Amendment 3.pdf
PDF 198 KB Posted
- Attached to
- Harbor Security Boat
- Solicitation number
- N00024-21-R-2295
About this file
This modification amends a solicitation for the procurement of Harbor Security Boats and spare propulsion systems to support the Strategic Systems Program. The Navy seeks up to twenty-six boats through indefinite-delivery/indefinite-quantity contracts with firm-fixed prices. The period of performance spans seven years. Bids are due by April 15, 2021. The modification answers sixteen questions from potential offerors, clarifying that Section A is the Form 1449 cover sheet, replacing a reference to Standard Form 33 with Standard Form 30, and confirming that break-in of spare propulsion systems is required per the original terms. Eligible contractors are invited to directly address the requirements set forth in this amended solicitation issued by the Naval Sea Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 7.pdf | ||
| Amendment 6.pdf | ||
| Amendment 5.pdf | ||
| Attachment 1_SSP HSB Specification_REV C 09Apr21.pdf | ||
| Amendment 4.pdf | ||
| Amendment 2.pdf | ||
| Amendment 1.pdf | ||
| Att_7_-_HSB_Production_Schedule Rev A.xlsx | XLSX spreadsheet | |
| Att_9_-_Past_Performance_Information.doc | DOC document | |
| Attachment 1_SSP HSB Specification_REV B 23Feb2021.pdf | ||
| Att_8_-_CLIN Pricing Chart Rev A.xls | XLS spreadsheet | |
| Att_10_-_Past_Performance_Questionnaire.doc | DOC document | |
| N00024-21-R-2295 Solicitation.pdf | ||
| Att_6_-_Warranty_Terms Rev A.docx | DOCX document | |
| Att_5_-_Unique_Item_Identification_(UID).doc | DOC document | |
| Att_4_-_Techncial_Data_Rights.pdf | ||
| Att_2_-_Specification_Response_Matrix.xlsx | XLSX spreadsheet | |
| Att_3_-_Vendor_Provided_Spares_Parts_List Rev A.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Ameendment is to answ er bidders questions and to extend the date of submission os this Solicitation
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R2295
X 9B. DATED (SEE ITEM 11)
25-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2021
CODE
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE
WASHINGTON NAVY YARD DC 20376
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002421R2295
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CHANGES
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Apr-2021 02:00 PM to 15-Apr-2021 02:00 PM.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
Question 8 Section: N/A RFP Change? YES Question:
L‐1.2, Can you please confirm that Section A is the Form 1449 cover sheet?
Answer:
Section A is the Form 1449 cover sheet
Question 9 Section: N/A RFP Change? YES Question:
L‐3.2.1 B, Where is Standard Form 33 attached?
Answer:
Should read Standard Form 30
Question 10 Section: N/A RFP Change? YES Question:
L‐3.2.1 E, Can you confirm that we fill in only Section K certs and Reps that are not already included in our
SAMS?
Answer:
Yes you only need to fill out the certs that are not included in SAM
Question 11 Section: N/A RFP Change? YES Question:
Section B CLIN 1001, There is a reference to Note C, do you mean Section ‐C?
Answer:
Yes, it should ready Section C
Question 12 Section: N/A RFP Change? YES Question:
CLINS 1002 and other spares propulsion system sets, this seems like a very large number of spare engines, is this correct that the Gov’t may buy, 16 sets of Propulsion systems? We need this information to conclude quotes from suppliers.?
Answer:
The number of spare propulsion systems required for CLIN 1002,(if exercised) 2002, 3002, 4002, 5002, and 6002 are the required number by the user.
Question 13 Section: N/A RFP Change? YES Question:
CLINS 1002 spares, The CLINS for spare propulsion systems sets require breaking in, can you confirm this is required as this is a spare set of engines? If so is this intended to be done on a dyno? Please confirm as this will be expensive for the Navy
N0002421R2295
Answer:
A break‐in of each spare engine is required per Section C‐2.2. The type of break‐in is as OEM requirements Question 14 Section: N/A RFP Change? YES Question:
CLIN 1001, Can you confirm that HSB described in CLIN 1001 includes everything noted in Attachment 1 only Answer:
CLIN 1001 includes all of the Att 1 items with the exception of PDITs and Engine Diagnostics which are separately priced in CLINs 1003 and 1011 (and following CLINs if exercised).
Question 15 Section: N/A RFP Change? YES Question:
Section C‐1.2, Is it not possible for the Navy to confirm consecutive years of the same qty’s, five per year, so that production planning can be more price effective for the Navy?
Answer:
The Government understands the cost implications of a break in production. The break in production is as specified Question 16 Section: N/A RFP Change? YES Question:
SEctio C‐2.2, Can you confirm that the CLINs for Propulsion sets will occur in the same years as the respective Boat CLINs?
Answer:
Spare propulsions sets are concurrent with the boats specified in Section C‐2.2.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .