AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the due date for receipt of quotes to 25 April 2016, add a site visit, and revise the due date for contractor questions. See Summary of Changes for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M00146-16-T-9006
X 9B. DATED (SEE ITEM 11)
25-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Mar-2016
CODE
CHERRY POINT SATELLITE CONTRACTING OFF.
ATTN: CHRISTINE PISTOCHINI
PSC BOX 8018
BLDG. 159, MCAS
CHERRY POINT NC 28533
M00146 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M00146-16-T-9006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
SUBJ: Amendment 0001 to Solicitation M00146-16-T-9006 for the Upgrade of the Existing Cold Spray
System, FRC-East, Cherry Point, NC
The purpose of this amendment is to incorporate the answers to the RFI’s into the solicitation in order to revise and/or clarify the contractual requirements:
Question 1: 3.1.1; Page #9 of the RFQ document – You state; Cold spray powders to be used include 2000 series (aluminum copper alloys), 5000 series (aluminum magnesium alloys), 6000 series (aluminum magnesium silicon alloys), 7000 series (aluminum zinc alloys), aluminum oxide blended powders, and a copper blended powder. In addition, one chamber will be used to texture the surface in preparation of the cold spray application via 54 to 80 grit aluminum oxide blast media. Please supply the MSDS (Material
Safety Data Sheets) and the KST value (if not listed) for each of these cold spray powders.
Answer 1: MSDS Sheets are hereby included as Attachment 06
Question 2: 3.1.1; Page #9 of the RFQ document – You list the part to be processed in this system as; H-53 gearbox, H1 combining gearbox, AV-8B landing gear housings, and V-22 canopy tracks. We saw the large gearbox housings. Please supply a overall dimension drawing of each part and shown CG (center of gravity) for each.
Answer 2: Please reference files named CS_65391-11602_78286, CS_65391-11603-78286C and CS_65391-
11603-78286, included as Attachment 07. There are a total of six different drawings for the H53.
The weight of H53 gearbox housing casting with inserts is 573 lbs. The H53 engineers were not able to identify the center of gravity CG on the H53 main gear box at this time.
The drawings contain sections of the H53 main gear box drawing. FRCE is not at this time providing the V22 canopy tracks drawing or the H1 combining gearbox drawing. The canopy track is an I-channel of approximately 4 inch high by 4 inch wide, 6 foot long. During cold spray, the H1 combining gearbox will be attached to a government owned transportation dolly with dimensions of approximately 5 foot wide by 4 foot deep by 4 foot high.
Question 3: What is the specification (version of) the FRC East's existing Johnson Controls Facilities
Management System (FMS)?
Answer 3: The version of software is Johnson Controls Metasys 7.0. The communication protocol that the contractor needs to plan for is Bacnet. The JCI system in B4225 is a Metasys system with a Network Automation
Engine (NAE) located in Building 4225. The interface of building devices to the NAE is over the JCI N2 Bus, but the NAEs also have a BACNET building interface.
Question 4: What is driving the 75 RPM requirement on the turn table 3.3.4.5 Page #15? These type table usually max out at 10 RPM. This becomes very special at this speed, I wanted to make sure this was required.
Answer 4: The prime workload for this booth is the H53 main gear box. FRCE is in agreement with10 RPM being suitable for the process. If we can get more than 10 RPM that is preferable, but FRCE does not want to have to go to a custom table. FRCE would prefer to stick with something "off the shelf".
The system shall be designed so that FRCE may add a second smaller turntable in the future. The turntable would be located within the new robots limits. The intent of the Government is for the second turntable to operate at a much higher RPM than the larger turntable being installed by this contract. The part recipe created by the operator shall have a field for "large" or "small" turntable and RPM. The specification has been revised.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 24-Mar-2016 02:00 PM to 25-Apr-2016 02:00 PM.
SUMMARY INFORMATION FOR VENDORS
1. Point of Contact:
Christine Pistochini/Contract Specialist
Phone: 252-466-2022
E-mail: christine.pistochini@usmc.mil
2. Deleted
3. Quotation due date/time: Quotations submitted in response to this requirement must be received at the location specified in paragraph 2) of Addendum to FAR 52.212-1 (See Section L) no later than
2:00 p.m. (EST) on 25 April 2016.
4. Address for submission of Vendor’s quote: Quotations submitted in response to this requirement must be submitted to the location specified in paragraph 2) of Addendum to FAR 52.212-1 (See
Section L).
5. Advice to Vendors: Vendors are advised to read this document in its entirety, paying particular attention to the information provided in Section C –Specification, Section L - Instructions, Conditions and Notices to Vendors, and Section M- Evaluation Factors for Award.
6. Content of Vendor’s Quote: At a minimum, the vendor’s quote must includeall of the information requested in paragraph 3) of the Addendum to FAR 52.212-1 located in Section L. It is recommended, but not required, that the information be presented in the same order as listed in the instructions.
7. Evaluation of Quotes: Quotes received in response to this requirement will be evaluated in accordance with the information provided in Section M- Evaluation Factors for Award.
8. Site Visit: A Site Visit relating to the above requirement is scheduled to be conducted on 23 March at
1:00 PM at the Fleet Readiness Center (FRC) East, MCAS Cherry Point, NC. See paragraph 4) of the
Addendum to FAR 52.212-1 located in Section L.
mailto:christine.pistochini@usmc.mil
SECTION F - DELIVERIES OR PERFORMANCE
1.0 PLACE OF PERFORMANCE: Installation and training shall be performed at the Fleet Readiness Center East, MCAS Cherry Point, NC.
2.0 PLACE OF DELIVERY (DESTINATION): All supplies, materials, and documentation to be furnished hereunder shall be delivered, FOB Destination, all transportation charges paid by the contractor, to:
Fleet Readiness Center East
MCAS Cherry Point, NC 28533-0021
3.0 REQUIRED DELIVERY DATES
a. DELIVERY: All related equipment shall be delivered to the installation site no later than 270 Calendar
Days after date of contract award.
a. COMPLETION: All work to be performed (to include manufacture, delivery, installation, testing, acceptance, and training) shall be completed within 320 calendar days from date of contract award, in accordance with the Specification, Section C.
b. DOCUMENTATION: All documentation/deliverables shall be delivered in accordance with the requirements of the Specification.
SECTION G - CONTRACT ADMINISTRATION DATA
1.0 CONTRACT ADMINISTRATOR FOR THE GOVERNMENT
a) The following representative of the Contracting Officer shall be contacted for contract administration purposes:
NAME: Christine Pistochini
TELEPHONE: (252) 466-2022 DSN: 582-2022
e-mail: christine.pistochini@usmc.mil
2.0 COMMUNICATIONS
a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the contractor’s facilities or in any other manner communicate with contractor personnel during the performance of this contract shall constitute a change under the “Changes” clause of this contract.
b) The contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and is signed by the Contracting Officer or is pursuant to specific authority otherwise included as a part of this contract.
c) A Contracting Officer for the Marine Corps Air Station, Cherry Point, NC is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding, provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer’s. In the event the contractor effects any change at the direction of any person other than a designated Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made.
d) The contact information for the Contracting Officer is:
Name: Christopher Poulos
Address: MCIEAST Cherry Point Satellite Contracting Office
PSC Box 8018
Cherry Point, NC 28533-0018
Phone:(252) 466-4038 or (DSN) 582-4038 e-mail:christopher.poulos@usmc.mil
3.0 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
a) The COR for this contract is: To be determined
b) The COR will act as the Contracting Officer’s representative for technical matters, providing technical direction and discussion as necessary with respect to the specification or statement of work, and monitoring the progress and quality of contractor performance. The COR is not an Administrative Contracting Officer and does not have the authority to take any action, either directly or indirectly, that would change the pricing, quantity, quality, place of performance, delivery schedule, or any other terms and conditions of the contract (or delivery order), or to direct the accomplishment of effort which goes beyond the scope of the statement of work in the contract (or delivery order).
c) When, in the opinion of the contractor, the COR requests effort outside the existing scope of the contract (or delivery order), the contractor shall promptly notify the Contracting Officer (or Ordering Officer) in writing. The contractor under such direction shall take no action until the Contracting Officer (or Ordering Officer) has issued a modification to the contract (or delivery order) or has otherwise resolved the issue.
4.0 CONTRACT FINANCING
a) Contract Financing in the form of Commercial Interim payments will be allowed in accordance with FAR
Subpart 32.2 and FAR Clause 52.232-29 “Terms for Financing of Purchases of Commercial Items” (FEB 2002), incorporated herein by reference.
b) Interim payments shall be made only for supplies and services completed and accepted by the Government in accordance with the terms of the contract.
c) The method for computing financing payment amounts, as well as the specific conditions of contractor entitlement to these financing payments, are set forth in the chart below. The contractor shall grant the Government access to information and/or facilities, to the extent access is necessary, for the purposes of verifying the contractor’s entitlement to payment of contract financing.
d) The Contracting Officer may determine that the contractor’s financial condition constitutes adequate security for commercial contract financing payments. However, the Contracting Officer may always exercise the Government’s rights to require other security under paragraph (c) of the clause at 52.232-29, Terms for Financing of Purchases of
Commercial Items, should that financial condition become inadequate security.
e) Liquidation of contract financing payments shall be on the same basis as the computation of contract financing payments; that is, financing payment computed on a whole contract basis shall be liquidated on a whole contract basis; and a payment computed on a line item basis shall be liquidated against that line item. If liquidation is on a whole contract basis, the contracting officer shall use a uniform liquidation percentage as the liquidation method, mailto:christopher.poulos@usmc.mil unless the contracting officer obtains the concurrence of the cognizant payment office that the proposed liquidation provisions can be executed by that office, or unless agency regulations provide alternative liquidation methods.
f) Payments for CLIN 0001 will be allowed upon completion of the following events in amounts equal to the percentage of the total fixed price as indicated below. The contractor’s requests for contract financing payments may be submitted no more frequently than monthly and shall contain the information set forth in paragraph (e) of the clause at 52.232-29, Terms for Financing of Purchases of Commerical Items.
Event Milestone
/Description
Milestone
Payment
Percentage
Accomplishment Method of
Verification
*Payment
Amount
*Cumulative
Amount
Preliminary Design
Review
20% Completion of PDR
(Paragraph 3.6.8.1)
Email from
TPOC to COR verifying acceptance.
Joint Design Review
20%
Completion of JDR
(Paragraph 3.6.8.2)
Site Preparation and
Installation Plan
10% First submission due no later than 60 calendar days prior to installation.
(Paragraph 3.6.3)
Delivery of
Equipment
20% Delivery of equipment and all associated items. (Paragraph 3.9)
Email from COR to CO verifying completion.
Balance upon completion of remaining deliverables, installation, open action items, final acceptance test (FAT), and training.
30% Last deliverables received, installation completed, all open action items completed, FAT, and training.
Email from COR to CO verifying completion and/or
* To be determined at time of contract award.
Special Note: Contract financing payments will be authorized for 70% of the total contract value. The remaining
30% balance of the contract value may be invoiced after completion of all remaining contact requirements including
Final Acceptance Testing, submittal of all remaining documentation, and satisfactory completion of all punch list items.
5.0 CERTIFICATION OF CONTRACT FINANCING PAYMENTS
The following certification shall be provided with each request for contract financing payment:
I certify to the best of my knowledge and belief that--
(1) This request for contract financing payment is true and correct; this request (and attachments) has been prepared from the books and records of the Contractor, in accordance with the contract and the instructions of the Contracting
Officer;
(2) (Except as reported in writing on __________), all payments to subcontractors and suppliers under this contract have been paid, or will be paid, currently, when due in the ordinary course of business;
(3) There are no encumbrances (except as reported in writing on _________) against the property acquired or produced for, and allocated or properly chargeable to, the contract which would affect or impair the Government's title;
(4) There has been no materially adverse change in the financial condition of the Contractor since the submission by the Contractor to the Government of the most recent written information dated _____________ ; and
(5) After the making of this requested financing payment, the amount of all payments for each deliverable item for which financing payments have been requested will not exceed any limitation in the contract, and the amount of all payments under the contract will not exceed any limitation in the contract.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
ADDENDA TO FAR 52.212-1
1) NOTE REGARDING TERMS: The terms “solicitation” and “offer” are used throughout this document, including in the clauses and provisions incorporated by reference. When encountered, those terms have the same force and effect that the term “quote” incurs. The term “offeror(s)” is also used throughout and shall have the same meaning as the term “vendor.” This document is a Request for Quotes (RFQ) and as such, does not create an obligation on the part of the vendor simply by government acceptance. Both parties must sign a final contract document to create a binding contract.
2) ADDRESS FOR SUBMISSION OF QUOTES.
a) The vendor is responsible for ensuring that quotes are received in the Contracting Office no later than 2:00 P.M.
(EST) on 25 April 2016 as indicated on page one (1) of this solicitation. Failure of vendor’s quote to be received prior to the hour and date specified will result in rejection of the quote.
b) Quotes shall be submitted by FedEx, UPS, etc. and shall be addressed for delivery to the following physical location:
Cherry Point Satellite Contracting Office
Attn: Christine Pistochini, 252-466-2022
Cunningham Street
Bldg. 159, Door T1
MCAS Cherry Point, NC 28533
c) RFQ Number M00146-16-T-9006 must be clearly marked on the outside of your quote.
d) Deliveries via the United States Postal Services (USPS) are not authorized as the Postal Services does not deliver to the physical location of the Contracting Office.
e) Facsimile submission of quotes is not authorized.
f) Electronic submission of quotes is authorized, however submission shall be less than 2Mb. You must receive a confirmation email to ensure receipt of quote.
3) INSTRUCTIONS FOR THE PREPARATION OF QUOTES. THE VENDOR’S QUOTE SHALL INCLUDE
Technical Capability Information, Past Performance Information, a Price Quote, completed Representations and Certifications, and a Small Business Subcontracting Plan (if applicable) in accordance with the solicitation and the following instructions:
a) Technical Capability. For this procurement, vendors must provide information that demonstrates how the offered product meets the minimum requirements of the Specification (Section C).
(i) The vendor shall include a statement that the vendor “understands and will comply with all requirements set forth in the Specification.
(ii) The vendor shall provide a detailed response to each paragraph of Sections 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.5, 3.3.6, 3.3.7, and 3.3.8, inclusive of all sub-paragraphs, of the Specification. The information must clearly demonstrate how the proposed solution meets the minimum requirements of the specification. A statement that the vendor “will comply” or “will meet the Government’s requirement,” or restating the requirement, is not sufficient. The vendor must describe and demonstrate how that will be accomplished.
(iii) In accordance with Paragraph 3.6.6 of the Specification, the vendor shall provide a draft POA&M with proposed schedule for completion of all major events/milestones from contract award to completion, within 320 calendar days from date of contrat award (Section F).
(iv) This portion of the quote must be separate from the past performance and price portions of the quote.
b) Past Performance Information Instructions
i) Vendors shall submit past performance information requested below as part of their quotation.
ii) Vendors shall submit at least three (3) relevant past performance references. Relevant past performance is defined as performance of contracts of similar technical complexity to this requirement completed within the past three (3) years. Include the following information for each contract listed:
(a) Agency or company name.
(b) Contract number (if applicable).
(c) Point of Contact name, phone number and fax number.
(e) Brief description of contract and relevance to this requirement.
(f) Total contract value.
(g) Period of performance.
iii) If a vendor has no relevant past performance history, a vendor must affirmatively state that it possesses no relevant past performance history. Vendors will neither be evaluated favorably or unfavorably on past performance in the event that there is no relevant past performance history available.
c) Price Quote Instructions. The price quote shall be submitted separately from all other quotation documents.
The vendor shall prepare and submit one (1) copy of the price quote for this requirement. The vendor’s price quotation shall include:
(i) The vendor’s proposed firm-fixed price for each line item shown in Section B. Vendor must include unit price and total amount for each line item.
(ii) The government requires FOB Destination pricing.
(iii) Indication of the vendor’s acceptance of the proposed contract financing payments (see Section G, Note
4.0) or statement that contract financing will not be required.
(iv) Indication of the offeror’s understanding that, in order to receive contract financing payments, the successful offeror will be required to provide proof of adequate security in accordance with FAR Subpart
32.202-4. The Contracting Officer may determine the offeror’s financial condition to be adequate security. However, if the Contracting Officer finds the offeror’s financial condition is not adequate security, the Contracting Officer shall require other adequate security, which may be in the form of an irrevocable letter of credit from a federally insured financial institution.
d) Representations and Certifications Instructions. Vendors are to include completed copies of the
Representations and Certifications incorporated into Section K of this document by reference and in full-text with their quote. Electronic copies of the full-text version of the provisions incorporated by reference are available at:
http://farsite.hill.af.mil/VFFARA.HTM. If the vendor has completed the representations and certifications electronically in the System for Award Management (SAM) at https://www.sam.gov, a completed copy of the provision is not required. However, the vendor must provide documentation that confirms the electronic certification, including a list of the provisions certified.
e) Small Business Subcontracting Plan: If your total quoted price exceeds $7000,000 and your firm is not a small business as defined in Federal Acquisition Regulation (FAR) Subpart 19.1, then you must submit a plan for subcontracting in accordance with FAR Subpart 19.704 and FAR 52.219-9 as part of your quote. If there are no planned opportunities for subcontracting in the performance of the contract, you must affirmatively state that no subcontracting possibilities exist and understand that you will be expected to perform 100% of the work involved in the contract if you are the successful awardee. Failure to do so would violate the terms of the contract and potentially put a contractor in breach of contract.
i) In accordance with FAR 52.219-8 (b), “It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns.” Therefore, any vendor, other than a small business concern, before being awarded a contract exceeding $700,000, must demonstrate that its subcontracting plan represents a creative and innovative program for involving these types of business concerns as subcontractors in the performance of this contract or that there are no planned opportunities for subcontracting in the performance of the contract.
ii) The following are the DoD’s subcontracting goals which vendor should consider and strive to attain when allocating subcontracting efforts. It should be noted that these are not mandatory and each vendor’s subcontracting goals will vary based upon: (1) approach to satisfying solicitation requirements; and, (2) available subcontracting opportunities allowed for in the offeror’s approach.
Small Business (which includes all of the following) 36.0%
Small Disadvantaged Business 5.0%
Women-Owned Small Business 5.0%
Service-Disabled Veteran Owned Small Business 3.0%
HubZone Small Business 3.0% http://farsite.hill.af.mil/VFFARA.HTM
Note: For requirements containing provisions for option periods, the offeror’s subcontracting plan must contain separate goals for each option period.
iii) The Government will review each plan to assure it is consistent with the provisions of the 52.219-9.
Subcontracting plans are subject to negotiations along with the terms and conditions of any contract resulting from this solicitation. Vendors are hereby informed that failure to submit an acceptable subcontracting plan or confirm that there are no planned opportunities for subcontracting in the performance of the contract shall make the vendor ineligible for contract award.
iv) The following requirement will be included in any order resulting from this solicitation that is awarded to other than a small business and for which it is determined that there are opportunities for subcontracting in the performance of the contract :
Subcontracting Plan Reporting. In accordance with paragraph (l) of FAR Clause 52.219-9 “Small Business
Subcontracting Plan” (OCT 2014), the contractor shall submit an Individual Subcontract Report (ISR) and a
Summary Subcontract Report (SSR) via the Electronic Subcontracting Reporting System (eSRS) located at http://www.esrs.gov .
4) QUESTIONS RELATING TO THE SOLICITATION
Vendors may submit questions concerning, or request clarification of, any aspect of this solicitation. All questions must be submitted electronically via e-mail to christine.pistochini@usmc.mil no later than 2:00 p.m. EST. on the
06 April 2016. No questions will be accepted after this cutoff date/time. Comments and questions must reference solicitation number M00146-16-T-9006.
5) SITE VISIT
1. Interested vendors are invited to inspect the site of where the new equipement will be installed, which is located at the Fleet Readiness Center (FRC) East, Building 137, Marine Corps Air Station (MCAS), Cherry Point, NC.
(a) The Site Visit is scheduled to be conducted on 23 March 2016 at 1:00 PM EST. Contractors are to assemble in the main lobby of Building 137 at least 15 minutes prior to the start of the site-visit, where a Government representative will be available to escort participants to the appropriate location(s).
(b) Contractors planning to attend the site visit must submit requests for access to both the MCAS Cherry Point and
FRC East as follows:
(i) Access to MCAS Cherry Point and FRC East: For security purposes, contractors wishing to visit the
FRC East facility are required to provide a letter requesting access. The letter should be on official company/activity letterhead and must be signed by an official of the requesting organization (other than the visitor).
FRC East visit requests must include the following information:
Name of Visitor (Last, First, MI)
Date and Place of Birth
Proof of Citizenship (requests from non-U.S. citizens must be accompanied by legible copies (front and back) of work card showing expiration date.
FRC East point of contact and telephone number (Shane Dalpiaz, 252-464-6827)
Date and duration of visit (23 March 2016, One (1) day)
Company telephone and FAX numbers and contract number and dates
RFQ number M00146-16-T-9006
(c) Visit request must be submitted via e-mail to shane.dalpiaz@navy.mil with copies to christine.pistochini@usmc.mil by 12:00 PM EST on Thursday, 21 March 2016.
http://www.esrs.gov/ mailto:christine.pistochini@usmc.mil mailto:shane.dalpiaz@navy.mil
(d) Although a security clearance is not required for the site visit, all contractor representatives must be U.S.
citizens and will be required to furnish a valid driver’s license or other generally acceptable form of picture identification for issuance of a visitors badge allowing for entrance into the facility. Substitution of personnel is not allowed. Technology/Electronic (Flash Media) devices, Photography (including cellular telephones with camera capability), and/or the use of recording devices within the facility are strictly prohibited
(e) Additional information regarding access to the Air Station and FRC East is available by phone at 252.464.7397 or by accessing the FRC East web-site at https://www.navair.navy.mil/frce/visinfo.html. Failure to submit the proper visit request information may result in denial of access to the facility. Additional site visits will not be scheduled as a result of such failure.
2. The MCAS Cherry Point main gate is located off NC State Highway 101, Havelock, NC. Visitors without proper vehicle identification are required to check-in at the visitor’s center adjacent to the main gate. Once through the
Main Gate, proceed to Building 137. Directions from the main gate to Building 137 are available upon request at the visitor’s center. Participants should allow at least one hour for check-in at the main gate and travel to the FRC
East location. Participants will depart from the main lobby of Building 137 promptly at 1:00 PM EST. Participants arriving late will NOT be included in the Site Visit.
3. Participants will be required to wear personal protective equipment (PPE) consisting of hearing protection, eye protection, and safety shoes. PPE will not be provided by the facility. Contractor representatives without the appropriate PPE will not be allowed access to the facility and additional site visits will not be scheduled as a result of such failure.
4. The purpose of the site visit is to allow contractors the opportunity to inspect the site of where the new equipment will be installed in order to be better able to relate to the specification requirements. The site visit, in conjunction with the work requirements identified in the specification, should provide contractors a detailed understanding of the requirement.
5. The site visit is not intended to be and will NOT be an open forum for questions. Contractors must submit questions concerning, or request clarification via e-mail to christine.pistochini@usmc.mil no later than 2:00 PM
EST on Wednesday, 06 April 2016. Comments and questions must reference Request for Quotation M00146-16-
T-9006.
6. Failure of a contractor to submit questions regarding this requirement or to attend the Site Visit will be construed to mean that the contractor fully understands all requirements of the final specification and Request for Quotation.
In no event will failure of a contractor to submit questions or inspect the site constitute grounds for a claim after contract award.
7. ADDITIONAL INFORMATION: Interested contractors should continue to monitor the Federal Business
Opportunities web site for additional information and documents relating to this requirement.
(End of Addenda)
(End of Summary of Changes) https://www.navair.navy.mil/frce/visinfo.html