Main_Jail_–_Hall_of_Justice_–_Refurbish_Existing_Pipe_Chase_Leak_Detection_System.pdf

PDF 360 KB Posted

Attached to
Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System
Solicitation number
41010
Issued by
Sacramento County, San Francisco City, California

About this file

File Summary

This is a Notice to Contractors issued by the County of Sacramento's Department of General Services for Contract #41010, a project to refurbish the existing Raychem Tracetek leak detection system at the Main Jail facility located at 651 I Street, Sacramento, California. The project involves furnishing all necessary labor, materials, equipment, and incidental work to restore full functionality to the proprietary leak detection system, which monitors sanitary and pressure water lines throughout the facility. Work includes refurbishing water sensing cables, zone connectors, leader cables, and control/monitoring modules, with all work required to be performed by technicians trained and certified by the system manufacturer. The mandatory pre-bid meeting is scheduled for October 13, 2026, at 8:00 AM at the Main Jail facility; attendance is required and representatives must sign the attendance log, with RSVP and clearance form submission required by October 9 and September 28, 2026, respectively. The question submission deadline is October 19, 2026, at 5:00 PM, and sealed bids must be submitted electronically via the Sacramento County Electronic Bidding Portal no later than November 5, 2026, at 2:00 PM, with automatic opening occurring at 2:01 PM. Work is constrained by strict security protocols, with construction on the second and third floors limited to 12:00 PM to 4:00 PM, and all personnel required to pass background checks and be escorted onsite. The contractor must test the continuity of existing jumper cables with an allowance provided to replace up to ten cables if testing indicates failure.

The estimated construction cost is $148,590.00, and contractors must hold a valid California C-7 Low Voltage Systems Contractor license and be registered with the California Department of Industrial Relations. A bid bond, certified check, or cash equal to ten percent of the aggregate bid amount is required as bid security, and the successful bidder must provide performance and payment bonds each equal to one hundred percent of the contract price. This is classified as repair work; therefore, prevailing wage requirements apply per California Labor Code sections 1720 and 1770. Contractors must comply with the California Air Resources Board Advanced Clean Fleets regulations and submit Certificates of Reported Compliance or applicable exemptions by 4:00 PM on the Monday following bid opening. The contract documents include the Notice to Contractors, Sacramento County Standard Construction Specifications, Special Provisions, Bid Proposal forms, and various attachments including contract plans, clearance packets, and pre-bid agendas. All inquiries must be submitted via OpenGov, and contact with unauthorized County personnel may result in disqualification. The project manager is Raleigh Moyher, Associate Mechanical Engineer, reachable at moyherr@saccounty.gov or (916) 876-5072.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO CONTRACTORS

41010

MAIN JAIL – HALL OF JUSTICE – REFURBISH EXISTING PIPE CHASE

LEAK DETECTION SYSTEM

County of Sacramento

9660 Ecology Lane

Sacramento, CA 95827

RELEASE DATE: September 10, 2026

DEADLINE FOR QUESTIONS: October 19, 2026

RESPONSE DEADLINE: November 5, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d

County of Sacramento

NOTICE TO CONTRACTORS

Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection

System

1. Introduction

2. Notice to Contractors

3. Pricing Proposal

4. Vendor Submissions

Attachments:

A - Contract_41010_Special_Provisions_(CUPCCAA)

B - Contract_41010_Bid_Set_Plans

C - Main jail clearance packet - USED FOR PRE BID ATTENDANCE

D - Contract 41010 Pre Bid Agenda

Notice to Contractors #41010 Title: Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System

1. Introduction

1.1. Summary

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.

1.2. Background

The Main Jail facility at 651 I Street houses a proprietary leak detection system for sanitary and pressure water lines, which is currently non-functional. This system is critical for maintaining operational continuity and safety in a secure correctional environment. The refurbishment project aims to restore full functionality to the leak detection system.

The contractor will be responsible for refurbishing the Raychem Tracetek leak detection system, including water sensing cables, zone connectors, leader cables, and control/monitoring modules. All work must be performed by technicians trained and certified by the system manufacturer. The system will be integrated with the facility’s building management system for alarm and fault monitoring.

A key challenge is the need to coordinate all site activities with the Sacramento Sheriff Organization

(SSO), adhering to strict security protocols and allowable construction times. Work on the second and third floors is limited to 12pm–4pm, and all personnel must pass background checks and be escorted while onsite. Contractors must comply with personal protective equipment requirements, including N95 or P-100 respirators for work in designated pipe chases, and follow all site safety and operational procedures.

The contractor is required to test the continuity of existing jumper (leader) cables between pipe chases.

The basis of bid assumes these conductors are suitable for reuse. If this is found not to be the case however, an allowance is provided to replace up to ten (10) of these conductors between pipe chases if tests indicate failure. All work must be coordinated with the County Project Inspector and SSO, and the contractor is responsible for protecting all property, maintaining site safety, and submitting all required documentation, including as-built drawings, test results, and operation manuals.

1.3. Contact Information

Any inquiries or requests regarding this solicitation must be submitted via OpenGov. Contact with unauthorized County personnel during the selection process may result in disqualification.

Raleigh Moyher

Associate Mechanical Engineer

Email: moyherr@saccounty.gov

Phone: (916) 876-5072

Department:

DGS: CAPSD - Construction

Department Head:

Joshua Green

Department Director

1.4. Timeline

Release Project Date September 10, 2026

Pre-Bid Meeting (Mandatory) October 13, 2026, 8:00am

Agenda

Location: 651 I Street, Sacramento CA 95814 (Main

Jail)

Review the pre-bid agenda in full. *Please RSVP by following these steps*:

1. RSVP on OpenGov by October 9, 2026, 5pm

2. Complete the “Main Jail Contractor Clearance

Forms” Packet (attachment C) in the open gov attachments section. Submit by September 28, 2026, 5pm.

Question Submission Deadline October 19, 2026, 5:00pm

Bid Submission Deadline November 5, 2026, 2:00pm mailto:moyherr@saccounty.gov tel:(916)876-5072 https://government-project.s3.amazonaws.com/244573/6dd8c8ce-1451-4594-92e7-cbfa5755932f_Contract_41010_Pre_Bid_Agenda.pdf

2. Notice to Contractors

2.1. ADVERTISEMENT SUMMARY

Notice is hereby given that the County of Sacramento will receive sealed bids for the following project:

BID DATE: Thursday, November 5, 2026

SUBMIT BIDS TO: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO

COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT

THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL

AUTOMATICALLY OCCUR ONLINE AT 2:01 PM AT THE FOLLOWING LINK: SACCOUNTYEBIDS.

Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for assistance in entering your online response.

FOR: Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System

CONTRACT NUMBER: 41010

ESTIMATED CONSTRUCTION COST: $148,590.00

CONTRACTOR LICENSE REQUIRED: C-7, Low Voltage Systems Contractor

PRE-BID QUESTIONS DUE VIA Q&A: Date: Monday, October 19, 2026 No later than: 5:00 pm

PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: Refurbish the existing pipe chase leak detection system at the main jail. Provide a replacement leak detection panel in the basement and replace existing leak detections components at the pipe chases.

BASIS FOR AWARD: The basis for award shall be base bid plus additive or deductive items as identified in the bid solicitation.

CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to

Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the

Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.

• Contract Documents are available at: SacCountyEbids

• The Standard Construction Specifications, which are incorporated by reference in the Contract

Documents, may be downloaded at: https://saccountyspecs.saccounty.gov/Pages/default.aspx.

https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training https://saccountyspecs.saccounty.gov/Pages/default.aspx

2.2. MANDATORY PRE-BID MEETING

A mandatory pre-bid meeting will be held on Tuesday, October 13, 2026, at 8:00 am, Location: 651 I

Street, Sacramento CA 95814 (Main Jail) Review the pre-bid agenda in full. *Please RSVP by following these steps*: 1. RSVP on OpenGov by October 9, 2026, 5pm 2. Complete the “Main Jail Contractor

Clearance Forms” Packet (attachment C) in the open gov attachments section. Submit by September 28, 2026, 5pm.. The project engineers will be present to provide a project summary and to answer questions.

Attendance of the Pre-Bid Conference is MANDATORY for this project. The mandatory pre-bid conference and walk-through will be held for the purpose of reviewing questions regarding the project.

A representative of the prime Contractor must be in attendance and sign the log. A representative of the

County will be present to review the project with the bidders, allow bidders to walk the site and to answer questions. Bids received from bidders who do not attend this meeting will be deemed non-responsive.

2.3. BID GUARANTEES

Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the

Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.

2.4. BONDS

The successful bidder shall be required to execute a material and labor Payment Bond and Performance

Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.

Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The

Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.

2.5. LICENSE REQUIREMENTS

Award of this contract requires a valid California contractor's license with the classification identified above.

Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.

No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.

2.6. LABOR COMPLIANCE PROGRAM

The County of Sacramento received final approval from the Director of California Department of

Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor

Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.

This is a Repair project in accordance with Labor Code section 1771.5.

Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the

Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700

Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.

2.7. ADVANCED CLEAN FLEETS REGULATION

Vehicles with a gross vehicle weight rating greater than 8,500 lbs. and light-duty package delivery vehicles operated in California may be subject to the California Air Resources Board

(CARB) Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, see CARB Advanced

Clean Fleets and Advanced Clean Fleets Regulation & Advisories | California Air Resources

Board.

The apparent low bidder shall provide copies of valid Certificates of Reported Compliance as described in California Code of Regulations, title 13, ("13 CCR") section 2449(n) for the bidder’s fleet, and fleets of any listed subcontractors, of vehicles subject to 13 CCR section 2449 which may be use in performance of this project.

If the apparent low bidder’s fleet, or any subcontractor’s fleet, is exempt or is not subject to the regulation bidder shall clearly indicate the applicable exemption in the bidder’s response. For more information, see CARB Advanced Clean Fleets Regulation Exemptions and Extensions

Overview | California Air Resources Board.

Certificates of Reported Compliance and/or exemptions must be submitted by the apparent low bidder by 4:00PM on Monday following Bid Opening and must be received by the County prior to contract award.

https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview

2.8. QUESTIONS

Direct pre-bid questions to the Project Manager, Raleigh Moyher, via the Q&A tab in the portal. ALL PRE-

BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Monday, October 19, 2026 BY 5:00

pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents.

The County of Sacramento reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.

3. Pricing Proposal

PRICING TABLE

Line Item Description Quantity Unit of

Measure Unit Cost Total

10 Base Bid - Lump Sum 1 LS

20 Bid allowance - Replacement of jumper (leader) cables between pipe chases - price per unit

10 Each

TOTAL

4. Vendor Submissions

4.1. What form of Bid Guaranty will Contractor be submitting?* Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the

County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.

☐ Scanned copy of Fully Executed Bid Bond

☐ E-bid Bond (Use Surety 2000)

☐ Cashier's or Certified Check

☐ Cash

*Response required

4.2. Bid Guaranty

Upload a scanned copy of your fully executed bid bond here if Contractor is submitting a scanned bid bond.

4.3. E-Bid Bond

Please enter your Bid Bond information from Surety2000 below If Contractor is submitting an E-Bid

Bond

4.4. Non-collusion Declaration*

The undersigned declares:

I am an authorized representative with binding authority for my company, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.

☐ Please confirm

*Response required

4.5. Designation of Subcontractors - Unit Price Contracts*

Please download the below documents, complete, and upload.

• DESIGNATION_OF_SUBCONTRACTO...

*Response required

4.6. Bid Item Percentage Listing on Designation of Subcontractor form* Bidder shall certify that the bidder entered the PERCENTAGE OF BID ITEM SUBCONTRACTED in Column

(C) of the Designation of Subcontractor form NOT the percentage of total bid.

☐ Please confirm

*Response required

4.7. Type of Business*

☐ C Corporation

☐ S Corporation

☐ Limited Liability C Corporation

☐ Partnership

☐ Limited Liability Partnership

☐ Sole Proprietor/Individual

☐ Other

*Response required

4.8. Type your Legal Company Name Here*

State your Company's Name Here. This will be verified against the California Secretary of State's

Website.

*Response required

4.9. Secretary of State Entity Number*

Provide your Entity Number from the CA Secretary of State. If not registered in CA, provide the Entity

Number from your registered state.

*Response required

4.10. Contractors State License Board (CSLB) Number*

Please enter your License Number here. This will be verified against the state database

*Response required

4.11. Contractors State License Board (CSLB) License Expiration Date * Enter your CSLB license expiration date:

https://government-project.s3.us-west-2.amazonaws.com/17213/fc3a4145-e6ee-47da-97f2-00cbed9173b9_DESIGNATION_OF_SUBCONTRACTORS.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LQTGKUPT%2F20260910%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260910T152647Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEL%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCO8b2LD%2FGwNh9Tv9Dku0faFf3ADEpgrPn9Umvu0Az7bwIgI%2FVSqDLbBA%2BRv56%2FpcEpCAiClDTiRRRD28W6GUOeIZEqlQUIiP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDK9Wp359Bnamfn0cvCrpBN7QgtaHQcPg5EN6UMaSD8R9MI3OX3CRh2Orkk9LrX0QRE5iOeu1fE3XA33eMNFNbNE0%2Fnlu2Y0y7CEhQQ3NDGwiYLQN5yjda59id%2BuNO7HtrgKQLWWh6AQ7k5O%2BbgxfHuQRE%2BFuMH%2B%2FXAQ%2FN2nKaspPGckQEW53dXgvR0j3ErRe55Rk0QCmVOKCuklpARY6xDPiz5Si3%2FcN5Kvo7gh4j4s7G6Ur4IUYbmRuILDoibSnFZ%2FgZPQTSXZTTyp9dy2tIEn8YYrlSTW9ckuiEewSIWlSNF3uEFljmvlJu%2BJu7fFT4Vo3NJz%2FKlDgAgvARgj12KfL5sFgn7%2Fd09kxkGSi0NmhaekiaqgtSA%2BlPICXSUv0eSPlsJUOA2CD0go4Ln466EXJMsg9vLehSJGPtG25f5MqSrQq2QjfNCw%2BOD4zurKTllmriRHi9AOIbNQFGzm1dmtB9aegedLE4BEFUTx7r39HclWPWC3IgrtIk%2By2gc4EF614P4bkGPPdoGSAla57bDDFVcQOMZijtXYCfsxoN%2FI6kWX2jaNM31n8HT5OIpJEUruYMW9KPw7szrzTXY1Fm%2BpvoGBeBKoOE4Ks4aWi4CksOHbtHDLCT5t5%2FpGkaS0rkPlU4HTlJlTPliWXt%2B9RFyxMAhlYE3Zzl5l4qOGPJlzdEbdQWJ72sUQfp2wsUlf2jVnd2AbHpy6%2FcxBLiS3bE188INPMK6k4JXtshRmq76U3hZf2%2F1q0T9a93pKECcHSeHTDs5jhEHLPB4QIQGdr1uhkwqneqZ6WNd9QlY94L4c4REQ6zJRBxmmg1gab2CVcfegSnlGA9wniMPqMi9UGOpkBdI93QYiobEgRfqWTF30ti6jwj62JSs0ylWrVPbobug3U1Vq4vCkYk77nGnVW3CpsF7wR3hgk0HW%2FMrehzWXmOM5g204aM%2FwjTeUKcoDlyuwJXNwX21lx6h%2FJ5a%2B7sw%2BGLaKrUu1ZCl96UFnnaG1ItPlnZ5P5ElOHozHBsOHQsGTgXb%2BwZqqRQdDjtuLuHOa%2BT5yPwteWi88j&X-Amz-Signature=c90fe8cec4d3e5003b88eca9b14aec5d69bf18a904c6e15d533ee53eb43c1401&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22DESIGNATION_OF_SUBCONTRACTORS.docx%22&x-id=GetObject

4.12. Contractors State License Board (CSLB) License Classifications* Enter your current CSLB license classifications:

*Response required

4.13. California Department of Industrial Relations Registration* Please enter your Public Works Contractor Registration Number. This will be verified against the state database.

*Response required

4.14. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information (full name, e-mail, phone number) for the contract manager for your firm in order to distribute Contract Documents, if awarded, including other recipients requiring a copy.* signatory: name, title, email contract manager/admin: name, email, phone

*Response required

4.15. PaymentWorks Contact*

Please provide the name and e-mail for a finance point-of-contact for your firm that will receive an invitation to complete the vendor registration process on the County's PaymentWorks portal.

To clarify, if you are set-up with other agencies using PaymentWorks, that information is not available to the County, so you must complete this process for the County.

*Response required

4.16. I hereby certify under penalty of perjury that the above statements are true.*

☐ Please confirm

1. Introduction
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Notice to Contractors
2.1. ADVERTISEMENT SUMMARY
2.2. MANDATORY PRE-BID MEETING
2.3. BID GUARANTEES
2.4. BONDS
2.5. LICENSE REQUIREMENTS
2.6. LABOR COMPLIANCE PROGRAM
2.7. ADVANCED CLEAN FLEETS REGULATION
2.8. QUESTIONS
3. Pricing Proposal
4. Vendor Submissions
4.1. What form of Bid Guaranty will Contractor be submitting?*
4.2. Bid Guaranty
4.3. E-Bid Bond
4.4. Non-collusion Declaration*
4.5. Designation of Subcontractors - Unit Price Contracts*
4.6. Bid Item Percentage Listing on Designation of Subcontractor form*
4.7. Type of Business*
4.8. Type your Legal Company Name Here*
4.9. Secretary of State Entity Number*
4.10. Contractors State License Board (CSLB) Number*
4.11. Contractors State License Board (CSLB) License Expiration Date *
4.12. Contractors State License Board (CSLB) License Classifications*
4.13. California Department of Industrial Relations Registration*
4.14. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information (full name, e-mail, phone number) for the contract manager for your firm in order to distribute Contract Documents, if awarded, includin...
4.15. PaymentWorks Contact*
4.16. I hereby certify under penalty of perjury that the above statements are true.*