DRAFT_EPTS_Exhibit_A_CDRLs_and_Annexes.xls

XLS spreadsheet 980 KB Posted

Attached to
Engineering Products and Technical Services
Solicitation number
N00421-15-R-0009
Issued by

About this file

Draft Engineering Products and Technical Services Exhibit A Contracts Data Requirements List (CDRLs)

View the file

Other files

File Type Posted
EPTS_Questions_amendment_3_N00421.docx DOCX document
Amendment_3_mod_0004_N00421-15-R-0009.docx DOCX document
N00421-15-R-0009__0003.docx DOCX document
EPTS_N00421-15-D-0009_Response_to_Questions_110315.docx DOCX document
EPTS_Response_to_Question.docx DOCX document
N00421-15-D-0009_0001.docx DOCX document
Attachment_P5-_Past_Performance_Questionnaire.doc DOC document
WD_05-2057.pdf PDF
Attachment_1_-QASP.docx DOCX document
Attachment_5-_ScheduledGovernmentFurnishedPropertryFORM.pdf PDF
Attachment_P7-Subcontractor_CLIN_Breakout.xls XLS spreadsheet
Exhibit_A_CDRLs_and_Annexes_.xls XLS spreadsheet
RFP_N00421-15-D-0009.docx DOCX document
Attachment_P6-CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_3-_DD254_temp.doc DOC document
Attachment_6-_RequisitionedGovernmentFurnishedPropertyFORM.pdf PDF
Attachment_2-_OCI_List.doc DOC document
WD_05-3033.pdf PDF
WD_05-2103.pdf PDF
WD_05-2543.pdf PDF
Attachment_4-_Data_Transmittal_Form.doc DOC document
Attachment_7-List_of_Applicable_Wage_Determinations.pdf PDF
EPTS_Advance_Notice_questions.docx DOCX document
DRAFT_RFP_EPTS_N00421-15-D-0009.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A001

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Acceptance Test Plans/Procedures
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.1.1.aNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit in contractor format using NAVAIRINST 3960.4 Project Test Plan Policy and Guide for TestingSee Block 16
Air Vehicles, Air Vehicle Weapons, and Air Vehicle Installed Systems for guidance
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 30 working days prior to scheduled testing.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
1of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183Attachment E

DRAFT

A002

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002Preparation of Test ReportTest Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.1.1.b, 3.1.1.d, 3.1.1.f , 3.5.1.1.d, 3.5.2.1.b , 3.8.1.eNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Contractor format acceptable. Use MIL-HDBK-831A Note 1, Preparation of Test Reports, for
guidance.
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 15 working days after completion of testing.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
2of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A003

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003Test Plans/Test Procedures
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81704SOW Para. 3.1.1.c, 3.1.1.e, 3.5.1.1.d, 3.6.1.c, 3.8.1.bNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 30 working days before test is scheduled to be performed.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
3of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A004

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Certification/Verification Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.2.1.1NAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit using the Government format shown in Annex 1See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 10 working days after completion of certification/verification.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
4of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A005

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Certification/Verification Manual
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.2.1.1NAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - The Government will provide the Contractor with the Certification Manuals to complete.See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 10 working days after completion of a certification.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
5of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A006

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006Maintenance Action Form (MAF) Status Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor FormatSOW Para. 3.2.1.1, 3.2.2.1, 3.2.3.1NAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXMTHLYSee Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit by the 10th working day of each month.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
6of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A007

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Scientific and Technical ReportsRecommendations Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80711ASOW Para. 3.2.1.1, 3.2.4.1.i, 3.3.1.1.a/b/c/e/f/g, 3.3.2.1.a/b/c/e/h, 3.4.1.1.a, 3.4.2.1.a, 3.5.1.1, 3.5.1.1.a/c/g, 3.5.2.1.a, 3.6.1.a, 3.7.1, 3.9.1, 3.9.2NAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit by10 working days after identifying a recommendation.
For Rapid Response tasking ( PBSOW paragraph 3.9.1) submit within 48 hours.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
7of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A008

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008Data Information Form
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.2.2.1, 3.2.3.1, 3.5.1.1.NAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit using the Government format provided in Annex 2.See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit 20 working days after travel, test completion and field changes.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
8of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A009

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACTS DATA REQUIREMENTS LISTB. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Status Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80368ASOW Para. 3.2.3.1.aNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXWeeklySee Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 11, 12, & 13 - Submit on the second working day after the end of each week
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
9of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A010

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010Field Change Installation Program (FCIP) Form
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.2.3.1.d, 3.5.1.1.hNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit using the Government format in Annex 3See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit NLT 10 working days after a field change installation.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
10of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A011

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A011Parts Inventory Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.2.4.1.aNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXQTRLYSee Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit using Government format in Annex 4See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 11, 12, & 13 - Submit NLT 10 working days after the end of each month.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
11of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A012

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A012Payback Status Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.2.4.1.fNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXQTRLYSee Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit using the Government format shown in Annex 5.See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 11, 12, & 13 - Submit within 10 working days after the end of each quarter.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
12of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A013

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A013Engineering DrawingsInstallation Control Drawings
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-DRPR-80651SOW Para. 3.3.1.1.dNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 30 working days after approved system changes/upgrades.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
13of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A014

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A014Status ReportLanding Data Summary Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.3.1.1.hNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXQTRLYSee Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Submit using the Government format shown in Annex 6.See Block 16
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 11, 12, & 13 - Submit witihin 30 working days after the end of each quarter.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
14of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A015

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A015Planned Maintenance System (PMS)/ Mainteance
Requirements Card (MRC)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MNTY-80991ASOW Para. 3.3.1.1.i, 3.3.2.1.fNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within10 working days after approved system change/upgrade.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
15of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A016

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A016Planned Maintenance System (PMS)/Maintenance Index
Page (MIP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MNTY-80992ASOW Para. 3.3.1.1.i, 3.3.2.1.fNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 10 working days after approved system change/upgrade.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
16of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A017

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A017Navy Training Systems Plan
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Para. 3.3.2.1.dNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 4 - Contractor format acceptable using OPNAVINST 1500.76A Naval Training Systems Requirements,See Block 16
Acquisition, and Management for guidance.
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 30 working days after installation/certification or ECP implementation.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
17of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A018

A. CONTRACT LINE ITEM NO.Form Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDPTMOTHERX
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Air Traffic Control and Landing SystemsN00421-15-R-0009TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A018Logistics Support Status ReportIntegrated Logistics Support Plan (ILSP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ILSS-80525SOW Para. 3.3.2.1.dNAWCAD 4.11.7.1
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7.1010
Block 7 - Acceptance will be by the COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment X).See Block 16
If this form has not been transmitted within 30 days of transmission of CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12, & 13 - Submit within 30 working days after installation/certification or ECP implementation.
Block 14 - Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
010
15. TOTALJ. DATE
G. PREPARED BYH. DATEI. APPROVED BY
18of49
DD Form 1423-1, JUN 90Previous editions are obsoletePage
1007/183

DRAFT

A019

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .