RFQ_M00146-16-T-9006_Amendment_06.pdf
PDF 162 KB Posted
- Attached to
- Upgrade Cold Spray System
- Solicitation number
- M00146-16-T-9006
- Issued by
-
United States Marine Corps
About this file
Amendment 06
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6592316SU00068
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide clarifications in response to contractor submitted questions that arose during the solicitation phase.
Due to these changes, the solicitation closing date has been extended to 2:00 PM on 12 May 2016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M00146-16-T-9006
X 9B. DATED (SEE ITEM 11)
25-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-May-2016
CODE
CHERRY POINT SATELLITE CONTRACTING OFF.
ATTN: CHRISTINE PISTOCHINI
PSC BOX 8018
BLDG. 159, MCAS
CHERRY POINT NC 28533
M00146 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M00146-16-T-9006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Question: We have a disagreement on the verbiage having to do with Fire Suppression Item #3.3.8. Is a sprinkler system or other required for these chambers? UFC 1-600-01 is not definitive as to what in this type of enclosure.
Answer: All components parts and pieces shall have fire suppression in accordance with UFC 1-600-01 whether that is in the form of fire sprinklers or some other form of fire suppression. The contractor shall hire a fire protection engineer who will evaluate the overall project scope to determine correct means and methods for fire suppression.
Question: In reference to Government Answer 16: “Downdraft design shall collect grit blast material and dust. The entire floor area of the surface preparation chamber shall be designed for downdraft.
Depth of floor shall be determined by the contractor per the contractor’s design and shall meet all requirements of the specification.”
- Does FRCE want the downdraft plenum to be recessed into the floor (cut concrete floor out and create a cement pit for the downdraft plenum), so it is level with the rest of the shop floor?
OR
- Does FRCE want an elevated floor downdraft plenum for the blast room? This will require getting the parts up on the elevated floor either inside the booth or load the part on an elevated platform outside the blast room with a cart that goes inside and can hold up to a 1000 lb. part?
Answer: The contractor shall provide means to have items placed within the surface preparation chamber. If concrete work is recommended or desired by the contractor, such as a pit, please refer to section 3.7.4 e. If a ramp system is desired by the contractor then the ramp shall have some means of becoming level with the existing floor either by lowering and then raising the chamber floor or ramp system exterior to the chamber."
Question: In reference to RFQ Section 3.6.1, please have the government provide how they will assert unlimited rights-based upon what?
Answer: See DFARS 252.227-7013 and 252.227-7015. Anything funded by the Government and developed for this requirement gives the Government unlimited rights.
M00146-16-T-9006
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-May-2016 02:00 PM to 12-May-2016 02:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .