Amendment 3 modification 0004

View the file

Other files

File Type Posted
EPTS_Questions_amendment_3_N00421.docx DOCX document
N00421-15-R-0009__0003.docx DOCX document
EPTS_N00421-15-D-0009_Response_to_Questions_110315.docx DOCX document
EPTS_Response_to_Question.docx DOCX document
N00421-15-D-0009_0001.docx DOCX document
Attachment_P5-_Past_Performance_Questionnaire.doc DOC document
WD_05-2057.pdf PDF
Attachment_1_-QASP.docx DOCX document
Attachment_5-_ScheduledGovernmentFurnishedPropertryFORM.pdf PDF
Attachment_P7-Subcontractor_CLIN_Breakout.xls XLS spreadsheet
Exhibit_A_CDRLs_and_Annexes_.xls XLS spreadsheet
RFP_N00421-15-D-0009.docx DOCX document
Attachment_P6-CLIN_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_3-_DD254_temp.doc DOC document
Attachment_6-_RequisitionedGovernmentFurnishedPropertyFORM.pdf PDF
Attachment_2-_OCI_List.doc DOC document
WD_05-3033.pdf PDF
WD_05-2103.pdf PDF
WD_05-2543.pdf PDF
Attachment_4-_Data_Transmittal_Form.doc DOC document
Attachment_7-List_of_Applicable_Wage_Determinations.pdf PDF
EPTS_Advance_Notice_questions.docx DOCX document
DRAFT_EPTS_Exhibit_A_CDRLs_and_Annexes.xls XLS spreadsheet
DRAFT_RFP_EPTS_N00421-15-D-0009.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-15-R-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

DESCRIPTION

The required response date/time is 04 December 2015 1200 or 12:00pm Eastern Standard Time.

NOTES

Both completion and term task orders will be issued under this single award Indefinite Delivery Indefinite Quantity (IDIQ) contract. NAVAIR clause 5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR) (DEC 2012) will be included in applicable term task orders.

This solicitation is, and the resulting contract will be, subject to the Service Contract Act (SCA) of 1965, as amended, and to FAR clause 52.222-41, contained in Section I of this solicitation. The cost/price proposal shall demonstrate compliance with the minimum monetary wages and fringe benefits for service employees as specified in the Wage Determinations (provided as an attachment in Section J of this solicitation). The following Wage Determinations may be applicable for this effort:

05-2103 (Rev. 16) revised 07/08/2015– applicable 05-2057 (Rev. 17) revised 07/08/2015 - applicable, if SCA labor category is proposed for this site.

05-2543 (Rev. 18) revised 07/08/2015 - applicable, if SCA labor category is proposed for this site.

05-3033 (Rev. 16) revised 07/08/2015 - applicable, if SCA labor category is proposed for this site.

The FAR 52.222-17 requires successor contractors to give the right of first refusal to all qualified service employees (within the meaning of the SCA) that were performing in the proposed positions under the predecessor contract. The Offeror’s proposal shall demonstrate compliance with FAR 22.12 and Clause 52.222-17. If the offeror is proposing the incumbent workforce based on FAR 52.222-17 for SCA labor categories, the proposed employee should be identified as either current (only applies if offeror is the incumbent contractor), contingent (only if offeror has a letter of intent in place with the employee) or “Prospective/Incumbent” if the offeror does not know the identity of the incumbent employee.

The Product Service Code (PSC) for this procurement is AC65.

This contract will have a five-year ordering period.

POINTS OF CONTACT

Contract Specialist:

Maria Mattei-Chaney, AIR-2.5.1.4.6

Phone:301-757-0740
E-mail:maria.mattei-chaney@navy.mil

Contract Specialist:

Theresa Newton, AIR-2.5.1.4.3

Phone:301-757-0859
E-mail:theresa.newton@navy.mil

Procurement Contracting Officer:

Frank Douglass, AIR-2.5.1.4 Phone: 301-757-0463 E-mail: frank.douglass@navy.mil

SECTION B - SUPPLIES OR SERVICES AND PRICES

NOTICE

1) A lot is defined as a five year ordering period to include all associated task orders placed during the ordering period.

2) The contractor will be required to have a SECRET facility clearance and a SECRET clearance for personnel identified in Section C Performance Work Statement (PWS) paragraph 15.3 upon award of the contract. The contractor will not be permitted access to classified information until a final DD254 is incorporated as an attachment to the contract award.

5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012)

(a) The level of effort estimated to be ordered during the term of this contract is 706,560 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in the contract/order.

Labor Category
Estimated Hours
*Program Manager
4800
*Project Manger
15360
*Engineer/Scientist III
96000
Engineer/Scientist II
28800
Engineer/Scientist I
26880
*Engineering/Electronics Technician, Senior
96000
Engineering/Electronics Technician, Senior-OFF SITE
12000
*Engineering/Electronics Technician
122880
Engineering/Electronics Technician-OFF SITE
30720
Engineering/Electronics Technician, Junior
23040
Electronics-Mechanic Assembler, Senior
28800
Mechanic Assembler
15360
Information Assurance Analyst, Senior
19200
Logistics Analyst, Senior
17280
Logistics Analyst
46080
Systems Analyst, Senior
9600
Systems Analyst
16800
Project Support Specialist
24000
Administrative Assistant
4800
Administrative Assistant-OFF SITE
4800
General Clerk III
9600
Analyst, Senior
9600
Drafter/CAD Operator III
9120
Drafter/CAD Operator II
8160
Shipping/Receiving Clerk
12480
Warehouse Specialist (Warehouse Worker)
14400
TOTALS
706560

* denotes Key Personnel labor categories

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.

(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

PBWS

PERFORMANCE WORK STATEMENT

FOR

ENGINEERING PRODUCTS AND TECHNICAL SERVICES IN SUPPORT OF

AIR TRAFFIC CONTROL AND LANDING SYSTEMS

1.0 INTRODUCTION. The Air Traffic Control (ATC) Systems Division, Naval Air Warfare Center Aircraft Division (NAWCAD) Patuxent River at St. Inigoes is designated as the Design Agent, the In-Service Engineering Agent (ISEA), and the Software Support Activity (SSA) for Air Traffic Control and Landing Systems (ATC&LS). In accordance with these assignments, the ATC Systems Division conducts the following ATC&LS efforts: system test and evaluation; system certification; technical support; pre-positioned technical support; supply support; systems improvement; systems engineering; systems development; operational software development and maintenance; test support software development and maintenance; field change program support; production engineering; special purpose test fixture development; test bed support; overhaul and restoration program support; program management; quality assurance; and system safety support.

1.1. Scope. The contractor shall design and develop engineering products and provide technical services for the above mentioned areas in accordance with this Performance Work Statement (PWS) and Contract Data Requirements Lists (CDRLs) for the various systems under the ATC Systems Division's cognizance, including the systems in paragraph 3 below.

This effort is composed of engineering design and development and test and evaluation of ATC&LS products and technical services. The products are produced for the Navy’s ATC&LS equipment under the responsibility of NAWCAD 4.11.7. These requirements are continuous and ongoing and encompass the many ATC Systems installed on the Navy’s Air Capable Ships. These systems require design, development of modifications, testing, and certification; therefore, a contiguous work force is mandatory to ensure safety of flight. NAWCAD 4.11.7 establishes the requirements for system modifications, testing, and certification. Schedules are established by Naval Air Systems Command (NAVAIR) and Type Commanders (TYCOMs) annually and updated on a quarterly basis. The majority of tasking for this contract comes from NAVAIR PMA213, Naval Sea Command (NAVSEA), and fleet TYCOMS.

2.0 APPLICABLE DOCUMENTS. The following is a list of documents that shall be used during the performance of the technical and engineering services required by this PWS. The latest version of the listed documents shall apply and can be found on the ASSIST web site at https://assist.daps.dla.mil, which provides direct access to Defense and Federal specifications and standards. All further document titles, revision letters, and dates of issue are omitted for brevity of reference; the short form reference shall be understood to be the specific document identified in this section.

2.1 MILITARY STANDARDS/SPECIFICATIONS

NUMBERTITLE
MIL-STD-973(3) Not 5Configuration Management

MIL-STD-1388-1A(5) Not 5 Logistics Support Analysis

MIL-STD-1561B Not 1 Provisioning Procedures, Uniform DoD

MIL-STD-1679 Weapons Systems Software Development

MIL-HDBK-2036 General Requirements for Electronic Equipment Specifications

MIL-STD-2039(1) Not 2 Field Changes and Field Change Kits, Preparation of

MIL-HDBK-831A Preparation of Test Reports

MIL-P-24534A Not 1 Planned Maintenance System: Development of Maintenance Requirements Cards, Maintenance Pages, and Associated Documentation

2.2 OTHER DOCUMENTS

NUMBER TITLE

NAVAIRINST 3960.4C Project Test Plan Policy and Guide for Testing Air Vehicles, Air Vehicle Weapons, and Air Vehicle Installed Systems

DOD-STD-1702 Not 1 Integrated Logistics Support Programs for Equipment, Subsystems, & Systems (Metric)

DODINST 5000.2M Defense Acquisition Management Documentation and Reports

DOD Manual 5200.1R Information Security Program Regulation, Chapter IX

ISO 9001:2008 International Organization for Standardization (ISO) 9001:2008 Quality Management Systems

NAVSEA SL720-AA-MAN-030 Navy Modernization Process Management and Operational Manual (NMP-MOM)

NAWCAD No. 4581-149Certification Procedures for Aircraft Approach Control
AN/SPN-41/41A

NAWCAD No. 458-165 Certification Procedures for Aircraft Control Approach Central AN/SPN-35C

NAWCAD No.43603-00573 Category I and II Certification Procedures for AN/SPN-46(V)3

NAWCAD No.43603-00704 Category I and II Certification Procedures for AN/SPN-46(V)4

NESEA No. 2120-121Certification Procedures for Aircraft Approach Control
AN/TRN-28

NESEA No. 2120-128 Category I and II Certification Procedures for AN/SPN-42-T3/T4

OPNAVINST 1500.76C Navy Training System Requirements, Acquisition and Management

OPNAVINST 3432.1A Operations Security

OPNAVINST 5200.28 Life Cycle Management (LCM) of Mission Critical Computer Resources (MCCR) for Navy Systems Managed Under the Research, Development and Acquisition (RDA) Process

NAWCAD No. 43603-0053 Software Development Plan for the AN/SPN-46 System Version 0.9

3.0 REQUIREMENTS. The contractor shall perform the tasks listed below for various ATC&LS equipment including but not limited to: Precision Approach Landing System (PALS) AN/SPN-46(V); Landing Control Central Trainer AN/SPN-42T; Aircraft Approach Control Transmitting Set AN/SPN-41; Radar Set AN/SPN-43; Aircraft Control Approach Central AN/SPN-35; Aircraft Approach Control Transmitting Set AN/TRN-28; Shipboard UHF Link 4 Transceivers; Radio Set AN/GRC-171; Advanced Display System AN/UYQ-70(V)1; next generation ATC&LS systems presently under development such as Joint Precision Approach Landing System (JPALS), Dual Band Radar (DBR); Naval Avionics Platform Integration Emulator (NAPIE); shipboard PALS Data Acquisition and Data Reduction Systems; and other ATC&LS equipment.

3.1. ATC&LS Systems Test and Evaluation. (1000, 1001, 1002, 1003, and 1004)

3.1.1.Requirements. The contractor shall provide engineering and technical services to test and evaluate ATC&LS equipment and modifications/engineering change proposals (ECPs) to these systems. Travel may be required in the performance of this task. The contractor shall:
a.Develop acceptance test plans and procedures (CDRL A001).
b.Conduct acceptance testing of new or modified ATC&LS to determine conformance to specifications in accordance with PWS paragraph 3.1.1a above and generate a test report (CDRL A002).
c.Develop functional and performance test plans and procedures (CDRL A003).
d.Conduct functional and performance testing of new or modified ATC&LS to determine conformance to specifications in accordance with PWS paragraph 3.1.1c above and generate a test report (CDRL A002).
e.Develop total system test plans and test procedures for ATC&LS Landing System Test Facility (LSTF) testing (CDRL A003).
f.Perform total system testing of new or modified ATC&LS to determine conformance to specifications in accordance with PWS paragraph 3.1.1e above and generate a test report (CDRL A002).

3.2. Fleet Support. (1000, 1001, 1002, 1003, and 1004)

3.2.1. System Certification/Verification.

3.2.1.1.Requirements. The contractor shall provide personnel to conduct category I/II/III certification/verification tests on the ATC&LS equipment, listed in PWS paragraph 3 above, aboard carriers, amphibious assault ships, and at shore stations. Upon completion of certification category I testing, the ship will have an operational PALS system ready for category II and category III testing. The completion of category I test will take no longer than 2 weeks. The contractor shall submit a final certification/verification report upon completion of each certification/verification (CDRL A004). If any certification/verification procedures are outdated because of hardware/software changes, the contractor shall provide recommended changes to the certification/verification procedures in the completed certification/verification manual (CDRL A005). The contractor shall provide daily verbal briefings on the status of test results to the designated Government coordinator. The contractor shall maintain a Functional Area Manager (FAM) approved database of all site delivered maintenance action forms (MAFs) and submit a MAF status report (CDRL A006). This database shall include site name, date, and resolved and unresolved deficiencies. The database shall be updated with each visit to the site. A recommendations report shall be submitted upon the completion of each trip (CDRL A007). The following provides a list of current ATC&LS certification/verification procedures:
a.AN/SPN-42-T3/T4 systems in accordance with NESEA Document No. 2120-128 (latest revision), Category I and II Certification Test Procedures for AN/SPN-42-T3/T4.
b.AN/SPN-46(V)3 systems in accordance with NAWCAD Document No. 43603-00573 (latest revision), Category I and II Certification Procedures for AN/SPN-46(V)3.
c.AN/SPN-46(V)4 systems in accordance with NAWCAD Document No. 43603-00704 (latest revision), Category I and II Certification Procedures for AN/SPN-46(V)4.
d.AN/SPN-41 systems in accordance with NAWCAD Document No. 4581-149 (latest revision), Certification Test Procedures for Aircraft Approach Control AN/SPN-41/41A.
e.AN/TRN-28(A) systems in accordance with NESEA Document No. 2120-121 (latest revision), Certification Procedures for Aircraft Approach Control AN/TRN-28.
f.AN/SPN-35C systems in accordance with NAWCAD Document No. 458-165 (latest revision), Certification Procedures for Aircraft Control Approach Central AN/SPN-35C.

3.2.2. Technical Support.

3.2.2.1. Requirements. In performance of these tasks the contractor shall provide personnel to travel to the areas described in PWS paragraph 6 below. A data information form, shall be submitted upon the completion of each trip (CDRL A008). Schedules are established by NAVSEA on an annual basis and reviewed/updated quarterly. The Government fleet support representative will provide all schedule information to the contractor. The contractor shall maintain a FAM approved database of all site delivered MAFs and provide a MAF status report (CDRL A006). This database shall include site name, date, and resolved and unresolved deficiencies. The database shall be updated with each site visit. The contractor shall provide on-call fleet support during non-core working hours, the contractor shall:

a. Conduct pier side Board of Inspection Surveys (INSURVs), evaluating system hardware, identifying equipment deficiencies, and completing documentation/updating database provided by the ship INSURV Team (INSURV documentation will remain aboard ship). The contractor shall document the results of the Board of Inspection Surveys in their trip reports.

b. Conduct Phase I (pier side) and Phase II (underway) Combat Systems, Command, Control, Communications and Computer Readiness Assessments (C5RAs), which are formally known as Combat System Readiness Reviews (CSRRs). Evaluate operational system hardware and software and complete C5RA documentation/update database provided by the ship C5RA Team (C5RA documentation will remain aboard ship). The contractor shall document the results of the C5RAs in their trip reports.

c. Participate in Combat System Ship Qualification Tests (CSSQTs), which is a shipboard operational exercise to evaluate equipment readiness (hardware and software) during underway availabilities. The contractor shall document the results of the CSSQTs in their trip reports.

d.Provide engineering and technical services to test and evaluate ATC&LS equipment during pre-deployment, mid-deployment, or regularly scheduled groom efforts. Monitor equipment problems found during pre-deployment grooming reviews. Track and report unresolved deficiencies.
e.Respond to fleet technical assistance requests on ATC&LS equipment and provide technical services including: equipment fault isolation and repair; restoration of systems to normal operating condition; On-the-Job Training (OJT) of military technicians and air traffic controllers; and briefing of the military chain of command upon completion of the event. Technical assistance may be provided by telephone and/or email. In situations in which telephone and email technical assists are inadequate, this tasking will require onsite visits to naval vessels that are located at various worldwide naval ports or deployed at-sea.

3.2.3. Pre-Positioned Technical Support

3.2.3.1.Requirements. The contractor shall provide pre-positioned technicians resident in Norfolk, Virginia and San Diego, California. These technicians shall provide maintenance and training for ATC&LS equipment. Schedules are established by NAVSEA annually and reviewed/updated quarterly. The Government fleet support representative will regularly provide all schedule information to the contractor. Pre-positioned technical support shall be provided to ATC&LS-equipped ships with home ports in San Diego, California; Norfolk, Virginia; Bremerton, Washington; Everett, Washington; and Yokosuka, Japan; and to ships operating in the Western Pacific, Mediterranean, and Indian Oceans. Travel shall be required in the performance of this task. A data information form shall be submitted (CDRL A008) for each trip. The contractor shall maintain a FAM approved database of all site delivered MAFs and provide a MAF status report (CDRL A006). This database shall include site name, date, and resolved and unresolved deficiencies. The database shall be updated with each visit to the site. The contractor shall provide personnel with the ability to respond to travel requirements with 24 hours’ notice and who possess a passport. The contractor shall provide on-call fleet support during non-core working hours, the contractor shall:
a.Conduct system grooms and configuration assessments for ship and shore stations and provide a weekly status report (CDRL A009).
b.Provide OJT and logistics support to ship and shore station system maintenance personnel.
c.Provide maintenance to ships and shore stations.
d.In accordance with NAVSEA SL720-AA-MAN-030, Navy Modernization Process Management and Operational Manual (NMP-MOM), install equipment field changes and provide field change installation program (FCIP) forms (CDRL A010).

3.2.4 Supply Support.

3.2.4.1.Requirements. The contractor shall provide supply support including translating technical requirements and program constraints into inputs for acquisition documentation, ordering material, maintaining status accounting, receiving supply items, controlling inventory, and distributing ATC&LS equipment on a daily basis. The contractor shall provide on-call fleet support during non-core working hours. The contractor shall:
a.Maintain storerooms and/or warehouses for the storage of ATC&LS equipment, spare and repair parts, and provide a quarterly inventory report (CDRL A011).
b.Monitor the ATC&LS spare parts inventory and recommend parts to be procured when quantities are low.
c.Order, track, and receive material and services for ATC&LS equipment and projects.
d.Package, ship, and track material for ATC&LS equipment and projects.
e.Maintain a current FAM approved database inventory of all test equipment. Store, issue, and receive test equipment. Track test equipment to determine if it needs to be calibrated or if it has been issued to a calibration facility.
f.Monitor the return of material that has been designated as a payback item for material that was issued/shipped to other activities and provide a payback status report (CDRL A012).
g.Produce, maintain, and provide ATC&LS certification kits.
h.Monitor, schedule and ship equipment for the ATC&LS Restoration Program.
i.Perform analysis and recommend solutions to Naval Supply Systems (NAVSUP) Command Weapons Systems Support (WSS) and Defense Logistics Agency (DLA) engineering requests (Recommendations Report) (CDRL A007).

3.3. ATC&LS Systems Engineering. (1000, 1001, 1002, 1003, and 1004)

3.3.1. ATC&LS Systems Improvement.

3.3.1.1.Requirements. The contractor shall provide engineering and engineering logistics for the improvement of existing ATC&LS. Travel may be required in the performance of this task. The contractor shall:
a.Recommend improvements, via a recommendations report, for system performance, reliability, maintainability, and supportability (CDRL A007).
b.Review proposed ATC&LS system improvements, ECPs, Field Change Bulletins (FCBs), and Trouble Reports (TRs) for technical content and recommend corrections or improvements (CDRL A007). Tasks may include review and analyses of equipment performance, configuration, standardization, compatibility and interface, and system specifications for system improvements.
c.Analyze and recommend solutions for system performance and procedural problems reported by Fleet personnel in deployed ATC&LS systems (CDRL A007).
d.Provide updated Installation Control Drawings (ICDs) for both ship and shore stations (CDRL A013). Review ship alteration proposals and NAVSEA Ship Installation Drawings (SIDs) for technical content and recommend corrections or improvements including Liaison Action Requests (LARs) and Design LARs (DLARs) as applicable for submission to the Planning Yard. Interface with shipyard personnel on shipboard installation problems. Provide technical support to develop solutions for ATC&LS system installation problems on ships and at shore facilities.
e.Analyze Maintenance, Material Management (3M) and Casualty Report (CASREP) Failure Data to determine the annual cost of ownership for each system and to determine the obtained operational availability for each system. Perform Reliability and Maintainability Analyses in the form of a recommendations report (CDRL A007).
f.Review logistics documentation for technical content including Navy Training System Plans, Integrated Logistics Support Plans (ILSPs), User Logistics Support Summaries (ULSSs), Maintenance Plans, Computer Resources Life Cycle Management Plans (CRLCMPs), and System Life Cycle Documentation and recommend corrections or improvements (CDRL A007).
g.Review for technical content Master Allowance Parts Lists (MAPLs) for existing equipment prepare and/or review Provisioning Parts Lists (PPLs) and Provisioning Technical Documentation (PTD) to ensure MAPLs accurately reflect current configuration (CDRL A007).
h.Prepare Landing Data Summary Reports using ATC&LS quarterly reports from ships and shore stations (CDRL A014).
i.Review existing Preventive Maintenance System (PMS) records, including Maintenance Requirement Cards (MRCs) and Maintenance Index Pages (MIPs), to identify problem areas and recommend improvements. Review and provide new MRCs and MIPs for equipment as necessary (CDRLs A015 and A016).
j.Provide configuration management of drawings for all ATC&LS equipment.
k.In accordance with NAVSEA SL720-AA-MAN-030, Navy Modernization Process Management and Operational Manual (NMP-MOM), maintain status and all documentation for shipboard implementation of all ship alterations and field changes for the Regional Maintenance and Modernization Coordination Office (RMMCO) process. Prepare ISEA work files for entry into the Configuration Data Manager’s Data-Open Architecture (CDMD-OA) Database for field change/ship alteration installation and configuration installation and configuration validation. Prepare/submit Integrated Logistics Support (ILS) Certifications for field change/ship alteration installations.

3.3.2. ATC&LS Systems Development.

3.3.2.1.Requirements. The contractor shall provide engineering and engineering logistics for the development of new ATC&LS systems. Travel may be required in the performance of this task. The contractor shall:
a.Review and analyze proposed ATC&LS operational and performance specification requirements, and report findings in a recommendations report (CDRL A007). Tasks shall include operational and performance requirements definition, review, and analyses; equipment performance, configuration, standardization, and compatibility analyses; interface analyses; and system specification reviews for new system acquisitions.
b.Develop ATC&LS equipment ensuring system compatibility and compliance with applicable Government standards, specifications, performance requirements, and quality assurance and test provisions. Such tasks shall include review and analysis of development documentation, test documentation, technical manuals and operator's manuals. Participate in program reviews, design reviews, and configuration audits. These tasks may require travel to other development and testing sites (CDRL A007).
c.Review ship alterations plans. Prepare or review ICDs for both ship and shore stations (CDRL A007).

d. Prepare technical inputs to logistics documentation including, but not limited to, Navy Training System Plans (CDRL A017) in accordance with OPNAVINST 1500.76 Navy Training System Requirements, Acquisition, and Management; ILSPs (CDRL A018) in accordance with DOD-STD-1702 Integrated Logistics Support Programs for Equipment, Subsystems, & Systems (Metric); ULSSs (CDRL A019) in accordance with DODINST 5000.2M, Defense Acquisition Management Documentation and Reports; Maintenance Plans (CDRL A020); and Life Cycle Management Documentation (CDRL A021) in accordance with OPNAVINST 5200.28, Life Cycle Management (LCM) of Mission Critical Computer Resources for (MCCR) for Navy Systems Managed Under the Research, Development and Acquisition (RDA) Process.

e.Develop PPLs and PTD for new ATC&LS equipment or changes to existing equipment (CDRL A007).
f.Develop new MRCs (CDRL A015) and MIPs (CDRL A016) for equipment as necessary.
g.Provide configuration management of drawings for all ATC&LS equipment.
h.Develop interim training material for use in familiarizing fleet personnel with the operation and maintenance of new or modified software and hardware and submit a recommendations report for Government approval (CDRL A007). The contractor shall use the approved material to conduct interim training for fleet personnel at LSTF. The contractor shall update training curriculum for the Naval Air Technical Training Center (NATTC) and submit a recommendations report for Government approval (CDRL A007).

3.4. ATC&LS Software. (1000, 1001, 1002, 1003, and 1004)

3.4.1. Operational Software Development and Maintenance.

3.4.1.1.Requirements. NAWCAD maintains ATC&LS systems operational computer programs (software and firmware), these NAWCAD programs are used in operational ATC&LS systems on ships and at shore stations, and at NAWCAD test beds located at St. Inigoes, Maryland and at LSTF, Patuxent River, Maryland. The ATC&LS operational computer programs are resident in AN/SPN-46(V) systems. The contractor shall develop documentation in accordance with MIL-STD-1679, Weapons Systems Software Development and the Software Development Plan for the AN/SPN-46 System, NAWCAD Document No. 43603-0053 (Version 0.9). Problems encountered shall be documented using a TR Form (CDRL A022). Proposed computer program changes shall be submitted for Government acceptance using a Software Change Proposal (SCP) Form (CDRL A023). Computer software test plans and procedures shall be submitted for Government approval prior to testing (CDRL A024). Software quality tests shall be conducted using programs compiled and assembled from configuration baseline programs controlled by NAWCAD 4.11.7. The tests shall be conducted at NAWCAD Patuxent River ATC&LS test beds in accordance with Section 5.10 of MIL-STD-1679. The contractor shall submit a Computer Software Test Report upon test completion (CDRL A025). Travel may be required in the performance of this task. The contractor shall:
a.Recommend new computer programs and changes to existing programs to add new functions or to improve performance, reliability and maintainability via a recommendations report (CDRL A007).
b.Develop new and maintain existing ATC&LS systems operational programs. Provide System Operator’s Manuals (CDRL A026).
c.Prepare Software TRs to document proposed changes or perceived problems with operational programs (CDRL A022).
d.Prepare SCPs to document approved changes to operational programs (CDRL A023).
e.Maintain and update program documentation such as Program Performance Specifications (PPSs), Program Design Specifications (PDSs), Interface Design Specifications (IDSs), Data Base Design Documentation (DBDD) and annotated listings. Provide updated information in a Program Package for Government approval (CDRL A027).
f.Provide quality assurance for development of all operational computer programs.
g.Install, and verify for use, certified operational computer programs at user sites. Provide a Computer Software Version Description Document (VDD) as part of each program package installation and verification. (CDRL A028).
h.Inspect operational program installations and evaluate performance at user sites. The contractor shall submit a Software Certification Form (CDRL A029).
i.Maintain the ATC&LS LSTF Test Bed Computer Program Support Library. Provide a quarterly Inventory Report (CDRL A030).

3.4.2. Software Development, Test and Maintenance.

3.4.2.1. Requirements. The contractor shall continually design, develop, document, and maintain ATC&LS test programs (software and firmware) including those required for data acquisition/reduction and analysis, simulation, stimulation or other functions needed to test and evaluate ATC&LS systems performance. The contractor shall provide quality assurance for ATC&LS test programs. The contractor shall use the ATC&LS computer program compiling facility and special purpose or personal computer based systems to accomplish this work. Travel may be required in the performance of this task. The contractor shall:

a.Recommend new test programs and capability enhancements to existing test programs using software TRs, SCPs, or a recommendations report (CDRL A022, CDRL A023 & CDRL A007).
b.Design, develop, test and document new test programs. The documentation shall include PPSs, Interface Design Documents (IDDs) and User Documents.
c.Modify, test, and document changes to existing test programs. Computer software test plan and procedures shall be submitted prior to conducting any testing (CDRL A024).
d.Prepare final computer software test reports (CDRL A025).
e.Prepare documentation and program packages for each test software program (developed or modified) (CDRL A027).
f.Prepare system operators' manuals (CDRL A026).

3.5. ATC&LS Hardware. (1000, 1001, 1002, 1003, and 1004)

3.5.1. Field Change Program.

3.5.1.1.Requirements. The contractor shall recommend, design, develop, test, fabricate and assemble, install, and document field changes and modifications to ATC&LS operational hardware in accordance with NAVSEA SL720-AA-MAN-030, Navy Modernization Process Management and Operational Manual (NMP-MOM). The contractor shall attend monthly meetings to discuss emergent fleet issues. Based on the information provided, the contractor shall develop recommendations and submit to the Government via a recommendations report (CDRL A007). If an issue is discovered while the contractor is on board a ship, the contractor shall notify NAWCAD 4.11.7 immediately and document the issue in their trip report. Travel may be required in the performance of this task. A data information form shall be submitted (CDRL A008). The contractor shall:
a.Recommend engineering changes for the improvement of ATC&LS equipment (CDRL A007).
b.Develop and submit ECPs in accordance with MIL-STD-973, Configuration Management, for ATC&LS operational hardware (CDRL A031).
c.Design, develop, fabricate, provide, and install prototype hardware field changes. Develop field change engineering documentation in accordance with MIL-HDBK-2036, General Requirements for Electronic Equipment Specifications (CDRL A007).
d.Develop test plans and procedures for testing of ATC&LS system ECPs and field changes to determine conformance to specifications and requirements (CDRL A003). Plans and procedures shall be submitted to the government for approval prior to implementation. Test field changes using the test plans and procedures and provide test results via a test report (CDRL A002).
e.Develop FCBs including technical manual revisions for all ATC&LS ECPs in accordance with MIL-STD-2039, Preparation of Field Changes and Field Change Kits (CDRL A032 & CDRL A033). The FCBs shall include schematic diagrams, mechanical drawings, parts lists, operating procedures and level I/II/III drawings (CDRL A034).
f.Fabricate, assemble, and provide the hardware for field change kits and other modifications and improvements to ATC&LS equipment necessary to complete an engineering change. Provide field change kits ready for installation prior to scheduled shipboard installation.
g.Provide technical recommendations to PPLs and PTD in accordance with MIL-STD-1561, Provisioning Procedures, Uniform DoD and MIL-STD-1388-1A, Logistics Support Analysis (CDRL A007).
h.Install field changes in ATC&LS systems and provide a completed FCIP Form (CDRL A010). Field change installation schedules are established by NAVSEA on an annual basis and reviewed quarterly.
i.Install Field Change Kits aboard US Navy Ships. Perform Ships Operational Verification Test (SOVT) to verify field change is fully operational.
j.Perform a Configuration Validation and include data in a trip report.

3.5.2. Production.

3.5.2.1.Requirements. The contractor shall fabricate hardware for ATC&LS systems based on field changes developed and approved by NAVSEA in paragraph 3.5.1.1. The contractor shall:
a.Review engineering documentation to ensure hardware can be reproduced based on documentation provided and make recommendations for documentation changes using a recommendations report (CDRL A007). Update engineering documentation including level I/II/III drawings (CDRL A034).
b.Procure material and assemble ATC&LS hardware in accordance with assembly documentation. Test hardware for conformance to test documentation. The contractor shall provide a test report (CDRL A002).

3.6. Special Purpose Test Fixtures. (1000, 1001, 1002, 1003, and 1004)

3.6.1.Requirements. The contractor shall design, develop, test, fabricate, and document prototype and final version special purpose test fixtures. Test fixtures include those required to test, align, troubleshoot, and monitor the performance of existing or new ATC&LS systems and to develop and produce ATC&LS systems. Travel may be required in the performance of this task. The contractor shall:
a.Make recommendations for test fixture development utilizing a recommendations report (CDRL A007).
b.Design test fixtures.
c.Prepare test plans and procedures for test fixtures (CDRL A003).
d.Fabricate test fixtures.
e.Prepare operating procedures and drawings for ATC&LS test fixtures, including schematic diagrams (CDRL A034).

3.7. Test Bed (1000, 1001, 1002, 1003, and 1004)

3.7.1.Requirements. The contractor shall provide routine maintenance and operational services for the ATC&LS test beds at LSTF and at NAWCAD St. Inigoes. A recommendations report shall be submitted when the contractor finds any abnormalities or issues (CDRL A007). The contractor shall:
a.Perform preventive and corrective maintenance, and fault isolation and repair on ATC&LS equipment and ancillary equipment in accordance with operation and maintenance manuals and MRCs. Maintain a daily log book of all maintenance performed, pertinent test events, and system configurations (CDRL A035).
b.Operate ATC&LS equipment during flight tests, problem analysis and investigations, hardware and software development, and testing efforts. Maintain a daily flight test log (CDRL A036).
c.Establish standard and special test bed configurations and equipment operating conditions for test and evaluation purposes and flight tests. Submit problem reports when problems are encountered. (CDRLA037).
d.Provide test bed integration services, including installation, checkout, and removal of systems, subsystems, and components. For permanent installation of an approved field change, submit a Certification Test Report documenting the installation start and completion dates and the contractor's results of certification tests that demonstrate the system was returned to normal operational status (CDRL A038).

3.8. Overhaul and Restoration Program. (1000, 1001, 1002, 1003, and 1004)

3.8.1.Requirements. The contractor shall overhaul and restore ATC&LS equipment in accordance with system specifications and overhaul procedures. The system specifications and overhaul procedure manuals establish specific intervals and schedules for this effort. Travel may be required for this task. The contractor shall:
a.De-install ATC&LS equipment at shipyards and/or shore stations.
b.Develop, revise, and provide overhaul and restoration test plans and procedures for ATC&LS equipment (CDRL A003).
c.Review, develop, revise, and provide Technical Repair Standards (TRS) (CDRL A039).
d.Perform electrical and mechanical overhaul and repair of ATC&LS equipment. The contractor shall submit a restoration status report (CDRL A040).
e.Perform electrical and mechanical tests on overhauled and restored ATC&LS equipment to ensure proper system performance prior to shipment to designated carrier for re-installation aboard ship by Alteration Installation Team (AIT) and provide test results. in a test report (CDRL A002)

f. Provide technical support to the AIT Installation Team as requested.

g. Work performed under PWS Paragraphs 3.8.1d and 3.8.1e above shall be completed within a 17 month period. This timeframe may be reduced due to ship scheduling issues.

3.9. ATC&LS Program Management. (1000, 1001, 1002, 1003, and 1004)

3.9.1. Program Management. The contractor shall collect, consolidate, and summarize information such as historical summaries, current project status, and project milestones to prepare briefing and presentation material for ATC&LS program reviews. The contractor shall identify potential program issues and proposed resolutions in a recommendations report (CDRL A007).

3.9.2. Local Area Network. The contractor shall provide engineering services to test, maintain, and recommend improvements to add capabilities to the ATC&LS Research, Development, Test and Engineering (RDT&E) Lab and related hardware and software used for ATC&LS equipment at NAWCAD at St. Inigoes and at LSTF, Patuxent River. The ATC&LS (RDT&E) Lab is comprised of several network servers operating under Microsoft Windows. The contractor shall perform duties as site administrator to the ATC&LS RDT&E Lab including maintaining documentation and workstation configuration; installing approved software/hardware to workstations and network devices; and performing upgrades. Provide inputs for future development of the ATC&LS RDT&E Lab in a recommendations report; document and maintain the ATC&LS network configuration as defined in the Information Assurance (IA) Accreditation package (CDRL A007).

4.0 QUALITY ASSURANCE AND SYSTEM SAFETY (1000, 1001, 1002, 1003, 1004)

4.1.Quality Assurance. The contractor shall provide and maintain a quality program in accordance with the following:
a.The contractor/supplier shall maintain and operate a facility wide quality management system that is designed for the products and services to be provided under the contract. The quality management system will use the quality requirements as defined in FAR 46.202-4(a) and satisfy ISO 9001:2008, International Organization for Standardization (ISO) 9001:2008 Quality Management Systems, registration. The quality management system documentation and the system’s effectiveness are subject to review by NAWCAD at any time during the period of performance of this agreement.
b.All procedures used to fabricate, assemble, modify, install, and test products shall be documented and kept current. These written work instructions shall be made available to the employees required to perform the specific task.
c.The quality management organization shall be clearly defined and employees in quality functions shall have adequate responsibility, authority, and freedom to identify and evaluate problems and to initiate, recommend, or provide corrective action.
d.The contractor shall conduct a thorough review of quality requirements to identify the controls, processes, skills, fixtures, tools, and test equipment necessary to assure product quality. The planning review shall also update inspection and testing techniques, instrumentation, and manufacturing methods and processes. Additionally, standard program data required by the Government for use in the compilation of trend analysis shall be made available upon request.

4.2 Quality Assurance Surveillance Plan (QASP). The Government shall monitor the Contractor’s performance under this contract IAW the Government’s QASP, Attachment 1. The COR and/or Technical Point of Contact (TPOC) will assess product quality and timeliness based on performance standards set forth in the QASP, utilizing the monitoring methods identified therein.

5.0 PROGRESS REPORTS (1000, 1001, 1002, 1003, and 1004)

5.1. Funds Expenditure Report. The contractor shall prepare monthly funds expenditure reports and report the costs associated with each PWS paragraph including a breakout of costs per task (CDRL A041). The contractor shall reconcile monthly vouchers with cost data and explain any discrepancies in a voucher reconciliation report (CDRL A042).

5.2. Time Expenditure Report. The contractor shall prepare monthly time expenditure reports including monthly and year-to-date work hours (straight time and overtime), hourly rate, and costs expended per individual. These reports may be reviewed by a support contractor for compilation of data and verification purposes. A nondisclosure form shall be submitted by the support contractor (CDRL A043).

5.3. Progress Report. The contractor shall prepare monthly progress reports describing tasks performed each month (CDRL A044). Technical assistance responses provided by telephone or e-mail shall be documented in the monthly progress status report. The contractor shall notify the Government, by letter, when the cost for a task exceeds 75 percent of the total estimated cost and provide recommendations if the task can be completed as estimated.

5.4. Material. The contractor shall prepare quarterly material tracking reports that include the burdened and unburdened current and cumulative costs and any record of material transferred to the Government via Form 1149 (CDRL A045).

5.5 NON-DISCLOSURE AGREEMENTS. In the performance of the contract, the Contractor may have access to non-public proprietary information. The Contractor shall require that any employee performing services under the contract execute a non-disclosure agreement satisfactory to the contract Contracting Officer. The non-disclosure agreement shall acknowledge the Contractor and employee’s duties with respect to non-public information and promise to comply with those obligations. The Contractor shall provide copies of the executed non-disclosure agreements to the Government.

The Contractor shall not use, modify, reproduce, release, perform, display, or disclose any non-public information provided to or obtained by the Contractor in the course of performing the contract for other than Government purposes, and shall not use for any commercial or personal purpose pursuant to the terms and conditions of:

· NAVAIR clause 5252.209-9510(e)(5), Organizational Conflicts of Interest (Services), with respect to proprietary data of third parties.

· DFARS clause 252.227-7025 Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends with respect to technical data.

In the event that the Contractor knows of or identifies that it has a commercial interest in the subject matter of any proposed or ongoing agreement related to the services to be performed herein, the Contractor shall consider such interest a potential conflict of interest under paragraph (g) of NAVAIR 5252.209-9510, and promptly disclose it to the Contracting Officer in writing.

6.0 OTHER DIRECT COSTS (ODCS).

6.1 TRAVEL (CLINs 2000, 2001, 2002, 2003, and 2004). The Contractor shall be required to travel and/or work on-site at the Government’s request, see Section H Clause 5252.232-9509 Travel Approval and reimbursement Procedures for further instruction. The Government shall reimburse the Contractor for allowable travel costs, exclusive of fee, incurred by the Contractor in performance of the contract IAW FAR Subpart 31.2 and with rules set forth for temporary duty travel in the Department of Defense Joint Travel Regulations, Volume II, for civilian personnel. The Government authorizes Travel and subsistence for travel beyond a 50-mile radius of the Contractor's office whenever a task assignment requires work at a temporary alternate work site. The Contractor is responsible for making all travel arrangements for its personnel. The Contractor shall not bill costs associated with obtaining passports for Contractor personnel as a direct charge to this contract. The Contractor shall prepare and deliver trip report IAW (CDRL A047), to all sites at which work is performed under PWS 3.1-3.9

6.1.1 CONUS Travel: Travel locations include: Norfolk, Virginia; Portsmouth, Virginia; Newport News, Virginia; Pensacola, Florida; San Diego, California; Bremerton, Washington; Everett, Washington; Seattle, Washington; other domestic locations as ATC&LS locations change; and other contractor test sites and facilities.

6.1.1 OCONUS Travel: The contractor may be required to travel outside of the Continental US (OCONUS) as required by the Contracting Officer's Representative (COR) in accordance with DFAR clause 252.225-7040. OCONUS travel shall be in accordance with PWS paragraphs 3.1-3.9. When travel is required to OCONUS locations, the contractor shall meet requirements set forth in the contract. The contractor shall provide personnel with passports who can respond to travel requirements with 24 hours’ notice. Potential locations may include but are not limited to Yokosuka, Japan and other overseas locations as ATC&LS systems locations change.

Possible travel locations include U.S. Navy homeports and ports of call (CONUS and OCONUS), U.S. Navy and Marine Corps air stations (CONUS and OCONUS), U.S. Navy supply and logistic centers, as well as deployed ships. Emergent technical support requirements will occasionally require immediate travel with no prior notification. Anticipated travel locations over a five year period include, but are not limited to the following:

Location
Trips
People
Days/Person/Trip

(1) Norfolk, VA

(2) Lemoore, CA

(3) Whidbey Island, WA

(4) Oceana, VA

(1) Norfolk, VA

30
4
15

(2) Portsmouth, VA

20
3
15

(3) Newport News, VA

7
3
45
(4) Pensacola, FL
5
2
7
(5) San Diego, CA
25
4
20
(6) Bremerton, WA
10
4
20
(7) Everett, WA
10
3
20
(8) Seattle, WA
1
1
2
(9) Yokosuka, Japan
15
4
20

Other locations as required by fleet operations.

6.2 MATERIAL (CLINs 3000, 3001, 3002, 3003, and 3004): The Contractor shall provide material or other items, which are necessary or integral to the performance of tasking included in the PWS IAW Section H-2 clause Restriction on the Direct Charging of Material.

The contractor shall have a material funding allocation (CLIN) to allow immediate response to system development requirements, system failures, and system operation requirements that provides sufficient funding for both the prime and all subcontractor’s immediate material needs. All material associated with this contract that is purchased by the Contractor shall become the property of the Federal Government.

7.0 FACILITIES/PROPERTY.

7.1. Government Furnished and Accessible Facilities. The Government will provide access to facilities and equipment to perform applicable PWS requirements. These facilities are located at Patuxent River and St. Inigoes, Maryland. The following facilities will be provided by the Government for full-time staffing by the contractor. Government provided facilities are subject to change.

a. Building 8142RoomSq. Ft.
St. Inigoes101318
102315
104919
10890
109100
110177
111366
112657
113329
1141,872
1152,750
168201
202165
203165
204165
205165

This is the start of the file's text. The full file is on GovTribe.