Attachment 2 Surveillance Activity Checklist

View the file

Other files

File Type Posted
N00421-16-R-0044-0006_Modification.pdf PDF
N00421-16-R-0044-0006_Conformed.pdf PDF
N00421-16-R-0044-0005_Conformed.pdf PDF
N00421-16-R-0044-0005_Amendment.pdf PDF
Q A_22_June_2016.pdf PDF
N00421-16-R-0044-0004_Conformed.pdf PDF
N00421-16-R-0044-0004_Modification.pdf PDF
Q As_16_June_2016.pdf PDF
N00421-16-R-0044_Amend_03_Conformed.pdf PDF
Attachment_P1_Workforce_Quals.xls XLS spreadsheet
Attachment_P8_On_Off_Site_Tables.pdf PDF
N00421-16-R-0044_Amendment_03.pdf PDF
Attachment_P7_CLIN_Breakout_Sub.xls XLS spreadsheet
Attachment_P5_PP_Quest_16-R-0044.doc DOC document
Attachment_P6_CLIN_Breakout_PRIME.xls.xlsx XLSX spreadsheet
Attachment_6_SOW.pdf PDF
QAs_27_May_2016.pdf PDF
QAs_27_May_2016.pdf PDF
CDRL_A002_Performance_and_Financial_Report.pdf PDF
Attachment_P8_On_Off_Site_Tables.xlsx XLSX spreadsheet
Attachment_8_Scheduled_Government_Furnished_Property_(SGFP).pdf PDF
Attachment_9_Requisitioned_Government_Furnished_Property_(RGFP).pdf PDF
N00421-16-R-0044.pdf PDF
Attachment_1_DD254.pdf PDF
Attachment_P7_CLIN_Breakout_SUBS.xls XLS spreadsheet
Attachment_3_OCI_List.pdf PDF
Attachment_6_SOW.pdf PDF
Attachment_P6_CLIN_Breakout_PRIME.xls XLS spreadsheet
CDRL_A0001_Technical_Reports.pdf PDF
CDRL_A004_Company_NDA.pdf PDF
Attachment_7_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Exhibit_A_Attach_NDA_A005.docx DOCX document
Exhibit_A_Attach_NDA_A004.docx DOCX document
Attachment_P1_Workforce_Quals.xls XLS spreadsheet
CDRL_A005_Individual_NDA.pdf PDF
CDRL_A003_OPSEC_Plan.pdf PDF
Attachment_P5_PP_Quest_16-R-0044.doc DOC document
AIR_4.3_Draft_SOW.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surveillance Activity Checklist (SAC)

For Contractor Support Services for the Air Vehicle

Engineering Department

1. Purpose

This Surveillance Activity Checklist (SAC) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract and task orders.

This contract requirement provides for engineering and technical support for reliability, maintainability, testability, quality assurance, diagnostic, and system safety analyses during the design, development production, and in-service cycles of Naval aircraft and their systems. Specifically, the contractor shall provide Engineering and Non-Technical support to Air Vehicle Engineering Department (4.3). The resulting vehicle will be a performance-based, Cost Plus Fixed Fee Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a five year period of performance. A properly executed SAC will assist the

Government in achieving the objectives of this procurement and provide the contractor with clearly defined performance expectations.

2. Authority

Authority for issuance of this SAC is provided in the task order under Section E, Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation required to be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between quality control and the SAC. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract or task orders.

The SAC, executed to provide Government surveillance oversight of the Contractor’s quality control efforts to ensure that they are timely, effective and are delivering the results specified in the contract or task order.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer - The person duly appointed with the authority to enter into

(Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer

(ACO)) contracts and make related determination and findings on behalf of the

Government. The PCO for this contract is Ms. Melinda K. Stann, AIR-2.5.1.5. The

ACO will be designated in the resulting order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be designated in the resulting contract and individual task orders. The limitations of authority are contained in a written letter of designation.

5. Responsibilities

The following Government resources shall have responsibility for the implementation of this SAC:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the

Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

6. Methods of Surveillance

a. Contractor Performance Assessment Report System (CPARS) – The marketplace for contractor support services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS, rating under this contract as a substandard rating could have an adverse impact on future proposal evaluations. An evaluation using the CPARS format will be performed at the midpoint of each contract year. For this procurement, the Government will address the quality of product or service, schedule, cost control, business relations, management of key personnel, and other important areas. As this information may affect future source selections throughout the Department of Defense (DoD) and the continuation of the contract, the annual

Government assessment will be used appropriately as an additional performance oversight and communication tool in addition to the SAC.

b. SAC - The below listed method of surveillance shall be used by the COR in the technical administration of this SAC. In addition to the below instruction, the form to be used for documentation of surveillance is the Surveillance Activity Checklist provided as

Enclosure (2) herein.

7. Identified QA Surveillance Tasks

Enclosures (1), (2), and (3) set forth the performance standards, incentives, and surveillance methods for the contractor and COR while enclosure (4) provides the checklist and means for the COR to document the results of the surveillance. Enclosure

(4) will be provided to the Contracting Officer on a quarterly basis.

8. Documentation

In addition to providing annual reports to the Contracting Officer, the COR shall maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the original copies of the SACs. All such records will be maintained for the life of the contract. The COR shall forward these records to the officer at termination or completion of the contract.

9. Enclosures

Enclosure (1) - Reliability, Maintainability and System Safety Support Performance

Standards Enclosure (2) - Data Performance Standards

Enclosure (3) - Incentives

Enclosure (4) - Surveillance Activity Checklist

Enclosure 1

AIR VEHICLE ENGINEERING SUPPORT

PERFORMANCE STANDARDS

SOW

Para # Title Description

Surveillance Method/

Measure Incentives

4.1.1

Systems Engineering

Analysis

Provide the engineering and analytical support to manage complex engineering systems throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems using standardized systems engineering methods.

Review of performance and financial statement, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.2.1 Project Management

Analyze non-program specific Air Vehicle

Engineering Department project requirements in the areas of business management, financial management, program scheduling, milestone tracking, critical path analyses, and support requirements, and perform other related analyst/management activities required for successful completion of required tasks.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.1 Materials Characterization Support

Support the use of the competency’s materials characterization facilities to investigate and analyze the properties of materials and to perform evaluations of material specimens. Support the design, preparation and testing of metallic, non-metallic, composite, ceramic, and chemical specimens, collect and analyze test data, and report findings.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.2 Metallic/Ceramic Materials

Support the Air Vehicle Engineering

Department in the development, utilization, and sustainment of metallic and ceramic materials used in military and non-military aircraft, support equipment and propulsion systems, and provide recommended guidance to resolve characterization, processing, fabrication, productivity, quality, manufacturing issues and technology, and unexpected failures.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.3 Composite/Non-Metallic

Materials

Support the Air Vehicle Engineering Department in the development, utilization, and sustainment of composite materials, adhesives, sealants, and other non-metallic materials used in military and non-military aircraft, support equipment and propulsion systems. Provide recommended guidance to resolve characterization, processing, fabrication, productivity, quality, manufacturing issues and technology, and unexpected failure of components.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.4 Organic Material Coatings

Support the Air Vehicle Engineering

Department in the development, implementation, and sustainment of organic protective coatings used on military and non-military aircraft, support equipment and propulsion systems. The contractor shall perform both laboratory and real-world testing of organic

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3 protective coatings to establish relative performance in the aircraft environment.

4.3.5 Inorganic Material Coatings

Support the Air Vehicle Engineering Department in the development, implementation, and sustainment of inorganic coating systems (i.e.

electroplating, conversion coatings, anodization, passivation, etc.) to be used on military and non-military aircraft, support equipment, and propulsion systems. The contractor shall perform both laboratory and real-world testing of the inorganic protective coatings to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.6 Operational Chemicals

Support the Air Vehicle Engineering

Department in the development, implementation, and sustainment of all chemicals necessary for the operation and maintenance of military and non-military aircraft, support equipment, and propulsion systems. The contractor shall perform both laboratory and real-world testing of those chemicals to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.7 Environmental Support

Support the development, implementation, and sustainment of environmental and occupational health regulatory guidance and associated documentation for environmental compliance and hazmat usage and control for military and non-military aircraft, support equipment, and propulsion systems.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.8 Non-Destructive Testing and

Inspection

Support the Air Vehicle Engineering

Department in the area of Non-Destructive Testing and Inspection throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems. Develop, implement, and maintain analysis techniques for failed materials, validate inspection techniques and procedures, and provide inspection recommendations.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.3.9 Corrosion Protection

Support the Air Vehicle Engineering Department in the development, implementation, and sustainment of corrosion protection technologies used on military and non-military aircraft, support equipment, and propulsion systems.

Perform both laboratory and real-world corrosion testing of metallic and composite materials and protective coatings to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.4.1 Structural Analysis and

Testing

Provide engineering support to the Air Vehicle Engineering Department throughout the complete life cycle

(research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly development, implementation, and sustainment of static and dynamic stress analyses of airframe systems, subsystems and attached stores. Support the development and updating of plans regarding procedures, specifications, and processes for structural analyses, testing procedures, and certification of structural integrity. Support the development , implementation, and maintainance of component and aircraft system structural test plans, and perform hardware instrumentation, article preparation, testing, test data evaluation, and reporting.

4.4.2 Aeromechanics Engineering

Provide engineering support to the Air

Vehicle Engineering Department throughout the complete life cycle

(research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of technology in the areas of fuel optimization, aerodynamics characterization, flight dynamics, performance analysis, wind tunnel testing, computational fluid dynamics, aircraft/stores separation analysis, flight test data analysis, and flight control systems.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.4.3 Aircraft Subsystems

Provide engineering support to the Air

Vehicle Engineering Department throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of technology in the areas of aircraft hydraulic power systems, fuel systems and associated stores, environmental control systems, and mechanical subsystems.

hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly customer questionnaire.

See enclosure 3

4.5.1 Documentation and Proposal

Support

Provide support to the Air Vehicle

Engineering Department throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of standardized technical reports, manuals, briefs, proposals, statements of work, and associated technical and administrative documents. The contractor shall be responsible for configuration control of those documents.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly

Enclosure 2

DATA PERFORMANCE STANDARDS

Description Standard AQL Surveillance

Measure Incentives

Technical Report

(Status/Services)

Submission is in accordance with the

DID cited in the CDRL

A001.

90% acceptable on first submission to

Government100% acceptable on subsequent submission to

Government

100% Inspection by Contracting

Officer

Representative

Performance and Financial

Report

Submission is in accordance with the

DID cited in the CDRL

A002

90% acceptable on first submission to

Government100% acceptable on subsequent submission to

Government.

100% Inspection by Contracting

Officer

Representative

Enclosure 3

INCENTIVES

The following incentives shall apply to performance under this contract.

Assessment Period Acceptable Performance

Definition How Measured Incentives

Evaluation Period 1

All measurement areas rated “Satisfactory”. See below.

Midpoint of the assessment period (6 month) evaluation using the CPARs format covering the previous 6 months.

(+) award of future orders or exercise of options*

(-) Not awarded future exercising of options and orders unless there is remediation with COR.* (+) Positive performance marks which will be reflected in CPARS.

(-) Negative performance marks which will be reflected in CPARS.

Evaluation Period 2

All measurement areas rated

“Satisfactory”. See below.

period (18 month) evaluation using the CPARS format covering the previous 12

(-)Not awarded future exercising of options and orders unless there is remediation with COR

(+) Positive performance marks which will be reflected in CPARS.

(-) Negative performance marks which will be

Evaluation Period 3

All measurement areas rated at least “Satisfactory”. Three or more measurements rated either “Very Good” or

“Exceptional”. See below.

period (30 month) evaluation using the CPARS format

(-)Not awarded future exercising of options and orders unless there is remediation with COR (+) Positive performance marks which will be reflected in CPARS.

(-) Negative performance marks which will be

Evaluation Period 4 more measurements rated period (42 month) evaluation using the CPARS format

Not awarded future exercising of options and orders unless there is remediation with COR

(+) Positive performance marks which will be reflected in CPARS.

(-) Negative performance marks which will be

Evaluation Period 5 more measurements rated period (54 month) evaluation using the CPARS format

(+) Positive performance marks which will be

(-) Negative performance marks which will be

* The Government may not award orders unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following.

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality

Enclosure 3

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or overruns? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit.

The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

Enclosure 4

SURVEILLANCE ACTIVITY CHECKLIST

Monthly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, and Management as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.

SOW

Para # Title Description

Surveillance Method/

Measure

Tasking on

Contract?

Date

Complete Quality Schedule

Cost

Control Mgmt

Business

Relations

4.1.1 Systems Engineering Analysis

Provide the engineering and analytical support to manage complex engineering systems throughout the complete life cycle

(research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems using standardized systems engineering methods.

Review of performance and financial statement, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer feedback, surveillance by quarterly

4.2.1 Project Management

Analyze non-program specific Air Vehicle

Engineering Department project requirements in the areas of business management, financial management, program scheduling, milestone tracking, critical path analyses, and support requirements, and perform other related analyst/management activities required for successful completion of required tasks.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.1

Materials Characterization

Support

Support the use of the competency’s materials characterization facilities to investigate and analyze the properties of materials and to perform evaluations of material specimens. Support the design, preparation and testing of metallic, non-metallic, composite, ceramic, and chemical specimens, collect and analyze test data, and report findings.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.2 Metallic/Ceramic Materials

Department in the development, utilization, and sustainment of metallic and ceramic materials used in military and non-military aircraft, support equipment and propulsion systems, and provide recommended guidance to resolve characterization, processing, fabrication, productivity, quality, manufacturing issues and technology, and unexpected failures.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.3 Composite/Non-Metallic Materials

Support the Air Vehicle Engineering

Department in the development, utilization, and sustainment of composite materials, adhesives, sealants, and other non-metallic materials used in military and non-military aircraft, support equipment and propulsion systems. Provide recommended guidance to resolve characterization, processing, fabrication, productivity, quality, manufacturing issues and technology, and unexpected failure of components.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.4 Organic Material Coatings

Department in the development, implementation, and sustainment of organic protective coatings used on military and non-military aircraft, support equipment and propulsion systems. The contractor shall perform both laboratory and real-world testing of organic protective coatings to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.5 Inorganic Material Coatings

Department in the development, implementation, and sustainment of inorganic coating systems (i.e.

electroplating, conversion coatings, anodization, passivation, etc.) to be used on military and non-military aircraft, support equipment, and propulsion systems. The contractor shall perform both laboratory and real-world testing of the inorganic protective coatings to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.6 Operational Chemicals

Department in the development, implementation, and sustainment of all chemicals necessary for the operation and maintenance of military and non-military aircraft, support equipment, and propulsion systems. The contractor shall perform both laboratory and real-world testing of those chemicals to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.7 Environmental Support

Support the development, implementation, and sustainment of environmental and occupational health regulatory guidance

Review of performance and financial hours billed monthly is consistent with and associated documentation for environmental compliance and hazmat usage and control for military and non-military aircraft, support equipment, and propulsion systems.

activities performed. Customer customer questionnaire.

4.3.8 Non-Destructive Testing and

Inspection

Support the Air Vehicle Engineering

Department in the area of Non-Destructive Testing and Inspection throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems. Develop, implement, and maintain analysis techniques for failed materials, validate inspection techniques and procedures, and provide inspection recommendations.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.3.9 Corrosion Protection

Department in the development, implementation, and sustainment of corrosion protection technologies used on military and non-military aircraft, support equipment, and propulsion systems.

Perform both laboratory and real-world corrosion testing of metallic and composite materials and protective coatings to establish relative performance in the aircraft environment.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.4.1 Structural Analysis and

Testing

Provide engineering support to the Air Vehicle Engineering Department throughout the complete life cycle

(research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of static and dynamic stress analyses of airframe systems, subsystems and attached stores. Support the development and updating of plans regarding procedures, specifications, and processes for structural analyses, testing procedures, and certification of structural integrity. Support the development , implementation, and maintainance of component and aircraft system structural test plans, and perform hardware instrumentation, article preparation, testing, test data evaluation, and reporting.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.4.2 Aeromechanics Engineering

Vehicle Engineering Department throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of technology in the areas of fuel optimization, aerodynamics characterization, flight dynamics, performance analysis, wind tunnel testing, computational fluid dynamics, aircraft/stores separation analysis, flight test data analysis, and flight control systems.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

4.4.3 Aircraft Subsystems

Vehicle Engineering Department throughout the complete life cycle

(research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of technology in the areas of aircraft hydraulic power systems, fuel systems and associated stores, environmental control systems, and mechanical subsystems.

hours billed monthly is consistent with activities performed. Customer

4.5.1 Documentation and Proposal Support

Provide support to the Air Vehicle Engineering Department throughout the complete life cycle (research and development, acquisition, and sustainment) of military and non-military aircraft, support equipment and propulsion systems through the development, implementation, and sustainment of standardized technical reports, manuals, briefs, proposals, statements of work, and associated technical and administrative documents. The contractor shall be responsible for configuration control of those documents.

Review of performance and financial statements, surveillance by ensuring hours billed monthly is consistent with activities performed. Customer

Monthly Summary of Ratings:

Quality Schedule

Number of Exceptional _____ Number of Exceptional _____

Number of Very Good _____ Number of Very Good _____

Number of Satisfactory _____ Number of Satisfactory _____

Number of Marginal _____ Number of Marginal _____

Number of Unsatisfactory _____ Number of Unsatisfactory _____

Cost Control Business Relations

Number of Exceptional _____ Number of Exceptional _____

Number of Very Good _____ Number of Very Good _____

Number of Satisfactory _____ Number of Satisfactory _____

Number of Marginal _____ Number of Marginal _____

Number of Unsatisfactory _____ Number of Unsatisfactory _____

Management

Number of Exceptional _____

Number of Very Good _____

Number of Satisfactory _____

Number of Marginal _____

Number of Unsatisfactory _____

Annual Surveillance Summary:

The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3) and the monthly summary of ratings. This annual assessment will occur at the midpoint of each period and cover the previous 12 months, except for the base period which will cover only the previously six months.

Description Surveillance Method/

Measure

Date Planned Date

Completed

Summary Rating/ Results

Quality of Service Review of Monthly Ratings TBD

Schedule Review of Monthly Ratings TBD

Cost Control Review of Monthly Ratings TBD

Business Relations Review of Monthly Ratings TBD

Management Review of Monthly Ratings TBD