AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Respond to a bidder's question and modify Sections L and M.
1. CONTRACT ID CODE PAGE OF PAGES
L 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-15-R-6263
X 9B. DATED (SEE ITEM 11)
16-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jul-2015
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2050
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-15-R-6263
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Q&A
Number Question and Answer
Q1 Is it NAVSEA’s intent to evaluate the Offeror’s production and manufacturing approach, including production processes, procedures, material handling, and controls for the fabrication of the TB-29X
Tow Cable Assemblies? The TB-29X tow cable assembly is not included in the required hardware configuration.
Page 143, Section M 2.2.1.c
“c) The degree to which the proposal demonstrates the Offeror’s production and manufacturing approach, including production processes, procedures, material handling, and controls for the fabrication of the TB-29X Towed Array Assemblies, Tow Cable Assemblies, Array Receiver Units, and
Test Sets; and identifies the production level documentation needed to produce the TB-29X Towed
Array Assemblies, Array Receiver Units, and Test Sets.”
A1 No, it is not NAVSEA’s intent to evaluate the Offeror's production and manufacturing approach, including production processes, procedures, material handling, and controls for the fabrication of the
TB-29X Tow Cable Assemblies. Please see the modification below to SECTION M - EVALUATION
FACTORS FOR AWARD, Paragraph 2.1(c) under VOLUME I - TECHNICAL/MANAGEMENT
PROPOSAL, evaluation criteria.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
Paragraph 1.1(g) under VOLUME I - TECHNICAL/MANAGEMENT PROPOSAL is hereby modified:
From:
g) Meets or exceeds the Towed Array Assembly reliability threshold or objective requirements. The offeror shall provide a Reliability Block Diagram for the TB-29X Towed Body (Consisting of a TB-29X Towed
Array Assembly and Tow Cable Assembly) that includes the Mean Time Between Failure (MTBF) at the array module or tow cable level and bases for estimated MTBF for each module or tow cable element.
To:
g) Meets or exceeds the Towed Array Assembly reliability threshold or objective requirements. The offeror shall provide calculations using a Reliability Block Diagram (RBD) for the entire TB-29X Towed Array
Assembly and TB-29A Tow Cable Assembly that includes the Mean Time Between Critical Failure
(MTBCF) at the array level (summed as a series of modules) combined with historical TB-29A tow cable critical reliability performance (17,500 on-hull hours MTBCF). A basis for estimated MTBCF for the
Towed Array Assembly portion of the RBD shall be provided.
SECTION M - EVALUATION FACTORS FOR AWARD
Paragraph 1.1(g) under VOLUME I - TECHNICAL/MANAGEMENT PROPOSAL is hereby modified:
N00024-15-R-6263
g) The degree to which the proposed demonstrates compliance with the Towed Array Assembly reliability threshold or achieves the objective reliability requirement. The offeror that demonstrates it can achieve the objective reliability requirement will receive a more favorable evaluation rating.
g) The degree to which the proposed demonstrates compliance with the Towed Array Assembly reliability threshold or achieves the objective requirements. The Offeror that demonstrates it can achieve the objective reliability requirement will receive a more favorable evaluation rating.
Paragraph 2.1(c) under VOLUME I - TECHNICAL/MANAGEMENT PROPOSAL is hereby modified:
c) The degree to which the proposal demonstrates the Offeror’s production and manufacturing approach, including production processes, procedures, material handling, and controls for the fabrication of the
TB-29X Towed Array Assemblies, Tow Cable Assemblies, Array Receiver Units, and Test Sets; and identifies the production level documentation needed to produce the TB-29X Towed Array Assemblies, Array Receiver Units, and Test Sets.
c) The degree to which the proposal demonstrates the Offeror's production and manufacturing approach, including production processes, procedures, material handling, and controls for the fabrication of the TB-
29X Towed Array Assemblies, Array Receiver Units, and Test Sets; and identifies the production level documentation needed to produce the TB-29X Towed Array Assemblies, Array Receiver Units, and Test
Sets.