_of_J-4.xls XLS spreadsheet
Amd_0013.doc DOC document
J-3_Category_B_Items_RAPP_8-19-2015.xlsx XLSX spreadsheet
Amendment_0012.pdf PDF
J-4.xls XLS spreadsheet
Amd_0011.pdf PDF
Amendment_0010.docx DOCX document
J-2_Category_A_Items_RAPP_7-16-2015.xlsx XLSX spreadsheet
Request for Spec Clarification 16.docx DOCX document
Request for Spec Clarification 15.docx DOCX document
Request for Spec Clarification 18.docx DOCX document
Request for Spec Clarification 17.docx DOCX document
Amendment_0009.docx DOCX document
Request_for_Spec_Clarification_14.docx DOCX document
Amendment_0008.docx DOCX document
Request for Spec Clarification 6.docx DOCX document
Request for Spec Clarification 10.docx DOCX document
Request for Spec Clarification 13.docx DOCX document
Request for Spec Clarification 11.docx DOCX document
Request for Spec Clarification 9.docx DOCX document
Request for Spec Clarification 7.docx DOCX document
Request for Spec Clarification 5.docx DOCX document
Request for Spec Clarification 8.docx DOCX document
Amendment_0007.docx DOCX document
Amendment_0006.docx DOCX document
Amendment_0005.docx DOCX document
J-3_Category_B_Items_RAPP_6-24-15.xlsx XLSX spreadsheet
J-2_Category_A_Items_RAPP_6-24-15.xlsx XLSX spreadsheet
RAPPAHANNOCK_N32205-15-R-1009-0004.pdf PDF
Request_for_Spec_Clarification_4.docx DOCX document
Amendment_0003.docx DOCX document
Request_for_Spec_Clarification_3.docx DOCX document
J-2_Category_A_Items_RAPP_6-22-15.xlsx XLSX spreadsheet
Amendment_0002.docx DOCX document
Request_for_Spec_Clarification_1.docx DOCX document
Request_for_Spec_Clarification_2.docx DOCX document
Amendment_0001.docx DOCX document
J-4 RAPPAHANOCK MASTER GFM LIST.pdf PDF
RAPP_Solicitation_15-R-1009_Final2.pdf PDF
RAPPAHANNOCK_ROH_J_and_A_FedBizOps.pdf PDF
J-14 Technical Data Non-Disclosure_RAPP.docx DOCX document
J-5 Subcontracting Plan_RAPP.docx DOCX document
J-6 WI 015 CDRL.pdf PDF
J-9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
J-2 Category A Items_RAPP.xlsx XLSX spreadsheet
J-11 Dry Dock Evaluation Form.docx DOCX document
J-10 Interport Differential.docx DOCX document
J-7 MSC Ship Repair Facility Survey.docx DOCX document
J-3 Category B Items RAPP_6-9-15.xlsx XLSX spreadsheet
J-12 Past Performance Data.docx DOCX document
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-15-R-1009

USNS RAPPAHANNOCK (T-AO 204)

REQUEST FOR SPECIFICATION CLARIFICATION - #012

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 904

PARAGRAPH / SECTION NO: WI# 904, Para 7.2.5

TITLE: FREEBOARD PRESERVATION

In review of work items 904 we note the requirement for Sweep Blasting the remaining surfaces of the freeboard that do not receive “Spot Blasting” surface preparation. We take exception to this method of surface preparation as the existing urethane top coating can often fracture and result in a complete system removal to remove fracturing. Standard practice on Freeboard hulls is to chemically etch the urethane surface after spot blasting with a cleaner (Devprep) to etch the surface in preparation for receiving the final application of a full coat of urethane paint.

7.2.5 Sweep blast the remaining freeboard surfaces to remove any lose non-adhering paint on the surface. Any edges shall be feathered. Contain and dispose of all sweep blast media in accordance with all national, state and local regulations as a part of this work item.

Note; any loose non-adhering paint coatings on the surface will be removed during the 3,000 psi washing process.

QUESTION:

Recommend paragraph 7.2.5 be revised to exclude grit sweeping the Freeboard and include chemical etching using “DEVPERP” prior to paint application.

ANSWER:

The contractor shall perform work in accordance with the Work Item as stated. No changes will be made as a result of this request for specification clarification.

ATTACHMENT J - 8