Amendment 7.pdf
PDF 162 KB Posted
- Attached to
- Harbor Security Boat
- Solicitation number
- N00024-21-R-2295
About this file
This document is an amendment to a solicitation for the procurement of Harbor Security Boats by the Department of the Navy Naval Sea Systems Command. The amendment provides answers to questions from bidders to clarify requirements. It confirms that watertight compartmentation alone does not meet the definition of permanent sealed buoyancy under ISO 12217-1 unless it can be proven as an air tank meeting additional standards. It also confirms that while ISO 6185-4 section 3.1 requires buoyancy tubes to comprise over 50% of total buoyancy, the standard allows for alternative calculations under ISO 12217-1 if this is not met. Bidders must meet either the 50% threshold or provide alternative calculations demonstrating buoyancy requirements are still fulfilled.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 6.pdf | ||
| Amendment 5.pdf | ||
| Attachment 1_SSP HSB Specification_REV C 09Apr21.pdf | ||
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| Amendment 1.pdf | ||
| Attachment 1_SSP HSB Specification_REV B 23Feb2021.pdf | ||
| Att_8_-_CLIN Pricing Chart Rev A.xls | XLS spreadsheet | |
| Att_10_-_Past_Performance_Questionnaire.doc | DOC document | |
| Att_7_-_HSB_Production_Schedule Rev A.xlsx | XLSX spreadsheet | |
| Att_9_-_Past_Performance_Information.doc | DOC document | |
| N00024-21-R-2295 Solicitation.pdf | ||
| Att_6_-_Warranty_Terms Rev A.docx | DOCX document | |
| Att_5_-_Unique_Item_Identification_(UID).doc | DOC document | |
| Att_4_-_Techncial_Data_Rights.pdf | ||
| Att_2_-_Specification_Response_Matrix.xlsx | XLSX spreadsheet | |
| Att_3_-_Vendor_Provided_Spares_Parts_List Rev A.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the Amendment is to Answ er Bidder questions
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R2295
X 9B. DATED (SEE ITEM 11)
25-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Apr-2021
CODE
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE
WASHINGTON NAVY YARD DC 20376
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002421R2295
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CHANGES
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added:
INSTRUCTIONS TO OFFERORS
Question 28 Section: N/A RFP Change? NO Question:
Section 079-2 – Does the Government consider proven watertight compartmentation to be the same as permanent sealed buoyancy?
Answer:
Watertight compartmentation does not meet the ISO requirements for permanent sealed buoyancy unless it can be proven as an air tank or air container (cannot use hull or deck structure) and is subject the ISO requirements in ISO 12217-1 Annex G requirements for flotation elements, and the applicable number of air tanks are open per Annex F. Note that an air tank will not pass (or be extremely difficult to pass) the Specification Section 071 accessibility requirements Question 29 Section: N/A RFP Change? NO Question:
Section 079-2 – Is the requirement in ISO 6185-4 section 3.1 that the buoyancy tube comprise of more than 50% of the required total buoyant volume of the boat applicable for this solicitation?
Answer:
Yes, section 3.1 is an ISO requirement to meet the requirements of Section 7.6. However ISO 6185-4 allows for an alternative calculation for buoyancy. This is stated in ISO 6185 Section 7.4, “Alternatively, the static stability, BUOYANCY, and freeboard may be assessed using option 1, 2 or 3 of ISO 12217-1. Where this alternative is employed, the requirements of 7.6 do not apply.”
If the collar in the Offeror’s design does not comprise of at least 50% of the required buoyant volume then this alternative, more complicated, calculation is required.
Therefore if an Offeror’s bid is acceptable if it meets ISO 6185-4 Section 7.6 with at least 50% of the total required buoyancy comprised of the collars. And a bid is also acceptable if it meets the alternative 12217-1 buoyancy requirements when the collar does not comprise of at least 50% of the required buoyant volume.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .