Attachment_2-QASP.PDF
PDF 850 KB Posted
- Attached to
- Terminal Attack Controller Trainer Federal contract opportunity
- Solicitation number
- N00421-17-R-0018
About this file
This document provides a Quality Assurance Surveillance Plan (QASP) for a multiple award indefinite delivery, indefinite quantity contract seeking Terminal Attack Controller Trainer (TACT) services. The Naval Air Systems Command (NAVAIR) will utilize the QASP to monitor contractor performance and ensure quality standards are met in providing the required aircraft, crew, and payload at least 95% of the time to support terminal attack controller training for the Navy and Marine Corps. The Contracting Officer and Contracting Officer Representative will oversee contractor performance through methods including annual Contractor Performance Assessment Reporting System evaluations and monthly surveillance activity checklists focusing on critical performance metrics for the TACT mission and data delivery requirements. Enclosures define performance standards and incentives tied to the evaluations.
QASP
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
N00421-17-R-0018
Quality Assurance Surveillance Plan (QASP)
For
Contracted Air Services (CAS)
Terminal Attack Controller Trainer (TACT) Services
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to ensure the systematic quality assurance methods are used in the administration of the performance based service tasks under the planned contract. The intent is to ensure that the Contractor performs in accordance with the performance metrics, the Government receives the quality of services required under the contract, and that the actual performance results are documented in accordance with this plan.
This QASP describes how the Government will observe, evaluate and document the contractor's performance in meeting the critical performance standards identified in the contract and task orders.
Specifically, the QASP will identify the Government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. The intent is to establish and properly execute a QASP that will assist the Government in obtaining services from the contractor.
The contract required, in support of Contracted Air Services (CAS) Program Office (PMA-226), is to acquire Terminal Attack Controller Trainer (TACT) services to the Department of the Navy (DoN) and
United States Marine Corps (USMC) Fleet customers and other Department of Defense (DoD) agencies.
The resultant contract is anticipated to be a performance-based Multiple Award (MAC) Indefinite Delivery, Indefinite Quantity (IDIQ) Firm Fixed Price (FFP) contract. This contract will have a Ten Year ordering period. A properly executed and administered QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP is provided under Contract Section E - Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The QASP on the other hand, is put in place to provide Government surveillance and oversight of the
Contractor's efforts to assure that they are timely, effective, and are delivering the results specified in the order.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting
Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR 2.5.1.13. The
ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer - The Contracting Officer shall monitor performance of all necessary actions for effective contracting, ensure compliance with the terms of the contract and safeguard the interests of the
United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor's performance.
Contracting Officer's Representative (COR) - The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor's performance. In addition to the continuous monitoring of performance, the COR will also submit an annual assessment in the Navy's
Contractor Performance Assessment Reporting System (CPARS). In CPARS, the COR assesses general quality of product or service, schedule, cost control, business relations, management, small business compliance, and other important areas. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government's behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
6. Methods of Quality Assurance (QA) Surveillance
Contractor Performance Assessment Reporting System (CPARS) - CPARS reports will impact the determination to issue task orders under this contract and will impact the contractor's ability to compete on future DoD contracts. As such, the successful offeror has a vested interest in the Government generated
CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed annually. This evaluation will be one determinant in the continuation of issuing task orders under this contract. The Government for this procurement will address the quality of product or service, schedule, cost control, management, and other areas. As this information may affect future source selections throughout
DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein.
7. Surveillance
Enclosures (1), (2), and (3) sets forth the Terminal Attack Controller Trainer (TACT) Services Performance
Standards, Data Performance Standards, and Incentives for the Contractor and COR. Enclosure (4) provides the checklist and means for the COR to document on a monthly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete
Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government's performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of each task order.
9. Enclosures
Enclosure (1) –Terminal Attack Controller Trainer (TACT) Mission / Performance Standards
Enclosure (2) –CDRL Data Performance Standards
Enclosure (3) -Incentives
Enclosure (4) - Terminal Attack Controller Trainer (TACT) Activity Checklist
TERMINAL ATTACK CONTROLLER TRAINER (TACT)
MISSION/PERFORMANCE STANDARDS
PWS Task Description
Performance Standards
Required and Tied to
CPARS Ratings
Surveillance Method/Measure
Incentives
Provide Contracted
Offensive Air Support
Services for Terminal
Attack Controller
Training (TACT) in support NAWDC and
USMC JTAC utilizing aircraft which meet
Requirements within the
PWS.
Metric 1
Provide the prescribed aircraft and required crew & payload
95% of the time to be mission effective.
9 5 % = Exceptional
90% = Very Good
85% = Satisfactory
80% = Marginal
<80% = Unsatisfactory
100% Inspection by COR and customer feedback.
Example:
Mission Effectiveness is the total sorties flown in which the aircraft’s function as required by the PWS and in accordance with scheduled flights / sorties prescribed by Scheduling
Officer (SO) / NAWDC or USMC Course
Coordinator divided into the total sorties scheduled to achieve percentage (e.g. 49 flown/50 scheduled = 98%). Excludes canceled sorties by customer or due to weather related occurrences.
See enclosure 3.
Provide Flight crews that are trained, qualified, and scheduled in accordance with the
PWS and FAA Part 91 rules and regulations.
Metric 2
Provide qualified flight crews
(pilots) to support mandatory mission requirement profile (e.g.
based on payload, time on station, A/C configuration, etc.)
95% of the time for each scheduled mission.
100% = Exceptional
98% = Very Good
95% = Satisfactory
91% = Marginal
<90% = Unsatisfactory
100% Inspection by COR and customer feedback.
Example:
Take total mission / sortie requirement profile in accordance with scheduled flights prescribed by
Scheduling Officer (SO) / NAWDC or USMC
Course Coordinator and divide into the total requirement profiles scheduled to achieve percentage (e.g. 49 mission profiles met satisfactorily/50 scheduled = 98%)
Excludes canceled sorties by customer or due to weather-related occurrences.
enclosure
3.
Contractor to maintain
Government Furnished
Equipment (GFE) accountability IAW DI-
MGMT-80269
Metric 3
Contractor shall account for all
GFE with a goal of 100% accuracy and a Satisfactory metric of 95%. Reports shall be submitted semi- annually and in compliance with Dl-MGMT-
80269.
100% = Exceptional
97% = Very Good
95% = Satisfactory
90% = Marginal
<90% = Unsatisfactory
Government- performed random on-site physical audits combined with 100% inspection by COR of customer GFE reports submitted per
DI-MGNT-80269 of Contractor assigned GFE against the contract master list of assigned
GFR.
Example:
Take total number of GFE items issued from the
Government to the Contractor compared to the
1149 list and complete reports submitted, then divide the total GFE items accounted for during physical audit and divide by total GFE issued by Government to derive percentage (299/300 = 99.7%).
Enclosure (1)
Safety program compliance
Metric 4
Contractor shall maintain compliance with all safety requirements by category:
1. Aircraft air & ground mishaps
2. Non-compliance with hazmat policy.
Contractor goal is 100% compliance with a Satisfactory metric of 98%
100% = Exceptional
99% = Very Good
98% = Satisfactory
97% = Marginal
<97% = Unsatisfactory
100% Inspection by COR and customer feedback. Example:
Take total days where an incident has occurred and subtract that from the total number of days in the CPARS cycle...then divide that number by total number of days in the CPARS cycle to derive percentage (360/365 = 98.6%).
Fuel
Accountability
Compliance
(PWS
Paragraph
4.2.2.1)
Metric 5
Contractor shall maintain 95% accurate fuel consumption tracking between fuel cards, fuel receipts, flight logs, and fuel receipts, with a goal of 100% accurate tracking.
100% = Exceptional
97% = Very Good
95% = Satisfactory
90% = Marginal
<90% = Unsatisfactory
100% Inspection by COR and customer feedback.
Example:
Provide evidence that the fuel card charge receipts match with flight log and fuel receipts.
Take total fuel transactions (receipt amounts and gallons dispensed) and compare/match aggregate cost, gallons, fuel log, and flight log information.
Perform sample audit each month of transaction
IAW MIL-STD-105D using normal, single sample plan using Acceptable Quality Level
(AQL) 0.4 or 4%. Use table I General Inspection
Level II for sample size determination. Use table
II-A for sample plan. Aggregate 12 months of audits into % compliance. Take each months results (pass/fail) 12/12=100% compliance.
Enclosure (1)
CDRL DATA PERFORMANCE STANDARDS
PWS/CDRL #
Standard
Performance Standards
Required
Surveillance Method/
Measure
Incentives
CDRL A001-
Airworthiness and
Related
Substantiation Data
Submission is in accordance with the
Data Item Description
(DID) cited in the
CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL
See enclosure
3.
CDRL A002-
Management Plan and Standard
Operation
Procedures (SOP)
Submission is in accordance with the
DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL
See enclosure
3.
CDRL A003-
Fuel Chit Report
Submission is in accordance with the
DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL.
See enclosure
3.
CDRL A004-
Contractor's Progress, Status and Management
Report
Submission is in accordance with the
DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL
See enclosure
3.
CDRL A005-
Government Furnished Property (GFP) Report
Submission is in accordance with the
DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL.
See enclosure
3.
CDRL A006-
Operations Security
(OPSEC) Plan
Submission is in accordance with the
DID cited in the CDRL
98% of required deliverables provided on time and with no more than one report per year may be inaccurate or require a re-write
100% Inspection by
COR and/or technical points of contacts as indicated on CDRL
See enclosure
3.
Enclosure (2)
INCENTIVES
The following incentives shall apply to performance under this contract:
Assessment
Period
Acceptable
Performance
Definition
How Measured Incentives
Year 1
All measurement areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (12th month into contract period).
Evaluation using the
CPARS format covering the previous
6 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 2*
(+) Receives a positive assessment (CPARS), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition as a condition for issuance of task orders in Year 2*
(-)Receives a negative assessment (CPARS), appropriate for the quality of service provided.
Year 2 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (24th month into contract period).
Evaluation using the
CPARS format covering the previous
12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 3* issuance of task orders in Year 3*
(-)Receives a negative assessment (CPARS), appropriate for the quality
Year 3 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (36th month into contract period).
Evaluation using the
CPARS format covering the previous
12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 4* issuance of task orders in Year 4*
Year 4 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (48th month into contract period).
Evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 5* issuance of task orders in Year 5*
Year 5 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (60th month into contract period).
Evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 6* issuance of task orders in Year 6*
Year 6 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (72nd month into contract period). Evaluation using the CPARS format covering the previous 6 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 7* issuance of task orders in Year 7*
Year 7 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (84th month into contract period).
Evaluation using the
CPARS format covering the previous
12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 8* issuance of task orders in Year 8*
Year 8 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (96th month into contract period).
Evaluation using the
CPARS format covering the previous
12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 9* issuance of task orders in Year 9*
Year 9 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (108th month into contract period).
Evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for issuance of task orders in Year 10* issuance of task orders in Year 10*
Year 10 areas rated**
"Satisfactory" or above.
Annual Assessment
Period: (120th month into contract period).
Evaluation using the
CPARS format covering the previous 12 months.
*The Government reserves the right to not issue task orders unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
**Evaluation Ratings will be in accordance with FAR 42.1503.
Enclosure (3)
TERMINAL ATTACK CONTROLLER TRAINER (TACT)
ACTIVITY CHECKLIST
Monthly Surveillance Format Used:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Management
Responsiveness, Utilization of Small Business, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
Description Surveillance Method/Measure
Date Planned
Date Completed
Quality Metric =
Schedule Metric =
Cost Control Metric =
CPARS
Mgmt.
Metric
CPARS
Utilization of Small Business (yes/no)
Other Areas
As described above in Enclosure 1& 2
100% Inspection by COR and customer feedback
TBD
100% Inspection by COR and customer feedback
Enclosure (4)
Monthly Summary of Ratings:
Quality
Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Schedule
Number of Exceptional
Number of Very Good
Number of Satisfactory
Cost Control
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Management Responsiveness
Number of Exceptional
Number of Very Good
Number of Satisfactory
Utilization of Small Business
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Other Areas
Number of Exceptional
Number of Very Good
Number of Satisfactory
Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (4) and the monthly summary of ratings.
Description Surveillance Method/
Measure
Date Planned Date Completed Summary
Rating Results
Quality of Product or
Service
Review of Monthly
Ratings.
Metric = CPARS ratings
Schedule
Ratings.
Cost Control
Ratings
Management Responsiveness
Utilization of Small Business
Concerns
(Yes/No)
Other Areas
Enclosure (4)
File details come from the government source that posted it. Updated .