Attachment J-7 Schedule Model Review.docx

DOCX document 16 KB Posted

Attached to
USS WAYNE E. MEYER (DDG 108) DSRA Federal contract opportunity
Solicitation number
N00024-19-R-4464
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to USS WAYNE E. MEYER (DDG 108) DSRA, newest first.
File Type Posted
N00024-19-R-4464_A0005.pdf PDF
N00024-19-R-4464_RFP_Conformed_through_A0005.pdf PDF
Attachment_J-4_DDG108_WEM_Pricing_Spreadsheet_A0005.xlsx XLSX spreadsheet
19-R-4464_WEM_QAs_2.pdf PDF
19-R-4464_WEM_QAs.pdf PDF
N00024-19-R-4464_A0004.pdf PDF
N00024-19-R-4464_Conformed_RFP_through_A0004.pdf PDF
N00024-19-R-4464_A0003.pdf PDF
N00024-19-R-4464_Conformed_through_A0003.pdf PDF
N00024-19-R-4464_Conformed_RFP_through_A0002.pdf PDF
N00024-19-R-4464_A0001.pdf PDF
N00024-19-R-4464_Conformed_through_A0001.pdf PDF
CDRL A011 PDF
CDRL B006 PDF
J-9_SECREQS_FOR_CIA,_CNIA_&_NWA_REV_AUG2013.pdf PDF
CDRL C002 PDF
Attachment J-4 DDG108 WEM Pricing_Spreadsheet.xlsx XLSX spreadsheet
CDRL A007 PDF
CDRL A005 PDF
Attachment S-2 PP CPARS Reference List USS WEM.docx DOCX document
CDRL B004 PDF
Attachment J-5 QASP WEM —
CDRL B007 PDF
CDRL A006 PDF
CDRL A003 PDF
S-9 Past Performance Questionnaire _USS WEM.docx DOCX document
S-6 —
CDRL A014 PDF
J-10_JBPHHINST_5560.2_PARKING_REGULATIONS.pdf PDF
CDRL B002 PDF
CDRL B009 PDF
CDRL C001 PDF
Attachment J-3 - DDG108 DSRA Flex Milestones 15Jul2019.xlsx XLSX spreadsheet
Attachment S-3 PPI Form.docx DOCX document
CDRL A002 PDF
CDRL A008 PDF
J_Attachments.zip ZIP file
Attachment S-4 Manpower Plan to Actual Data Sheet.xlsx XLSX spreadsheet
J-8_LSI_099-01PH,_099-03PH,_099-05PH,_099-06PH,_099-07PH.pdf PDF
S-5 Eligibility Criteria Data Sheet_USS WEM.docx DOCX document
S_Attachments.zip ZIP file
J_Attachments.zip ZIP file
CDRL B003 PDF
N00024-19-R-4464.pdf PDF
CDRL B001 PDF
CDRL B008 PDF
CDRL A012 PDF
CDRL A009 PDF
CDRL B005 PDF
CDRL A001 PDF
Show all 50

USS WAYNE E. MEYER (DDG 108) DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-7 Schedule Model Review Purpose: At A-30 the LMA shall lead a Schedule Model Review of the Integrated Production Schedule (IPS) with all parties to validate integration requirements. The Schedule Model Review is intended to be a detailed review of all work items to ensure adequate integration into the master schedule and to de-conflict any overlapping activities. The anticipated duration of this meeting is 5-7 days. Hours for Day 1 is 0800-1600 and for Day2 and following is 0800-1130.

1. Required Attendees:

a. LMA management team

b. Government Project Management Team (NSA)

c. Turnkey Subcontractors

d. AIT On Site Installation Coordinators (OSIC)

e. Intermediate Maintenance Facility (IMF) Ship’s Superintendent, if applicable

f. Ship’s Force (one representative from each department, Ship’s Maintenance Officer)

2. Agenda:

Day 1 WPER (Government Facilitated)

a. Early Start Candidates (LMA)

b. WAF/Tag Out coordination (LMA)

c. Pier Laydown Plan (LMA)

d. First 100 Hour Plan (NSA)

e. Communications Plan (NSA)

f. Process Control Procedures (PCP) (LMA)

g. Access Cuts (LMA)

h. Fire Prevention and Fire Drill (8010) requirements (NSA)

i. Memorandum of Agreement (MOA) – AIT’s only (NSA)

Day 2 - 7

j. LMA to Present the IPS for review. The IPS shall include (but not limited to) all work associated with the Lead Maintenance Activity (LMA), subcontractors, Alteration Installation Teams (AIT), Ship’s Force, and Intermediate Maintenance Activity (IMA).

3. Deliverables:

a. Updated IPS with all maintenance activities fully integrated. (LMA)

b. Early start candidates submitted and approved by the NSA. (LMA)

c. WAF/Tag Out coordination plan established. (LMA)

d. First 100 Hour Plan established. (NSA)

e. Set schedule for all required meetings. (NSA)

f. Pier Laydown Plan submitted for approval by Naval Station Everett. (LMA)

g. List of Process Control Procedures with projected due dates. (LMA)

h. List of access cuts (if required). (LMA)

i. Fire drill execution date set. (NSA)

j. Detailed review of critical path and top three controlling path items. (LMA)

File details come from the government source that posted it.