N00033-13-R-2015-0013.pdf

PDF 93 KB Posted

Attached to
Maritime Support Vessel Federal contract opportunity
Solicitation number
N00033-13-R-2015
Issued by
Department of the Navy Military Sealift Command

About this file

N00033-13-R-2015 Amendment 0013

View the file

Other files for this federal contract opportunity

Other files attached to Maritime Support Vessel, newest first.
File Type Posted
N00033-13-R-2015_QA_Part_Thirteen.pdf PDF
N00033-13-R-2015-0014.pdf PDF
UPDATED_Helicopter_Facilities_Requirements__REVISED_AMENDMENT_14.pdf PDF
N00033-13-R-2015_ATTACHMENT_15_-_Past_Performance_Questionnaire_REVISED_AMEND_0014.pdf PDF
N00033-13-R-2015_ATTACHMENT_4_-_Helicopter_Facilities_Requirements_REVISED_AMEND_0013.pdf PDF
N00033-13-R-2015_QA_Part_Twelve.pdf PDF
N00033-13-R-2015_ATTACHMENT_12_-_Pricing_Summary_-_REVISED_AMEND_13.xls XLS spreadsheet
Question_to_Potential_Offerors.pdf PDF
N00033-13-R-2015_-_ATTACHMENT_1_-_GFE_LIST_-_REVISED_AMEND_0011.pdf PDF
N00033-13-R-2015_Conformed_after_Amend_0011.pdf PDF
N00033-13-R-2015-0011.pdf PDF
SPECIALTIME_BOXES_in_Word.doc DOC document
N00033-13-R-2015_ATTACHMENT_12_-_Pricing_Summary_-_REVISED_AMEND_0011.xls XLS spreadsheet
N00033-13-R-2015_QA_Part_Ten.pdf PDF
RFP_N00033-13-R-2015_Questions_and_Answers_Part_Five.doc DOC document
N00033-13-R-2015-_Amendment_0005.pdf PDF
N00033-13-R-2015_ATTACHMENT_4_-_Helicopter_Facilities_Requirements_-_REVISED_AMEND_0005.pdf PDF
N00033-13-R-2015_ATTACHMENT_12_-_Pricing_Summary_-_REVISED_AMEND_5.xls XLS spreadsheet
N00033-13-R-2015_ATTACHMENT_2_-_MSV_2.0_Shipboard_Habitability_-_REVISED_AMEND_0005.pdf PDF
N00033-13-R-2015_ATTACHMENT_1_-_GFE_List_-_REVISED_AMEND_0005.pdf PDF
N00033-13-R-2015_ATTACHMENT_11_Basic_Pricing_Data.xls XLS spreadsheet
N00033-13-R-2015_Attachment_16_SF_LLL.pdf PDF
N00033-13-R-2015_ALL_ATTACHMENTS.pdf PDF
N00033-13-R-2015_ATTACHMENT_12_Pricing_Summary.xls XLS spreadsheet
N00033-13-R-2015_ATTACHMENT_13_Crew_Complement_Form.xls XLS spreadsheet
N00033-13-R-2015_MSV_RFP.pdf PDF
N00033-13-R-2015_ATTACHMENT_7_DD254.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes to several sections of the RFP and Attachments.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00033-13-R-2015

X 9B. DATED (SEE ITEM 11)

15-Nov-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Feb-2013

CODE

MILITARY SEALIFT COMMAND, N1031/PM2

914 CHARLES MORRIS COURT SE

WASHINGTON NAVY YARD DC 20398-5540

N00033 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00033-13-R-2015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

MODIFICATION

The purpose of this modification is to:

1. Make changes to several sections of the RFP, as reflected in the below Summary of Changes.

2. Revise Attachment 4, Helicopter Facilities Requirements.

3. Revise Attachment 12, Pricing Summary.

4. Extend the closing date of the RFP, as reflected in the below Summary of Changes.

All other terms and conditions remain unchanged.

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Feb-2013 02:00 PM to 22-Feb-2013 02:00

PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SPECIALTIME BOXES

Vessel(s):

FUEL CONSUMPTION AT SERVICE SPEEDS

57. Average warranted speed (knots, for laden to summer marks, moderate weather)

58. Reserved.

59. Average fuel consumption (net bbls at 60 deg F and grade(s): for laden to summer marks, moderate weather passage at speed identified in Box 57; not including auxiliaries)

60. Average fuel consumption at loiter/anchor(net bbls at 60 deg F and grade(s), laden to summer marks)

61. Auxiliaries underway fuel consumption (net bbls at 60 deg F and grade(s), laden to summer marks, only if not elsewhere identified)

62. Inport fuel consumption (net bbls at 60 deg F and grade(s), laden to summer marks)

FUEL CONSUMPTION AT VARIABLE SPEEDS

63: Average fuel consumption (net bbls at 60 deg F for all grades and all engines/auxiliaries utilized while underway over moderate-weather passages, laden to summer marks)

63A: Grades Consumed:

63 B. LADEN TO SUMMER MARKS

Knots

(NM)

Net bbls per mile

Net bbls per day

Operating Range

01> 02>

03> PLEASE COMPLETE BOX 63B IN ENTIRETY

04> 05> 06> 07> 08> 09> 10> 11> 12> 13> 14> 15> 16> 17> 18> 19> 20> 21> 22> 23> 24> 25>

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

SECTION C

C-2.10 Pre-delivery Modifications. During the pre-delivery ramp-up period, the Contractor is required to perform all modifications necessary to meet the requirements of the RFP. As part of the modification process, the Contractor is required to install the GFE referenced in Section C and Attachment 1 without Government support. However, the Government intends to provide technical direction in support of the installation of GFE while the Contractor performs vessel modifications necessary to meet contractual requirements (Note: In accordance with Section G-3, technical direction as described herein shall not constitute any change in price). Installation of GFE included in Section C and Attachment 1 shall be included in the performance schedule documented in accordance with Paragraph F-2. Upon completion of the pre-delivery modifications and prior to delivery of the vessel, the contractor shall submit an updated copy of Specialtime Boxes 32-37, 39-40, 42-52, 54, 55-57, and 59-64, previously submitted with the contractor's proposal, to include any and all revisions necessary to accurately describe the modified vessel. The contractor shall also warrant the fuel consumption rates provided in boxes 57 and 59-63 upon submission of the revised boxes.

C-3.2.5 Small Craft / Rotary Wing Fueling. The contractor shall provide four (4) separate internal fueling/filtering systems for MOGAS and four (4) separate fueling/filtering stations for AVFUEL, to include one (1) 100LL (minimum 4,000 gallons). If internal storage is not available, the contractor shall install two (2) GFE Fuel System (USCG approved) containers. Two (2) shall be 20'L x8'W x8'H containers with a 4,000 gallon capacity for craft and rotary wing refueling. The contractor shall provide a shelter for each of the Fuel Systems. Additionally, these fuel systems need to be hardwired into the vessel electrical distribution system. If GFE fuel systems are installed, the contractor shall install GFE provided ballistic protection. The Government will provide the design and/or material for the ballistic protection.

The specifications will be provided after award.

C-4.28.4 Contractor Manpower Reporting. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Military Sealift Command via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at:

http://www.ecmra.mil/.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SECTION H

H-51 CONTRACTOR MANPOWER REPORTING. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Military Sealift Command via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at:

http://www.ecmra.mil/.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

SECTION L

L-4 General Proposal Requirements

The successful proposal may be incorporated into the resulting contract. Offers submitted in response to this solicitation should address all relevant requirements. Offerors shall follow the guidelines set forth below for Volumes I and II.

L-4.1 Volume I - Technical Proposal

L-4.1.1 The Technical Volume shall describe how the vessel meets the requirements and capabilities set forth in this solicitation. The technical data, documentation and supporting rationale shall be complete and specific. The offeror shall provide an adequate level of detail to demonstrate complete understanding and compliance with each of the requirements set forth in Sections L-4.1.2(3)(a) through (d) and M-2.1, and detail regarding how they will be met. This can be done through drawings, descriptions, and supporting calculations and analysis. The Government will determine whether an offeror’s proposal is acceptable based on the information submitted. Additional information may be requested if deemed necessary.

L-4.1.2 Volume I shall contain the following, with no pricing information:

(1) Title Page, Cover Letter, Table of Contents. The title page shall meet the requirements of FAR 52.215-1(c)(2). If the offeror wishes to restrict disclosure of information in its proposal, it may include the legend permitted by FAR 52.215-1(e). Although a cover letter is not required, offerors may submit one, and it should be placed after the title page. A table of contents shall be provided after the title page (and cover letter, if applicable), listing the chapters, sections, subsections, page numbers, etc.

(2) Completed Specialtime Boxes. Offerors shall provide Specialtime Boxes identifying the vessel and providing the offeror’s DUNS, CAGE, and TIN.

Offerors shall complete and provide Boxes 7-12, 21, 23-37, 39-40, 42-57, and 59-64 from Part B of this solicitation. The fuel consumption information provided in Boxes 57 and 59-63 shall be for the pre-modified vessel. Offerors shall include in their submission a fuel grade list from the list of fuel grades in Section M-2.3.2(c) of the solicitation.

Offerors shall include two dates in Box 24; (1) the earliest date on which the offeror could commence performance of the ramp-up period, as outlined in F-1.1, and (2) the estimated date on which the vessel will be ready for delivery, as outlined in F-1.2. Offerors shall include in Box 64 the appropriate fuel grade(s) for the vessel from the list of fuel grades below.

The below fuels are the only available fuel grades at DESC/Defense Fuel Stocking Points (DFSPs):

Type IFO 180/RME-180 Open Market IFO 380/RMG-380 Open Market MGO Open Market

(3) Technical Proposal. Offerors shall fully describe the vessel proposed for this contract. Offerors must address how the proposed vessel and the contractor’s organization meet the minimum requirements in the solicitation and attachments. The offeror’s technical proposal shall specifically address the following:

(a) Vessel Characteristics: Offerors shall demonstrate that the proposed vessel meets or exceeds the requirements below:

RFP Section Minimum Technical Requirements Berthing C-1.2, C-3.3.1

The vessel will have the capacity to berth, support, and feed fifty (50) Government personnel with the ability to surge to one hundred fifty-nine (159) for a total of two hundred nine (209) sponsor personnel within twenty-four (24) hours for a maximum of ninety (90) days.

Certifications C-2.6

The vessel shall be U.S.-flagged upon delivery, inspected or certified by the United States Coast Guard (USCG) under Sub Chapter I, and classed by American Bureau of Shipping (ABS) (A1 AMS) or International Association of Classification Societies (IACS) member classification society. Offerors not meeting these requirements at the time of proposal submission shall submit with proposals an affirmative statement that the certifications described in C-2.6 will be met prior to delivery of the vessel.

Minimum Range C-3.1.1

8,000 NM at a minimum speed of 20 knots

Draft C-3.1.2

30 ft maximum

Length C-3.1.3

700 ft maximum

Speed C-3.1.4 Minimum speed of 20 knots sustained for 8,000 NM

Seakeeping/docking and station keeping (including small boats) C-3.1.5

The support vessel shall be able to maintain course and speed in storm conditions of 50 knot winds and/or seas of up to 20 foot significant wave height. Vessel must support small craft launch and recovery operations up to and including seas described in Attachment 3. Alongside refueling operations with small craft shall be conducted in maximum sea conditions described in Attachment 3. The vessel must be capable of anchoring in water depths for a vessel of its class and size.

The vessel will be required to loiter for long periods of time as a re-supply station for small crafts. The vessel shall have the capability to maintain directional stability below two knots.

Endurance C-3.1.6

The vessel shall maintain sufficient stores onboard to support the crew and fifty

(50) Sponsor personnel for a minimum of forty-five (45) days without resupply.

Additionally, the vessel shall have sufficient storage capacity able to support at sea operations for all two hundred nine (209) personnel for a minimum of forty-five

(45) days without re-supply. The vessel shall be Underway Replenishment (UNREP) (Fueling at Sea and Vertical Replenishment) capable to include fuel and supplies with the standard Coalition/USNS logistics ships in order to extend operations for a maximum of ninety (90) days.

Fuel C-3.1.7 The vessel must capable of burning diesel fuel in order to receive fuel and to resupply small boats.

Propulsion C-3.1.8 The vessel shall be twin shaft allowing for propulsion redundancy. The propulsion plant will be designed so as to mitigate the loss of a single piece of equipment that will leave the vessel dead in the water. The minimum speed for the vessel will be 20 knots with two shafts and the vessel must maintain the ability to maneuver with speeds in excess of 10 knots on one shaft.

Flight Deck C-3.2.1 The contractor shall provide a flight deck capable of being NAVAIR certified to Level 1, Class 2 with the ability to simultaneously launch/recover two (2) MH-60 Class or one (1) CH-53E Class helicopter with clear, unobstructed vertical airspace in accordance with NAVAIR 4.8.2.5 Air Capable Ship Aviation Facilities Bulletin No. 1M. The contractor shall provide a hangar in accordance with Attachment4, Section 4.0.

The flight deck shall also meet NAVAIR requirements for Level I, Class 4, Special Type 2 vertical replenishment operations (VERTREP) for the H-60 series, CH-53K, H-46, CH-47, and V-22 aircraft.

Craft Launch/Recovery Systems C-3.2.2

The contractor shall provide four (4) launch and recovery systems to launch or recover two manned 12.5m x 3m craft with a draft of 2m in twenty (20) minutes.

The launch and recovery system shall be capable of lifting and supporting 30,000 pounds per craft and shall meet the requirements of the ABS Guide for Certification of Lifting Appliances (latest revision at time of vessel delivery), including the requirements for personnel lifting. The speed for the vessel when conducting launch and recovery is 0-2 knots with a maximum wave height of seven (7) feet.

The contractor shall provide a safe means of controlling the motion of the craft during launch and recovery operations so as to prevent injury to personnel, both embarked and on deck, and damage to the craft.

The contractor shall also provide:

Two (2) 110v 30A and outlets near the launch and recovery system.

Each outlet shall be sealed to prevent salt water intrusion.

Freshwater supply/hose near the launch and recovery system.

A minimum of two (2) craft refueling stations in the vicinity of the launch and recovery stations.

Jet Ski Launch and Recovery System C-3.2.3

The contractor shall utilize the Craft Launch and Recovery Systems to launch and recover eight (8) Jet Ski sized craft and eight (8) Zodiac F470 craft.

Covered/Enclosed Craft Storage/Craft Work Area Covered/Enclosed Craft Storage/Craft Work Area C-3.2.4

The contractor shall provide a covered, hard/rigid sided, storage area with a minimum of:

18 ft height, with minimum 30 ft opening to accommodate eight (8) craft up to 12.5m x 3m, eight (8) Jet Ski craft and eight (8) Zodiac F470.

Must be adjacent to the craft launch and recovery systems to allow for easy transfer and movement of personnel and equipment and ease of maintenance.

Must be sealed from the outside environment during non-launch and recovery operations to prevent saltwater or outside air intrusion into the space.

During non-launch and recovery operations, no portion of the interior may be visible to any outside observer.

500 sq ft mechanic workspace with workbench, modular drawer storage cabinets, electrical outlets, and compressed air. There will be 4 work benches 6’x28” x30’wide. The work benches can sit on 30” tall 36” wide by 28-30” deep cabinet/drawer system (4 cabinet style 4x4-5 drawer style at 36” wide). There will be two electrical outlets above each work bench, 110v 20 amp (total 8). An additional 4-110V, 20 Amp outlets are required, at least one on each wall. The space will require double door access with a minimum 5 ft opening for access to/from the work space. The doorway shall be fitted so as to allow a pallet jack through the door with 1500 lbs loads.

300 sq ft secure communications storage and coxswain electronics maintenance space.

Exhaust fans to allow removal of craft engine exhaust and to facilitate the drying of craft and equipment.

5 ft of clearance shall be provided around the front and back of each of the eight (8) craft.

220 V 30A and 110 V 30A outlets in craft storage / work areas.

Include space for one (1) ISU 8' L x 9' W x 8' H.

Include freshwater hookups for garden hose style connection and exhaust fans to allow removal of craft engine exhaust.

Two (2) LP air lines from the ship service air system with a retractable reel system with standard air nozzles and 100 ft hoses in the storage/work area. The exact location of the LP air lines will be coordinated at a later time.

Small craft stowage locations require adequate tie downs to secure the 30,000lb craft in up to sea state 5

Crane with a 2,000 lb lift capacity for the ability to pull craft engines.

Small Craft/Rotary Wing Fueling C-3.2.5

The contractor shall provide four (4) separate internal fueling/filtering systems for MOGAS and four (4) separate fueling/filtering stations for AVFUEL, to include one (1) 100LL (minimum 4,000 gallons). If internal storage is not available, the contractor shall install two (2) GFE Fuel System (USCG approved) containers.

Two (2) shall be 20'L x8'W x8'H containers with a 4,000 gallon capacity for craft and rotary wing refueling. The contractor shall provide a shelter for each of the Fuel Systems. Additionally, these fuel systems need to be hardwired into the vessel electrical distribution system.

Fueling at Sea

(FAS) C3.2.6

A single-hose, single-probe fuel STREAM receiver station shall be provided on the starboard side of the vessel in accordance with NTTP 4-01.4 UNDERWAY REPLENISHMENT and NAVSHIPS drawing 804-2227933. Station shall be provided with gypsy winch (coastal Marine 1G4-150S7-16-40, or equal) located aft of the receiver probe for inhaul of hose messenger and span wire.

Small Boat and Aviation Fuel Capacity C-3.2.7

The contractor shall provide multiple JP5 fueling station(s) in close proximity to the small craft launch and recovery system and flight deck with an overall capacity of 150,000 gal of JP5 fuel. This system shall be designed to ensure that there can be no cross contamination of the JP5 fuel. The contractor shall provide the required hoses and nozzles.

Sponsor Berthing/Living Spaces C-3.3.1

The contractor shall provide berthing/habitability accommodations for two hundred seven (207) Sponsor personnel in accordance with Attachment 2.

Adequate showers/heads shall be provided. All accommodations shall be air conditioned and heated.

The contractor shall make available self-service laundry facilities. The contractor shall provide commercial grade heavy duty machines to accommodate two hundred seven (207) Sponsor personnel. Laundry facilities will be available at all times and will include a sufficient amount of cleaning supplies, iron, ironing board and ironing board cover.

Government Work Spaces Requirements C- 3.3.2

The contractor shall provide the work spaces listed in paragraph(s) C-3.3.2 a-m.

Unless otherwise specified, the contractor shall ensure adequate cooling with a maximum temperature of 80 degrees F and adequate office lighting with dimmers shall be installed.

Medical Spaces C-3.3.2.m

The contractor shall provide a medical space where the primary focus shall be support of a surged Surgical Response Team (SRT). The secondary focus shall be support of shipboard medical clinic operations run by an independent duty corpsman or civilian equivalent.

Government Equipment Space Requirements C-3.3.3

The contractor shall provide sufficient space to accommodate the GFE listed in Section C-3.3.3.

Communications Requirements C-3.4

The contractor shall provide space and power for mounting GFE described in:

C-3.4.1 Internal Communications; C-3.4.2 External Communications; and C-3.4.3 Network Requirements/Access

Required antennae mounting C-3.4.4

The contractor shall provide space and power as stated in Section C-3.4.4, including Paragraphs C-3.4.4.1 through C-3.4.4.17.

Security Requirements/Force Protection C-3.4.5

The contractor shall establish, provide, and install the requirements listed in Paragraphs C-3.4.5 through 3.4.11.

Water Supply C-3.4.12

The contractor shall provide a minimum of 22,500 gallons per day of potable water production to support sponsor personnel and crew living onboard and 6,000 gallons per day of fresh water for wash down of embarked equipment, gear and machinery. The Contractor shall also provide a reserve water capacity, with enough water to sustain the onboard personnel, crew, and wash down of equipment at the daily potable and fresh water minimums defined in this section for a minimum of three (3) days, in case the primary system suffers a casualty.

Crane Support C-3.4.13

The vessel shall have a minimum 15 ton ship’s crane capable of supporting 24-hour crane services in support of Government requirements. This crane shall be separate from the Craft Launch and Recovery System.

(b) Arrangements: Offerors shall provide current General Arrangement drawings of the proposed vessel. Additionally, offerors shall provide General Arrangement drawings or draft sketches, and narrative descriptions showing the proposed locations of all required spaces and compartments listed in Section C-3.2 and C-3.3.

(c) Operations and Manning: Offerors shall demonstrate recent experience, within the last five (5) years, operating and manning a deep ocean going vessel (greater than 1600 tons). This requirement may be fulfilled via a combination of prime contractor and subcontractor experience. If subcontractor experience is to be used to meet this requirement, the offeror’s proposal must clearly provide evidence of the planned relationship between the contractor and subcontractor (i.e., contract between the parties, pending award of the contract).

(d) Maintenance and Repair: Offerors shall demonstrate recent experience, within the last five (5) years, in soliciting, awarding, and managing shipyard overhauls, voyage repairs, and crew capable repairs. This requirement may be fulfilled via a combination of prime contractor and subcontractor experience. If subcontractor experience is to be used to meet this requirement, the offeror’s proposal must clearly provide evidence of the planned relationship between the contractor and subcontractor (i.e., contract between the parties, pending award of the contract).

L-4.2 Volume II – Solicitation Package, Price Proposal, and Past Performance Information

L-4.2.1 With the exception of the Technical Proposal contents, Volume II contains all additional information and documentation necessary to demonstrate compliance with the requirements of the solicitation, including the offeror’s pricing and past performance information.

L-4.2.2 Volume II shall contain the following :

(1) Proposal Cover Letter that includes:

(i) The solicitation number, the name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(ii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iii) The names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(iv) Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(v) Offeror shall certify that it currently owns or is the bareboat charterer of the vessel(s) or has an irrevocable, legally enforceable right (e.g., contract or option) to purchase, bareboat charter or lease the vessel(s) proposed, for the duration of any charter awarded pursuant to this solicitation (including any extension thereto). Any such right to purchase, bareboat charter or lease the vessel(s) may be contingent upon receipt of award of a contract under this solicitation. In the event the offeror is not the owner or bareboat charterer of the vessel(s) at the time of submission of its offer, offeror shall provide as part of its proposal the following evidence of the legally enforceable right (e.g., contract or option) to purchase, bareboat charter or lease the vessel(s) proposed:

Identity of current owner Current nation of registry Description and date of contract or option to purchase, bareboat charter or lease the vessel Name and position of signatories to such contract or option

Offeror shall provide documentation corroborating such certification if requested by the Contracting Officer, to include, but not limited to, copies of any contracts or agreements to purchase or lease such vessel(s).

(2) Standard Form (SF) 33 (page 1 of the RFP) with blocks 12 through 18 completed (signed and dated). Failure to submit a signed and dated SF 33 may result in rejection of the offer.

(3) Representations and Certifications. The offeror must submit a complete

Representations and Certifications of all applicable provisions included in the solicitation. Items which are not applicable must be marked “N/A.” If an offeror has completed its representations and certifications online, it must so state in its proposal.

(4) Attachment 16, Standard Form SF-LLL, “Disclosure of Lobbying

Activities”.

(5) DD Form 254, Contract Security Classification Specification, (Attachment 7) completed with offeror’s information in Blocks 6 and 7.

(6) Corporate Viability. The offeror shall provide financial information sufficient to permit the Contracting Officer to make a determination of financial responsibility. Examples of information to support the determination are balance sheets, cash flow statements, income statements, and combined financial statements that illustrate the company’s ability to remain a viable business concern. The offeror must furnish evidence of adequate financial resources to perform the contract or the ability to obtain such resources. For the purpose of this section, adequate financial resources are an amount equal to the total value of forty-five (45) days of the proposed daily charter hire rate for the vessel (calculated on the basis of the firm period FOS charter hire rate).

(7) Collective Bargaining Agreements (CBAs). If applicable, provide copies of current documents that are signed and dated by the parties.

(8) Mission-Essential Contractor Services Plan. In accordance with DFARS 252.237-7023 and 252.237-7024, all offerors shall submit a Mission- Essential Contractor Services Plan.

(9) Small Business Subcontracting Plan. In accordance with FAR 52.219-9 and

DFARS 252.219-7003, large business offerors shall submit a Small Business Subcontracting Plan with their proposal. Offerors shall ensure that they submit a Small Business Subcontracting Plan with all of the information required by FAR 52.219-9. A subcontracting plan is NOT REQUIRED from small business concerns and will not be evaluated.

(10) Past Performance. Offerors are requested to provide information on up to three (3) previous Government contracts whose effort is/was recent and relevant to the effort required by this solicitation.

(i) “Recent” is defined as a contract in-progress or completed within the last three (3) years. If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.

(ii) “Relevant” is defined as a contract that is of similar scope, magnitude, complexity to the requirements as set forth in this solicitation.

Scope: Experience in the areas defined in the PWS.

Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the PWS.

Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the PWS. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).

A Past Performance Data Sheet (Attachment 14) is requested to be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offerors are responsible for the accuracy of all data provided. Past performance information regarding predecessor companies, key personnel who have relevant experience and subcontractors that will perform major or critical aspects of the requirement may be provided as past performance submissions.

For each of the contracts the offeror describes in a Performance Data Sheet (Attachment 14), the offeror is requested to provide a Past Performance Questionnaire (Attachment 15) to a reference at the organization that awarded the contract. It is requested that the reference, not the offeror, email or fax the completed Past Performance Questionnaire (Attachment

15) BEFORE THE DUE DATE FOR PROPOSALS directly to Veronica Gekhman, Military Sealift Command, 914 Charles Morris Court SE, Washington Navy Yard DC 20398-5540, e-mail:

veronica.gekhman@navy.mil; Fax Number: (202) 685-5966. The offeror, NOT THE GOVERNMENT, is responsible for ensuring that the Government receives a sufficient number of questionnaires.

All offerors are required to address historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns) in the Performance Data Sheet (Attachment 14). In addition, large businesses shall address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan, DOD Requirements.)

in the Performance Data Sheet (Attachment 14).

(11) Price Proposal. Offeror’s price proposal must clearly indicate the prices that are applicable to the program management support for the ramp-up period, the vessel modifications, and the FOS/ROS operation offered. The offeror’s price proposal shall contain the following:

(i) Offeror’s proposed firm-fixed-price daily rate for program management support of the approximately seven-month ramp-up period described in Sections C-2.1 through C-2.9 shall be entered under Specialtime Box 22.

(ii) Offeror’s proposed firm-fixed-price sum for vessel modifications shall be entered under Specialtime Box 22.

(iii) Offeror’s proposed Daily Charter Hire prices shall be entered under Specialtime Boxes 18-22.

(iv) Offerors shall complete Attachment 11, “Basic Pricing Data,” for each performance period, and Attachment 12, “Pricing Summary.”

Attachment 12 will be used for evaluation purposes only. In completing Attachments 11 and 12 offerors shall assume 216 days in the ramp-up period, 149 days in the firm period of the time charter, 365 days in option one, 366 days in option two, 365 days in option three, and 365 days in option four. In completing the fuel consumption portion of Attachment 12, offerors shall use the 5% in port, 72% underway at loiter/anchor, and 23% underway at transit speed operating tempo specified in Section C-1.6, and the fuel conversion factors and pricing specified in Section M, paragraph M-2.3.2(c). Attachment 12 shall also detail the type and number of auxiliary equipment included in Box 61 of the Specialtime Box format. The fuel consumption information provided in Attachment 12 shall be for the pre-modified vessel.

(v) Offerors shall complete Attachment 13, “Crew Complement Form” for each performance period.

(vi) Provide support data and breakdowns as required by FAR 52.215-20, below.

(12) Evidence of Contractor Responsibility. Offerors must provide evidence to support the prospective contractor’s affirmative responsibility determination, to include a response to each of the seven (7) elements of a responsibility determination as defined in FAR 9.104-1. These elements include:

(i) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104-3(a));

(ii) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

(iii) Have a satisfactory performance record (see 9.104-3(b) and Subpart

42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2;

(iv) Have a satisfactory record of integrity and business ethics (for example, see Subpart 42.15);

(v) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). (See 9.104-3 (a).)

(vi) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and

(vii)Be otherwise qualified and eligible to receive an award under applicable laws and regulations (see also inverted domestic corporation prohibition at 9.108).

L-7 Pre-Award Survey of Vessel

As part of a technical pre-award survey the Government reserves the right to inspect the offeror’s proposed vessel and associated equipment prior to award, which may include a two-hour speed trial to evaluate proposed speed and fuel consumption figures. Such acceptability inspection shall not be conducted for the purpose of determining whether an offeror’s proposal is superior to another, but only to determine that the offered vessel, as set forth in the proposal, meets the acceptability standards in the solicitation. If, upon inspection of the vessel, the Government determines that the offered vessel does not meet the acceptability standards, the offer may be rejected.

SECTION M - EVALUATION FACTORS FOR AWARD

SECTION M

M-2.3.2 Evaluated Price.

(a) The total evaluated price will equal the sum of the total dollar amounts offered for program management support of ramp-up period, vessel modifications, charter hire and fuel for the firm and option time periods, redelivery bonus (if offered), and any other costs (excluding ROS rates and cancellation fees) set forth in the offer. For evaluation purposes, the redelivery bonus and any additional costs (excluding ROS rates and cancellation fees) not already incorporated in the program management support of the ramp-up period, vessel modifications, or charter hire will be incorporated as part of the time charter firm period price. The total Program Management Support of Ramp-Up Period will equal the offered daily rate multiplied by the expected number of days in the ramp-up period portion of the firm period (216). The total Charter Hire will equal the offered daily rate multiplied by the expected number of days in the period (149 in the charter portion of the firm period, 365 in option periods 1, 3 and 4, and 366 in option period 2). The proposed price must be determined to be fair and reasonable prior to award.

(b) For evaluation purposes, fuel cost will be based upon the fuel consumption figures provided in each proposal, calculated according to the operational tempo of the mission. Fuel consumption will be calculated using the operational tempo in the table below. Evaluated fuel consumption will be added to the evaluated price for each contract period.

Operational Tempo

Underway 23% Loiter/Anchor 72% In Port 5%

(c) Fuel consumption costs will be calculated using the most current Defense Logistics Agency-

Energy (DLA-E) standard prices and fuel conversion factors. The following DLA-E FY 2013 rates, effective 01 October 2012, will be used:

Type Price

Market

$767.45 per metric ton

IFO 380/RMG-380 Open Market

$760.62 per metric ton

MGO Open Market $1,198.14 per metric ton

The following fuel conversion factors will be used:

Type Bbls per Metric Ton

Market

6.526

IFO 380/RMG-380 Open Market

6.468

MGO Open Market 7.507

(d) The above fuels are the only available fuels at DESC/Defense Fuel Stocking Points (DFSPs).

Only the above fuels will be used for evaluation purposes. Offerors shall propose fuels from the above list (whichever types are appropriate for their vessel). The fuel consumption rates proposed shall be for the pre-modified vessel. When multiple fuels are proposed, the fuel with the lowest per unit cost will be used for evaluation purposes.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .