Attachment_P6_CLIN_Breakout_PRIME.xls.xlsx

XLSX spreadsheet 106 KB Posted

Attached to
Engineering and Technical Support to the Air Vehicle Competency (AIR-4. 3)
Solicitation number
N00421-16-R-0044
Issued by

About this file

Attachment P6 (01 Revision)

View the file

Other files

File Type Posted
N00421-16-R-0044-0006_Modification.pdf PDF
N00421-16-R-0044-0006_Conformed.pdf PDF
N00421-16-R-0044-0005_Conformed.pdf PDF
N00421-16-R-0044-0005_Amendment.pdf PDF
Q A_22_June_2016.pdf PDF
N00421-16-R-0044-0004_Conformed.pdf PDF
N00421-16-R-0044-0004_Modification.pdf PDF
Q As_16_June_2016.pdf PDF
N00421-16-R-0044_Amend_03_Conformed.pdf PDF
Attachment_P1_Workforce_Quals.xls XLS spreadsheet
Attachment_P8_On_Off_Site_Tables.pdf PDF
N00421-16-R-0044_Amendment_03.pdf PDF
Attachment_P7_CLIN_Breakout_Sub.xls XLS spreadsheet
Attachment_P5_PP_Quest_16-R-0044.doc DOC document
Attachment_6_SOW.pdf PDF
QAs_27_May_2016.pdf PDF
QAs_27_May_2016.pdf PDF
CDRL_A002_Performance_and_Financial_Report.pdf PDF
Attachment_P8_On_Off_Site_Tables.xlsx XLSX spreadsheet
Attachment_8_Scheduled_Government_Furnished_Property_(SGFP).pdf PDF
Attachment_9_Requisitioned_Government_Furnished_Property_(RGFP).pdf PDF
N00421-16-R-0044.pdf PDF
Attachment_1_DD254.pdf PDF
Attachment_P7_CLIN_Breakout_SUBS.xls XLS spreadsheet
Attachment_3_OCI_List.pdf PDF
Attachment_6_SOW.pdf PDF
Attachment_P6_CLIN_Breakout_PRIME.xls XLS spreadsheet
CDRL_A0001_Technical_Reports.pdf PDF
CDRL_A004_Company_NDA.pdf PDF
Attachment_7_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Exhibit_A_Attach_NDA_A005.docx DOCX document
Exhibit_A_Attach_NDA_A004.docx DOCX document
Attachment_P1_Workforce_Quals.xls XLS spreadsheet
Attachment_2_SAC.pdf PDF
CDRL_A005_Individual_NDA.pdf PDF
CDRL_A003_OPSEC_Plan.pdf PDF
Attachment_P5_PP_Quest_16-R-0044.doc DOC document
AIR_4.3_Draft_SOW.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions

Contractor:
1On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated.
2On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in.
3Worksheets should be prepared for the entire FIVE (5) YEAR ORDERING PERIOD. The Year 1 TAB is provided. The Offerors will be required to add Tabs for Years 2 through 5 for each subsequent year of the ordering period. The tabs should be labeled to match the Year (e.g. Year 1, Year 2, etc.). THE OFFEROR MUST ALSO PROVIDE A CUMULATIVE SUMMARY SHEET OF ALL YEARS (1-5) AND ADD THIS AS A SEPARATE TAB CALLED "SUMMARY".
4Every worksheet should have items 1 through 3 completed.
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6Within the worksheet any cell colored "blue" contains a formula and should not be edited.
7All dollar figures shall be carried out no further than two decimal places.
8The worksheet is arranged so that the workforce being proposed for an entire ordering period is shown together, even though it will separated by individual CLINS in Section B. When the TOTAL ceiling value for Labor is carried to Section B, it should be the same overall total shown on the worksheet for the entire five (5) year order period. When the TOTAL ceiling value for ODCs (Travel & Material) is carried to Section B, it should be the same overall total shown on the worksheet for the entire five (5) year order period.
9In Cell B2, enter the period of performance calendar dates (ex: 1 Jan 09 - 31 Dec 09). Enter the period of performance calendar dates for all ordering years in the corresponding cells for each period of performance. Type "SUMMARY" in the period of performance cell for the summary spreadsheet created under Instruction #3 above.
10In column A, starting at row 5 to 40, the Government Furnished Labor Categories utilized from the Historical Information should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. However, if it is not comparable, utilize the "not comparable" row. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. The Offeror does not insert any subcontractor information in this section. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
11In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces.
12In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Offeror in this column. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
14In column F, enter the name of the proposed individual for that position.
15In column G:
(a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-44)
(b) In Cell G46 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell G47 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank.
(d) In Cell G50, the prime contractor should insert its overhead rate for work performed at the contractor's facility.
(e) In Cell G51, the prime contractor should insert its overhead rate for work performed at the Client/Government's facility.
(f) In Cell G53, the prime contractor should insert its G&A rate being applied.
(g) for the subcontractor enter the fully burden cost including fixed fee associated with individual labor category for each year (e.g., CLIN 0100 rows 59-87, 90-118, 121-149, 152-180, 183-211, 214-242, 245-273, and 276-304)
(h) In Cell G307, the prime should insert the subcontractor handling charge, if any.
(i) In Cell G310, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
(j) In Cell G311, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
(k) In Cell G333, the prime should insert the rate for material handling if it is being applied to Material. Material handling should be applied in accordance with the contractors approved accounting practices. See Instruction #16(i) below. If the offeror is not applying material handling, cell G333 should be left blank.
(l) In Cell G334, the prime should insert the G&A rate it is applying to the ODCs, if any. If not applying a G&A rate, cell should be left blank.
16In column H:
(a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for each year (e.g., rows 5-44, 59-87, 90-118, 121-149, 152-180, 183-211, 214-242, 245-273, and 276-304).
(b) In Cell H46, the prime contractor should insert the "labor base" its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell H47, the prime contractor should insert the "labor base" its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(d) In Cell H50, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the contractor's facility.
(e) In Cell H51, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the Client/Government's facility.
(f) In Cell H53, the prime contractor should insert the base its G&A rate is being applied to.
(g) In Cell H310, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor).
(h) In Cell H311, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any.
(i) In Cell H333, the prime should insert the PRIME's ODC base its material handling fee is being applied to. The ODC base should be set in accordance with the offeror's accounting practices (i.e., the base may include material only vs both material and travel.) If the offeror is not applying a material handling, this cell should be left blank.
(j) In Cell H334, the prime should insert the PRIME's ODC base its G&A is being applied to. The ODC base should be set in accordance with the offeror's accounting practices. If the offeror is not applying G&A, this cell should be left blank.
17In cell I330, enter the amount for Travel as noted in Section L (L-2, Government Furnished Information) of the RFP by CLIN, when completing each year. NOTE: The proposed cumulative travel between the Prime and all subcontractors must not exceed the Government estimates provided in Section L (L-2) of the solicitation.
18In cell I331, enter the amount for Material as noted in Section L (L-2, Government Furnished Information) of the RFP by CLIN, when completing each year. NOTE: The proposed cumulative Material between the Prime and all subcontractors must not exceed the Government estimates provided in Section L (L-2) of the solicitation.
19Insert the CLIN number for the specific period of performance as identified in Section B of the Solicitation (and as shown on YEAR 1 TAB) in cells I2 and I327, when completing each year.
20Column AE automatically calculated the total hours for all the CLINS.
21Column AG is a summation of the costs.
22If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 would be hidden.
23When submitting this file, the instructions may be deleted.

N00421-16-R-0044 Attachment P6

YEAR 1

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:Year ICLINCLINCLINCLINCLINCLINCLINCLINCLINCLINCLIN
ServicesContractorhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalHrs
Government Labor CategoryProposed CategorySitesubf/pEmployee NameRateSUMTotal
Analyst (4.3) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
subtotal0$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
fringe fulltime0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
OverheadBaseBaseBaseBaseBaseBaseBaseBaseBaseBaseBase
Contractor site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Client site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
COM0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor$ - 0
Subcontractors
Sub: 1:
Analyst (4.3) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 1- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 2:
Analyst (4.3) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 2- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 3
Analyst (4.3) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 3- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 4:
Analyst (4.3) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 4- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 5:
Analyst (4.3) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 5- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 6:
Analyst (4.3) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 6- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 7
Analyst (4.3) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst, Junior (4.3) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Analyst (4.3.4) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Composites) Contractor Facility PAX (offsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Organic Coatings) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Aeromechanics) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Senior (Structures) JAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(General) PAX (onsite)

7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Environmental Support) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/scientist, Journey (Operational Chemicals) PAX (onsite)
7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Subsystems) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey

(Metals) PAX (onsite)

7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Plating Specialist) PAX (onsite)
7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Systems Engineering) PAX (onsite)
7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Crystal City (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Journey (Structures) Contractor Facility PAX (offsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (General) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer/Scientist, Junior (Organic Coatings) PAX (onsite)
7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Senior (Corrosion) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journey (General) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Junior (General) PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer III PAX (onsite)7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .