CERS_DAR_CWBS_Template_(2)_Attachment_7.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
CONSOLIDATED EMERGENCY RESPONSE SYSTEM Federal contract opportunity
Solicitation number
M67854-13-R-4953
Issued by
United States Marine Corps

About this file

M67854-13-R-4953 CERS CWBS TEMPLATE ATTACHMENT 7

View the file

Other files for this federal contract opportunity

Other files attached to CONSOLIDATED EMERGENCY RESPONSE SYSTEM, newest first.
File Type Posted
CERS_Pricing_Summery_Attachment_6_-_RFP_Amendment_0006.xls XLS spreadsheet
Amendment_0006.pdf PDF
Conformed_Copy_thru_Amendment_0006.pdf PDF
CERS_DAR_CWBS_Template_(2)_Attachment_7.xls XLS spreadsheet
M67854-13-R-4953_RFCs_(1_May_2013).doc DOC document
AMENDMENT_0005.pdf PDF
M67854-13-R-4953_Conformed_thru_Amendment_0005.pdf PDF
AMENDMENT_0004.pdf PDF
CERS_PWS_Attachment_1_Amendment_0004.pdf PDF
M67854-13-R-4953_Conformed_thru_Amendment_0003.pdf PDF
DD_254.pdf PDF
CERS_QASP_D_Attachment_2.pdf PDF
M67854-13-R-4953_RFC_AND_ANSWERS_20130419.pdf PDF
CERS_NR-KPP_20120105.doc DOC document
CERS_PWS_Attachment_1.pdf PDF
Extract_of_MCLB_Barstow_Report_for_CERS_PWS_(SIGNED).pdf PDF
Amendment_3_M67854-13-R-4953.pdf PDF
Extract_of_MCB_MCAS_Camp_Pendleton_Report_for_E911_CERS_(SIGNED).pdf PDF
Extract_of_MCB_Camp_Lejeune_Report_for_CERS_PWS_(SIGNED).pdf PDF
CERS_Pricing_Summery_Attachment_6.rtf RTF text file
AMENDMENT_0002.pdf PDF
AMENDMENT_0001.pdf PDF
CERS_DAR_Reqt_Eval_Matrix_20130227.xlsx XLSX spreadsheet
CERS_PWS_Attachment_1_v1.0_022713.pdf PDF
CERS_DAR_Reqt_Eval_Matrix_20130227_Attachment_4.pdf PDF
CERS_PWS_Attachment_1.pdf PDF
M67854-13-R-4953_Site_Surveys_2.zip ZIP file
CERS_RFP_Camp_HardCorps_v3_Attachment_5.pdf PDF
M67854-13-R-4953_Attachment_6_-_Pricing_Summary.pdf PDF
CERS_GPAT_Attachment_3.pdf PDF
M67854-13-R-4953_Site_Surveys.zip ZIP file
M67854-13-R-4953.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

The provided template is the minimum required level 1 and 2 CWBS elements. It is expected that the Offeror identifes the milestones, tasks and additional actions required to complete the CERS DAR PWS requirements. The offerors CWBS may be generated in MS Project or Excel prior to making PDF.
Provide a CWBS in .pdf format with the appropriate level of detail to provide how the Offeror intends to manage the proposed effort with visibility of tasks, activities, schedule, and list of deliverables. The CWBS shall be presented in Government Fiscal Year, Government work day and include the minimum level of detail as indicated in the template. The Offeror shall provide a proposed schedule for delivery of CERS DAR to installations, outlined in Section 11.10.2 of the PWS completed no later than the end of Fiscal Year 2017 (FY17) (September 30th, 2017). The contractor shall identify start and finish dates associated with the tasks in the CWBS template. In addition, the contractor may add additional CWBS elements at or below level two (2).

Sample CWBS

The provided template is the minimum required level 1 and 2 CWBS elements. It is expected that the Offeror identifes the milestones, tasks and additional actions required to complete the CERS DAR PWS requirements. The offerors CWBS may be generated in MS Project or Excel prior to making PDF.
Provide a CWBS in .pdf format with the appropriate level of detail to provide how the Offeror intends to manage the proposed effort with visibility of tasks, activities, schedule, and list of deliverables. The CWBS shall be presented in Government Fiscal Year, Government work day and include the minimum level of detail as indicated in the template. The Offeror shall provide a proposed schedule for delivery of CERS DAR to installations, outlined in Section 11.10.2 of the PWS completed no later than the end of Fiscal Year 2017 (FY17) (September 30th, 2017). The contractor shall identify start and finish dates associated with the tasks in the CWBS template. In addition, the contractor may add additional CWBS elements at or below level two (2).
WBSTask NameDurationStartFinishPredecessors
0Consolidated Emergency Response System Dispatch, Alerting and Records Management
1CERS DAR Design
1.1SETR Events
1.2Information Assurance
1.3Design for Sustainment
2CERS DAR Test
2.1Test Events
2.2Information Assurance
3CERS DAR Fielding
3.1Camp Hard Corps
3.2Other USMC installations (UP TO 15 INSTALLATIONS COMPLETE BY 30 SEPT 2017)
4Sustainment
4.1Warranty
4.2E911 Support Services

File details come from the government source that posted it. Updated .