Attachment 5 - GFI List 28JUL2015
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Furnished Information Attachment #___5____ PR #: N00024-14-NR-94087
NAVSEA Form 4205/19 (REV. 11-90) Attachment “5” to Solicitation N00024-15-R-6263 Page 1 of 1
PROGRAM TITLE: TB-29X Production
SOLICITATION NO.: N00024-15-R-6263
DATE:
28 July 2015
LINE ITEM NUMBERS
MOD
(3)
(5)
DOC DATE
(6)
CODE: PMS4011
SCHEDULE
(1)
A/C
(2)
EQUIPMENT NOMENCLATURE
EQUIPMENT DESIGNATOR
DOCUMENT TITLE
DOCUMENT NUMBER
(4)
VOL PRT REV CHG SUP GFI DUE DATE
(7)
Submarine Acoustic Systems Program
Office, Sensor Systems Risk Process Description Revision A 12 October 2006
Concurrent with offeror’s request for
Attachment 2a.
PMS4011 Towed Sensor Systems
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan
Revision B 22 October 2009
Concurrent with
PMS4011/4013 Configuration
Management Plan, PEO-SUB
PMS4011/4013-CMP-001
16 January 2008
PMS4011/4013 Configuration Control
Manual, PEO-SUB PMS4011/4013-
CCM-001
16 January 2008
PMS4011 – Towed Sensor
Systems/PMS4013 – Hull Sensor Systems Unique Identification (UID) Implementation Plan
15 February 2007
Integrated Logistics Support Plan (ILSP) for the TB-29A/BQ Towed Array Revision A 20 February 2014
Concurrent with
Technical Manual Contract Requirement
(TMCR) TMCR NO.
SNIPP-150057-000
13 April 2015
Attachment #___5____ PR #: N00024-14-NR-94087
Attachment “5” to Solicitation N00024-15-R-6263 Page 2 of 2
CODE: PMS4011
SCHEDULE
(1)
A/C
(2)
EQUIPMENT NOMENCLATURE
EQUIPMENT DESIGNATOR
DOCUMENT TITLE
DOCUMENT NUMBER
(4)
VOL PRT REV CHG SUP GFI DUE DATE
(7)
“Interface Requirements Specification
TAIPT Common Telemetry,” Chesapeake Sciences Document 2001A0764
Issue H 12 July 2008
Concurrent with
“Timing Architecture Requirements
Definition and Design Description,” Revision F, Lockheed-Martin MS2 Document, #N/A ATS Timing Definition
Rev F 23 March 2009
Concurrent with offeror’s request for Attachment 2a.
AN/BQQ-10(V) with TI-10 APB09/11 and TI12 APB-11/13 Sonar System to Acoustic Intelligence (ACINT) Subsystem,” ACINT Interface Requirements Specification
15 April 2011
APB-13 (Advanced Processing Build)
Common Color Function Description Document (FDD),” APB-13 Common Color FDD
Version 2.0 7 June 2013
Concurrent with
Prime Item Development Specification for the TB-29A Towed Body,”
SHIPS-T-5976A (U)
Rev C 17 December 2002 Concurrent with offeror’s request for Attachment 2a.
13a Submarine Sonar Specification for
Advanced Processing Build 2011 (and later), SUB-SONAR-SPEC-11 Vol 1 (U)
Rev (-) 19 September 2014 Concurrent with offeror’s request for Attachment 2a.
13b Submarine Sonar Specification for
Advanced Processing Build 2011 (and later), SUB-SONAR-SPEC-11, Vol. 2 – Sections 3.6, 3.7, 3.8 and 4 (U)
Rev (-) 19 September 2014
Concurrent with
Attachment #___5____ PR #: N00024-14-NR-94087
Attachment “5” to Solicitation N00024-15-R-6263 Page 3 of 3
CODE: PMS4011
SCHEDULE
(1)
A/C
(2)
EQUIPMENT NOMENCLATURE
EQUIPMENT DESIGNATOR
DOCUMENT TITLE
DOCUMENT NUMBER
(4)
VOL PRT REV CHG SUP GFI DUE DATE
(7)
13c Submarine Sonar Specification for
Advanced Processing Build 2011 (and later), SUB-SONAR-SPEC-11, Secret Appendices (U)
Rev (-) 19 September 2014
Concurrent with offeror’s request for Attachment 2a.
13d Submarine Sonar Specification for
Advanced Processing Build 2011 (and later), SUB-SONAR-SPEC-11 TSMS (Appendix D) (U)
Rev (-) 19 September 2014
Concurrent with offeror’s request for Attachment 2a.
Specifications for Fiber Optic and Hybrid Fiber Optic/Electrical Hull Penetrator Assemblies and Outboard Cable and Connector Assemblies
PPD 802-6337554
Rev B 15 July 2006
Concurrent with offeror’s request for Attachment 2a.
Server, 1U, 18-Inch Deep, Front I/O, Drawing TI12-C01-1 N/D Concurrent with offeror’s request for Attachment 2a.
OPNAVINST 5513.5 SCG ID# 05.002.02
Unclassified AN/BQQ-10 (V) and Legacy Sonar Systems
Administrative Update 29 Mar 2013 29 April 2010 Concurrent with offeror’s request for Attachment 2a.
OPNAVINST 5513.5 SCG ID# 05.003.01
Confidential Acoustic Warfare, Submarine (U)
9 July 2010 Concurrent with offeror’s request for Attachment 2a.
OPNAVINST 5513.5 SCG ID# 05-038.03
Unclassified Submarine Technology, Nuclear and Conventional
Administrative Update 29 Mar 2013 29 June 2010 Concurrent with offeror’s request for Attachment 2a.
OPNAVINST 5513.5 SCG ID# 05-063.04
Unclassified Submarine Towed Arrays Administrative Update 29 Mar 2013 3 May 2010 Concurrent with
Attachment #___5____ PR #: N00024-14-NR-94087
Attachment “5” to Solicitation N00024-15-R-6263 Page 4 of 4
CODE: PMS4011
SCHEDULE
(1)
A/C
(2)
EQUIPMENT NOMENCLATURE
EQUIPMENT DESIGNATOR
DOCUMENT TITLE
DOCUMENT NUMBER
(4)
VOL PRT REV CHG SUP GFI DUE DATE
(7)
OPNAVINST 5513.5 SCG ID# 05-104.03
Unclassified Submarine Combat Systems (AN/BYG-1 Combat and Weapon Control System, AN/BSG-1, AN/BSY 1 Combat Control/Acoustic Set, AN/BSY-2, CCS
MK1 & CCS MK2)
Administrative Update 29 Mar 2013 4 June 2010
Concurrent with offeror’s request for Attachment 2a.
Technical Requirements Manual for
Temporary Submarine Alterations
(NAVSEA S9070-AA-MME-
010/SSN/SSBN)
Rev 3 18 January 2005
Concurrent with
File details come from the government source that posted it. Updated .