N0002418NR53038
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to replace Attachment J-1 "ARSV Specification Version 2.0" w ith "ARSV Sepcification Version 3.0" as attached to this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002419R2205
X 9B. DATED (SEE ITEM 11)
01-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Dec-2018
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002419R2205
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
I. SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following has been modified as shown in red below:
“SECTION J ATTACHMENTS
J-1 - ARSV Specification and Drawings, Version 3.0, dated 14 December 2018 J-2 - Data Requirements List (DRL) J-3 - Government Furnished Equipment
J-4 - RESERVED
J-5 - Commercial Warranty J-6 - Restrictions on Non-Commercial and Commercial Technical Data and Non-commercial Computer Software and Computer Software Documentation (provided by contractor) J-7 - List of Prohibited Materials
J-8 - RESERVED
J-9 - RESERVED
J-10 - ARSV Preservation Instructions
For Solicitation Only, will not be incorporated into the contract:
J-11 – Offeror’s Questions Submittal Form J-12 – Technical Data Package Status J-13 - Past Performance Questionnaire Form J-14 - Financial Data Requirements J-15 - Price Breakdown Worksheet”
II. ATTACHMENT J-1 ARSV SPECIFICATION
J-1 ARSV Specification is updated to Version 3.0 as attached to this amendment.
(End of Summary of Changes)
AUTEC RANGE SUPPORT VESSEL (ARSV) 5
SPECIFICATION
14 December 2018 10
ATTACHMENT J-1
DEPARTMENT OF THE NAVY
PROGRAM EXECUTIVE OFFICE, SHIPS 30
WASHINGTON, DC 20376
AUTEC RANGE SUPPORT VESSEL SPECIFICATION - VERSION 3.0
iii
Revision History
Revision Date Pages Description
Version 1.0 June 14, 2018 All Initial issue
Version 2.0 November 26, 2018 20 Added “All living spaces, including, but not limited to, berthing and lounges, shall be interior to the ship.” to 5.640 to prohibit the use of berthing modules to satisfy the berthing and lounge requirements.
Version 2.0 approved by Technical Authority per Ser 05D/266 dated 26 November 2018.
Version 3.0 December 14, 2018 8, 10 Changed the Maximum Length Overall to 245 feet.
Moved the Minimum Clear Working Deck Area requirement from Table 3.070c-1 to table 5.070c- 1.
Version 3.0 approved by Technical Authority per Ser 05D/284 dated 14 December 2018.
TABLE OF CONTENTS
1.000 SCOPE
2.000 DOCUMENTS
2.100 GOVERNMENT DOCUMENTS
2.200 NON-GOVERNMENT STANDARDS AND REFERENCES
2.300 DEFINITIONS
2.400 ACRONYMS AND ABBREVIATIONS
3.000 REQUIREMENTS FOR THE OSV PRIOR TO CONVERSION
3.070 GENERAL REQUIREMENTS FOR THE OSV
4.000 REQUIREMENTS FOR REACTIVATION OF THE OSV (IF IN LAID-UP STATUS) ..9
4.070 GENERAL
5.000 REQUIREMENTS FOR THE CONVERSION OF THE OSV
5.070 GENERAL
5.077 ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH
5.079 STABILITY
5.091 RELIABILITY, MAINTAINABILITY, AND AVAILABILITY
5.100 GENERAL REQUIREMNTS FOR HULL STRUCTURE
5.172 INSTALL ANTENNA FRAME ON PILOTHOUSE TOP
5.320 LIGHTING AND POWER DISTRIBUTION
5.422 SEARCHLIGHTS
5.424 SHIP'S ELECTRONIC NAVIGATION SYSTEMS AIDS
5.432 DIAL TELEPHONE SYSTEM
5.441 SHIP EQUIPMENT
5.532 FRESHWATER SERVICE SYSTEM
5.541 FUEL SYSTEM
5.544 MODIFICATION OF LIQUID MUD TANKS
5.551 COMPRESSED AIR SYSTEM
5.583 LIFESAVING APPLIANCES
5.589 DECK CRANE & FOUNDATION
5.590 REMOVAL OF EQUIPMENT RELATED TO OSV CLASS NOTATIONS
5.593 POLLUTION CONTROL SYSTEMS
5.602 HULL DESIGNATION AND MARKING
5.612 RAILS AND STANCHIONS
5.621 NON-STRUCTURAL BULKHEADS
5.622 SHIP’S BROW
5.631 PAINTING AND COATINGS
5.633 CATHODIC PROTECTION
5.640 REQUIREMENTS FOR LIVING, MESSING, LOUNGE AND LEISURE SPACES
5.651 FOOD SERVICE SPACES
5.654 CLEANING GEAR LOCKER
5.655 LAUNDRY
5.663 PILOTHOUSE, CHART AREA, AND MACHINERY CONTROL STATION
FURNISHINGS
5.664 DAMAGE CONTROL EQUIPMENT
5.672 STOREROOMS
6.000 VERIFICATION
APPENDIX A: INSTALL NEW HYDRAULIC SYSTEM
APPENDIX B: NEW OFFSHORE CRANE AND FOUNDATION
APPENDIX C: INSTALL TELESCOPIC TARGET LAUNCHING SYSTEM (TTLS)
APPENDIX D: INSTALL U-FRAME, FOUNDATION, RAMP, HINGE PLATE, DECK
ROLLERS, DECK STORAGE RACKS, AND ASSOCIATED DECK SOCKETS
LIST OF TABLES
Table 3.070c-1: Characteristics of the OSV Prior to Conversion Table 5.070c-1: Characteristics of Converted Ship Table 5.320-1: Working Deck Receptacles Table 3.672b-1: Food Service Store Volumes Table B-1: Crane Loading Table B-2: Load Test Sequence at Maximum Crane Rating Table B-3: Load Test Sequence for 3,000lb Ordinance Rating at Maximum Crane Radius Table D-1: Load Test Sequence at Maximum Crane Ratings
1.000 SCOPE
This Specification defines the requirements for the AUTEC Range Support Vessel
(ARSV). The ARSV will be an existing offshore supply vessel (OSV) converted for use as a US Navy range support vessel. The ARSV will replace the current range support vessel RANGE ROVER. The overall requirement is to provide all labor, services and materials to accomplish the delivery of the vessel activated from layup (if applicable), converted, and ready for service as a US Navy range support vessel.
The Contractor shall provide a suitable OSV for the conversion that meets the general principal characteristics and performance requirements of this Specification.
If the OSV is in lay-up status, the Contractor shall reactivate the vessel in accordance with the ABS Guide for Lay-up and Reactivation of Offshore Support Vessels. The Contractor shall complete all due and overdue surveys upon reactivation including any Special Surveys.
The Contractor shall convert the OSV in accordance with the requirements of this Specification. The conversion includes the following:
a. The conversion of any existing liquid mud tanks to ballast water tanks and the removal of any existing bulk mud tanks.
b. The design, installation, and certification of a Contractor furnished, folding-boom, deck crane.
c. The design and installation of a Contractor furnished hydraulic system to power the deck crane and various GFE mission equipment.
d. Installation of deck sockets for the installation of various GFE mission equipment.
e. The installation and testing of the following (GFE):
1. Telescoping Target Launching System (TTLS) which is a modified hydraulic shipboard crane
2. Ramp Recovery System (RRS), which is comprised of a centerline mounted U-frame, a recovery ramp for operation off the stern, and various other deck, hydraulic and electrical installations.
The Contractor shall complete all the inspection and survey requirements for delivery of the vessel with an International Load Line Certificate valid for 5 years. The contractor shall obtain the services of ABS, coordinate all required inspections, and perform any resulting required repairs. The Contractor shall submit to ABS all drawings necessary for review and approval in order to obtain an International Load Line assignment. The vessel shall be delivered with an ABS Classification certificate in accordance with the requirements of this Specification.
After the completion of all work, the US NAVY will take ownership of the vessel and operate it as a government owned, Public Vessel. The vessel will enter into service as a Navy testing range support boat.
2.000 DOCUMENTS
The following standards and documents are specified in this Specification. While every effort was made to ensure the completeness of this list, the Contractor is required to meet all specified requirements documents cited in this Specification, whether or not they are listed in this section. Compliance with referenced documents is mandatory even where the referenced document may use terms similar to “recommendation”, “guideline”, or “guidance” in their title or text.
Order of precedence - In the event of a conflict between the text of this document and the references (other than Regulatory Body requirements) cited in this document, the text of this document takes precedence. First tier references take precedence over sub-tier references in the event of a conflict. Nothing in this document shall supersede applicable laws and regulations unless a specific exemption has been obtained.
Silence of one document with respect to details or requirements in another document shall not be considered an inconsistency.
Effective issue - Where first tier references, such as industry standards, are referred to, the issue or revision/amendment in effect at Contract Award shall apply.
First Tier and Sub-tier Reference - Any referenced document that is directly cited for use or application by an identifying number or name in this Specification is a first tier reference for each particular use or application for which it is so cited. Any document that is cited in a first tier reference, or in a document referenced therein, is a sub tier reference. A document that is a sub-tier reference in one application may also be a first tier reference in another application when it is cited directly.
2.100 GOVERNMENT DOCUMENTS
2.100a. ARSV CONVERSION REFERENCE DRAWINGS
1. ACN 4416: Deck Rollers Ramp Recovery System
2. ACN 4420: Hydraulic Schematic Ramp Recovery System
3. ACN 4563: Stowage Chock Assembly & Details Ramp Recovery System
4. ACN 4565: Recovery Ramp Hinge Plate Assy and Det.
5. ACN 4570: Assembly, TTLS Deck Rollers
6. ACN 4571: TTLS Deck Rollers Weldment & Details
7. ACN 4572: Recovery Ramp Assy and Det’s,
8. ACN 4577: TTL Extended Pedestal Section Detail
9. ACN 4578: 1 ¼” Deck Socket and Plug
10. ACN 4583: In-Haul Winch Foundation
11. ACN 4974: 1” Deck Socket and Plug
12. ACN 6088: U-Frame & In-haul Winch Wiring Diagram RANGE ROVER & RANGER
13. ACN 6345: Main Deck Socket Installation for RRS & TTL
14. ACN 6346: Main Deck Electrical Outlet Locations
15. ACN 6347: Layout, Hydraulic Piping
16. ACN 6348: TTL Foundation Layout, Structural Stiffing and Roller Installation
17. ACN 6349: TTLS Grating Installation Detail
18. ACN 6350: 1” and 2” Deck Inserts With Installation Detail
19. ACN 6351: General Arrangement OSV Conversion Locations
20. ACN 6352: Antenna Frame
21. ACN 6353: U-Frame Assembly and Details Bolted Flange Connections
2.100b. OTHER GOVERNMENT DOCUMENTS
1. 46 USC Chapter 51 “Load Lines”
2. 46 CFR Parts 41-47, “Load Lines”
3. 46 CFR Subchapter L Offshore Supply Vessels
4. 46 CFR Subchapter S (parts 170-174)
5. NSTM Chapter 505 Piping Systems
6. NSTM Chapter 589 Cranes
7. NSTM Chapter 700 Shipboard Ammunition Handling and Stowage
8. MIL-A-18001 K Anodes Sacrificial Zinc Alloy
9. MIL-STD-419 LEVEL 6 Cleaning, Protecting, and Testing Piping, Tubing and Fittings for
Hydraulic Power Transmission Equipment
10. MIL-DTL-16884 Fuel Naval Distillate
2.200 NON-GOVERNMENT STANDARDS AND REFERENCES
1. ABS Rules for Building and Classing Offshore Support Vessels
2. ABS Guide for Lay-up and Reactivation of Offshore Support Vessels
3. ABS Guide for Certification of Lifting Appliances
4. ABS Guide for Dynamic Positioning Systems
5. American Society for Testing Materials (ASTM)
6. API Specification 2C Specification for Offshore Pedestal Mounted Cranes
7. Diesel Fuel Marine (NATO) Code F-76
8. IEEE Std 45-2002 Recommended Practice for Electrical Installation on Shipboard
9. International Load Line Convention (1966) as amended by the IMO 1988
10. ISO Standard 4406.2017 Code 17/15/13 Cleanliness Requirements for Hydraulic Oil
11. ISO Standard 8217 Specifications of Marine Fuels
12. MARPOL 73/78 International Convention for Prevention
13. PPG Marine Coating Product Data Sheets
14. SAE J429 Mechanical and Material Requirements for Externally Threaded Fasteners
15. SNAME T&R Bulletin No. 3-39, 2018
16. SNAME T&R Bulletin No. 3-47, 2015
17. Steel Structures Painting Council Surface Preparation Specifications (SSPC-SP)
2.300 DEFINITIONS
Accommodations: The facilities provided to support the people on board the vessel including sleeping, recreation, and sanitary, medical, food service and office spaces.
Approve: The terms ’as approved,’ ’to approve’, ‘approved’, ’as required’, and ’required’ mean the approval by, the requirements of, or the selection of the Government.
Additionally, the terms ’approved’ and ’required’ may also mean approved or required by a Regulatory Agency or Regulatory Body. Wherever these terms are used without further qualification, it is the approval, decision, or direction of the Government or Regulatory Bodies, as appropriate that is required.
Approximate: Where the term “approximate” or “approximately” is used, it means that delivered performance, parameter, or characteristics shall be within 10% of the specified value, except where an upper or lower bound on the specified value is provided.
Contractor: The firm that holds the prime contract with the Government for procurement and conversion of the vessel.
Deck toilet: Deck toilets shall consist of a toilet and wash basin.
Dedicated: When used to describe a space, dedicated means that the space serves a single purpose and does not contain any outfitting, equipment, and controls which do not serve the purpose of that space. When used to describe systems or equipment, dedicated means that the item serves a single purpose.
Government: The United States Government, and the Owner of the vessel.
Government Furnished Information (GFI): Information essential for the installation, test, operation, and interface support of all Government Furnished Material.
Guidance: A referenced document identified herein as “guidance” does not necessarily provide, nor is it intended that it provide all features and details of the system, subsystems, and equipment to which it relates. It serves the purpose of providing information and guidance which, when utilized in conjunction with applicable specification requirements, may assist in the design and construction of the ship. Reference documents identified herein as “guidance” are furnished without warranty or representation as to their accuracy, completeness, or suitability for use.
Herein: Wherever the term "herein" is used, it is intended to mean in any section of these Specifications, including Appendices.
Installed, Furnished, Fitted, or Provided: The Contractor shall procure, install, inspect, and perform other work necessary to ensure systems, subsystems, equipment, and their support systems and structure are capable of performing their intended function, as appropriate, unless otherwise specified.
Living spaces: Spaces whose primary function are the health and comfort of the crew.
Machinery space: Spaces classified as machinery spaces by the Regulatory Bodies, steering gear compartments, shaft alleys, pump rooms, motor rooms, thruster machinery rooms, and spaces containing sewage, oil, and solid waste transfer and processing equipment.
Or equal: Equipment, machinery, or an item of material that performs the same function as one named by the manufacturer or trade designation is of similar quality and construction.
Specifications: This Specification for the design, conversion, testing, and commissioning of the vessel.
Authorized NAVSEA Representative: The person or persons acting under the authority of the Government Contracting Officer. Representative’s duties will be to accept technical information and determine its completeness or correctness for the Government Contracting Officer.
Regulatory Body: Includes Governmental agencies such as United States Coast Guard (USCG), Centers for Disease Control and Prevention, Federal Communication Commission (FCC) or designated third parties (such as ABS) that are authorized to act on their behalf that have Federal regulations applicable to the design or construction of public vessels. In addition, includes non-governmental agencies (such as ABS), International Maritime Organization (IMO), International Convention for the Prevention of Pollution from Ships (MARPOL), IMO International Convention for the Safety of Life at Sea (SOLAS), and IMO Convention on the International Regulations for Preventing Collisions at Sea, 1972 (COLREG) for international voyages.
Shall be provided: Means the item or service is to be provided by the Contractor.
Will be provided: Means the material, equipment, or information will be provided to the
Contractor by the Government.
2.400 ACRONYMS AND ABBREVIATIONS
ABS American Bureau of Shipping ACAD AutoCAD ACS Aft Control Station AFFF Aqueous Film-Forming Foam Concentrates AIS Automatic Identification System AMS ABS Notation for vessel machinery, boilers, and systems
ANSI American National Standards Institute API American Petroleum Institute APS ABS Notation for self-propelled vessel with athwartship thrusters ASTM American Society for Testing and Materials AUTEC Atlantic Undersea Testing and Evaluation Center CCTV Closed circuit Television COLREG International Regulations for Preventing Collisions at Sea CRC Crane Register Certification CRES Corrosion Resistant DGPS Differential Global Positioning System DPS Dynamic positioning System DSC Digital Selective Calling ECDIS Electronic Chart Display and Information System EPIRB Emergency Position Indication Radio beacon FFV Fire Fighting Vessel GFE Government Furnished Equipment GMDSS Global Maritime Distress and Safety System HF High frequency IEEE Institute of Electrical and Electronic Engineers IMO International Maritime Organization ISO International Standards Organization ITC International Tonnage Convention JIC Joint Industry Council MARPOL International Convention for the Prevention of Pollution from Ships MCR Maximum Continuous Rating MSD Marine Sanitary Device NATO North Atlantic Treaty Organization NAVSEA Naval Sea Systems Command NDT Nondestructive Testing NGA National Geospatial-Intelligence Agency NPT National Pipe Taper NSTM Naval Ships Technical Manual OSHA Occupational Safety and Health Administration OSR Oil Spill Response OSV Offshore Supply Vessel PA/GA Public Address and General Alarm RRS Ramp Recovery System RX Receive SCBA Self Contained Breathing Apparatus SNAME Society of Naval Architects and Marine Engineers SOLAS Safety of Life at Sea SS Stainless Steel SSCC Stainless Steel Control Console SSPC-SP Steel Structures Painting Council Surface Preparation Specifications SSR Safety Stand-by Service STO Service Thermoplastic Oil Resistant
SWL Safe Working Load TOW Towing TTL Telescopic Target Launcher TTLS Telescopic Target Launching System TX Transmit USCG United States Coast Guard UWILD Underwater Inspection in Lieu of Dry docking VDC Volts DC VHF Very High Frequency WHE Weight Handling Equipment
3.000 REQUIREMENTS FOR THE OSV PRIOR TO CONVERSION
3.070 GENERAL REQUIREMENTS FOR THE OSV
3.070a. GENERAL
The OSV procured shall have been newly constructed and delivered after January 1, 2006.
OSVs with soft coatings in saltwater ballast tanks are not acceptable.
The OSV shall have fixed pitch propellers. OSVs with Z-drives as their main propulsors are acceptable.
3.070b. REGULATORY BODY REQUIREMENTS The OSV procured shall be U.S. Flagged and classed under ABS as A1, Offshore Support
Vessel, Ⓔ, AMS, and DPS-1 or greater prior to any conversion work.
The OSV procured shall have been designed and built in accordance with and complied with all Statutory Regulations listed below:
1. US Regulatory Tonnage
2. MARPOL 73/78 (All Applicable Annex’s)
3. 46 CFR Subchapter L Offshore Supply Vessels
4. International Load Line Convention 1966
5. International Tonnage Convention 1969
6. COLREG 1972
7. IMO 1974 SOLAS (with Amendments)
3.070c. CHARACTERISTICS The OSV procured shall comply with the characteristics described in Table 3.070c-1 below prior to any conversion work.
Characteristic Requirement Minimum Length Overall 180 feet Maximum Length Overall 245 feet Minimum Beam 40 feet Maximum Beam 56 feet Maximum Full Load Draft 15 feet Minimum Deck Cargo Load Capacity 25 long tons Minimum Speed at 90% of Max Continuous Rating 10 knots
Minimum Fuel Oil Storage Capacity 40,000 gallons Table 3.070c-1: Characteristics of the OSV Prior to Conversion
4.000 REQUIREMENTS FOR REACTIVATION OF THE OSV (IF IN LAID-UP
STATUS)
4.070 GENERAL
4.070a. GENERAL
The OSV supplied for conversion, if currently laid-up, shall be reactivated in accordance with the ABS Guide for Lay-up and Reactivation of Offshore Support Vessels.
4.070b. CERTIFICATIONS
Upon the completion of the reactivation, the vessel shall be certified by ABS as having been reactivated in accordance with the ABS Guide for Lay-up and Reactivation of Offshore Support Vessels.
5.000 REQUIREMENTS FOR THE CONVERSION OF THE OSV
5.070 GENERAL
5.070a. GENERAL
5.070b. REGULATORY BODY REQUIREMENTS
All modifications to the OSV to meet the conversion requirements shall be in accordance with ABS rules. The Contractor shall provide all drawings and data necessary for ABS review and approval of the design and work necessary to meet the conversion requirements.
The ship, once converted, shall be classed under ABS as A1, Offshore Support Vessel, Ⓔ, AMS, CRC(SC), and DPS-1 or greater. All class surveys and special surveys due within a year after delivery of the ship shall be completed. Any class surveys and special surveys that allow for early completion within a year after delivery of the ship shall also be completed.
The ship shall be issued certificates of compliance for MARPOL, SOLAS, and IMO Convention on the COLREGs for international voyages by a Public Vessel.
The ship shall be delivered with an International Load Line Certificate.
5.070c. CHARACTERISTICS The ship shall be capable of maintaining a sustained speed of at least 10 knots. The sustained speed shall be specified at 90% of ABS Maximum Continuous Rating (MCR) of the propulsion prime movers at trial conditions, with the ship at full load displacement in calm water (no current, wind or waves), and with a clean hull and propellers.
The aft deck shall allow for operations over each side.
The aft working deck shall have a clear open, continuous, coplanar, rectangular area with a minimum area of 3800 square feet. The aft working deck shall have a minimum length of 100 feet and a minimum width of 38 feet with a clear opening on the stern of 30 feet at the deck level. The aft working deck shall be clear of all equipment and deck protrusions taller than 2 inches.
The converted vessel shall maintain all the characteristics listed in Table 3.070c-1 and also comply with those listed below in Table 5.070c-1.
Table 5.070c-1: Characteristics of Converted Ship
All propulsion, electrical generating and auxiliary machinery shall be capable of continuous operation using diesel fuel in accordance with ASTM D975, Grade 2-D; International Standards Organization (ISO) 8217, F-DMA; and Diesel Fuel Marine (North Atlantic Treaty Organization (NATO) Code F-76) in accordance with MIL-DTL-16884.
5.070d. CERTIFICATIONS
The following certificates shall be supplied to the ship, at the time of delivery, as applicable for this category and size of the ship:
1. Certificates required by ABS Classification and Flag State Authority
2. SOLAS
3. MARPOL
4. IMO Convention on the COLREGs for international voyages
5. IMO International Convention on Load Lines, 1966
6. IMO International Convention on Tonnage Measurement on Ships, 1969 (re-admeasured to account for modifications)
7. Load test certificate for all non-GFE lifting and lashing equipment including overhead beams and lugs
8. Magnetic compass calibration and other navigational certificates required by Flag
State Authority
9. Life rafts and hydrostatic releaser
10. Lien Free Certificate
11. Certificate for davits and rescue boat
12. Lifesaving equipment Certificate
13. US Regulatory and ITC Tonnage
14. International Radio Communication Regulations
Characteristic Requirement Minimum Clear Working Deck Area 100 feet long by 38 feet wide Minimum Dry Stores Volume 120 cubic feet Minimum Refrigerated Stores Volume 170 cubic feet Minimum Freezer Stores Volume 125 cubic feet Bridge Arrangement Forward and aft vessel control and navigation stations
Main Engine Arrangement Conventional twin diesel engines, diesel electric, or Z-Drive arrangement
Generator Arrangement
Each generator shall have paralleling capability and be able to accommodate the full ship’s load plus an additional 200kW for
GFE
Minimum Potable Water Making Capacity and Arrangement
Reverse Osmosis unit with minimum capacity of 1,700 gallons per day
Total Personnel Capacity 22 total, including crew Accommodations Arrangement 22 berths total, including crew
15. Safety Lifesaving Radios Certificate for GMDSS Areas A1 and A2
No USCG review is required for conversion and no Certificate of Inspection will be issued.
5.070e. OPERATING ENVIRONMENT At a minimum, the ship and its systems shall retain full capabilities within a seawater temperature range of 40o F to 95o F and a weather ambient air temperature range of 35o F to 104o
F dry bulb and 86o F wet bulb.
5.070f. GENERAL REQUIREMENTS FOR EQUIPMENT, MACHINERY, AND
MATERIALS
All equipment, machinery, and material that is new to the vessel, and provided to meet the requirements of the conversion, shall be purchased new, and be protected and handled to maintain such condition.
The ship shall be provided with fixed eyewash stations in the engine room, near sewage machinery related spaces, near battery charging stations, near workshops, and on the working deck aft of the deckhouse.
5.070g. WORKMANSHIP This section applies to all new work completed by the Contractor as part of the conversion.
Inaccessible void spaces, and corners and crevices in which water and dirt may collect or pool shall be eliminated. Drain holes shall be cut and watercourses provided to prevent accumulation and retention of liquids and to permit the free flow to drains, scuppers, sumps, and suction pipes. Drain holes in bottom longitudinals and vertical keel shall be located to ensure drainage of each bay formed by longitudinal and transverse frames.
Exposed outside corners or sharp edges of interior bulkheads, joiner bulkheads, coamings and other raised structures, and their stiffeners in accommodation and mission operations spaces shall be rounded to prevent personal injury.
All surface coatings, lagging and insulation disturbed during the conversion, including but not limited to paint, deck covering, piping lagging and bulkhead insulation, shall be restored to match the surrounding areas. This includes both sides of steel where welding or burning has occurred. All new steel structure shall be painted to match other steel in the area. All new and modified piping shall be painted to match other piping in the area.
5.077 ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH
5.077a. GENERAL
The Contractor shall incorporate Environmental, Safety and Occupational Health considerations and criteria into the design of ship’s systems, equipment, and arrangements to ensure the safety of personnel, systems, equipment, and the environment, to ensure regulatory compliance with all applicable environmental laws and regulations.
5.077b. SYSTEM SAFETY
For all new rotating or oscillating equipment and machinery, safety devices or guards shall be installed over unprotected moving parts that could pose a hazard to personnel.
5.077c. POLLUTION PREVENTION
Class I or II ozone depleting substances, as defined in the Clean Air Act, 42 United States Code, shall not be permitted in the conversion and operation of the ship. Lead paint shall not be used in the conversion of the ship.
The ship shall comply with MARPOL 73/78 International Convention for the Prevention of Pollution from Ships and its subsequent amendments.
5.077d. HAZARDOUS MATERIAL The prohibited chemicals in T9070-AL-DPC-020/077-2 NAVSEA hazardous material Avoidance Process manual shall not be used in the conversion and operation of the ship unless excepted as noted in the process manual or otherwise approved. Use of restricted chemicals in the NAVSEA Hazardous Material Avoidance Process manual shall be minimized in the conversion and operation of the ship.
5.079 STABILITY
The vessel shall meet the stability requirements necessary for the assignment of the International Load Line Certificate. The addition of the crane shall be considered when performing the stability analysis. The vessel shall be delivered with the capability to ballast down to the load line with no deck cargo and 70% liquid consumables and meet all regulatory stability requirements. This shall be achieved without the use of permanent ballast.
5.091 RELIABILITY, MAINTAINABILITY, AND AVAILABILITY
All application software, including embedded software within systems, and operating systems shall be supportable and provided the means to be upgraded or updated during the vessel's life. At delivery of the vessel, all application software and firmware programs, and operating systems shall be delivered with at least three years remaining prior to the software developer's or Original Equipment Manufacturer's end of support date.
5.100 GENERAL REQUIREMNTS FOR HULL STRUCTURE
5.100a. STRUCTURAL REQUIREMENTS FOR MISSION PAYLOADS The working deck shall be steel and have a minimum cargo load capacity of 25 long tons.
Any wood decking on the working deck shall be removed including any fasteners and attachment devices. The working deck shall be coplanar and preserved in accordance with Attachment J-10 Preservation Instructions.
5.100b. REMOVAL OF CARGO RAILS ON MAIN DECK AND BULWARK
OPENINGS
If the OSV has cargo rails on the main deck, they shall be removed in their entirety.
The bulwarks at the stern shall be modified as necessary to provide a clear opening of 30 feet at the main deck level.
The bulwarks on the port and starboard side of the main deck, aft of the new deck crane, shall be modified to provide a clear opening of 12 feet at the deck level to allow for over-the-side operations. The exact location of the openings shall be approved by the Authorized NAVSEA
Representative. The bulwark openings on both sides shall be in two adjacent 6-foot sections and be capable of being closed off by timber inserts.
5.100c. DECK SOCKETS The main deck aft of the deckhouse shall be provided with a system of deck sockets installed in accordance with Appendices A through D.
5.172 INSTALL ANTENNA FRAME ON PILOTHOUSE TOP
Install a new antenna structure on the pilothouse top plate using the referenced drawing (ACN 6352) as a guide for construction and configuration. The installation shall be designed not to interfere with already installed equipment, lighting, and access ladders. The installation requirement is for the pipe frame only and not any antennas or cables.
1. Material: ASTM A312 304 Alloy Stainless Steel 1¼" Standard IPS pipe
2. Width: (same as pilot house top)
3. Length: 12 feet (do not interfere other installed equipment)
4. Height: 7.5 feet above pilothouse top plate
5. Height to top hand rail: 40 inches above pilothouse top plate
6. Height to lower tier of rail: 24 inches above pilothouse top plate
7. Height to bottom tier of rail: 9 inches above pilothouse top plate
8. Provide and install all pipe, fittings, elbows, and brackets, as required
9. Provide and install new wire way studs and stainless steel stand-off assemblies on the frame structure in equally spaces intervals of 24 inches.
The final design of the antenna frame shall be approved by the Authorized NAVSEA Representative.
5.320 LIGHTING AND POWER DISTRIBUTION
5.320a. WORKING DECK LIGHTING
Nine corrosion resistant, watertight floodlights shall be installed on the port and starboard sides of the working deck along the bulwarks at locations approved by the Authorized NAVSEA Representative. The floodlights (Proflood Model# QA1605) shall be mounted on pole supports such that the lights are 10 feet above the deck when installed. The floodlight and support pole assemblies shall be capable of being easily installed and uninstalled from the ship by means of sockets or sleeves similar to those shown in Figure 5.320a-1. The poles shall be capable of being rotated in place when installed. The final design of the pole socket or sleeve system shall be approved by the Authorized NAVSEA Representative.
The Contractor shall procure and install all waterproof receptacles, plugs and junction boxes, penetrations, cableways, and STO-type electrical cable necessary to provide functioning floodlights. Receptacles for each floodlight shall be located at each support pole. Each circuit shall be rated for 120 VAC, 20 Amp service. The cable from the floodlight down to receptacle level shall be properly secured to the pole with enough slack to rotate the pole while the cable is plugged in.
Four additional watertight floodlights shall be installed on the two upper weather decks, without pole stand assemblies, above the main deck. The Contractor shall affix these lights to the deck edges with the lights directed down ward towards the working deck. The Authorized
NAVSEA Representative shall approve the location for each light. See drawing ACN6346 for general locations and arrangement.
The floodlights shall be provided with a dedicated lighting distribution panel. A single on/off switch with box and cover for all the floodlights shall be provided in the galley area.
Figure 5.320a-1 Floodlight Support Pole
5.320b. WORKING DECK RECEPTACLES
General purpose, corrosion resistant, watertight receptacles shall be installed with Grade 316 stainless steel fasteners on the port and starboard sides of the working deck along the bulwarks at locations approved by the Authorized NAVSEA Representative. See drawing ACN6346 for general locations and arrangement.
The number and type of receptacles are as detailed in Table 5.320-1 below.
Quantity Description Manufacturer Part Number 5 480 VAC 60 AMP 3-PH Thomas & Betts F26954 1 480 VAC 200 AMP 3- PH Thomas & Betts D53504FRABO
4 208/120 VAC 60 AMP 3-PH HUBBELL HBL560R9W
2 120 VAC 20 AMP 1 PH Paulin INX3181
Table 5.320-1: Working Deck Receptacles
The contractor shall procure and install the necessary receptacles, electrical cableways, cable, penetrations, junction boxes, transformers, and distribution panels to provide functional receptacles.
Install suitable Grade 316 stainless steel pipes for working deck cable penetrations with suitable cable connectors sealing the cable.
5.320c. POWER DISTRIBUTION INSTALLATION ON BRIDGE
The Pilothouse shall be equipped with six dedicated mission system, duplex power receptacles on separate circuits each rated for 120 V, 60 Hz, 20 Amps. Three receptacles shall be located on the port side of the aft bulkhead and three receptacles shall be located on the starboard side of the aft bulkhead. Final location of the receptacles shall be approved by the Authorized NAVSEA Representative.
A dedicated penetration from the Pilothouse to the weather for mission system cables shall be provided. Unless otherwise specified, penetrations through weathertight, watertight, and fire zone boundaries shall be provided with multi-cable transits with closure blocks installed.
Wire way penetrations shall be installed to allow transits to be accessed and connected to the top of the pilothouse. Procure and install six watertight ROX or Nelson RGSS-4 transits, supports, and wire ways to allow for future GFE cable installations. Two transits on both the port and starboard sides shall be installed along the longitudinal bulkheads on top of the pilothouse. One transit each shall be installed on both the port and starboard side of the center mast on top of the pilothouse. Final location of the transits shall be approved by the Authorized NAVSEA Representative. All procured parts (i.e. transits, frames, hardware, stay plates, compression plates, etc.) shall be stainless steel.
5.422 SEARCHLIGHTS
Three 1,000 Watt, 480 volts, 60 Hz, focusable beam signal searchlights shall be provided above the Pilothouse in the following locations:
1. Port side forward
2. Starboard side forward
3. Port side aft
The searchlights shall be provided with remote controls in the pilothouse. The aft light shall be controllable from the aft ship control console.
5.424 SHIP'S ELECTRONIC NAVIGATION SYSTEMS AIDS
Control consoles for the Pilothouse shall be comprised of the following systems: Auto Pilot, Chart Plotter, Depth Sounder, two DGPS, EPIRB, GMDSS “A3”, Gyro Compass, Magnetic Compass, Radar (S-BAND), VHF Radio, and X-band Radar.
Aft Control Station (ACS): The ACS shall be provided and located in the aft portion of the Pilothouse. CCTV monitoring is to be provided in the Pilothouse with remotely controlled pan-tilt-zoom color exterior cameras to view the windlass, bow, aft deck, and the brow service area.
5.424a. ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM
(ECDIS)
An IMO compliant ECDIS shall be provided at the forward bridge console and in the Chart Area. Each ECDIS shall have the ability to access and read electronic charts as follows:
1. Official, government approved Electronic Navigational Charts in International Hydrographic Office S-57 format
2. National Geospatial-Intelligence Agency (NGA) produced Digital Nautical Charts®
Each ECDIS display shall be capable of radar overlay. ECDIS shall not be connected to any Information Technology infrastructure, systems, and/or networks to include wireless networks capable of off ship communication.
5.424b. AUTOMATIC IDENTIFICATION SYSTEM (AIS)
An AIS shall be provided (SAAB R5 or equal). Equivalency based on AIS shall have four modes of operation, Normal mode (standard receive (RX)/standard transmit (TX)), Silent mode (standard and silent RX Only), Tactical mode (standard and secure RX/secure TX only) and Hybrid mode (standard and secure RX/standard TX/secure TX for user generated messages only). The AIS shall be upgradeable by software-only change to support Emissions Control.
5.432 DIAL TELEPHONE SYSTEM
A Dial Telephone Directory shall be provided. A six-line shore telephone connection box shall be provided in the vicinity of the shore power connection. This box shall be located for service from both sides of the ship. Phone jacks shall be installed in the following areas: bridge, Captains quarters, Chief Engineer quarters, galley, (1) below deck machinery space, and crew lounge.
A combined Intercom/PA/GA system shall be installed for intercom, telephone communications, announcements, and alarms over the vessel's loudspeakers throughout the vessels interior, machinery spaces, and weather decks. The system shall include tone generators and controls, speaker placement, wiring, and zoning; as required to comply with the requirements for public address and general alarm systems. The general alarm function shall be integrated with the PA system. The audible alarm shall be transmitted over the vessel's loudspeakers. Nameplates and markings shall be provided for all phones, equipment cabinets, and cabling.
5.441 SHIP EQUIPMENT
The ship shall be equipped with a GMDSS compliant for Sea Area A3. The requirement for initiating the transmission of ship-to-shore distress alerts by a radio service can either be accomplished through the use of a second INMARSAT or HF DSC.
5.532 FRESHWATER SERVICE SYSTEM
A reverse osmosis water maker capable of producing at least 1700 gallons per day shall be installed on the vessel.
The vessel shall be provided with freshwater hose bibs on the working deck on the port and starboard sides. The fittings shall be ATSM 316 Stainless and be threaded for NPT threads.
Each hose bib shall be sized for a minimum of 14 gallons per minute. Supply branches to the hose bibs on the working deck shall be provided with means for back flow prevention.
5.541 FUEL SYSTEM
A minimum of 40,000 gallons fuel oil storage shall be provided.
5.544 MODIFICATION OF LIQUID MUD TANKS
All existing liquid mud tanks shall be converted for use as saltwater ballast tanks. The contractor shall remove piping, valves, electrical, mud pumps, deck discharges, circulation system/agitators, and controls dedicated to the liquid mud tank system. The tanks shall then be incorporated into the saltwater ballast discharge and suction piping systems, including venting to main deck, and allow for independent service to each tank. All tanks shall be hard coated in accordance with the J-10 Attachment requirements.
5.551 COMPRESSED AIR SYSTEM
Connections to ship’s service air system shall be provided at a minimum of one per weather deck. Each connection shall include a shut off valve and a female quick disconnect fitting. Fittings shall be ATSM 316 Stainless and be threaded for NPT threads.
5.583 LIFESAVING APPLIANCES
SOLAS and USCG approved lifeboats or inflatable life rafts, handling systems, lifebuoys, and lifejackets shall be provided for the maximum number of people that can be accommodated on the vessel after its conversion. All lifesaving appliances must be certified prior to delivery of the vessel.
5.589 DECK CRANE & FOUNDATION
A folding-boom deck crane for AUTEC range support operations shall be provided. The crane shall be designed, constructed, tested and certified as an offshore crane in accordance with the requirements of the API Specification 2C and ABS Guide for Certification of Lifting Appliances and be delivered with ABS Crane Register Certification (CRC). The crane shall be load tested to meet the requirements of NSTM Chapter 589 Cranes and NSTM Chapter 700 Shipboard Ammunition Handling and Storage. The crane shall be located per drawing ACN 6345 and all portions of the working deck underneath the U-Frame (GFE) shall be accessed by the crane. All design parameters of the new deck crane and its respective foundation can be found in Appendix B.
5.590 REMOVAL OF EQUIPMENT RELATED TO OSV CLASS NOTATIONS
The contractor shall remove in their entirety any and all equipment and installations related to classification of the vessel (if ever installed) for Fire Fighting Vessel (FFV), Anchor Handling (AH), Towing (TOW), Oil Spill Response (OSR), Safety Stand-by Service (SSR).
This also applies to any other class notation which is not specifically required as part of this specification.
All bulk mud tanks and associated piping, valves, pumps, deck connections, compressors, controls, electrical equipment, wiring, and engines shall be removed in their entirety. Structure in way of the removals shall be replaced as necessary. The contractor shall ensure the remaining space retains the proper access, piping, and electrical connections necessary for continued service.
All disturbed coating shall be touched up according to Attachment J-10 Preservation Instructions.
5.593 POLLUTION CONTROL SYSTEMS
All required pollution control systems shall be provided for compliance with the applicable MARPOL 73/78 ANNEX’s. Taking into account the applicability changes as a result of changes of the vessel admeasured tonnage, and, ownership to a publically owned vessel (government owned). The contractor shall obtain a re-admeasured ITC tonnage value for the vessel after all modifications outlined herein have been accomplished.
5.593a. SEWAGE SYSTEMS AND MARINE SANITARY DEVICE (MSD)
SYSTEM
The ship shall be provided with a sewage treatment system sized for the maximum personnel capacity of the vessel after conversion. Onboard tankage capable of holding untreated sewage and gray water generated during 5 days for maximum vessel personnel capacity shall be provided. The ship shall be capable of discharging untreated sewage and gray water directly overboard, or directly to the holding tank, or overboard processed first through the MSD. The MSD shall be a USCG/IMO compliant Type 2, Grey and Black Water capable. All modifications to the vessel to meet this requirement shall be reviewed by ABS and all requirements for maintaining applicable class notations shall be met.
5.593b. OIL POLLUTION SYSTEMS
Machinery space bilges shall be dry. Means shall be provided to minimize both the production of and the oil contamination of bilge water. Clean water drains shall not discharge to the bilge, or to the waste oil or oily waste drain tanks. A 700-gallon, minimum, oily bilge water tank shall be provided in the main machinery space to collect accumulated bilge water along with a separate, isolated, pumping arrangement for filling the tank from the bilge. Devices shall be provided to provide the ability to pump the accumulated oily bilge water through a properly sized deck connection. A proper venting arrangement shall be installed on the tank venting to the exterior weather deck. All modifications to the vessel to meet this requirement shall be reviewed by ABS and all requirements for maintaining applicable class notations shall be met.
5.602 HULL DESIGNATION AND MARKING
5.602a. GENERAL The ship shall be provided with identification, display markings, label plates, placards, and signs for all spaces and equipment.
Plates provided in the weather or areas exposed to seawater shall be sealed to exclude moisture between the plate and mounting surface. Non-corrosive label plates affixed to equipment by manufacturers are acceptable if they contain the required information, or are augmented by Contractor provided label plates as required.
All piping and fittings systems shall be identified in accordance with NSTM Chapter 505.
All equipment and components shall be labeled as to service and function. All remote operating gear shall be labeled. All bulkhead and ceiling access plates shall be labeled as to the service concealed.
Warning, caution, operating, and instruction plates shall be installed in accordance with USCG regulations.
5.602b. ANCHOR AND ANCHOR CHAIN MARKINGS The anchor chains shall be painted and marked in accordance with the AUTEC Support Vessel Preservation Instructions, Attachment J-10.
5.602c. DRAFT MARKS & MISCELLANEOUS HULL LABELS AND MARKING Stainless Steel Series ASTM Grade 316 label plates showing SWL, test load and last date tested shall be attached to structure close to load carrying fittings.
The ship shall be provided with draft marks located forward, amidships, and aft on both the port and starboard sides. Draft marks shall cover the draft of the ship under all probable conditions of loading and corresponding trims. Draft marks shall be outlined by weld bead and painted in “WHITE” numerals to contrast with the background color. Ships designed and built in the Inch-Pound system of units shall have numerals precisely 6” high, and spaced 6” vertically. The bottom of the number shall coincide with the draft it represents. Ships designed and built in the International System of Units shall have numerals precisely 100 mm high and spaced 0.2 m vertically. The bottom of the number shall coincide with the draft it represents.
Load line and Plimsoll markings shall be provided on the port and starboard sides as directed by ABS surveyor. Markings shall be raised steel plating and painted “WHITE”.
Any existing weld bead outlining original hull markings that are not being kept shall be ground flush. Letters and numerals of the new hull markings described below shall be outlined by weld bead.
Lettering, spacing, and sizing of the below markings shall be as follows:
1. Letters shall be at least 12 inches tall and 2 inches thick in plain block font. Numerals shall be at least 6 inches tall and 1-inch thick plain block font.
2. Paint all lettering and numbers with white or black paint contrasting with the background color.
3. Apply “VENTURE” in “BLACK” lettering on the port and starboard forward bulwarks.
4. Apply “AUTEC” and “U.S. NAVY” in “BLACK” lettering on the pilothouse roof.
5. Apply "AUTEC" and "U.S. NAVY" in “BLACK” lettering to the port and starboard…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.