NFLSS_SRS.docx

DOCX document 2 MB Posted

Attached to
Oil & Gas IT Support and Development IDIQ Federal contract opportunity
Solicitation number
L15PS00378
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

Attachment 6 (Attchmt 5 to RFP)

View the file

Other files for this federal contract opportunity

Other files attached to Oil & Gas IT Support and Development IDIQ, newest first.
File Type Posted
Sol_L15PS00378_Amd_000003.pdf PDF
Sol_L15PS00378_Amd_000002.pdf PDF
Sol_L15PS00378_Amd_000001.pdf PDF
L15PS00378_Pricing_Worksheet.xls XLS spreadsheet
Answers_to_Questions_for_O M_IDIQ_Competition.xlsx XLSX spreadsheet
11515_IDIQ_Labor_Categories_(2).docx DOCX document
Appendix_1_-_AFMSS_II_Scope_(2).docx DOCX document
Sol_L15PS00378.pdf PDF
Appendix_2_-_NFLSS_Scope_(2).docx DOCX document
031715_IDIQ_PWS_Oil_and_Gas_App_Dev_(3).docx DOCX document
L15PS00378_IDIQ.doc DOC document
L15PS00378_Pricing_Worksheet.xls XLS spreadsheet
L15PS00378_PPQ_Attachment_7.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL FLUIDS

LEASE SALE SYSTEM

SOFTWARE requirements SPECIFICATION

JUNE 18, 2014

NFLSS PWS SRS, vers. 1.03

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

DIVISION OF INFORMATION RESOURCE MANAGEMENT

DENVER FEDERAL CENTER

DENVER, COLORADO 80225-0047

i

Revision/Change Record

Revision
Date
Authorization

(Optional)

Revision/Change Description
Pages Affected
DV1.00
11/14/13
Initial release
All
DV1.01
4/9/14
Inserted workflows and other edits
Many
DV1.02
5/23/14
Some edits and accept all changes
Many
1.03
6/18/2014
More edits
Many
1SCOPE4
1.1Identification4
1.2System Overview4
1.3Document Overview4
2Referenced documents5
2.1Government Information Bulletins, Instruction Memoranda, Policy Manuals and Guides5
2.2System References5
3Requirements6
3.1Required States and Modes6
3.2Software Item Capability Requirements7
3.3Software Item External Interface Requirements7
3.3.1Interface Identification and Diagram7
3.3.2Project-Unique Identifier of Interface7
3.4Personnel-Related Requirements7
3.5Training-Related Requirements7
3.6Logistics-Related Requirements7
3.7Safety Requirements8
3.8Software Item Internal Interface Requirements8
3.9Software Item Internal Data Requirements8
3.10Site/Business Line Specific Requirements8
3.11Software Item Environment Requirements8
3.12Computer Resource Requirements8
3.12.1Computer Hardware Requirements8
3.12.2Computer Hardware Resource Utilization Requirements8
3.12.3Computer Software Requirements8
3.12.4Computer Communications Requirements9
3.13Security and Privacy Protection Requirements9
3.14Software Quality Factors9
3.15Design and Implementation Constraints9
3.16Other Requirements9
3.17Packaging Requirements9
4Qualification provisions9
5Requirements Traceability9
6Notes9
6.1List of Acronyms and Abbreviations9
6.2Volume Glossary10
Appendix A:Requirements Traceability Matrix12
Appendix B:Unanswered Technical Requirements13
Appendix C:General Information for Oil and Gas and Geothermal Systems14
Appendix D:Oil and Gas Specifications17
D.1Expression of Interest17
D.1.1Submit/Enter Expressions of Interest/Nominations, Bureau Motions, and Pre-Sale Offers for Lease Sale18
D.1.2Accept/Review Nominations22
D.1.3Acknowledge EOI, Pre-Sale Offer, or Withdrawal23
D.1.4Prepare Mailing Labels24
D.1.5Create Nomination Worksheet25
D.1.6Withdraw Nomination26
D.2Perform Adjudication / Determine Land Status Availability27
D.2.1Maintain Duplicate Land Description Information29
D.2.2Advance Notification to the Field Office30
D.2.3Record Duplicate Land Description Review Decision30
D.2.4Determine Disposition31
D.2.5Acknowledge Unacceptable Nominations33
D.2.6Create Sale Parcels34
D.3Create Preliminary Sales List36
D.3.1Create Draft Preliminary Sale Parcel Listing38
D.3.2Identify Initial Stipulations/Notices39
D.3.3Finalize Preliminary Sale Parcel Listing39
D.3.4Land Description Review41
D.3.5Generate SMA Letter42
D.3.6Record SMA Concurrence/Non Concurrence43
D.3.7Generate Split Estate Courtesy Notice44
D.3.8Field Office Notification45
D.3.9Field Office Review of Sale Parcel and Stipulations/Notices Data46
D.3.10Record and Finalize Sales Parcel and Stipulations/Notices Data Including FO Comments47
D.3.11Stipulations/Notices Maintenance (Alpha Numeric Data Entry)48
D.3.12Attach Documents49
D.4Create Lease Sale Notice49
D.4.1Create a Draft Lease Sale Notice51
D.4.2Finalize Lease Sale Notice52
D.4.3Create LR2000 Sale Notice Upload File53
D.4.4Lease Sale Information Amendment54
D.5Record Protest/Resolution Information55
D.5.1Record Sale Protest Information56
D.5.2Record Resolution Information57
D.6Conduct Before Sale Activities57
D.6.1Create and Display “On-the-Wall" Presentation58
D.6.2Contingency/Off Site Plan59
D.7Conduct Competitive Day of Sale Activities60
D.7.1Registration of Lease Sale Bidders61
D.7.2Record Bids and Create Running Total of Bids for Current Lease Sale63
D.7.3Load Data from Off Site/Contingency Plan64
D.7.4Reconcile Sales Information64
D.7.5Generate and Calculate Bidder Sale Report65
D.7.6Create Competitive Sale Results List66
D.7.7Create Balance Due Report67
D.7.8Generate WO Statistics Report68
D.7.9Generate High Bid Per Parcel/Acre Report69
D.7.10Upload or Allow for Manual Entry of NPR-Alaska Sale Results70
D.7.11Generate Cumulative Report per Sale for FY/CY and Update Dashboard72
D.7.12Generate Competitive Sale Results List that include land descriptions73
D.7.13Create List of Parcels Not Sold at Competitive Sale74
D.7.14Create Pre-sale Offer Rejection Letter75
D.7.15Create a Competitive Sale Upload File to LR200075
D.7.16Set Processed Nomination Status76
D.8Conduct Non-Competitive Day-After Drawing77
D.8.1Receive and Record Application for Day-After Drawing78
D.8.2Conduct Day-After Drawing79
D.8.3Create Day-After Drawing Rejection Letter80
D.8.4Refund Day-After Drawing Application Payment81
D.8.5Create Non-competitive Sale Upload File to LR200081
D.9Create 2-Year Window Land Table82
D.9.1Update 2-Year Window Land Table Description83
D.10Create/Print Lease Forms, Stipulations and Notices84
D.11Non-Competitive Offer Received on 2-year Window Lands85
D.11.1Receive a Non-Competitive 2-Year Window Application85
D.11.2Create Competitive/Non-Competitive Rejection Letter86
D.11.3Close Sale Parcels After the 2-Year Window87
D.12Create GIS Interface88
D.12.1Create Interface88
D.12.2Import Maps, Plats, Reference Layers and Add Spatial Layers88
D.13Create/Print Lease Sale Forms and Reports89
D.13.1Create/Print Lease Sale Forms and Reports89
D.13.2Nomination Query90
D.13.3Protest by Sales Date Report91
D.13.4Protested Parcels Report92
D.14Administration Processes93
D.14.1Maintain State Office Point of Contact93
D.14.2Maintain User Permission93
D.14.3Maintain Land Description94
D.14.4Maintain Domain Values95
D.14.5Establish Sale Dates96
D.14.6Data Preservation97
Appendix E:Geothermal Specifications98
Appendix F:LR2000 Upload Action Codes100

1 SCOPE

Identification

Project Name
National Fluids Lease Sale System
System Name
National Fluids Lease Sale System
System Abbreviation
NFLSS
System Version Number
Version 1.00
Project Office
Branch of Engineering and Development
Project Manager
Gail Colbert
Project Sponsor
Michael Nedd, Assistant Director, Minerals and Realty Management, WO-300
System Users
BLM Washington Offices, State and Field Offices

Members of the public nominating parcels for oil and gas, and geothermal lease sales

System Overview The National Fluids Lease Sale System (NFLSS) will be developed as a stand-alone system that will interface with existing bureau systems.

Additionally, functionality will be developed to utilize automated workflows and electronic forms allowing the public to enter information in compliance with the eGovernment initiative.

The system will be a powerful and flexible assistant in the leasing workflow process. It will interface with the Legacy Rehost 2000 (LR2000) system and the available spatial applications, and all pertinent surface use stipulations. The system will improve communications, decisions, and interactions with private and industrial clients, BLM Field Offices, and non-BLM Surface Management Agencies. This national system for onshore oil and gas and geothermal leasing will provide automated components which will reduce some duplicate data entry along with safe, reliable data handling to reduce errors and improve staff productivity.

Document Overview This Software Requirements Specification (SRS) contains the business requirements and detailed specifications for the system development. The document was developed with the user’s participation at the national and state level. This document should be used in conjunction with the business process requirements and BLM/DOI requirements for security and operations.

This document was created with the concurrence and review of the system User Requirements Team (URT), which is comprised of representation from WO300, WO310, DIRM, and State representatives from California, Colorado, Eastern States, Utah, New Mexico, Montana, Nevada and Wyoming.

Referenced documents Government Information Bulletins, Instruction Memoranda, Policy Manuals and Guides

Title
Document Number
Electronic Records Administration
H-1270-1
External Access to BLM Information
Manual 1278
IM 2002-064 Policy on the Use of Strong Passwords
January 7, 2002
Vital Records
Manual 1273
BLM CM Handbook
Release No.1-1680, 04/03/03
BLM CM Manual 1268-1
Release No.1-1679, 04/03/03
IEEE Standard Glossary of software Engineering Terminology
IEEE Std 610.12-1990
IEEE Guide for Software Configuration Management
IEEE Std 1042-1987 (reaff) 1993)
IEEE Standard for Quality Assurance Plans
IEEE Std 730-1998
BLM Manual 3120 - Competitive Leases
Rel.3-338 02/18/13

System References The following table contains all life cycle management documents that have been or will be created.

Title
Document Number

Exhibit 300 Business Case

User Requirements Specifications

Asset Valuation Guide (BLM)

Computer System Operator’s Manual

Configuration Management Plan

BLM Enclave GSS Contingency Plan

Continuity Of Operations Plan

Data Management Plan

Implementation Plan

Interface Requirements Specification

Official Agency Record Designation Document

Plan of Actions & Milestones

Privacy Impact Assessment

Project Change Management Board Charter

Quality Assurance Plan

Requirements Traceability Matrix

Residual Risk Report

Risk Assessment Report

Security Test and Evaluation Report

Self-Assessment

Software Development Plan

Software Requirements Specifications
NFLSS PWS SRS

Business Process Requirements

Software Test Plan

Software Test Report

Software Users Guide

ST&E Plan/Report

System Design Document

System Security Plan

Technical Vulnerability Assessment

Training Plan

Version Description Document

Requirements The detailed business requirements for the system are contained in Appendix D for Oil & Gas and Appendix E for Geothermal. The requirements were gathered and written by using the use case methodology and explains how the users (national, state, field, and public) expect to use the system.

Required States and Modes The methodology of states and modes has been replaced by the use case methodology. The required states and modes have been identified by the individual use cases; see Appendix D and Appendix E.

Software Item Capability Requirements Each use case identified in Appendix D and Appendix E is recognized as a capability. A use case can have multiple scenarios; therefore implying sub-functions.

Software Item External Interface Requirements Interface Identification and Diagram The system is a stand-alone system that will interface with the following:

· BLM Application Security Systems Version (BASS2) will control who has access to the national applications.

· LR2000

· GIS Services Project-Unique Identifier of Interface Not applicable.

Personnel-Related Requirements The skill level expected for the users accessing the system:

· National – knowledgeable about the program policies, guidelines and issues.

· State – knowledgeable about the program polices and guidelines. Responsible for the state’s data quality. Responsible for educating public of new processes.

· Field – knowledgeable about the program polices and guidelines. Responsible for the data within their office. Responsible for educating public of new processes.

· Public - knowledgeable about the lease sale process. Responsible for the data entered to initiate an Expression of Interest (EOI) for upcoming lease sales.

The skill level expected for the DIRM staff developing and maintaining the system:

· Technical team – proficient in developing WEB based programs using J2EEE applications.

· Data modeler – proficient in developing the system data model, using the standard methodology established by DIRM.

· Analysis – proficient in writing the system business rules, using the standard methodology established by DIRM.

Training-Related Requirements The system training will be done by three methods:

· Each screen in the system will have online help.

· Online training will be accessed via the WEB. The E-learning site will be developed and maintained by DIRM. The user will be able to:

· view a tutorial of the system

· frequently asked questions

· key word search

· access the software users guide

· Training classes for the state leads or all field users will be conducted prior to deployment of the system. Cost and time will determine if this method will be conducted.

Logistics-Related Requirements None reported.

Safety Requirements DIRM along with the operations and maintenance office has identified disaster and disaster recovery operations for the system. This document includes: prevention, offsite storage, backup, and recovery.

Software Item Internal Interface Requirements The system will have several interfaces. The system will be developed with COTS tools. This will not cause any special considerations since DIRM has already developed and deployed other systems using the same interfaces.

Software Item Internal Data Requirements There are no specific software item internal data requirements.

Site/Business Line Specific Requirements Not applicable.

Software Item Environment Requirements The system will be created and deployed on a BLM secured network. Access to the system will comply with the department and bureau policy and guidelines.

Computer Resource Requirements Computer Hardware Requirements The system will use the same hardware configuration as other systems maintained by DIRM. There is no special sizing, timing, or unique hardware requirements.

The Department of the Interior (DOI) will perform an assessment on the suitability and cost of hosting the development, testing, and/or the production environments via the DOI cloud contracts.

Computer Hardware Resource Utilization Requirements The following are estimated utilization for the system:

BLM Internal:
Washington Office & Fluid Minerals Group Staff (WO-310)
12 State Offices
75+ Field Offices
External:
Customer – Oil and Gas Industry

Computer Software Requirements The following have been identified in the use cases described in Appendix C and Appendix D:

· Each software unit has an unique identifier

· Specifications for databases and data files

· Security and privacy protection

· Data relationships and business rules Computer Communications Requirements Estimated utilization for NFLSS:

· Peak periods will be during the state lease sales;

· All states involving 120 users accessing the system, simultaneously;

· Average approximately 120 hrs. a week;

· Users are located in all state offices;

· Approximately 5 corrected serial numbers per state per year.

Security and Privacy Protection Requirements The system will be created and deployed on a BLM secured network. Access to the system will comply with the department and bureau policy and guidelines.

Software Quality Factors There will be access by the public to enter an Expression of Interest in upcoming lease sales throughout the Bureau. The system will be used by all levels of Bureau employees. There are no special software quality factors that are not already in place with the current systems.

Design and Implementation Constraints Design and implementation constraints, if any, will be identified in the software design document.

Other Requirements Not documented in the use case but required in the work flow process.

Packaging Requirements All deliverables will follow the national and project configuration management guidelines and standards.

Qualification provisions This section will be covered in the Requirements Traceability Matrix (RTM). The RTM will trace the requirement to the design module, how will it be tested, and state which test script will be used. The RTM will be completed when the software test scripts and software design document are done.

Requirements Traceability This section will be covered in the RTM. This document will trace the requirement to the design module, how will it be tested, and state which test script will be used.

Notes List of Acronyms and Abbreviations

Acronym
Definition
BASS2
BLM Application Security System Version 2
BLM
Bureau of Land Management
CBS
Collection and Billing System
CR
Case Recordation
DIRM
Division of Information Resource Management
EOI
Expression of Interest
GIS
Geographic Information Systems
LR2000
Legacy Rehost 2000
NFLSS
National Fluids Lease Sale System
ONRR
Office of Natural Resource Revenue
RTM
Requirements Traceability Matrix
SMA
Surface Management Agency
SO
State Office
SRS
Software Requirements Specification

Volume Glossary

Terms
Definition
Administrative Fee
This is the processing or filing fee required by 43 CFR 3000.12
Block
A grouping of geothermal lease sale parcels being offered for sale as one unit.
Bureau Motion
A nomination of lands by the BLM to be included in the oil and gas or geothermal competitive lease sales.
EOI
Expression of Interest – An informal nomination to request that specific lands be included in an oil and gas competitive lease sale.
Geothermal Nomination
A formal nomination requesting that specific lands be included in a geothermal competitive lease sale.
Disposition of Parcel
The BLM SO sales staff examines various paper and electronic data to determine current status or availability of nominated land descriptions and indicates the disposition accordingly.
Nomination
The term is used to include all nominations for lands to be included in a competitive oil and gas or geothermal lease sale. This includes EOIs, Pre-sale offers, geothermal nominations and Bureau Motions.
Parcel
A configuration of land that includes the land description acres, county and state.
Pre-sale offer (Non-competitive )
A formal nomination to request that specific lands be included in an oil and gas competitive lease sale. If no bid is received at the auction, the non-competitive lease shall be issued to applicant.

Requirements Traceability Matrix This section will be covered in a separate document due to its size. The document is the Requirements Traceability Matrix. The document will provide the following information:

· Trace the requirement to the design module

· How will it be tested

· State which test script will be used.

Unanswered Technical Requirements

The on-line interface with CBS is not required at this time. The interface with CBS will be manual for the initial release of the system but may be included in a future system updates. There are several steps within the use cases that involve CBS.

The on-line payment option requirements are not included at this time. This option is necessary for on-line submittal of oil & gas pre-sale offers and for geothermal nominations. This will be implemented in a later version.

LR2000 National Lease Sale System Version 1.00LR2000_LSS_SRS_DV1.00_(2005-09-15)
Software Requirements Specification (SRS)Release 00

General Information for Oil and Gas and Geothermal Systems

General Information

1. Numerous systems have been developed which automate many of the manual tasks associated with the oil and gas lease sale process. The use cases for the lease sale processes include a description of the manual tasks associated with the business processes.

2. Some states have created a stipulation data base which associates stipulations with sale parcels. The states will be able to down load this information for inclusion into the system.

3. The entire sale process, which includes the Competitive Sale, the Day-After Drawing and the 2-year Window Application, is identified by the sale date. The sale date is the actual date on which the Competitive Sale is scheduled to be conducted.

4. Currently, states upload sale information to the LR2000 system via an upload file.

5. Many of the forms used in the sale process currently reside in word processing applications, almost always Microsoft Word, and can be found in the H-3120-1 Competitive Leases handbook located at: http://www.blm.gov/wo/st/en/info/regulations/Instruction_Memos_and_Bulletins/blm_handbooks.html

6. Examples of forms and reports not provided in the handbook can be obtained upon request.

General System Requirements The system must track a sale and all of its data/information from the beginning, from expression of interest nominations through the two-year window sale process.

· The system will maintain a history of the entire sale.

· The history will be editable.

· The history will be stored as a permanent record The system will have functionality to maintain records of monies collected for all sales for the life of the sale.

The system will provide a reporting mechanism, and will generate reports:

· Statistics for WO

· Bidder Sale Report

· Sale list (table)

· Sale results

· The system will provide functionality to create customized reports (“Ad-hoc” reports).

The system will access available spatial applications/services and provide legal descriptions to spatial application/services in order to create shape files. The development of shape files can occur at any phase of the lease sale process, including shapes files for nominated parcels or parcels included in preliminary sale list, final sale, day after or 2 year window.

The system will provide electronic sale data entry.

· Entered data items will be sufficient to fulfill the requirement of maintaining sale history.

· The system will link with existing systems which may act as a repository for sale data.

The system will provide printing capabilities for all reports.

The system will provide on-shore O&G and Geothermal leasing business rules and capabilities only.

The system shall store/retain all entered information in the database. The information will be available for analysis, reporting and generating lease forms.

Form letters/notifications: data will be used to automatically generate the documents in the appropriate format (either email or printed for mailing).

These specifications provide high level workflow diagrams for use by the developers. The automation of these workflows will be a part of the initial release. The information tracked by the workflows will be available for reporting and ad-hoc queries.

On-line help information will be available to the users for every data element used in the system. The information on the on-line help shall be maintained by the WO Lead based on permissions. The use cases in the administrative section shall determine what permission levels are required to access a specific function. On-line help can be in the form of text, links to laws, regulations, or manuals, or brief videos. Help can be specific to a data field, a process/workflow, a section, or a screen/window.

Global Business Rules:

1. The system will be browser-based.

2. The system will automate all processes relating to leasing oil and gas parcels excluding NEPA (already automated in ePlanning), geospatial processing (provided by available GIS services/applications), and accounting and receipting functions performed in CBS. The system will replace the manual and semi-automated lease sale processes currently practiced in various BLM offices with one central system.

3. The system will provide a capability to allow external programs to interface.

4. The system will provide a browser-based user interface allowing for common Expression of Interest (EOI) generation (by internal and external users) and utility tasks, including reporting.

5. The system shall be 508 compliant (American Disability Act).

6. The system shall meet DIRM, Bureau, and Department of Interior security requirements.

7. The system will automatically create and manage the following information for each step in a workflow and/or when a record is created or modified:

a. Action taken

b. Username (Active Directory for internal users, provided name for external users)

c. Date and Time

8. All dates in the system must be valid dates.

9. Display of date format can be selected by the user; the default will be mm/dd/yyyy.

10. All codes in the system will be displayed with the code and code text.

11. Deletion of data will be strictly limited by role.

12. All codes and acronyms in system will be stored and displayed in upper case.

13. A user can create, update, or delete information based on:

a. User has the proper permission

b. User’s office is within the administrative state. Any user with the proper permission can access any record within their administrative state. The administrative state may have one or more geographic states assigned; therefore permissions to all assigned geographic states are implied. Users from other administrative states can be granted access as needed.

c. WO and NOC users can see all data

14. For any use case that returns multiple records for viewing or selection the user shall be able to sort the list by any data element. The use case will describe the initial sort order but the user can re-sort the list.

15. All processes indicated in appendix D and E will be included in the initial release of the system unless noted in the specific use case.

16. All windows will have the capability for the user to print the contents of the window.

LR2000 National Lease Sale System Version 1.00LR2000_LSS_SRS_DV1.00_(2005-09-15)
Software Requirements Specification (SRS)Release 00

Oil and Gas Specifications System Diagram

Expression of Interest Nominations of mineral lands may be received for consideration of oil and gas leasing through Expressions of Interest (EOI), Pre-sale Offers, or other Federal nominations.

Note on the business process/workflow diagrams:

These diagrams have three horizontal swim lanes. The middle lane displays the sub-processes for the subject business process. The bottom lane displays processes for entities outside of BLM. The top lane displays other processes within BLM, including the previous and subsequent NFLSS processes. Not all processes are required, some execute as needed. The arrows represent information flows such as nominations, requests, notifications, etc. In general all information is shared on the NFLSS platform. Some diagrams include more than one process.

Submit/Enter Expressions of Interest/Nominations, Bureau Motions, and Pre-Sale Offers for Lease Sale Description A customer or SO user will input the Expression of Interest (EOI) into the system. The information must be stored with the ability to access for future changes. Parcels for potential sale may come from:

· Online submittal by the customer (automatic notification to SO adjudicator)

· Other submittals entered by SO user (written request/letter, email, fax from the customer)

· Bureau Motion entered by SO user

· Presale Offers from the customer entered by SO user

Future version will allow the public user to enter pre-sale offers.

Use Case ID Pre-Condition The entry screen is available on the web.

Post-Condition Nomination of land for O&G lease sale is saved within the system. A Nomination/EOI number has been established.

Use Case Flow of Events

Step #
Description
1A
If the customer submits an Nomination/EOI electronically:

· Customer Name - If customer name is not entered then the system will insert the wording ‘Nominator’

· Address, City, State, Zip code, and Country (Optional)

· Contact Information may include phone, fax, and e-mail

· Land Description will be entered based on selection from set values. For example: selection of a state will determine what meridians values can be selected, meridian will determine which townships values can be selected, township will determine range, and so forth.

· The user must select or enter: geo state, meridian, township, range, section, survey type, and subdivisions. If a subdivision was entered but the survey types was not entered then default survey type to ”A” indicating aliquot.

· Entry of land below the section level is mandatory; the customer will be indicating all land below that level.

· Determine the administrative state office receiving the EOI. Based on the land description entered the system will determine which admin state office will receive the EOI. For example if the land resides in Utah then the state office is Utah. The system will not allow selection of land for multiple admin states.

· The system will allow selection of land for multiple geo states that belong to the admin state.

· Surface owner information – the user can indicate federal surface or other. If ‘other’ was selected then the user shall be able to enter one or more occurrences of name and address.

· The user can indicate if U.S. owns only a fractional interest in the mineral estate.

· The system will derive the acres from the land description table.

Design constraint:

· The public user’s entry is outside the BLM’s firewall. The developers will determine how and when information is moved between the BLM’s firewall consistent with BLM/DOI security requirements.

· The land description values are derived from LR2000 the information will have to be extracted for the public user’s access. See appendix B for technical issues.

· To assist the entry of the land description the system will auto fill (meridian, township, and range) of the next line of land description if the user starts at the ‘Section’ data field.

· Entry is restricted to only one administrative state but multiple geo states belonging to the administrative state is allowed.

· Foreign addresses are allowed so the data fields will be expanded for country, providence, and foreign zip codes.

1B
The SO user shall be able to enter a Nomination/EOI or Pre-Sale Offer for the customer, or a Bureau Motion. The SO user having the appropriate access shall be able to input the following information into the system:

· The user shall be able to designate the submission type:

· Nomination/EOI

· Pre-Sale Offer

· Bureau Motion

· Customer Name - If customer name is not entered then the system inserts the wording ‘Nominator’

· Address, City, State, Zip code, and Country (Optional)

· Contact Information may include phone, fax, and e-mail

· Land Description will be entered based on selection from set values. For example: selection of a state will determine what meridian values can be selected, meridian will determine which townships values can be selected, township will determine range, and so forth.

· The user must select or enter: geo state, meridian, township, range, section, survey type, and subdivisions. If a subdivision was entered but the survey type was not entered default to survey type to ‘A’ indicating aliquot.

· Entry of land below the section level is mandatory for PLS states; the user will be indicating all land below that level.

· The system will not allow selection of land for multiple admin states.

· The system will allow selection of land for multiple geo states that belong to the admin state

· Surface owner information – the user can indicate federal surface or other. If ‘other’ was selected then the user shall be able to enter one or more occurrences of name and address

· The user can indicate if U.S. owns only a fractional interest in the mineral estate.

· The system will derive the acres from the land description table as the initial value but the SO user can modify the information

· If the entry is for a Pre-Sale Offer then the user must enter an Pre-Sale Serial Number Design constraint: The system will take into account the BLM needs to access the same form/entry screen as the public. The same business rules will apply.

2
The system will validate the information and issue any error message(s) as applicable. The user will be allowed to correct any information.
3
If no errors then the system will generate the EOI number. The EOI number and an acknowledgement will be displayed to the user. The display should also include a message stating any future inquiries about the EOI will be tracked by this number.

If the user has not entered any information to be contacted by (phone number, fax number, email address, or mailing address) then the system will issue the following warning message:

“The BLM no longer requires you to provide your name or address on an EOI. You may continue to provide this information for contact purposes; however, the BLM will make this information available to the public. If you consider your name and address to be confidential, do not include it in your EOI. However, if your contact information is not included the BLM will be unable to contact you if we have questions regarding the submission.”

If contact information is provided, nominator will be required to check a box stating “they do not consider their contact information to be confidential”

4
The system will store a copy of the original entry that cannot be modified.

The system will create a working copy of the LDs in the nomination worksheet that will be used by the SO user.

5
The system shall insert the current date into received date when submitted electronically. When entered manually, the SO user will enter the received date.

For each land description entered, the system will generate a land description ID.

6
For electronic submittals, based on the land description, the system will determined the administrative state and send a notification that an EOI has been submitted. The system will look up the recipient by state.
7
The system will secure the customer information to be accessible only to authorized BLM staff. The customer information may be confidential or information protected by the Privacy Act. A Privacy Act Impact Assessment will be completed by the BLM prior to system implementation.

Design constraint: The original document (EOI, Pre-sale offer, or Bureau Motion) must be saved and cannot be modified. From this point on the SO users will be working with another instance of the information.

RTM Entry The public user shall be able to enter an EOI.

The BLM user shall be able to enter an EOI, Pre-sale offer, or Bureau motion.

Accept/Review Nominations Description The SO user will review the land description of the nominations.

Use Case ID Pre-Condition A customer has submitted an EOI or a SO user has entered an EOI, Pre-sale offer or bureau motion.

Post-Condition Submission has been reviewed. EOI number has been established.

Use Case Flow of Events

Step #
Description
1
Upon selection of this process by the SO user, the system will display:

· All land descriptions from nomination records submitted from process 1.1

· Land description must have a status of blank/null

· State nomination information for the user

2
The SO user shall be able to select any land description for review.
3
BLM SO user reviews nomination submissions for acceptance. Upon displaying the initial information to the SO user the system will derive the data based on the following business rules, see steps 4a and 4b
4a
It is possible to have multiple Land Descriptions per nomination. The system shall create a record for each land description. See references for the Logical Data Model, the Data Dictionary, and the Specifications for Descriptions of Land for definitions:

· Meridian

· Township

· Range

· Section

· Survey Type

· Subdivision

· Acres

· Land Type

· Percent of U.S. Interest

· Split Estate Information

· EOI Number

· Pre-Sale Number

· Former Lease Numbers

· Remarks

4b
The system will access LR2000 to derive the following fields from the above information.

· County

· BLM Field Office

· Other Agencies (SMAs). For example, Forest Service - FS, Bureau of Reclamation - BOR, etc. Original derived information can be modified by the user.

Design constraint – a land description can derive multiple occurrences of county, BLM field office, and SMAs. Since the derived information can be over-ridden by the user. The information must be stored versus generated.

5
The user will be able to select the status for the land description.
6
The system will store the information.

The SO user shall be able to review land description nominations.

A.1.1 Acknowledge EOI, Pre-Sale Offer, or Withdrawal Description An acknowledgement by the BLM of the receipt of the Nomination/EOI, Pre-Sale Offer, or Withdrawal is returned to the customer. This process is optional and can be performed at a later time.

· Online submittals automatically acknowledged by the system

· Other submittals we will acknowledge receipt of EOI by system-generated letter.

· Email acknowledgement when email address is provided

· Generate address labels when acknowledgement is via postal mail Use Case ID Pre-Condition Nomination/EOI, Pre-Sale Offer, or Withdrawal has been entered.

Post-Condition Acknowledgement has been sent. Nominations are now ready for adjudication.

Use Case Flow of Events

Step #
Description
1.
The system will search for:

· Any Nomination/EOI that does not have an acknowledgement created date.

· Any Pre-sale Offer that does not have an acknowledgement created date.

· Any withdrawal that does not have an acknowledgement created date.

· The system will not allow the SO user to select any record if there is no email address or mailing address. The system will display this type of record with an appropriate message: “Acknowledgement letter will not be created – no mailing or email address.

2.
The system will generate an acknowledgement letter which is automatically populated. The following fields will be populated by the system:

· Nomination/EOI Number or Pre-Sale Offer Serial Number

· Customer Information (Name, Contact, Address, City, State, Zip Code)

· Subject: Acknowledgement of Receipt

· Date Nomination Received

· The user will be able to select the SMA address and phone number

· Land Description (Meridian, Township, Range, Survey Type, Subdivisions)

· Status

· BLM Contact Phone

· Signature Block The system will insert the current date into the acknowledgement created date.

3.
If the customer has an email address then the SO user is given the option to send the letter by email.
4.
The SO user will have the option to print the letter and have it signed

The SO user shall be able to generate acknowledgement letters for Nominations/EOI, pre-sale offers, and withdrawals

Prepare Mailing Labels Description A mailing label will be created for any letters created for notification to the customer via mail. For example any letter/form that will be utilized for mailing, drawings, etc.

Use Case ID Pre-Condition A process has created a letter or form that will be mailed to the customer.

Post-Condition The letter or form can now be mailed.

Use Case Flow of Events

Step #
Description
1.
The SO user can specify the search criteria:

· Nomination/EOI ID/Serial Number

· Customer Name

2.
The system will list all records matching the criteria. The SO user shall be able to select any record(s)
3.
The user shall have the option to print directly on the envelope or print to labels. If labels are desired then user will have the option to select mailing label size.

Design Constraint: the user should be able to indicate or select from a list containing manufacture and label type. This information should equate to the number of labels on a page and the size.

4.
The system will create a mailing label with the following fields:

· Customer Information (Name, Address, City, State, Zip Code)

The SO user shall be able to generate mailing labels.

Create Nomination Worksheet Description A nomination worksheet is dynamically created view of all information relative to a submitted nomination and can be used for displaying, editing, and reporting a nomination. A nomination worksheet can be used as a checklist for the Adjudication process. A nomination/EOI land description can belong to one or more nomination worksheets. A nomination worksheet can have one or more land descriptions. Each land description will have a status and be assigned a sales date if the status indicates it is available for lease.

Use Case ID Pre-Condition Nomination has been entered.

Post-Condition Land descriptions are now available for updating via the nomination worksheet.

Use Case Flow of Events

Step #
Description
1.
The system will generate a nomination worksheet and display the following information sorted by State, Range, Township, and Section.

· Nomination/EOI Number:

· Parcel ID Number:

· Sale (mo/yr):

· Pre-sale No.:

· LDs: MTRS; Acres; % US Interest; Land Type (A or P); County; BLM FO; SMA, Split Estates (yes/no). Split estates will not provide detail information on the nomination worksheet, just a yes/no to indicator if there is detail information.

· Former Lease Numbers (must accommodate multiple nominations/EOIs);

· State

· Completed by:

· Reviewed by:

· Remarks Field The SO user shall be able to sort the display by any field.

The SO user shall be able to select any record for processing

2.
The user shall have the option to view additional detail information:

· Original submittal of the nomination

· Status history

· SMA detail

· History of all forms generated

· Attachments

3.
Users can access nomination data.
4.
User edits/modifies nomination worksheet. The user can indicate a status, comments, and workflow for each land description
5.
All fields entered or modified are validated. The system shall display entry error message(s) as appropriate. The user shall be able to correct the information.
6.
Validated information is stored

The SO user shall be able to generate the nomination worksheet.

Withdraw Nomination Description A nomination can be withdrawn or partially withdrawn.

Use Case ID Pre-Condition The submitter of the Nomination sends a withdrawal request.

Post-Condition The Nomination will be withdrawn, but will remain in system.

Use Case Flow of Events

Step #
Description
1.
SO user shall be able select a Nomination by the following criteria:

· EOI Number

· Pre-Sale Number

· Customer Name

· Date of Receipt

· County

· Field Office

· LD

2.
The system will display all Nominations matching the criteria. The following information is displayed:

· EOI Number

· Pre-Sale Number

· Parcel Number

· Serial Number

· Customer Name

· Sale Date

· Date of Receipt

· Land Description

3.
SO user shall be able to select a Nomination or specific land descriptions
4.
The system will verify if there are any duplicate land descriptions for the land descriptions being withdrawn.

· If there are duplicate land descriptions and all their status are “DUPL”

· Then the system will change the status to “PEND” for the duplicate land description with the earliest nomination date.

5.
If the entire Nomination was selected

· The EOI status is set to ‘Withdrawn’

· The status for each land description is set to ‘Withdrawn’ If specific land descriptions were selected

· If the land description status is set to ‘Withdrawn’

6.
System will store the information.

The SO user shall be able to withdraw a nomination/EOI.

Perform Adjudication / Determine Land Status Availability A nomination may be filed for available lands prior to a competitive sale. The BLM determines land availability, surface and subsurface rights, and existing oil and gas leases. BLM users conduct research to determine if the lands included in a nomination are available for leasing.

Maintain Duplicate Land Description Information Description Nominations may contain multiple requests for the same land from different customers. Therefore, land Descriptions that are found in other nominations must be identified.

Use Case ID Pre-Condition Determine land availability.

Post-Condition Parts of LDs of nominations that are contained in other nominations will be noted.

Use Case Flow of Events

Step #
Description
1.
The system must search all nominated land descriptions for:

· Omit any land description that has a land description status of:

· Withdrawn from nomination

· Sold (Competitive or Non-competitive)

· EXP2Y

· DUPL

· The user can select other data fields and values to further filter the information.

· Any duplicate lands for each land description. Each land description will be compared down to the quarter/quarter. If a land description stops at a higher level (for example section) then all sub divisions below that level are assumed to be contained within the description. For example section implies all quarters, quarter implies all quarter/quarters. The possibility exists that duplicate LDs could contain a smaller piece of the land within the LD that is a portion of the same land and not be exactly the same.

· Each land description that is a potential duplicate will be linked to the associated potential duplicates.

2.
The system will display the information:

· The duplicate nomination and the specific LD of those nominations and their status.

· LD having a duplicate record

· Specific LDs of the identified duplicate(s) The information will be sorted by the land description: Geo state, meridian, range, township, section, quarter

· Status

· Status date

· Status comments

· Parcel ID Number

· Parcel Number

· Serial Number

· EOI Numbers

3.
The SO user shall be able to print a report.

The user shall be able to generate the duplicate report.

Advance Notification to the Field Office Description Due to the number of land descriptions the work load impact to the field office may be great. This process gives the state office the ability to notify the affected field office that records may be ready for an early review.

Use Case ID Pre-Condition Land has been identified for review Post-Condition Field office can start a review.

Use Case Flow of Events

Step #
Description
1.
The system will display all land descriptions that have no sales dates and FO advance notification date is blank.
2.
The SO user shall be able to select land descriptions
3.
For each select land description the system will send a notification to the affected Field Office based on the land description.
4.
For each land description the system will save the current date in the FO advance notification date.

The SO user can send a notification to the FO user.

Record Duplicate Land Description Review Decision

After the system has identified that there may be possible duplicate land descriptions, the SO user will research the information. Based on the review a decision about the duplicate land will be made and recorded in the system.

Use Case ID Pre-Condition Land has been identified as possible duplication. The SO user can conduct a review of the duplicate lands.

Post-Condition Land description status is updated.

Use Case Flow of Events

Step #
Description
1.
The system can display all potential duplicate land descriptions. The SO user shall be able to view the duplicate land descriptions by:

· EOI number

· Land Description

2.
The SO user can select a potential duplicate land description and the system will display all associated potential duplicates.

· Sorted by: geo state, meridian, range, township, section

3.
The SO user will select a land description to modify:

· The SO user may split the land description. The user will set the land description status for each subdivision.

· The SO user can set the land description status.

· If a land description is a duplicate and does not have the earliest submission date, the status will be set to DUPL.

· If it is determined to not be a duplicate, the link to the associated potential duplicates will be deleted and the status remains blank.

4.
The system will save the information.

The user shall be able to update the land description status.

Determine Disposition Description SO users will review parcels and determine their availability for leasing. Allow the user to indicate availability in the status of LD. If the user determines an LD is not available, allow the user to enter reason(s) (both drop down categories and text). Examples of categories:

· CLOSEDLands Identified as Closed/Withdrawn fromLeasing
· DEFLands Deferred
· LEASEDLands Already Leased
· NO MINLands Contain No Federal Fluid Mineral Rights
· SALEPlaced on a Sale List
· WSALands included in a Wilderness Study Area

· Etc.

· Run LR2000 Geo Report

· Review LR2000 for records with Federal Interest on Acquired Lands

· Review LR2000 for records with sub surface rights

· Review LR2000 to create survey type report

· Review Oil and Gas plats for existing leases

· Review Historical Index

· Check for conflicting Executive and Secretarial Orders

· Review land patents (Government land Office records)

· Review for existing land restriction conflicts

· Review for conflicting land withdrawals

· Review for conflicting land exchanges

· Review for existing land restriction conflicts

· Review SMA areas

· Review includes oil and gas Plat and supplemental plat Design constraint: The reviews above will not be automated in a workflow but the workflow should indicate that land status was determined. Possibly have an automated checklist with a Yes/No answer to “was the review/check done” and a Yes/No if it was OK. If not OK, then allow/require an explanation in a text box or attach a file. Also consider situations where N/A is an appropriate answer.

Use Case ID

Pre-Condition The SO office user will review the availability of LDs for each nomination and is ready to update the status in the system.

Post-Condition Nominations have been reviewed and the results of the review have been recorded.

Availability of nominated LDs have been determined.

Use Case Flow of Events

Step #
Description
1.
The system will default to all LD with a status of null/blank. SO user shall be able to search for nominated LDs by:

· EOI Number/Serial Number

· Customer Name

· Date of Receipt

· County

· Field Office

· LD

2.
The system will display all nominations matching the criteria. The SO user shall be able to select a record for further processing.
3.
The system will display the selected LDs by:

· Nomination worksheet, or

· Sorted list selected by the user

4.
The SO user shall be able to change the Nomination data to reflect research.
5.
The system will validate entry and issue any error messages as applicable. The user will be able to correct the information
6.
The status of LD will be changed to:

· Pending (“PEND”) if available for leasing

· Appropriate status if not available for leasing

7.
The system will change the status from DUPL to the updated status if not available for leasing

Upon determination of the disposition the information is entered into the system.

Acknowledge Unacceptable Nominations Description This function can be accessed at any time during the lease sale process when it is determined that the nomination is unacceptable. A letter is sent to the originator stating a problem has occurred with the acceptance of the nomination.

Use Case ID Pre-Condition A nomination has been received Post-Condition Nomination is not acceptable.

Use Case Flow of Events

Step #
Description
1.
The SO user shall be able to search for the unacceptable nominations by:

· EOI number

· Customer name

2.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .