Submittal Register - Final 1.31.2020.xls
XLS spreadsheet 56 KB Posted
- Attached to
- Repair HVAC Federal contract opportunity
- Solicitation number
- M2638220MPT1860
About this file
This document contains a submittal register and pre-solicitation notice for a federal contract to repair HVAC systems at a Marine Reserve Facility in Westover Air Reserve Base, Massachusetts. The solicitation will require replacing two HVAC units, with piping, hangers, gauges, valves, coils, temperature sensors, pipe insulation, fire retardant caulking, refrigerant, and a liquid-line filter-drier. Offerors must provide documentation of schedules, warranties, operations and maintenance manuals, inspections, qualifications, and accident prevention plans. The pre-solicitation notice indicates this will be a sealed bid procurement conducted under FAR Part 14, with a 100% small business set-aside and a magnitude between $250,000 and $500,000. The solicitation is expected to be issued on May 26th, 2020 with a bid opening of July 7th, 2020 and a 150-day period of performance. The soliciting agency is the Department of the Air Force Reserve Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers KTR 7.8.2020.pdf | ||
| Abstract of Offers KTR.pdf | ||
| RFI 2 Before Award HVAC.pdf | ||
| RFI Before Award HVAC.pdf | ||
| H.1.3.pdf | ||
| Solicitation - FA660620B0004 Issued.pdf | ||
| Wage Determinations 3.13.2020.pdf | ||
| H.1.5.pdf | ||
| H.3.1.pdf | ||
| H.2.1.pdf | ||
| H.1.1.pdf | ||
| SOW HVAC 4.6.20.docx | DOCX document | |
| Special Standards of Responsibility.pdf | ||
| H.3.3.pdf | ||
| 15951a HVAC SOO.pdf | ||
| H.1.2.pdf | ||
| 04--BID SCHEDULE (Draft for Contractor Estimate).docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | REPAIR HVAC MARINE RES. B3505 | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | WESTOVER ARB, MA | |||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | SOW | 01 | Schedule | Schedule | 3.4 | G | ||||||||||||||
| 2 | SOW | 03 | 15 Ton Condensing Unit | Product Data | 2.9 | G | ||||||||||||||
| 3 | SOW | 03 | 40 Ton Condensing Unit | Product Data | 2.9 | G | ||||||||||||||
| 4 | SOW | 03 | Piping | Product Data | 2.9.1 | G | ||||||||||||||
| 5 | SOW | 03 | Pipe Hangars | Product Data | 2.9.1 | G | ||||||||||||||
| 6 | SOW | 03 | HVAC Gauges | Product Data | 2.9.1 | G | ||||||||||||||
| 7 | SOW | 03 | HVAC Valves | Product Data | 2.9.1 | G | ||||||||||||||
| 8 | SOW | 03 | Cooling Coil | Product Data | 2.9.2 | G | ||||||||||||||
| 9 | SOW | 03 | Temperature Sensor | Product Data | 2.9.2 | G | ||||||||||||||
| 10 | SOW | 03 | Pipe Insulation | Product Data | 2.9.1 | G | ||||||||||||||
| 11 | SOW | 03 | Fire Retardant Caulking | Product Data | 2.9.1 | G | ||||||||||||||
| 12 | SOW | 03 | Refrigerant | Product Data | 2.9 | G | ||||||||||||||
| 13 | SOW | 03 | Coil Frost Protection | Product Data | 2.9.2 | G | ||||||||||||||
| 14 | SOW | 03 | Liquid-Line Filter-Drier | Product Data | 2.9.3 | G | ||||||||||||||
| 15 | SOW | 06 | TAB | Procedures | 2.10.5 | G | ||||||||||||||
| 16 | SOW | 06 | TAB | Final TAB Report | 2.10.6 | G | ||||||||||||||
| 17 | SOW | 07 | TAB | Specialist Certification | 2.10.3 | G | ||||||||||||||
| 18 | SOW | 07 | TAB | Firm | 2.10.4 | G | ||||||||||||||
| 19 | SOW | 07 | Accident Prevention Plan | Plan | 3.5.1 | G | ||||||||||||||
| 20 | SOW | 07 | Crane Operators Plan | Qualifications | 3.5.2 | G | ||||||||||||||
| 21 | SOW | 07 | Contractor Qualification | License | 2.4 | G | ||||||||||||||
| 22 | SOW | 07 | Superintendent | Qualifications | 2.5 | G | ||||||||||||||
| 23 | SOW | 07 | HVAC Technician | Qualifications | 4.2 | G | ||||||||||||||
| 24 | SOW | 11 | Warranty | Equipment Warranties | 2.15 | G | ||||||||||||||
| 25 | SOW | 10 | O&M Manuals | Equipment Manuals | 2.12 | G | ||||||||||||||
| 26 | SOW | 06 | Report | Final Inspection Report | 2.13 | G |
&RPage &P of &N This is mentioned in 2.13 not 2.10.6, please double check