LAP_Certification_of_Current_Capacity_525-010-46_rev9.20.pdf
PDF 105 KB Posted
- Solicitation number
- IFB26-8
- Issued by
- Orange County, Florida
About this file
This is a LAP Certification of Current Capacity form issued by the Florida Department of Transportation (FDOT) for the Program Management work class (525-010-46). The form serves as a pre-bid certification requirement for contractors bidding on state and local transportation projects. Contractors must certify that any proposal submitted does not exceed their firm's current capacity, calculated as the maximum capacity rating minus total uncompleted work. The certification requires contractors to complete a detailed "Status of Contracts on Hand" report documenting all prime and subcontracts currently in progress or awarded but not yet begun, regardless of the contracting entity. The report must reflect uncompleted work as of specific dates depending on the letting date: the 15th day of the month preceding the letting (if the letting occurs before the 25th of the month) or the 15th day of the month of the letting (if after the 25th). Contractors may consolidate contracts individually not exceeding 3 percent of total value and aggregating less than 20 percent of total into a single line item.
The certification document requires the contractor's FDOT vendor number and firm name, with the sworn statement signed by an authorized representative. All amounts must be reported to the nearest $100. For the Hungerford Elementary School Sidewalk Gaps project referenced, this certification would be mandatory for any contractor submitting a bid, as the project exceeds the $250,000 threshold requiring FDOT prequalification in Work Classes 10 and 40. The form ensures that only contractors with sufficient bonding capacity and available resources to complete the work submit proposals, protecting the public interest and project delivery timelines.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LAP CERTIFICATION OF CURRENT CAPACITY
525-010-46
PROGRAM MANAGEMENT
09/20
CONFIDENTIAL per Ch 337.14(1) F.S.
For bids to be received on (Letting Date)
Fill in your FDOT Vendor Number
VF
(Only applicable to FDOT pre-qualified contractors)
CERTIFICATE
I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).
The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $
I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:
1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.
2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.
3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.
I certify that the information above is correct. NAME OF FIRM
Sworn to and subscribed this day By:
of , 20 Title
STATUS OF CONTRACTS ON HAND
525-010-46
PROGRAM MANAGEMENT
09/20
(Furnish complete information about all your contracts, whether prime or subcontracts;
whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)
1 2 3 4 5 6
PROJECTS
OWNER, LOCATION AND DESCRIPTION
CONTRACT (OR
SUBCONTRACT)
AMOUNT
AMOUNT
SUBLET
TO OTHERS
BALANCE OF
CONTRACT
AMOUNT
UNCOMPLETED AMOUNT TO BE DONE
BY YOU
AS PRIME
CONTRACTOR
AS
SUBCONTRACTOR
NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.
TOTALS $0.00 $0.00
TOTAL UNCOMPLETED WORK ON
HAND TO BE DONE BY YOU
(TOTAL COLUMNS 5 AND 6)
$0.00
File details come from the government source that posted it. Updated .