Attachment_P6_Cost_Summary_Spreadsheet_Rev1.xls

XLS spreadsheet 191 KB Posted

Attached to
NAVAL AIR WARFARE CENTER - AIRCRAFT DIVISION (NAWC-AD), AVIATION LOGISTICS ENVIRONMENT (ALE), PROGRAM MANAGEMENT AND LIFECYCLE SUPPORT SERVICES
Solicitation number
N00421-19-R-0018
Issued by

About this file

This document is a sources sought notice for logistics support services. The Naval Air Warfare Center Aircraft Division is seeking information from small businesses to determine if a small business set-aside is possible for program management, business process improvement, requirements engineering, cybersecurity, technology support, and test and evaluation services in support of its Aviation Readiness & Resources Analysis Competency. Interested small businesses are requested to submit a capabilities statement by October 31, 2018 demonstrating relevant experience in these task areas, an explanation of how the business can perform at least 50% of the work, and information on facility security clearances. The total level of effort for the cost-plus-fixed-fee contract is estimated at 662,400 hours over a five-year base period and four one-year ordering periods to be performed at locations including Patuxent River, Maryland and Marine Corps air stations.

Attachment P6 Cost Summary Rev1

View the file

Other files

File Type Posted
N0042119R0018_Amendment_0004.pdf PDF
N0042119R0018_Amendment_0003.pdf PDF
Attachment_P7_Fully_Burdened_Labor_Rates_Rev1.xls XLS spreadsheet
19R0018_questions_and_answers.xlsx XLSX spreadsheet
N0042119R0018_Amendment_0002_Final.docx DOCX document
N0042119R0018_Amendment_0002_Final.docx.pdf PDF
N0042119R0018_Amendment_0001.docx DOCX document
Attachment_4_CSP.pdf PDF
Attachment_3_OCI_Vendor_List.docx DOCX document
Attachment_P7_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Instructions_for_Attachment_P1_CPAQ.pdf PDF
N00421-19-R-0018.pdf PDF
A001.pdf PDF
A004.pdf PDF
Attachment_P1_Past_Performance_Information_Form.pdf PDF
Attachment_1_Draft_DD254.pdf PDF
Attachment_2_Data_Item_Transmittal_Form.doc DOC document
A002.pdf PDF
Attachment_P2_CPAQ.pdf PDF
Attachment_P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
A003.pdf PDF
Draft_PWS.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, "Ktr" signifies the worker will be performing at the Contractor's facility or a "Gov" signifies the services will be performed in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A32, A39, A45, and A90
2Enter all subcontractor employee names in Column A (starting at row 8) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 8) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, "Ktr" signifies the worker will be performing at the Contractor's facility or a "Gov" signifies the services will be performed in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For subcontractor cost summary sheets, delete Rows 22-48.
12When submitting this file, the instructions may be deleted.

Norfolk, VA

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
"*" indicates Key PersonnelYear 1Year 2Year 3Year 4Year 5Option Period 5Total for All Years
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Direct Labor Cost
Employee Name 1* Senior ManagerKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0000
Employee Name 2Senior Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0000
Employee Name 3Senior Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 4Senior Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 5Journeyman Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 6Journeyman Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 7Junior Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 8Junior Project AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 9Journeyman Administrator Services ManagerKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 10Journeyman Administrator Services ManagerKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 11Journeyman Configuration Management AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 12* Senior Management AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 13Journeyman Management AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 14Journeyman Management AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 15Journeyman Budget AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 16Journeyman Budget AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 17Senior Financial AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 18Journeyman Financial AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 19Junior Financial AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 20Junior Financial AnalystKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 21Senior Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 22Journeyman Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 23Journeyman Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 24Journeyman Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 25Junior Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 26Senior Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 27Senior Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 28Journeyman Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 29Journeyman Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 30Journeyman Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Total Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 000$ - 0
Prime Contractor Fringe
BaseBaseBaseBaseBase
Fringe Benefits (Full-time) (F)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits (Part-time) (P)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fringe Benefits Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal (Direct Labor + Fringe)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor OverheadBaseBaseBaseBaseBase
Overhead (Ktr. Site)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead (Gov. Site)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Overhead Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal (Direct Labor + Fringe + Overhead)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor G&ABaseBaseBaseBaseBase
G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Indirect Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Direct and Indirect Labor cost$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
BaseBaseBaseBaseBase
COM$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Prime Contractor Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Total proposed subcontractor labor cost and fee$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Prime contractor pass through (not including fee)
Handling SubcontractorBaseBaseBaseBaseBase
Handling Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Handling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A SubcontractorBaseBaseBaseBaseBase
G&A Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total G&A Subcontractor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other (if any)BaseBaseBaseBaseBase
Other (if any)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Other (if any)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total pass through (not including fee)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Cost including pass through$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed FeeBase
Prime Contractor Fee for Prime Contractor Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor Fee for Subcontractor Labor *$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fee (for Prime and Subcontractor Labor)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Cost Plus Fixed Fee (CPFF)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Direct Costs
Travel (cost only)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material (cost only)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material Handling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ODC Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A on ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total CPFF all CLINs (Labor and ODCs)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

Patuxent River, MD

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
"*" Signifies Key Personnel Position
"Gov" Signifies Government Site
"Ktr" Signifies Government SiteYear 1Year 2Year 3Year 4Year 5Option Period 5Total for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Direct Labor Cost
Employee Name 1* Senior Project AnalystGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0000
Employee Name 2Journeyman Project AnalystGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0000
Employee Name 3Journeyman Administrator Services ManagerKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 4Journeyman Management AnalystGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 000
Employee Name 5Journeyman Management AnalystGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 000
Employee Name 6Journeyman Financial AnalystGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 000
Employee Name 7Journeyman Financial AnalystGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 000
Employee Name 8Senior Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 9Journeyman Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 10Junior Technical WriterKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 11Senior Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
Employee Name 12Journeyman Logistics SpecialistKtr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 0Ktr$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
Total Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 000$ - 0
Prime Contractor Fringe
BaseBaseBaseBaseBase
Fringe Benefits (Full-time) (F)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits (Part-time) (P)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fringe Benefits Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal (Direct Labor + Fringe)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor OverheadBaseBaseBaseBaseBase
Overhead (Ktr. Site)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead (Gov. Site)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Overhead Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal (Direct Labor + Fringe + Overhead)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor G&ABaseBaseBaseBaseBase
G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Indirect Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Direct and Indirect Labor cost$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
BaseBaseBaseBaseBase
COM$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Prime Contractor Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Total proposed subcontractor labor cost and fee$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Prime contractor pass through (not including fee)
Handling SubcontractorBaseBaseBaseBaseBase
Handling Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Handling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A SubcontractorBaseBaseBaseBaseBase
G&A Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total G&A Subcontractor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other (if any)BaseBaseBaseBaseBase
Other (if any)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Other (if any)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total pass through (not including fee)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Cost including pass through$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed FeeBase
Prime Contractor Fee for Prime Contractor Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor Fee for Subcontractor Labor *$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fee (for Prime and Subcontractor Labor)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Cost Plus Fixed Fee (CPFF)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Direct Costs
Travel (cost only)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material (cost only)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material Handling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ODC Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A on ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total CPFF all CLINs (Labor and ODCs)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%

San Diego, CA

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 5Option Period 5Total for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountSiteRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Direct Labor Cost
Employee Name 1Senior Logistics SpecialistGov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0Gov$ - 0000
Employee Name 2$ - 0$ - 0$ - 0$ - 0$ - 0000
Employee Name 3$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 4$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 5$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 6$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 7$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 8$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 9$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 10$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 11$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 12$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 13$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 14$ - 0$ - 0$ - 0$ - 0$ - 000
Employee Name 15$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
$ - 0$ - 0$ - 0$ - 0$ - 000
Total Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 000$ - 0
Prime Contractor Fringe
BaseBaseBaseBaseBase
Fringe Benefits (Full-time) (F)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits (Part-time) (P)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fringe Benefits Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal (Direct Labor + Fringe)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor OverheadBaseBaseBaseBaseBase
Overhead (Ktr. Site)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead (Gov. Site)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Overhead Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal (Direct Labor + Fringe + Overhead)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor G&ABaseBaseBaseBaseBase
G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Indirect Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Direct and Indirect Labor cost$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
BaseBaseBaseBaseBase
COM$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Prime Contractor Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Total proposed subcontractor labor cost and fee$ - 0$ - 0$ - 0$ - 0$ - 00$ - 0
Prime contractor pass through (not including fee)
Handling SubcontractorBaseBaseBaseBaseBase
Handling Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Handling Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Handling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A SubcontractorBaseBaseBaseBaseBase
G&A Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A Subcontractor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Etc.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total G&A Subcontractor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other (if any)BaseBaseBaseBaseBase
Other (if any)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Other (if any)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total pass through (not including fee)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontractor Cost including pass through$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed FeeBase
Prime Contractor Fee for Prime Contractor Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Contractor Fee for Subcontractor Labor *$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Fee (for Prime and Subcontractor Labor)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Cost Plus Fixed Fee (CPFF)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Direct Costs
Travel (cost only)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material (cost only)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Material Handling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ODC Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A on ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total CPFF all CLINs (Labor and ODCs)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%

Summary

CLIN Summary Sheet
CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
0001Logistics Support (Labor)$ - 0$ - 0$ - 0
0002Logistic Support (O&M)Not Sperately Priced at the basic IDIQ level
0003Logistic Support (RDT&E)Not Sperately Priced at the basic IDIQ level
0004ODC - Travel$ - 0$ - 0$ - 0
0005ODC - Travel (O&M)Not Sperately Priced at the basic IDIQ level
0006ODC - Travel (RDT&E)Not Sperately Priced at the basic IDIQ level
0007DataNot Sperately Priced
Total0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .