RFP # N00421-15-R-0009
RFP # N00421-15-R-0009
Quality Assurance Surveillance Plan for Air Traffic Control and Landing Systems Engineering Products and Technical Services
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the performance based contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the statement of work (SOW).
The contract requirement is for a single award indefinite delivery/indefinite quantity (IDIQ) contract. This effort is composed of engineering design and development and test and evaluation of Air Traffic Control and Landing Systems (ATC&LS) products and technical services. The products are produced to support the Navy’s ATC&LS equipment under the responsibility of the Naval Air Warfare Center Aircraft Division (NAWCAD), 4.11.7. These requirements are continuous and ongoing and encompass the many Air Traffic Control (ATC) Systems installed on the Navy’s Air Capable Ships. These systems require design, development of modifications, testing, and certification; therefore, a contiguous workforce is mandatory to ensure safety of flight. NAWCAD 4.11.7 establishes the requirements for system modifications, testing, and certification. Schedules are established by Naval Air Systems Command (NAVAIR) and Type Commanders (TYCOMs) annually and updated on a quarterly basis. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract that will be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The QASP, on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective, and are delivering the results specified in the contract.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract in the absence of the COR. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Contracting Officer’s Representative – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
Alternate Contracting Officer’s Representative – The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS) – The marketplace for support services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS ratings under this contract. For this procurement the Government will address quality, schedule, cost control, management, regulatory compliance, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
b. QASP - The below listed methods of surveillance will be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist.
7. Surveillance
Enclosures (1), (2), and (3) set forth the performance standards, incentives, and surveillance methods for the contractor and COR, while enclosure (4) provides the checklist and means for the COR to document the results of the surveillance. Enclosure (4) will be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) – Performance-Based Standards Enclosure (2) – Data Performance Standards Enclosure (3) – Incentives Enclosure (4) – Surveillance Activity Checklist
RFP # N00421-15-R-0009
RFP # N00421-15-R-0009
Source Selection Information 1 For Official Use Only See FAR 3.104 and 2.101
Source Selection Information 17 For Official Use Only See FAR 2.101 and 3.104
ENCLOSURE 1- PERFORMANCE-BASED STANDARDS
Required Service (Performance Requirements)
| Standard (Performance Standards)/ Maximum Allowable Degree of Deviation Requirement (AQL) |
| Method of Surveillance |
(Quality Assurance) Incentives
| ATC&LS Systems Test and Evaluation IAW SOW Para 3.1. |
| The contractor shall provide engineering and technical services to test and evaluate ATC&LS equipment and modifications/engineering change proposals (ECPs) to these systems. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| System Certification/Verification IAW SOW Para 3.2.1 |
| The contractor shall conduct category I/II/III certification/verification tests on the ATC&LS equipment, listed in SOW paragraph 3, aboard carriers, amphibious assault ships, and at shore stations. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
See Enclosure 3
| Technical Support IAW SOW Para 3.2.2 |
| The contractor shall travel to the locations described in SOW Paragraph 7 to perform engineering and technical services to test and evaluate ATC&LS equipment and respond to fleet technical assistance requests on ATC&LS equipment. Based upon feedback from the Government Project Leads. The services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Pre-Positioned Technical Support IAW SOW Para 3.2.3 |
| The contractor shall provide pre-positioned technicians resident in Norfolk, Virginia and San Diego, California. These technicians shall provide maintenance and training for ATC&LS equipment. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Supply Support IAW SOW Para 3.2.4 |
| The contractor shall provide supply support including translating technical requirements and program constraints into inputs for acquisition documentation, ordering material, maintaining status accounting, receiving supply items, controlling inventory, and distributing ATC&LS equipment on a daily basis. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| ATC&LS Systems Improvement IAW SOW Para 3.3.1 |
| The contractor shall provide engineering and engineering logistics for the improvement of existing ATC&LS. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| ATC&LS Systems Development IAW SOW Para 3.3.2 |
| The contractor shall provide engineering and engineering logistics for the development of new ATC&LS systems. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Operational Software Development and Maintenance IAW SOW Para 3.4.1 |
| The contractor shall develop documentation in accordance with MIL-STD-1679, Weapons Systems Software Development and the Software Development Plan for the AN/SPN-46 System, NAWCAD Document No. 43603-0053 (Version 0.9). Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Software Development, Test and Maintenance IAW SOW Para 3.4.2 |
| The contractor shall continually design, develop, document, and maintain ATC&LS test programs (software and firmware) including those required for data acquisition/reduction and analysis, simulation, stimulation or other functions needed to test and evaluate ATC&LS systems performance. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Field Change Program IAW SOW Para 3.5.1 |
| The contractor shall recommend, design, develop, test, fabricate and assemble, install, and document field changes and modifications to ATC&LS operational hardware in accordance with NAVSEA SL720-AA-MAN-030, Navy Modernization Process Management and Operational Manual (NMP-MOM). Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Production IAW SOW Para 3.5.2 |
| The contractor shall fabricate hardware for ATC&LS systems based on field changes developed and approved by NAVSEA in SOW paragraph 3.5.1.1. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads |
| Special Purpose Test Fixtures IAW SOW Para 3.6 |
| The contractor shall design, develop, test, fabricate, and document prototype and final version special purpose test fixtures. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Test Bed IAW SOW Para 3.7 |
| The contractor shall provide routine maintenance and operational services for the ATC&LS test beds at LSTF and at NAWCAD St. Inigoes. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Overhaul and Restoration Program IAW SOW Para 3.8 |
| The contractor shall overhaul and restore ATC&LS equipment in accordance with system specifications and overhaul procedures. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| ATC&LS Program Management IAW SOW Para 3.9.1 |
| The contractor shall collect, consolidate, and summarize information such as historical summaries, current project status, and project milestones to prepare briefing and presentation material for ATC&LS program reviews. The contractor shall also identify potential program issues and proposed resolutions. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Local Area Network IAW SOW Para 3.9.2 |
| The contractor shall provide engineering services to test, maintain, and recommend improvements to add capabilities to the ATC&LS Research, Development, Test and Engineering (RDT&E) Lab and related hardware and software used for ATC&LS equipment at NAWCAD at St. Inigoes and at LSTF, Patuxent River. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
ENCLOSURE 1 – DATA PERFORMANCE STANDARDS
Description
Standard
AQL
Surveillance/ Method/Measure Incentives
| Acceptance Test Plans/Procedures, CDRL A001 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Test Report, CDRL A002 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Test Plans/Test Procedures, CDRL A003 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| Certification / Verification Report, CDRL A004 |
| Submission is in accordance with the format as cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Certification / Verification Manual, CDRL A005 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Maintenance Action Form (MAF) Status Report, CDRL A006 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Recommendations Report, CDRL A007 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Data Information Form, CDRL A008 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Status Report, CDRL A009 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Field Change Installation Program (FCIP) Form, CDRL A010 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Parts Inventory Report, CDRL A011 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Payback Status Report, CDRL A012 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Installation Control Drawings, CDRL A013 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Landing Data Summary Report, CDRL A014 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
AQL
Surveillance/ Method/Measure Incentives
| Planned Maintenance System (PMS)/Maintenance Requirements Card (MRC), CDRL A015 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Planned Maintenance System (PMS)/ Maintenance Index Page (MIP), CDRL A016 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Navy Training Systems Plan, CDRL A017 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Integrated Logistics Support Plan (ILSP), CDRL A018 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| User Logistics Support Summary (ULSS), CDRL A019 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Maintenance Plan, CDRL A020 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Life Cycle Management Documentation, CDRL A021 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Trouble Report, CDRL A022 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Software Change Proposal, CDRL A023 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Computer Software Test Plans & Procedures, CDRL A024 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Computer Software Test Report, CDRL A025 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Systems Operator’s Manual, CDRL A026 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Program Package Document, CDRL A027 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Computer Software Version Description Document, CDRL A028 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
AQL
Surveillance/ Method/Measure Incentives
| Software Certification Form, CDRL A029 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Computer Program Support Library Inventory Report, CDRL A030 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Engineering Change Proposal (ECP), CDRL A031 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Field Change Bulletin, CDRL A032 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Technical Manual Revisions, CDRL A033 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Government Project Leads. |
| See Enclosure 3 |
| Level I/II/III Drawings, CDRL A034 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Equipment Maintenance Log, CDRL A035 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Flight Test Log Report, CDRL A036 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Problem Report, CDRL A037 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Certification Test Report, CDRL A038 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Technical Repair Standards, CDRL A039 |
| Submission is in accordance with the military document cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Restoration Status Report, CDRL A040 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Funds Expenditure Report, CDRL A041 |
| Submission is in accordance with the format cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Voucher Reconciliation Report, CDRL A042 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
AQL
Surveillance/ Method/Measure Incentives
| Time Expenditure Report, CDRL A043 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Progress Status Report, CDRL A044 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Material Tracking Report, CDRL A045 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Report of Government Furnished Property, CDRL A046 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Trip Report, CDRL A047 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Operations Security (OPSEC) Plan, CDRL A048 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
| Segregation of Costs & Invoice Requirements, CDRL A049 |
| Submission is in accordance with the DID and contract clause cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or Gov Project Leads. |
| See Enclosure 3 |
ENCLOSURE 2 - INCENTIVES
The following incentives shall apply to performance under this order.
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
Incentives
Ordering Period: 01 Apr 2016 – 31 Mar 2021
All measurement areas rated “Satisfactory” or above. See below.
Annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition (-) Does not meet the acceptable performance definition
The following incentives shall apply to performance of the task orders under this order.
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
| Incentives |
| Base: |
| None of the measurement areas are rated “Marginal: or below. |
See below
| Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 6 months. |
| (+) Meet the acceptable performance definition as a condition for further option exercises.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of option 1.*
| Option 1: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below. |
See below.
| Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of an option 2.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of option. 2.*
| Option 2: |
| 2 or more of the measurement areas rated “very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below. |
See below.
| Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of an option 3.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of option. 3.*
| Option 3: |
| 2 or more of the measurement areas rated “very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below. |
See below.
| Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of an option 4.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of option. 4.*
| Option 4: |
| 2 or more of the measurement areas rated “very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below. |
See below.
| Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months. |
| (+) Meets the acceptable performance definition as a condition for satisfactory or better final CPARS rating.* |
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.*
* The government reserves the right to not exercise options unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All PBSOW/CDRL efforts will be assessed focusing on the following:
All SOW/CDRL efforts will be assessed focusing on the following:
Quality– Assess the contractor’s conformance to contract/order requirements, specifications and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety and health standards). Include, as applicable, information on the following:
Are reports/data accurate?
Does the product or service provided meet the specifications of the contract/order?
Does the contractor’s work measure up to commonly accepted technical or professional standards?
What degree of Government technical direction was required to solve problems that arise during performance?
Schedule – Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance).
This evaluation of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the evaluation period that contribute to or affect the schedule variance. Also, address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
This element applies to contract/order closeout activities as well as contract/order performance. Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract/order schedule and should, therefore, be noted in the evaluation.
Questions to consider include the following:
Is the contractor completing the design/engineering services activities in a timely manner? This includes administrative activities, as well as meeting all scheduled milestones in the design process.
Did the contractor adequately schedule the work?
Has the contractor met administrative milestone dates?
Has the contractor met physical milestone dates specified by contract or agreed to in the project schedule?
If the schedule has slipped through the contractor’s fault or negligence, has he taken appropriate corrective action of his own volition?
Has the contractor furnished all required deliverables on or ahead of schedule?
Is the contractor completing the construction activities in a timely manner? This includes administrative activities, as well as physical construction activities such as submittal of a management response to Request for Proposal (RFPs), etc.
Has the contract furnished updated project schedules on a timely basis?
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract/order cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. For contracts/orders where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate task cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed. Include, as applicable, the following information:
Does the contractor keep within the total estimated cost (what is the relationship of the negotiated costs and budgeted costs to actuals)?
Did the contractor do anything innovative that resulted in cost savings?
Were billings current, accurate and complete?
Are the contractor’s budgetary internal controls adequate?
Has the contractor provided a design that can be constructed with the available funds?
Has the contractor notified the Government and taken necessary corrective actions when the cost estimate exceeds available funds?
Evaluation information regarding performance under an Undefinitized Contract Action (UCA), including letter contracts and actions where price has not yet been negotiated, shall be included in the annual evaluation. If the final negotiated contract/order type is not a cost-type, cost information for the period the UCA was in effect shall be included under the Cost Control element. If the final negotiated contract/order type is a cost-type, cost information for the entire period of performance shall be included under the Cost Control rating element. The narrative shall fully explain the contractor’s performance during the UCA, including definitization of the contract/order. The contractor’s performance under the UCA shall be separately identified but considered in the overall annual ratings.
Management – Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Include, as applicable, information on the following:
Is the contractor oriented toward the customer?
Is interaction between the contractor and the government satisfactory or does it need improvement?
Include the adequacy of the contractor’s accounting, billing, and estimating systems and the contractor’s management of Government Furnished Property (GFP) if a substantial amount of GFP has been provided to the contractor under the contract/order.
Address the timeliness of awards to subcontractors and management of subcontractors, including subcontract costs. Consider efforts taken to ensure early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance.
Assess the prime contractor’s effort devoted to managing subcontracts and whether subcontractors were an integral part of the contractor’s team. Are the contractor’s management, on-site, and home office personnel exhibiting the capacity to adequately plan, schedule, resource, organize and otherwise manage the work? If not, describe and relate to other rated elements.
Regulatory Compliance – Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract. Consider questions such as the following:
Has the contractor complied with all contract clauses and reporting requirements (e.g., FAPIIS, FAR Subsection 9.104-6, FAR Clause 52.209-9)?
Has the contractor complied with Cost Accounting Standards and disclosure statements (FAR Subpart 30.2, FAR Clauses 52.230-2, 52.230-3, 52.230-4, 52.230-5, 52.230-6)?
Has the contractor complied with the reporting requirements relating to recovered material content utilized in contract performance (see FAR Subpart 23.4)?
Has the contractor complied with contractual safety requirements and labor laws (see FAR Subsection 22.407, FAR Clauses 52.222-4, 52.222-34, 52.222-20)?
Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production (FAR Subpart 42.302).
Has the contractor complied with Hazardous Material Identification and Material Safety Data (see FAR Subpart 23.3, FAR Clauses 52.223-3)?
Has the contractor complied with specifications or other contractual requirements requiring the delivery or use of environmentally preferable products, energy-efficient products, products containing recovered materials, and biobased products (FAR Subparts 23.2, 23.4, 23.7)? Monitor the contractor's environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract.
Has the contractor implemented an effective safety program; one which minimizes/mitigates potential accidents (FAR Subsection 36.513, FAR Clause 52.236-13)?
Is the contractor complying with affirmative action and EEO compliance requirements (see FAR Subpart 22.8, FAR Clauses 52.222-26, 52.222-27)?
Has the contractor complied with combating trafficking in persons (see FAR Subpart 22.17, FAR Clause 52.222-50)
Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business goals/concerns.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PBSOW paragraphs 3.1 through 3.7. The contractor shall be evaluated using the following ratings:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
RFP # N00421-15-R-0009
RFP # N00421-15-R-0009
ENCLOSURE 3 - SURVEILLANCE ACTIVITY CHECKLIST -
Quarterly COR Surveillance: The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Management, Regulatory Compliance, Utilization of Small Business, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Mgmt. |
| Reg. Compl. |
| Util. of Small Bus. |
| Other |
| ATC&LS Systems Test and Evaluation IAW SOW Para 3.1. |
| 100% inspection by COR or Gov Project Lead Input |
TBD
| System Certification/Verification IAW SOW Para 3.2.1 |
| 100% inspection by COR or Gov Project Lead Input |
| Technical Support IAW SOW Para 3.2.2 |
| 100% inspection by COR or Gov Project Lead Input |
| Pre-Positioned Technical Support IAW SOW Para 3.2.3 |
| 100% inspection by COR or Gov Project Lead Input |
| Supply Support IAW SOW Para 3.2.4 |
| 100% inspection by COR or Gov Project Lead Input |
| ATC&LS Systems Improvement IAW SOW Para 3.3.1 |
| 100% inspection by COR or Gov Project Lead Input |
| ATC&LS Systems Development IAW SOW Para 3.3.2 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Operation Software Development and Maintenance IAW SOW Para 3.4.1 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Software Development, Test and Maintenance Support IAW SOW Para 3.4.2 |
| 100% inspection by COR or Gov Project Lead Input |
| Field Change Program IAW SOW Para 3.5.1 |
| 100% inspection by COR or Gov Project Lead Input |
| Production IAW SOW Para 3.5.2 |
| 100% inspection by COR or Gov Project Lead Input |
| Special Purpose Test Fixtures IAW SOW Para 3.6 |
| 100% inspection by COR or Gov Project Lead Input |
| Test Bed IAW SOW Para 3.7 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Overhaul and Restoration Program IAW SOW Para 3.8 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| ATC&LS Program Management IAW SOW Para 3.9.1 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Local Area Network IAW SOW Para 3.9.2 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Mgmt. |
| Reg. Compl. |
| Util. of Small Bus. |
| Other |
| Acceptance Test Plans/Procedures, CDRL A001 |
| 100% inspection by COR or Gov Project Lead Input |
Test Report, CDRL A002
100% inspection by COR or Gov Project Lead Input
Test Plans/Test Procedures, CDRL A003
100% inspection by COR or Gov Project Lead Input
Certification/Verification Report, CDRL A004
100% inspection by COR or Gov Project Lead Input
Certification/Verification Manual, CDRL A005
100% inspection by COR or Gov Project Lead Input
Maintenance Action Form (MAF) Status Report, CDRL A006
100% inspection by COR or Gov Project Lead Input
Recommendation Report, CDRL A007
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
Data Information Form, CDRL A008
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
Status Report, CDRL A009
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
Field Change Installation Program (FCIP) Form, CDRL A010
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Parts Inventory Report, CDRL A011 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Payback Status Report, CDRL A012 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Installation Control Drawings, CDRL A013 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
Landing Data Summary Report, CDRL A014
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Mgmt. |
| Reg. Compl. |
| Util. of Small Bus. |
| Other |
| Planned Maintenance System (PMS)/Maintenance Requirements Card (MRC), CDRL A015 |
| 100% inspection by COR or Gov Project Lead Input |
| Planned Maintenance System (PMS)/Maintenance Index Page (MIP), CDRL A016 |
| 100% inspection by COR or Gov Project Lead Input |
| Navy Training Systems Plan, CDRL A017 |
| 100% inspection by COR or Gov Project Lead Input |
| Integrated Logistics Support Plan (ILSP), CDRL A018 |
| 100% inspection by COR or Gov Project Lead Input |
| User Logistics Support Summary (ULSS), CDRL A019 |
| 100% inspection by COR or Gov Project Lead Input |
| Maintenance Plan, CDRL A020 |
| 100% inspection by COR or Gov Project Lead Input |
| Life Cycle Management Documentation, CDRL A021 |
| 100% inspection by COR or Gov Project Lead Input |
| Trouble Report, CDRL A022 |
| 100% inspection by COR or Gov Project Lead Input |
| Software Change Proposal, CDRL A023 |
| 100% inspection by COR or Gov Project Lead Input |
| Computer Software Test Plans & Procedures, CDRL A024 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Computer Software Test Report, CDRL A025 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Systems Operator’s Manual, CDRL A026 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Program Package Document, CDRL A027 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Computer Software Version Description Document, CDRL A028 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Mgmt. |
| Reg. Compl. |
| Util. of Small Bus. |
| Other |
Software Certification Form, CDRL A029
100% inspection by COR or Gov Project Lead Input
| Computer Program Support Library Inventory Report, CDRL A030 |
| 100% inspection by COR or Gov Project Lead Input |
| Engineering Change Proposal, CDRL A031 |
| 100% inspection by COR or Gov Project Lead Input |
| Field Change Bulletin, CDRL A032 |
| 100% inspection by COR or Gov Project Lead Input |
| Technical Manual Revisions, CDRL A033 |
| 100% inspection by COR or Gov Project Lead Input |
| Level I/II/III Drawings, CDRL A034 |
| 100% inspection by COR or Gov Project Lead Input |
| Equipment Maintenance Log, CDRL A035 |
| 100% inspection by COR or Gov Project Lead Input |
| Flight Test Log Report, CDRL A036 |
| 100% inspection by COR or Gov Project Lead Input |
| Problem Report CDRL, A037 |
| 100% inspection by COR or Gov Project Lead Input |
| Certification Test Report, CDRL A038 |
| 100% inspection by COR or Gov Project Lead Input |
Technical Repair Standards, CDRL A039
100% inspection by COR or Gov Project Lead Input
| Restoration Status Report, CDRL A040 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Funds Expenditure Report, CDRL A041 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Voucher Reconciliation Report, CDRL A042 |
| 100% inspection by COR or Gov Project Lead Input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Mgmt. |
| Reg. Compl. |
| Util. of Small Bus. |
| Other |
Time Expenditure Report, CDRL A043
100% inspection by COR or Gov Project Lead Input
| Progress Status Report, CDRL A044 |
| 100% inspection by COR or Gov Project Lead Input |
| Material Tracking Report, CDRL A045 |
| 100% inspection by COR or Gov Project Lead Input |
| Report of Government Furnished Property, CDRL A046 |
| 100% inspection by COR or Gov Project Lead Input |
| Trip Report CDRL, A047 |
| 100% inspection by COR or Gov Project Lead Input |
| Operations Security (OPSEC) Plan, CDRL A048 |
| 100% inspection by COR or Gov Project Lead Input |
| Segregation of Costs & Invoice Requirements, CDRL A049 |
| 100% inspection by COR or Gov Project Lead Input |
Quarterly Summary of Ratings:
| Quality | Schedule | |||
| Number of Exceptional | ____ | Number of Exceptional | ____ | |
| Number of Very Good | ____ | Number of Very Good | ____ | |
| Number of Satisfactory | ____ | Number of Satisfactory | ____ | |
| Number of Marginal | ____ | Number of Marginal | ____ | |
| Number of Unsatisfactory | ____ | Number of Unsatisfactory | ____ |
| Cost Control | Management | |||
| Number of Exceptional | ____ | Number of Exceptional | ____ | |
| Number of Very Good | ____ | Number of Very Good | ____ | |
| Number of Satisfactory | ____ | Number of Satisfactory | ____ | |
| Number of Marginal | ____ | Number of Marginal | ____ | |
| Number of Unsatisfactory | ____ | Number of Unsatisfactory | ____ |
| Regulatory Compliance | Utilization of Small Business | |||
| Number of Exceptional | ____ | Number of Exceptional | ____ |