SPECIALTIME_BOXES_in_Word.doc
DOC document 141 KB Posted
- Attached to
- Maritime Support Vessel Federal contract opportunity
- Solicitation number
- N00033-13-R-2015
About this file
Specialtime Boxes in Word Format
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIALTIME BOXES – N00033-13-R-2015
SPECIALTIME BOXES
Vessel(s):
Owner Name:
Owner DUNS:
Owner CAGE:
Owner TIN (and TIN of parent, if applicable):
Solicitation Number:
N00033-13-R-2015
Contract Number (date):
TBD (TBD)
1. Vessel Required:
See RFP Section C
2. Place/Range of Delivery:
Little Creek, VA
3. Place/Range of Redelivery:
Little Creek, VA
4. Charter Period
The firm period of the Charter shall commence following the conclusion of the approximately 216 day ramp-up period, and conclude approximately twelve (12) months after contract award. The Charter shall also include four (4) one-year option periods.
5. Laydays:
Commencing: 09 December 2013 Cancelling: 13 December 2013
Laydays may be changed after award.
6. Terms/Conditions/Attachments added, deleted or modified:
Vessel:
| 7. Vessel/Flag/Year Built: |
| 8. Proposal Firm Until: |
UNLESS OTHERWISE SPECIFIED, PROPOSAL IS FIRM FOR 60 DAYS FROM THE DUE DATE FOR OFFERS
9. Amendments Acknowledged (amendment numbers and dates)
| 10. Owner (style, address, phone, cell phone, pager, e-mail, fax) |
| 11. Broker (address, phone, e-mail, fax) |
12. Remittance address for hire (if other than box 10)
13. — 17. RESERVED
Vessel:
PER DIEM RATES
FIRM PERIOD
| FULL OPERATIONAL STATUS RATES |
| REDUCED OPERATIONAL STATUS RATE |
(ROS 10 DAYS AND LONGER, IN CONUS OR HAWAII)
REDUCED OPERATIONAL STATUS RATE
(ROS 10 DAYS AND LONGER, OUTSIDE CONUS AND HAWAII)
18A.
| USD per diem |
| 19A. |
| USD per diem |
| 20A. |
USD per diem
FIRST OPTION PERIOD
| FULL OPERATIONAL STATUS RATES |
| REDUCED OPERATIONAL STATUS RATE |
(ROS 10 DAYS AND LONGER, IN CONUS OR HAWAII)
REDUCED OPERATIONAL STATUS RATE
(ROS 10 DAYS AND LONGER, OUTSIDE CONUS AND HAWAII)
18B.
| USD per diem |
| 19B. |
| USD per diem |
| 20B. |
USD per diem
SECOND OPTION PERIOD
| FULL OPERATIONAL STATUS RATES |
| REDUCED OPERATIONAL STATUS RATE |
(ROS 10 DAYS AND LONGER, IN CONUS OR HAWAII)
REDUCED OPERATIONAL STATUS RATE
(ROS 10 DAYS AND LONGER, OUTSIDE CONUS AND HAWAII)
18C.
| USD per diem |
| 19C. |
| USD per diem |
| 20C. |
USD per diem
THIRD OPTION PERIOD
| FULL OPERATIONAL STATUS RATES |
| REDUCED OPERATIONAL STATUS RATE |
(ROS 10 DAYS AND LONGER, IN CONUS OR HAWAII)
REDUCED OPERATIONAL STATUS RATE
(ROS 10 DAYS AND LONGER, OUTSIDE CONUS AND HAWAII))
18D.
| USD per diem |
| 19D. |
| USD per diem |
| 20D. |
USD per diem
FOURTH OPTION PERIOD
| FULL OPERATIONAL STATUS RATES |
| REDUCED OPERATIONAL STATUS RATE |
(ROS 10 DAYS AND LONGER, IN CONUS OR HAWAII)
REDUCED OPERATIONAL STATUS RATE
(ROS 10 DAYS AND LONGER, OUTSIDE CONUS AND HAWAII)
18E.
| USD per diem |
| 19E. |
| USD per diem |
| 20E. |
USD per diem
21. Indicate crewing arrangements during ROS (10 Days and Longer, in CONUS or Hawaii) and ROS (10 Days and Longer, outside CONUS and Hawaii):
22. Other Costs:
22. Other Costs (continued):
Cancellation Fee (see Section H-43): In the event the Government does not exercise an option to extend the term of the contract or terminates the contract for convenience, the contractor shall be entitled to not-to-exceed cancellation costs subject to the conditions in Section H-43 and according to the following schedule:
| Prior to Delivery of Vessel |
| $ |
| During Firm Charter Performance Period |
| $ |
| During 1st Optional Performance Period |
| $ |
| During 2nd Optional Performance Period |
| $ |
| During 3rd Optional Performance Period |
| $ |
| During 4th Optional Performance Period |
| $ |
NOTE: As defined in the cancellation clause in Section H-43, only prior to delivery of the vessel may the cancellation fee include the cost of ramp-up period vessel modifications, only to the extent that such modification or conversion costs were incurred in order for the vessel to meet contract requirements. Cancellation fees for cancellation during the firm or any optional charter period shall not include the cost of these vessel modifications.
Ramp-Up Period:
Program Management Support for Ramp-Up Period (see Sections B-2.1 and C-2.0): Program management support for the time charter ramp-up period, as described in Section C-2.0, shall be payable at the firm-fixed-price daily rate listed below.
Program Management Support
Vessel Modifications (See Sections B-2.2 and C-2.10): Modifications necessary to meet the vessel requirements shall be payable at the firm-fixed-price sum listed below.
Vessel Modifications $
Vessel Redelivery Bonus: $
Vessel(s):
| 23. Laydays Proposed: |
| 24. Estimated Readiness Date (see Section L-4.1.2(2): |
(1)
(2)
GENERAL
25. Vessel type and, if applicable, MARAD design type:
| 26. Place built: |
| 27. Year built: |
| 28. INMARSAT Ident.: |
| 29. Vessel's e-mail/Fax: |
| 30. Call Letters: |
| 31. Official number: |
| 32. Net registered tonnage: |
| 33. Panama Canal tonnage: |
| 34. Gross registered tonnage: |
| 35. Suez Canal tonnage: |
| 36. Beam (extreme): |
| 37. Length Overall: |
a. (ft)
b. (m)
a. (ft)
b. (m)
| 38. Reserved |
| 39. Length between perpendiculars: |
a. (ft)
b. (m)
| 40. Summer mean draft: |
| 41. Reserved |
a. (ft)
b. (m)
| 42. Displacement, loaded (on draft in Box 34): |
| 43. Summer Load Line Freeboard: |
a (LT)
b. (M)
a. (ft)
b. (m)
| 44. Shaft Horsepower/kilowatts |
| 45. Brake Horsepower/kilowatts |
a. (hp)
b. (kW)
a. (hp)
b. (kW)
| 46. Nationality of Master/Officers/Crew: |
| 47. Number of persons other than crew that can be carried: |
48. Classification society entered and class assigned:
| 49. Insured value of vessel (USD) |
| 50. Vessel's present position/destination: |
| 51. Last dry-dock date (mm/dd/yy): |
| 52. Next dry-dock date (mm/dd/yy): |
| 53. MARAd subsidized vessel: |
| Yes |
No
Vessel(s):
GEAR
54. Number/location/SWL capacity of winches, derricks, booms, and cranes
CASUALTIES/DEFICIENCIES
55. Has vessel been involved in any serious grounding or collision within a period of twelve months from the submission date of this proposal? (include full description if "yes")
56. Are any deficiencies lodged by any regulatory body outstanding against the Vessel (include full description if "yes")
Vessel(s):
FUEL CONSUMPTION AT SERVICE SPEEDS
| 57. Average warranted speed (knots, for laden, moderate weather) |
| 58. Reserved. |
| 59. Average fuel consumption (net bbls at 60 deg F and grade(s): for laden, moderate weather passage as speed identified in Box 57; not including auxiliaries) |
| 60. Average fuel consumption at loiter/anchor(net bbls at 60 deg F and grade(s)) |
| 61. Auxiliaries underway fuel consumption (net bbls at 60 deg F and grade(s), only if not elsewhere identified) |
| 62. Inport fuel consumption (net bbls at 60 deg F and grade(s)) |
FUEL CONSUMPTION AT VARIABLE SPEEDS
63: Average fuel consumption (net bbls at 60 deg F for all grades and all engines/auxiliaries utilized while underway over moderate-weather passages
63A: Grades Consumed:
63 B. LADEN TO SUMMER MARKS
Knots
(NM)
Net bbls per mile Net bbls per day Operating
Range
01>
02>
03>
PLEASE COMPLETE BOX 63B IN ENTIRETY
04>
05>
06>
07>
08>
09>
10>
11>
12>
13>
14>
15>
16>
17>
18>
19>
20>
21>
22>
23>
24>
25>
Vessel(s):
FUEL GRADE
64. Minimum vessel fuel specifications
Vessel(s):
| Box # |
| CONTINUATION |