J4 Lot A1 SEED BOQ UNPRICED.xls
XLS spreadsheet 564 KB Posted
- Attached to
- Secondary Education Expansion for Development (SEED) Rural Group 2 Activity Federal contract opportunity
- Solicitation number
- 72061222R00005
About this file
This document is a request for proposal for the Secondary Education Expansion for Development (SEED) Rural Group 2 Activity. USAID/Malawi is seeking proposals to construct community day secondary schools in 18 districts across Malawi. USAID anticipates awarding up to four firm fixed price contracts covering a 25-month period of performance comprising 13 months for construction and a 12-month warranty period. The sites are divided into two groups, with Group A consisting of two large lots of 19-20 schools each set aside for Malawian firms only. Group B consists of two small lots of 6 schools each conducted under full and open competition procedures. Offerors may bid on one or both Group A lots and one or both Group B lots. The proposal response deadline is set forth in Section L, with Section L also outlining all proposal submission requirements.
View the file
Other files for this federal contract opportunity
Show all 50
Secondary Education Expansion for Development (SEED) Rural Group 2 Activity has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lot A1
| Project: | SEED Rural, Group 2 | Schedule Summary | ||
| Bid Date: | ___________________________________ | Lot A1 | ||
| Name of Bidder: | ___________________________________ | |||
| Description | Schedule Total | |||
| 1. Facility Construction | ||||
| Line 1 | Classroom Block A | Schedule A Total | $ - 0 | |
| Line 2 | Classroom Block B | Schedule A Total | $ - 0 | |
| Line 3 | Science Classroom | Schedule B Total | $ - 0 | |
| Line 4 | Teacher Housing and Pit Latrine, Block A | Schedule C Total | $ - 0 | |
| Line 5 | Teacher Housing and Pit Latrine, Block B | Schedule C Total | $ - 0 | |
| Line 6 | Male and Female Pit Latrines | Schedule D Total | $ - 0 | |
| Line 7 | Teacher Pit Latrine | Schedule E Total | $ - 0 | |
| Line 8 | Facility Sub-Total (Add Lines 1-7) | $ - 0 | ||
| Line 9 | Number of Facilities in Lot A1 | 19 | ||
| Line 10 | Total Facility Bid (Multiply Line 8 x Line 9) | $ - 0 | ||
| 2. Mobilization and Site Work | ||||
| Line 11 | Chibweya | SCHEDULE F1 | $ - 0 | |
| Line 12 | Kambira | SCHEDULE F2 | $ - 0 | |
| Line 13 | Mpapa | SCHEDULE F3 | $ - 0 | |
| Line 14 | Mpamantha | SCHEDULE F4 | $ - 0 | |
| Line 15 | Lupachi | SCHEDULE F5 | $ - 0 | |
| Line 16 | Chilimani | SCHEDULE F6 | $ - 0 | |
| Line 17 | Kasipa | SCHEDULE F7 | $ - 0 | |
| Line 18 | Karopa | SCHEDULE F8 | $ - 0 | |
| Line 19 | Mulembe | SCHEDULE F9 | $ - 0 | |
| Line 20 | Chuba | SCHEDULE F10 | $ - 0 | |
| Line 21 | Muselema | SCHEDULE F11 | $ - 0 | |
| Line 22 | Ipyana | SCHEDULE F12 | $ - 0 | |
| Line 23 | Mayoka | SCHEDULE F13 | $ - 0 | |
| Line 24 | Bundi | SCHEDULE F14 | $ - 0 | |
| Line 25 | Bula | SCHEDULE F15 | $ - 0 | |
| Line 26 | Makumbo | SCHEDULE F16 | $ - 0 | |
| Line 27 | Kanyazuka | SCHEDULE F17 | $ - 0 | |
| Line 28 | Bale | SCHEDULE F18 | $ - 0 | |
| Line 29 | Matunkha | SCHEDULE F19 | $ - 0 | |
| Line 30 | Total Mobilization and Site Work Bid (Add Lines 11-29) | $ - 0 | ||
| 3. Extra Work | ||||
| Line 31 | Total Extra Work Bid | Schedule G | $ - 0 | |
| Grand Total Construction Cost Lot A1 (Add Lines 10, 30 and 31) …........................................................................................................ | $ - 0 | |||
| Line 32 | Performance Bond with value equal to 25% of the Grand Total Construction Cost is required. Enter Cost of this Performance Bond | $ - 0 | ||
| Grand Total Lot A1 Including Performance Bond (Add Lines 10, 30, 31 and 32) …........................................................................................................ | $ - 0 | |||
| Written Grand Total Including Bond: _____________________________________________________________ | ||||
| _____________________________________________________________________________________Dollars and ___________________Cents |
Sch A Classroom
| Project: | SEED Rural Group 2 | BILL OF QUANTITIES | SCHEDULE A | |||||
| Bid Date: | ______________________________________________________ | CLASSROOM BUILDINGS | 2 Each | |||||
| Name of Bidder: | ______________________________________________________ | |||||||
| Bid Section | Bid Item | Description | Specification Section | Quantity | Unit | Unit Price | Bid Item Extension | Section Subtotal |
| 1.00 | Concrete Work, Foundation and Slab | |||||||
| 1.01 | Structural Excavation for building foundations, includes 10% for over-excavation. | 31 20 00 | 24.00 | Cubic Meter | - 0 | |||
| 1.02 | Termite Control | 31 31 16 | 1.00 | Lump Sum | - 0 | |||
| 1.03 | Lean Concrete under reinforced concrete , Class 10/12 MPa | 03 30 00 | 10.50 | Cubic Meter | - 0 | |||
| 1.04 | Hard-Core under Exterior Slab | 31 20 00 | 14.00 | Cubic Meter | - 0 | |||
| 1.05 | Sand Blinding on Hard-Core Under Exterior Slab | 31 20 00 | 2.40 | Cubic Meter | - 0 | |||
| 1.06 | Grade Beams, Reinforced Concrete, Class C-20/25 | 03 30 30 | 18.25 | Cubic Meter | - 0 | |||
| 1.07 | Interior Floor Slab, Reinforced Concrete, Class C-20/25 | 03 30 30 | 21.00 | Cubic Meter | - 0 | |||
| 1.08 | Concrete Formwork, Ground Contact | 03 30 30 | 39.50 | Square Meter | - 0 | |||
| 1.09 | Waterproofing Membrane, Poly Sheet 250 Micron including overlap | 03 30 30 | 273.00 | Square Meter | - 0 | |||
| 1.10 | Saw-Cut Control Joints | 03 30 30 | 50.00 | Meter | - 0 | |||
| 1.11 | Interior Floor Slab, Reinforcing Wire Mesh, A98 | 03 30 30 | 311.00 | Square Meter | - 0 | |||
| 1.12 | Grade Beam Reinforcing Steel, Grade 450 | 03 30 30 | 1,016.00 | Kilogram | - 0 | |||
| 1.13 | Expansion Joint Material, Bitumen Impregnated, 12mm thickness | 03 30 30 | 11.00 | Square Meter | - 0 | |||
| 1.14 | Structural Backfill, Select Material from On-Site | 31 20 00 | 12.00 | Cubic Meter | - 0 | |||
| 1.16 | External Concrete Walkway, Stoops & Ramps, Class C-20/25 | 03 30 30 | 8.00 | Cubic Meter | - 0 | |||
| 1.17 | Reinforcing Wire Mesh in External Walkway, Stoops and Ramps, A98 Including overlap | 03 30 30 | 72.00 | Square Meter | - 0 | |||
| 1.18 | External Concrete Drainage Apron, INCLUDING A98 Reinforcing Wire, Stoop Drainage, Class C-20/25 | 32 13 13 | 40.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 2.00 | Concrete Work, Structure | |||||||
| 2.01 | Reinforced Concrete in Columns, Class C-20/25 with exposed surfaces finshed appropriate for location | 03 30 30 | 1.20 | Cubic Meter | - 0 | |||
| 2.02 | Reinforced Concrete in Bond Beams, Class C-20/25 with exposed surfaces finished appropriate for location. | 03 30 30 | 4.50 | Cubic Meter | - 0 | |||
| 2.03 | Concrete(steel or timber) formwork for Bond Beams | 03 30 30 | 73.00 | Square Meter | - 0 | |||
| 2.04 | Reinforcing Steel in Bond Beams and Columns, Grade 450 | 03 30 30 | 774.00 | Kilogram | - 0 | |||
| 2.05 | Anchor Bolts, 16mm Dia x 200mm long with 50mm tall and Heavy Duty Washer welded to plate and Painted after installation. Includes Leveling Grout. | 05 50 00 | 128.00 | Pieces | - 0 | |||
| 2.06 | Reinforcing Steel in Hollow Core Block at Truss Support Points, Grade 450 | 03 30 30 | 335.00 | Kilogram | - 0 | |||
| Sub-Total | - 0 | |||||||
| 3.00 | Masonry Work | |||||||
| 3.01 | Hollow Core Concrete Block, Class AAA (5.0MPa), 200mm thickness | Div 4 | 198.00 | Square Meter | - 0 | |||
| 3.02 | Hollow Core Concrete Block, Class AAA (5.0MPa), 150mm thickness | Div 4 | - 0 | Square Meter | - 0 | |||
| 3.03 | Mortar in Hollow Core Block at Truss Support Points | Div 4 | 6.00 | Cubic Meter | - 0 | |||
| 3.04 | Terrazzo Window Sill, Chamfered with Drip Ledge | Div 4 | 18.20 | Meter | - 0 | |||
| 3.05 | Masonry Pointing, Exterior | Div 4 | 167.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 4.00 | Structural Steel | |||||||
| 4.01 | Truss, Type 1 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | Division 05; 09 9100 | 2.00 | Pieces | - 0 | |||
| 4.02 | Truss, Type 2 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | Division 05; 09 9100 | 8.00 | Pieces | - 0 | |||
| 4.03 | Truss, Type 3 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | Division 05; 09 9100 | 1.00 | Pieces | - 0 | |||
| 4.04 | Rafter R1, Welded and Erected, Primer with 2-Coats of Synthetic Enamel Paint | Division 05; 09 9100 | 3.00 | Pieces | - 0 | |||
| 4.05 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 125 x 50 x 20 x 2.5mm, primed, erected and painted with two coats of sythetic enamel paint | Division 05; 09 9100 | 314.00 | M | - 0 | |||
| 4.07 | Fascia Bracing, Welded, Primed, Painted and Erected | Division 05; 09 9100 | 490.00 | Kilogram | - 0 | |||
| 4.08 | Misc. Steel for Bracing and Supports, Painted and Erected | Division 05; 09 9100 | 410.00 | Kilogram | - 0 | |||
| Sub-Total | - 0 | |||||||
| 5.00 | Carpentry and Joinery | |||||||
| 5.01 | Wood Fascia Board w Prime Coat and 2 Coats Alkyd Varnish all Sides, 30 CM Tall | 06 10 00, 06, 20 00, 09 91 00 | 84.00 | Meter | - 0 | |||
| 5.02 | Suspended Ceiling System, Interior PVC with Insulation including in the Clear story with 25 x 50mm CFM purlin support Grid | 06 10 00, 06, 20 00, 09 91 00 | 210.00 | Square Meter | - 0 | |||
| 5.03 | Soffit and Exterior Closure System, PVC with wood support grid and Soffit Vents | 06 10 00, 06, 20 00, 09 91 00 | 60.00 | Square Meter | - 0 | |||
| 5.04 | Ceiling Corner Trim, Interior, PVC | 06 10 00, 06, 20 00, 09 91 00 | 97.00 | Meter | - 0 | |||
| 5.05 | Ceiling Corner Trim, Exterior, PVC | 06 10 00, 06, 20 00, 09 91 00 | 20.50 | Meter | - 0 | |||
| 5.06 | Masonry Screen wall, pointed to match exterior of building | Division 04 | 29.00 | Square Meter | - 0 | |||
| 5.07 | Clearstory Interior Enclosure System with Metal Studs, Bracing and Gypsum Board | 06 10 00, 06, 20 00, 09 91 00 | 203.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 6.00 | Roofing, Gutters & Misc. Metals Sum | |||||||
| 6.01 | Steel Roof Panels Sum with fasteners in place, Pepainted 26 gage, Purchase and delivery, warranty | Divisions 05, 07 | 289.00 | Square Meter | - 0 | |||
| 6.02 | Shaped Metal Flashing installed with anchors at maximum 40cm spacing, Galvanized, primed and painted with 2 coats of synthetic enamel, Development Length 500mm | Divisions 05, 07 | 41.00 | Meter | - 0 | |||
| 6.03 | PVC Roof Gutter | Divisions 05, 07 | 4.20 | Meter | - 0 | |||
| 6.04 | PVC Roof Gutter Downspouts | Divisions 05, 07 | 3.00 | Meter | - 0 | |||
| 6.05 | Clearstory and Gable Closure Exterior Cladding with Stud Framing | Divisions 05, 07 | 48.00 | Square Meter | - 0 | |||
| 6.06 | Metal Roof Cap Prepainted, 26 gage with warranty | Divisions 05, 07 | 4.60 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Doors & Windows | |||||||
| 7.01 | Door, Steel, Double Sided, 800 x 2050mm D1 Installed with Fixtures, Primer plus 2 Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 5.00 | Pieces | - 0 | |||
| 7.05 | Door Frame, Steel with Skylight and Security Bars, F3 900x2800mm Installed with Fixtures, Caulking, Primer plus 2 Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 5.00 | Pieces | - 0 | |||
| 7.10 | Window Double Steel, Installed, W5, 1200 x 1725mm with Grill, Fixtures, Caulking, Primed with 2 Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 14.00 | Pieces | - 0 | |||
| 7.14 | Louver, Steel with Steel Frame, Installed L1, 4475 x 1000mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.15 | Louver, Steel with Steel Frame, Installed L2 2075 x 1000mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.16 | Louver, Steel with Steel Frame, Installed L3, 3805 x 1000mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.19 | Louver, Steel with Steel Frame, Installed L6, 4890 x 600mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.20 | Louver, Steel with Steel Frame, Installed L7, 1400 x 500mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.21 | Louver/Window, Steel with Steel Frame, Installed S1, 4475 x 300mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.22 | Louver/Window, Steel with Steel Frame, Installed S2, 2075 x 300mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.23 | Louver/Window, Steel with Steel Frame, Installed S3, 3805 x 300mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.29 | Glazing, 5 mm, Frosted/Opaque, Installed | 08 80 00 | 7.60 | Square Meter | - 0 | |||
| 7.30 | Glazing, 5 mm, Clear, Installed | 08 80 00 | 25.50 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 8.00 | Finishing | |||||||
| 8.01 | Internal Wall Plastering, Two Coats Cement/Sand Mortar | 09 91 00 | 250.00 | Square Meter | - 0 | |||
| 8.02 | Internal Wall Surface, Final Coat Gypsum Plaster | 09 91 00 | 250.00 | Square Meter | - 0 | |||
| 8.04 | Floor Mortar Screed, Smooth with 2 Coats sealer, 35mm Thick | 09 91 00 | 22.40 | Square Meter | - 0 | |||
| 8.05 | Plastic Emulsion Paint, Three Coats (Interior) | 09 91 00 | 240.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 9.00 | Specialties | Div 10, 12, 15 | ||||||
| 9.01 | Signage, Aluminum Placard with Vinyl Cover and Lettering | 3.00 | Pieces | - 0 | ||||
| 9.02 | Fire Extinguisher, 9 Kilogram Mounted with compatible bracket and "Fire Extinguisher" Signage. | 3.00 | Pieces | - 0 | ||||
| 9.03 | Slate Chalk Board with Tray | 17.30 | Square Meter | - 0 | ||||
| 9.04 | Marker Board, tray, fixed to wall | 4.80 | Square Meter | - 0 | ||||
| 9.05 | Tack Board | 26.40 | Square Meter | - 0 | ||||
| Sub-Total | - 0 | |||||||
| 10.00 | Electrical Rough-In | |||||||
| 11.01 | Secondary Distr. Board Flush Mtd, 24 space, lockable door with out circuit breakers, including (2 x 21mm) conduit to ceiling within masonry. | Division 26 | 1.00 | Pieces | - 0 | |||
| 11.02 | Conduit only with pull string for electric wire, Inside masonry, 21mm PVC | Division 26 | 150.00 | Meter | - 0 | |||
| 11.03 | Light Switch Box Only, Installed in Masonry with Blank Cover | Division 26 | 5.00 | Pieces | - 0 | |||
| 11.04 | Outlet Socket Box Only Installed in Masonry with Blank Cover | Division 26 | 12.00 | Pieces | - 0 | |||
| 11.05 | Exterior Wall light Box Only Installed in Masonry with Blank Cover | Division 26 | 12.00 | Pieces | - 0 | |||
| 11.06 | Interior Light Fixture Box Only Mounted in PVC Ceiling Panels with Blank Cover | Division 26 | 19.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| SCHEDULE TOTAL | - 0 |
Sch B Science Bld
| Project: | SEED Rural Group 2 | BILL OF QUANTITIES | SCHEDULE B | |||||
| Bid Date: | ______________________________________________________ | SCIENCE CLASSROOM | 1 EACH | |||||
| Name of Bidder: | ______________________________________________________ | |||||||
| Bid Section | Bid Item | Description | Specification Section | Quantity | Unit | Unit Price | Extension | Section Subtotal |
| 1.00 | Concrete Work, Foundation | |||||||
| 1.01 | Structural Excavation for building foundations, includes 10% for over-excavation. | 31 20 00 | 12.60 | Cubic Meter | - 0 | |||
| 1.02 | Termite Control | 31 31 16 | 1.00 | Lump Sum | - 0 | |||
| 1.03 | Lean Concrete under reinforced concrete , Class 10/12 MPa | 03 30 00 | 7.10 | Cubic Meter | - 0 | |||
| 1.04 | Hard-Core under Exterior Slab | 31 20 00 | 6.50 | Cubic Meter | - 0 | |||
| 1.05 | Sand Blinding on Hard-Core Under Exterior Slab | 31 20 00 | 1.70 | Cubic Meter | - 0 | |||
| 1.06 | Grade Beams, Reinforced Concrete, Class C-20/25 | 03 30 30 | 11.50 | Cubic Meter | - 0 | |||
| 1.07 | Interior Floor Slab, Reinforced Concrete, Class C-20/25 | 03 30 30 | 14.20 | Cubic Meter | - 0 | |||
| 1.08 | Concrete formwork, Ground Contact | 03 30 30 | 27.00 | Square Meter | - 0 | |||
| 1.09 | Waterproofing Membrane, Poly Sheet 250 Micron including overlap | 03 30 30 | 185.00 | Square Meter | - 0 | |||
| 1.10 | Saw-Cut Control Joints | 03 30 30 | 29.00 | Meter | - 0 | |||
| 1.11 | Interior Floor Slab, Reinforcing Wire Mesh, A98 | 03 30 30 | 142.00 | Square Meter | - 0 | |||
| 1.12 | Grade Beam Reinforcing Steel, Grade 450 | 03 30 30 | 903.00 | Kilogram | - 0 | |||
| 1.13 | Expansion Joint Material, Bitumen Impregnated, 12mm thickness | 03 30 30 | 6.00 | Square Meter | - 0 | |||
| 1.14 | Structural Backfill, Select Material from On-Site | 03 30 30 | 8.00 | Cubic Meter | - 0 | |||
| 1.16 | External Concrete Walkway, Stoops & Ramps, Class C-20/25 | 03 30 30 | 4.30 | Cubic Meter | - 0 | |||
| 1.17 | Reinforcing Wire Mesh in External Walkway, Stoops and Ramps, A98 Including overlap | 03 30 30 | 45.00 | Square Meter | - 0 | |||
| 1.18 | External Concrete Drainage Apron, INCLUDING A98 Reinforcing Wire, Stoop Drainage, Class C-20/25 | 03 30 30 | 24.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 2.00 | Concrete Work, Structure | |||||||
| 2.01 | Reinforced Concrete in Columns, Class C-20/25 with exposed surfaces finshed appropriate for location | 03 30 30 | 0.30 | Cubic Meter | - 0 | |||
| 2.02 | Reinforced Concrete in Bond Beams, Class C-20/25 with exposed surfaces finished appropriate for location. | 03 30 30 | 3.10 | Cubic Meter | - 0 | |||
| 2.03 | Concrete(steel or timber) formwork for Bond Beams | 03 30 30 | 36.00 | Square Meter | - 0 | |||
| 2.04 | Reinforcing Steel in Bond Beams and Columns, Grade 450 | 03 30 30 | 560.00 | Kilogram | - 0 | |||
| 2.05 | Anchor Bolts, 16mm Dia x 200mm long with 50mm Tall and Heavy Duty Washer welded to plate and Painted after installation. Includes Leveling Grout. | 05 50 00 | 84.00 | Pieces | - 0 | |||
| 2.06 | Reinforcing Steel in Hollow Core Block at Truss Support Points, Grade 450 | 03 30 30 | 213.00 | Kilogram | - 0 | |||
| Sub-Total | - 0 | |||||||
| 3.00 | Masonry Work | |||||||
| 3.01 | Hollow Core Concrete Block, Class AAA (5.0MPa), 200mm thickness | Division 4 | 132.00 | Square Meter | - 0 | |||
| 3.02 | Hollow Core Concrete Block, Class AAA (5.0MPa), 150mm thickness | Division 4 | 14.00 | Square Meter | - 0 | |||
| 3.03 | Mortar in Hollow Core Block at Truss Support Points | Division 4 | 3.50 | Cubic Meter | - 0 | |||
| 3.04 | Terrazzo Window Sill, Chamfered with Drip Ledge | Division 4 | 27.60 | Meter | - 0 | |||
| 3.05 | Masonry Pointing, Exterior | Division 4 | 88.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 4.00 | Structural Steel | |||||||
| 4.01 | Truss, Type 1 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | Division 05; 09 9100 | 3.00 | Pieces | - 0 | |||
| 4.02 | Truss, Type 2 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | Division 05; 09 9100 | 4.00 | Pieces | - 0 | |||
| 4.05 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 125 x 50 x 20 x 2.5mm, primed, erected and painted with two coats of sythetic enamel paint | Division 05; 09 9100 | 148.00 | Meter | - 0 | |||
| 4.07 | Fascia Bracing, Welded, Painted and Erected | Division 05; 09 9100 | 190.00 | Kilogram | - 0 | |||
| 4.08 | Misc. Steel for Bracing and Supports, Painted and Erected | Division 05; 09 9100 | 570.00 | Kilogram | - 0 | |||
| Sub-Total | - 0 | |||||||
| 5.00 | Carpentry and Joinery | |||||||
| 5.01 | Wood Fascia Board w Prime Coat and 2 Coats Oil Based Paint all Sides, 30 CM Tall | 06 10 00, 06, 20 00, 09 91 00 | 32.00 | Meter | - 0 | |||
| 5.02 | Suspended Ceiling System, Interior PVC with Insulation including in the Clear story with 25 x 50mm CFM purlin support Grid | 06 10 00, 06, 20 00, 09 91 00 | 142.00 | Square Meter | - 0 | |||
| 5.03 | Soffit and Exterior Closure System, PVC with wood support grid and Soffit Vents | 06 10 00, 06, 20 00, 09 91 00 | 36.00 | Square Meter | - 0 | |||
| 5.04 | Ceiling Trim, Interior, PVC | 06 10 00, 06, 20 00, 09 91 00 | 41.00 | Meter | - 0 | |||
| 5.05 | Ceiling Trim, Exterior, PVC | 06 10 00, 06, 20 00, 09 91 00 | 22.00 | Meter | - 0 | |||
| 5.06 | 0 | Division 04 | 14.60 | Square Meter | - 0 | |||
| 5.07 | Clearstory Interior Enclosure System with Metal Studs, Bracing and Gypsum Board | 06 10 00, 06, 20 00, 09 91 00 | 47.50 | Square Meter | - 0 | |||
| 5.08 | Concrete Counter 60.2 cm wide x 90 cm high, with Supports at 1.5m, Smooth Finish with 2 Coats of Concrete Sealer | Division 04 | 22.00 | Meter | - 0 | |||
| 5.09 | Concrete Counter Fascia framework and doors, 90cm high, 20mm Plywood, paint, hardware with interior bottom and mid-shelves | 06 20 00, 09 91 00 | 21.00 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 6.00 | Roofing, Gutters & Misc. Metals Sum | |||||||
| 6.01 | Steel Roof Panels Sum with fasteners in place, Prepainted 26 gage, Purchase and delivery, warranty | Divisions 05, 07 | 187.00 | Square Meter | - 0 | |||
| 6.02 | Shaped Metal Flashing installed with anchors at maximum 40cm spacing, Galvanized, primed and painted with 2 coats of synthetic enamel, Development Length 500mm | Divisions 05, 07 | 32.00 | Meter | - 0 | |||
| 6.05 | Clearstory and Gable Closure Exterior Cladding with Stud Framing | Divisions 05, 07 | 29.50 | Square Meter | - 0 | |||
| 6.06 | Metal Roof Cap Prepainted, 26 gage | Divisions 05, 07 | 7.20 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Doors & Windows | |||||||
| 7.01 | Door, Steel, Double Sided, 800 x 2050mm D1 Installed with Fixtures, Primer plus 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 5.00 | Pieces | - 0 | |||
| 7.03 | Door Frame, Steel with Skylight F1 900x2800mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.05 | Door Frame, Steel with Skylight and Security Bars, F3 900x2800mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 3.00 | Pieces | - 0 | |||
| 7.06 | Window Steel, Installed, W1, 600 x 1725mm with Grill, Fixtures, Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 6.00 | Pieces | - 0 | |||
| 7.09 | Window Steel, Installed, W4, 600 x 725mm with Grill, Fixtures, Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.11 | Window Double Steel, Installed, W6, 1200 x 1325mm with Grill, Fixtures, Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 6.00 | Pieces | - 0 | |||
| 7.17 | Louver, Steel with Steel Frame, Installed L4, 2400 x 1000mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.18 | Louver, Steel with Steel Frame, Installed L5, 2600 x 1000mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.19 | Louver, Steel with Steel Frame, Installed L6, 4890 x 600mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.24 | Louver/Window, Steel with Steel Frame, Installed S4, 2400 x 300mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.25 | Louver/Window, Steel with Steel Frame, Installed S5, 2600 x 300mm, Insect Screen, primed with two Coats of synthetic Enamel | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.29 | Glazing, 5 mm, Frosted/Opaque, Installed | 08 80 00 | 4.80 | Square Meter | - 0 | |||
| 7.30 | Glazing, 5 mm, Clear, Installed | 08 80 00 | 16.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 8.00 | Finishing | |||||||
| 8.01 | Internal Wall Plastering, Two Coats Cement/Sand Mortar | 09 91 00 | 198.00 | Square Meter | - 0 | |||
| 8.02 | Internal Wall Surface, Final Coat Gypsum Plaster | 09 91 00 | 198.00 | Square Meter | - 0 | |||
| 8.05 | Plastic Emulsion Paint, Three Coats (Interior) | 09 91 00 | 198.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 9.00 | Specialties | Div 10, 12, 15 | ||||||
| 9.01 | Signage, Aluminum Placard with Vinyl Cover and Lettering | 3.00 | Pieces | - 0 | ||||
| 9.02 | Fire Extinguisher, 9 Kilogram Mounted with compatible bracket and "Fire Extinguisher" Signage. | 3.00 | Pieces | - 0 | ||||
| 9.03 | Slate Chalk Board with Tray | 4.30 | Square Meter | - 0 | ||||
| 9.04 | Marker Board, tray, fixed to wall | 2.40 | Square Meter | - 0 | ||||
| 9.05 | Tack Board | 2.40 | Square Meter | - 0 | ||||
| 9.06 | Stainless Steel Sink with Temporary Cover | 10.00 | Pieces | - 0 | ||||
| Sub-Total | - 0 | |||||||
| 10.00 | Electrical Rough-In | |||||||
| 11.01 | Secondary Distr. Board Flush Mtd, 24 space, lockable door with out circuit breakers, including (2 x 21mm) conduit to ceiling within masonry. | Division 26 | 1.00 | Pieces | - 0 | |||
| 11.02 | Conduit only with pull string for electric wire, Inside masonry, 21mm PVC | Division 26 | 80.00 | Meter | - 0 | |||
| 11.03 | Light Switch Box Only, Installed in Masonry with Blank Cover | Division 26 | 7.00 | Pieces | - 0 | |||
| 11.04 | Outlet Socket Box Only Installed in Masonry with Blank Cover | Division 26 | 15.00 | Pieces | - 0 | |||
| 11.05 | Wall mounted light Box Only Installed in Masonry with Blank Cover | Division 26 | 3.00 | Pieces | - 0 | |||
| 11.06 | Interior Light Fixture Box Only Mounted in PVC Ceiling Panels with Blank Cover | Division 26 | 15.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| SCHEDULE TOTAL | - 0 |
Sch C Residence
| Project: | SEED Rural Group 2 | BILL OF QUANTITIES | SCHEDULE C | |||||
| Bid Date: | ______________________________________________________ | TEACHER HOUSING AND PIT LATRINE | 2 Each | |||||
| Name of Bidder: | ______________________________________________________ | |||||||
| Bid Section | Bid Item | Description | Specification Section | Quantity | Unit | Unit Price | Extension | Section Subtotal |
| 1.00 | Concrete Work, Foundation | |||||||
| 1.01 | Structural Excavation for building foundations, includes 10% for over-excavation. | 31 20 00 | 48.00 | Cubic Meter | - 0 | |||
| 1.02 | Termite Control | 31 31 16 | 1.00 | Lump Sum | - 0 | |||
| 1.03 | Lean Concrete under reinforced concrete , Class 10/12 MPa | 03 30 00 | 6.20 | Cubic Meter | - 0 | |||
| 1.04 | Hard-Core under Exterior Slab | 31 20 00 | 6.60 | Cubic Meter | - 0 | |||
| 1.05 | Sand Blinding on Hard-Core Under Exterior Slab | 31 20 00 | 1.70 | Cubic Meter | - 0 | |||
| 1.06 | Grade Beams, Reinforced Concrete, Class C-20/25 | 03 30 30 | 13.70 | Cubic Meter | - 0 | |||
| 1.07 | Interior Floor Slab, Reinforced Concrete, Class C-20/25 | 03 30 30 | 13.80 | Cubic Meter | - 0 | |||
| 1.08 | Concrete formwork, Ground Contact | 03 30 30 | 42.00 | Square Meter | - 0 | |||
| 1.09 | Waterproofing Membrane, Poly Sheet 250 Micron including overlap | 03 30 30 | 160.00 | Square Meter | - 0 | |||
| 1.10 | Saw-Cut Control Joints | 03 30 30 | 23.00 | Meter | - 0 | |||
| 1.11 | Interior Floor Slab, Reinforcing Wire Mesh, A98 | 03 30 30 | 123.00 | Square Meter | - 0 | |||
| 1.12 | Grade Beam Reinforcing Steel, Grade 450 | 03 30 30 | 952.00 | Kilogram | - 0 | |||
| 1.13 | Expansion Joint Material, Bitumen Impregnated, 12mm thickness | 03 30 30 | 3.30 | Square Meter | - 0 | |||
| 1.14 | Structural Backfill, Select Material from On-Site | 03 30 30 | 25.00 | Cubic Meter | - 0 | |||
| 1.15 | Hard-Core Drainage Material around Latrine Pit | 31 20 00 | 6.50 | Cubic Meter | - 0 | |||
| 1.16 | External Concrete Walkway, Stoops & Ramps, Class C-20/25 | 03 30 30 | 3.50 | Cubic Meter | - 0 | |||
| 1.17 | Reinforcing Wire Mesh in External Walkway, Stoops and Ramps, A98 Including overlap | 03 30 30 | 25.00 | Square Meter | - 0 | |||
| 1.18 | External Concrete Drainage Apron, INCLUDING A98 Reinforcing Wire, Stoop Drainage, Class C-20/24 | 03 30 30 | 24.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 2.00 | Concrete Work, Structure | |||||||
| 2.01 | Reinforced Concrete in Columns, Class C-20/25 with exposed surfaces finshed appropriate for location | 03 30 30 | 1.40 | Cubic Meter | - 0 | |||
| 2.02 | Reinforced Concrete in Bond Beams, Class C-20/25 with exposed surfaces finished appropriate for location. | 03 30 30 | 5.90 | Cubic Meter | - 0 | |||
| 2.03 | Concrete(steel or timber) formwork for Bond Beams | 03 30 30 | 57.00 | Square Meter | - 0 | |||
| 2.04 | Reinforcing Steel in Bond Beams and Columns, Grade 450 | 03 30 30 | 903.00 | Kilogram | - 0 | |||
| 2.05 | Anchor Bolts, 16mm Dia x 200mm long with 50mm tall and Heavy Duty Washer welded to plate and Painted after installation. Includes Leveling Grout. | 03 30 30 | 84.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 3.00 | Masonry Work | |||||||
| 3.01 | Hollow Core Concrete Block, Class AAA (5.0MPa), 200mm thickness including Open Joints where Indicated in Pit | Division 4 | 189.00 | Square Meter | - 0 | |||
| 3.02 | Hollow Core Concrete Block, Class AAA (5.0MPa), 150mm thickness | Division 4 | 19.00 | Square Meter | - 0 | |||
| 3.03 | Mortar in Hollow Core Block | Division 4 | 3.10 | Cubic Meter | - 0 | |||
| 3.04 | Terrazzo Window Sill, Chamfered with Drip Ledge | Division 4 | 12.60 | Meter | - 0 | |||
| 3.05 | Masonry Pointing, Exterior | Division 4 | 174.00 | Square Meter | - 0 | |||
| 3.06 | Concrete Lintel | Division 4 | 3.00 | M | - 0 | |||
| Sub-Total | - 0 | |||||||
| 4.00 | Structural Steel | |||||||
| 4.06 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 75 x 50 x 20 x 2.5mm, primed, erected and painted with 2 coats of synthetic enamel paint | Division 05; 09 9100 | 140.00 | M | - 0 | |||
| 4.07 | Fascia Bracing, Welded, Painted and Erected | Division 05; 09 9100 | 180.00 | Kilogram | - 0 | |||
| 4.08 | Misc. Steel for Bracing and Supports, Painted and Erected | Division 05; 09 9100 | 80.00 | Kilogram | - 0 | |||
| 4.09 | Teacher Housing Roofing System, Complete with all Structural Sections, Connections, Welding, Erection. Primed and Painted with 2 Coats of Oil-Based Paint, Less Purlins and Anchor Bolts | Division 05; 09 9100 | 2,200.00 | Kilogram | - 0 | |||
| 4.10 | Teacher Pit Latrine Roofing System, Wood, Complete with all Structural Sections, Connections. Primed and Painted with 2 Coats of Oil-Based Paint, Including Purlins and Anchor Straps | Division 6 | 1.00 | Lump Sum | - 0 | |||
| Sub-Total | - 0 | |||||||
| 5.00 | Carpentry and Joinery | |||||||
| 5.01 | Wood Fascia Board w Prime Coat and 2 Coats Oil Based Paint all Sides, 30 CM Tall | 06 10 00, 06, 20 00, 09 91 00 | 50.00 | Meter | - 0 | |||
| 5.02 | Suspended Ceiling System, Interior PVC with Insulation including in the Clear story with 25 x 50mm CFM purlin support Grid | 06 10 00, 06, 20 00, 09 91 00 | 123.00 | Square Meter | - 0 | |||
| 5.03 | Soffit and Exterior Closure System, PVC with wood support grid and Soffit Vents | 06 10 00, 06, 20 00, 09 91 00 | 22.50 | Square Meter | - 0 | |||
| 5.04 | Ceiling Trim, Interior, PVC | 06 10 00, 06, 20 00, 09 91 00 | 108.00 | Meter | - 0 | |||
| 5.06 | Masonry Vented Wall | Division 04 | 2.20 | Square Meter | - 0 | |||
| 5.07 | Clearstory Interior Enclosure System with Metal Studs, Bracing and Gypsum Board | 06 10 00, 06, 20 00, 09 91 00 | 9.00 | Square Meter | - 0 | |||
| 5.08 | Concrete Counter 60 cm wide x92cm high, with Supports at 1.5m, Smooth Finish with 2 Coats of Sealer | 0 | 3.40 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 6.00 | Roofing, Gutters & Misc. Metals Sum | |||||||
| 6.01 | Steel Roof Panels Sum with fasteners in place, Prepainted 26 gage, Purchase and delivery, warranty | Divisions 05, 07 | 178.00 | Square Meter | - 0 | |||
| 6.02 | Shaped Metal Flashing installed with anchors at maximum 40cm spacing, Galvanized, primed and painted with 2 coats of synthetic enamel, Development Length 500mm | Divisions 05, 07 | 25.80 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Doors & Windows | |||||||
| 7.01 | Door, Steel, Double Sided, 800 x 2050mm D1 Installed with Fixtures, Primer plus 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 3.00 | Pieces | - 0 | |||
| 7.02 | Door, Wood, 800 x 2050mm D1 Installed with Fixtures, Primer plus 2 Coats of Paint | 05 50 00, Divisions 08, 09 | 8.00 | Pieces | - 0 | |||
| 7.03 | Door Frame, Steel with Skylight F1, 900x2800mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 8.00 | Pieces | - 0 | |||
| 7.04 | Door Frame, Steel F2 900 x 2100mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.05 | Door Frame, Steel with Skylight and Security Bars, F3 900x2800mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.07 | Window Steel, Installed, W2, 600 x 600mm with Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 4.00 | Pieces | - 0 | |||
| 7.09 | Window Steel, Installed, W4, 600 x 725mm with Grill, Fixtures, Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.12 | Window Double Steel, Installed, W7, 1200 x 1725mm with Grill, Fixtures, Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 10.00 | Pieces | - 0 | |||
| 7.13 | Window Double Steel, Installed, W8, 600 x 1325mm with Grill, Fixtures, Caulking, Primed with 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 1.00 | Pieces | - 0 | |||
| 7.26 | Window, Steel with Steel Frame, Installed S6, 1150 x 400mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.27 | Louver, Steel with Steel Frame, Installed S7, 1150 x 400mm, Insect Screen, primed with two Coats of synthetic enamel | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.28 | Window/Louver, with Steel Frame, Installed S8, 2300 x 400mm, Insect Screen, primed with two Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.29 | Glazing, 5 mm, Frosted/Opaque, Installed | 08 80 00 | 4.10 | Square Meter | - 0 | |||
| 7.30 | Glazing, 5 mm, Clear, Installed | 08 80 00 | 25.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 8.00 | Finishing | |||||||
| 8.01 | Internal Wall Plastering, Two Coats Cement/Sand Mortar | 09 91 00 | 321.00 | Square Meter | - 0 | |||
| 8.02 | Internal Wall Surface, Final Coat Gypsum Plaster | 09 91 00 | 321.00 | Square Meter | - 0 | |||
| 8.05 | Plastic Emulsion Paint, Three Coats (Interior) | 09 91 00 | 321.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 9.00 | Specialties | Div 10, 12, 15 | ||||||
| 9.01 | Signage, Aluminum Placard with Vinyl Cover and Lettering | 1.00 | Pieces | - 0 | ||||
| 9.02 | Fire Extinguisher, 9 Kilogram Mounted with compatible bracket and "Fire Extinguisher" Signage. | 3.00 | Pieces | - 0 | ||||
| 9.07 | Metal Shelf, 35cm wide with mounting brackets | 21.00 | Meter | - 0 | ||||
| 9.08 | Grab Bars, Stainless Steel, 60cm length, installed | 1.00 | Pieces | - 0 | ||||
| 9.09 | Robe Hook, Installed | 1.00 | Pieces | - 0 | ||||
| 9.10 | Wooden Wardrobe with Doors, internal shelves and metal hanger rod, 220cm average wide by 210cm tall with two coats of polyurethane Varnish | 3.00 | Pieces | - 0 | ||||
| 9.11 | Masonry and Concrete Bench, 500mm x 800mm x 470mm high | 1.00 | Pieces | - 0 | ||||
| Sub-Total | - 0 | |||||||
| 10.00 | Electrical Rough-In | |||||||
| 11.01 | Secondary Distr. Board Flush Mtd, 24 space, lockable door with out circuit breakers, including (2 x 21mm) conduit to ceiling within masonry. | Division 26 | 1.00 | Pieces | - 0 | |||
| 11.02 | Conduit only with pull string for electric wire, Inside masonry, 21mm PVC | Division 26 | 110.00 | Meter | - 0 | |||
| 11.03 | Light Switch Box Only, Installed in Masonry with Blank Cover | Division 26 | 12.00 | Pieces | - 0 | |||
| 11.04 | Outlet Socket Box Only Installed in Masonry with Blank Cover | Division 26 | 23.00 | Pieces | - 0 | |||
| 11.05 | Wall mounted light Box Only Installed in Masonry with Blank Cover | Division 26 | 2.00 | Pieces | - 0 | |||
| 11.06 | Interior Light Fixture Box Only Mounted in PVC Ceiling Panels with Blank Cover | Division 26 | 16.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 11.00 | Plumbing | |||||||
| 11.02 | Handicap Toilet Fixture with Cover, Including Masonry Pedestal | Division 22 | 1.00 | Pieces | - 0 | |||
| 11.03 | Pit Vent, 100mm UPVC | Division 22 | 3.00 | Meter | - 0 | |||
| 11.04 | Pit Vent Cap | Division 22 | 1.00 | Meter | - 0 | |||
| 11.06 | Sanitary Drainage Pipe, 100mm UPVC | Division 22 | 10.00 | Meter | - 0 | |||
| 11.08 | Sanitary Drainage Pipe, 50mm UPVC | Division 22 | 3.00 | Meter | - 0 | |||
| 11.09 | Fittings, 50mm UPVC including, Bends and Sink Drain with Plug | Division 22 | 3.00 | Pieces | - 0 | |||
| 11.10 | Concrete Gully Box | Division 22 | 1.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| SCHEDULE TOTAL | - 0 |
Sch D Student PLs
| Project: | SEED Rural Group 2 | BILL OF QUANTITIES | SCHEDULE D | |||||
| Bid Date: | ______________________________________________________ | MALE AND FEMALE PIT LATRINES COMBINED | 1 EACH | |||||
| Name of Bidder: | ______________________________________________________ | |||||||
| Bid Section | Bid Item | Description | Specification Section | Quantity | Unit | Unit Price | Extension | Section Subtotal |
| 1.00 | Concrete Work, Foundation | |||||||
| 1.01 | Structural Excavation, includes 10% for over-excavation. | 31 20 00 | 113.00 | Cubic Meter | - 0 | |||
| 1.04 | Hard-Core under Exterior Slab | 31 20 00 | 15.00 | Cubic Meter | - 0 | |||
| 1.05 | Sand Blinding on Hard-Core Under Exterior Slab | 31 20 00 | 7.50 | Cubic Meter | - 0 | |||
| 1.06 | Reinforced Concrete grade beams, suspended slab, pit footing, pit ringbeam, Class C-20/25 | 03 30 30 | 13.50 | Cubic Meter | - 0 | |||
| 1.07 | Interior Floor Slab on Grade, Reinforced Concrete, Class C-20/25 | 03 30 30 | 5.00 | Cubic Meter | - 0 | |||
| 1.08 | Concrete formwork, Ground Contact | 03 30 30 | 58.00 | Square Meter | - 0 | |||
| 1.11 | Interior Floor Slab, Reinforcing Wire Mesh, A98 | 03 30 30 | 50.40 | Square Meter | - 0 | |||
| 1.12 | Reinforcing Steel, grade beams, suspended slab, pit footing, pit ringbeam and pit masonry, Grade 450 | 03 30 30 | 2,200.00 | Kilogram | - 0 | |||
| 1.13 | Expansion Joint Material, Bitumen Impregnated, 12mm thickness | 03 30 30 | 6.00 | Square Meter | - 0 | |||
| 1.14 | Structural Backfill, Select Material | 31 20 00 | 85.00 | Cubic Meter | - 0 | |||
| 1.15 | Hard-Core Drainage Material | 31 20 00 | 16.00 | Cubic Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 2.00 | Concrete Work, Structure | |||||||
| 2.01 | Reinforced Concrete in Columns, Class C-20/25 | 03 30 30 | - 0 | Cubic Meter | - 0 | |||
| 2.02 | Reinforced Concrete in Bond Beams on masonry, Class C-20/25 with exposed surfaces finished appropriate for location. | 03 30 30 | 1.60 | Cubic Meter | - 0 | |||
| 2.03 | Concrete(steel or timber) formwork for Bond Beams on Masonry | 03 30 30 | 99.00 | Square Meter | - 0 | |||
| 2.04 | Reinforcing Steel in Bond Beams, Grade 450 | 03 30 30 | 423.00 | Kilogram | - 0 | |||
| Sub-Total | - 0 | |||||||
| 3.00 | Masonry Work | |||||||
| 3.01 | Hollow Core Concrete Block, Class AAA (5.0MPa), 200mm thickness including Open Joints where Indicated in Pit | Div 4 | 235.00 | Square Meter | - 0 | |||
| 3.02 | Hollow Core Concrete Block, Class AAA (5.0MPa), 150mm thickness | Div 4 | 39.00 | Square Meter | - 0 | |||
| 3.03 | Mortar in Hollow Core Block | Div 4 | 13.50 | Cubic Meter | - 0 | |||
| 3.05 | Masonry Pointing, Exterior | Div 4 | 328.00 | Square Meter | - 0 | |||
| 3.07 | Wall Coping | Div 4 | 46.00 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 4.00 | Roofing System | |||||||
| 4.01 | Truss, Type 1 Welded, Bolted, Erected, Primer with 2-Coats of Oil-Based Paint | - 0 | Pieces | - 0 | ||||
| 4.02 | Truss, Type 2 Welded, Bolted, Erected, Primer with 2-Coats of Oil-Based Paint | - 0 | Pieces | - 0 | ||||
| 4.03 | Truss, Type 3 Welded, Bolted, Erected, Primer with 2-Coats of Oil-Based Paint | - 0 | Pieces | - 0 | ||||
| 4.04 | Rafter R1, Welded and Erected, Primer with 2-Coats of Oil-Based Paint | - 0 | Pieces | - 0 | ||||
| 4.05 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 120 x 60 x 2.5mm | - 0 | M | - 0 | ||||
| 4.06 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 75x50 x20x2.0mm | - 0 | M | - 0 | ||||
| 4.07 | Fascia Bracing, Welded, Painted and Erected | - 0 | Kilogram | - 0 | ||||
| 4.08 | Misc. Steel for Bracing and Supports, Painted and Erected | - 0 | Kilogram | - 0 | ||||
| 4.09 | Teacher Housing Roofing System, Complete with all Structural Sections, Connections, Welding, Erection. Primed and Painted with 2 Coats of Oil-Based Paint, Less Purlins and Anchor Bolts | - 0 | Kilogram | - 0 | ||||
| 4.10 | Student Male and Female Pit Latrine Roofing System: Wood Truss, Complete with all Structural Sections, Connections. Primed and Painted with 2 Coats of Oil-Based Paint, Including Purlins and Anchor Straps. Price per Building | Division 6 | 2.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 5.00 | Carpentry and Joinery | |||||||
| 5.01 | Wood Fascia and Soffit Board w Prime Coat and 2 Coats Synthetic Enamel Paint all Sides, 20 CM Tall | 06 10 00, 06, 20 00, 09 91 00 | 76.00 | Meter | - 0 | |||
| 5.06 | Masonry Vented Wall | Division 4 | 10.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 6.00 | Roofing, Gutters & Misc. Metals Sum | |||||||
| 6.01 | Steel Roof Panels Sum with fasteners in place, Prepainted 26 gage, Purchase and delivery, warranty | Divisions 05, 07 | 43.00 | Square Meter | - 0 | |||
| 6.02 | Shaped Metal Flashing installed with anchors at maximum 40cm spacing, Galvanized, primed and painted with 2 coats of synthetic enamel, Development Length 500mm | Divisions 05, 07 | - 0 | Meter | - 0 | |||
| 6.03 | Roof Gutter, 150mm UPVC | Divisions 05, 07 | - 0 | Meter | - 0 | |||
| 6.04 | PVC Roof Gutter Downspouts, 100mm UPVC | Divisions 05, 07 | - 0 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Doors & Windows | |||||||
| 7.01 | Door, Steel 800 x 2050mm D1 Installed with Fixtures, Primer plus 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 9.00 | Pieces | - 0 | |||
| 7.04 | Door Frame, Steel F2 900 x 2100mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 9.00 | Pieces | - 0 | |||
| 7.31 | Security Gate, Steel D2 900 x 2150-2300mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 4.00 | Pieces | - 0 | |||
| 7.32 | Security Gate Frame, Steel F4 1600 x 2300mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| 7.33 | Security Gate Frame, Steel F5 1200 x 2150mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 2.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 8.00 | Finishing | |||||||
| 8.01 | Internal Wall Plastering, Two Coats Cement/Sand Mortar | 09 91 00 | 190.00 | Square Meter | - 0 | |||
| 8.04 | Floor Mortar Screed, Smooth with 2 Coats Plaster, 48mm Thick, Internal only | 09 91 00 | 55.00 | Square Meter | - 0 | |||
| 8.05 | Plastic EmuLump Emulsion Paint, Three Coats (Interior) | 09 91 00 | 88.00 | Square Meter | - 0 | |||
| 8.06 | Two Coats Epoxy Paint in Stall and Urinal up to 1500mm above floor | 09 91 00 | 100.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 9.00 | Specialties | |||||||
| 9.01 | Signage, Aluminum Placard with Vinyl Cover and Lettering | 10 14 26 | 4.00 | Pieces | - 0 | |||
| 9.02 | Fire Extinguisher, 9 Kilogram Mounted with compatible bracket and "Fire Extinguisher" Signage. | 10 44 00 | 2.00 | Pieces | - 0 | |||
| 9.03 | Steel Handrail, Installed, Primed and Painted with 2-Coats of Synthetic Enamel paint | 05 50 00 | 4.00 | Meter | - 0 | |||
| 9.04 | Concrete Steps | 03 30 00 | 0.80 | Cubic Meter | - 0 | |||
| 9.05 | Specialty Concrete for Tanks and Troughs, Water Tight, Smooth-Troweled Finish with 3 Coats of Concrete Plaster | 31 20 00 | 3.60 | Cubic Meter | - 0 | |||
| 9.06 | Water Basin Cover, 2.0mm Steel, Primed and Painted with 2 Coats of Synthetic Enamel Paint | 05 50 00 | 2.00 | Pieces | - 0 | |||
| 9.07 | Stainless Steel Grab Bars | Division 22 | 3.00 | Pieces | - 0 | |||
| 9.08 | Robe Hook, Installed | Division 22 | 1.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 11.00 | Plumbing | |||||||
| 11.01 | Squat Toilet Fixture with Cover | Division 22 | 6.00 | Pieces | - 0 | |||
| 11.02 | Handicap Toilet Fixture with Cover, Including Masonry Pedestal | Division 22 | 2.00 | Pieces | - 0 | |||
| 11.03 | Pit Vent, 100mm UPVC | Division 22 | 16.00 | Meter | - 0 | |||
| 11.04 | Pit Vent Cap | Division 22 | 4.00 | Meter | - 0 | |||
| 11.05 | Handwash Spigot | Division 22 | 6.00 | Pieces | - 0 | |||
| 11.06 | Sanitary Drainage Pipe, 100mm UPVC | Division 22 | 10.00 | Meter | - 0 | |||
| 11.07 | Fittings, 90 Degree 100mm UPVC | Division 22 | 2.00 | Pieces | - 0 | |||
| 11.08 | Sanitary Drainage Pipe, 50mm UPVC | Division 22 | 10.00 | Meter | - 0 | |||
| 11.09 | Fittings, 50mm UPVC including, Bends and Sink Drain with Plug | Division 22 | 6.00 | Pieces | - 0 | |||
| 11.10 | Concrete Gully Box | Division 22 | 2.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| SCHEDULE TOTAL | - 0 |
Sch E Teacher PL
| Project: | SEED Rural Group 2 | BILL OF QUANTITIES | SCHEDULE E | |||||
| Bid Date: | ______________________________________________________ | TEACHER PIT LATRINE | 1 Each | |||||
| Name of Bidder: | ______________________________________________________ | |||||||
| Bid Section | Bid Item | Description | Specification Section | Quantity | Unit | Unit Price | Extension | Section Subtotal |
| 1.00 | Concrete Work, Foundation | |||||||
| 1.01 | Structural Excavation, includes 10% for over-excavation. | 31 20 00 | 81.00 | Cubic Meter | - 0 | |||
| 1.04 | Hard-Core under Exterior Slab | 31 20 00 | 4.00 | Cubic Meter | - 0 | |||
| 1.05 | Sand Blinding on Hard-Core Under Exterior Slab | 31 20 00 | 2.00 | Cubic Meter | - 0 | |||
| 1.06 | Reinforced Concrete grade beams, suspended slab, pit footing, pit ringbeam, Class C-20/25 | 03 30 30 | 5.80 | Cubic Meter | - 0 | |||
| 1.07 | Interior Floor Slab on Grade, Reinforced Concrete, Class C-20/25 | 03 30 30 | 1.40 | Cubic Meter | - 0 | |||
| 1.08 | Concrete formwork, Ground Contact | 03 30 30 | 22.50 | Square Meter | - 0 | |||
| 1.11 | Interior Floor Slab, Reinforcing Wire Mesh, A98 | 03 30 30 | 13.50 | Square Meter | - 0 | |||
| 1.12 | Reinforcing Steel, grade beams, suspended slab, pit footing, pit ringbeam and pit masonry, Grade 450 | 03 30 30 | 680.00 | Kilogram | - 0 | |||
| 1.13 | Expansion Joint Material, Bitumen Impregnated, 12mm thickness | 03 30 30 | 5.20 | Square Meter | - 0 | |||
| 1.14 | Structural Backfill, Select Material | 31 20 00 | 26.50 | Cubic Meter | - 0 | |||
| 1.15 | Hard-Core Drainage Material | 31 20 00 | 6.80 | Cubic Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 2.00 | Concrete Work, Structure | |||||||
| 2.01 | Reinforced Concrete in Columns, Class C-20/25 | 03 30 30 | - 0 | Cubic Meter | - 0 | |||
| 2.02 | Reinforced Concrete in Bond Beams on masonry, Class C-20/25 with exposed surfaces finished appropriate for location. | 03 30 30 | 0.70 | Cubic Meter | - 0 | |||
| 2.03 | Concrete(steel or timber) formwork for Bond Beams and suspended slab and beams | 03 30 30 | 8.40 | Square Meter | - 0 | |||
| 2.04 | Reinforcing Steel in Bond Beams, Grade 450 | 150.00 | Kilogram | - 0 | ||||
| Sub-Total | - 0 | |||||||
| 3.00 | Masonry Work | |||||||
| 3.01 | Hollow Core Concrete Block, Class AAA (5.0MPa), 200mm thickness including Open Joints where Indicated in Pit | Div 4 | 136.00 | Square Meter | - 0 | |||
| 3.02 | Hollow Core Concrete Block, Class AAA (5.0MPa), 150mm thickness | Div 4 | - 0 | Square Meter | - 0 | |||
| 3.03 | Mortar in Hollow Core Block | Div 4 | 4.50 | Cubic Meter | - 0 | |||
| 3.05 | Masonry Pointing, Exterior | Div 4 | 58.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 4.00 | Roofing System | |||||||
| 4.01 | Truss, Type 1 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | - 0 | Pieces | - 0 | ||||
| 4.02 | Truss, Type 2 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | - 0 | Pieces | - 0 | ||||
| 4.03 | Truss, Type 3 Welded, Bolted, Erected, Primer with 2-Coats of Synthetic Enamel Paint | - 0 | Pieces | - 0 | ||||
| 4.04 | Rafter R1, Welded and Erected, Primer with 2-Coats of Synthetic Enamel Paint | - 0 | Pieces | - 0 | ||||
| 4.05 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 120 x 60 x 2.5mm | - 0 | M | - 0 | ||||
| 4.06 | Purlins Cold Formed with Connection Angle , Bolts and Erected, 75x50 x20x2.0mm | - 0 | M | - 0 | ||||
| 4.07 | Fascia Bracing, Welded, Painted and Erected | - 0 | Kilogram | - 0 | ||||
| 4.08 | Misc. Steel for Bracing and Supports, Painted and Erected | - 0 | Kilogram | - 0 | ||||
| 4.09 | Teacher Housing Roofing System, Complete with all Structural Sections, Connections, Welding, Erection. Primed and Painted with 2 Coats of Synthetic Enamel Paint, Less Purlins and Anchor Bolts | - 0 | Kilogram | - 0 | ||||
| 4.10 | Teacher Pit Latrine Roofing System: Wood Truss, Complete with all Structural Sections, Connections. Primed and Painted with 2 Coats of Synthetic Enamel Paint, Including Purlins and Anchor Straps. Price per Building | Division 6 | 1.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 5.00 | Carpentry and Joinery | |||||||
| 5.01 | Wood Fascia and Soffit Board w Prime Coat and 2 Coats Synthetic Enamel Paint all Sides, 20 CM Tall | 06 10 00, 06, 20 00, 09 91 00 | 23.00 | Meter | - 0 | |||
| 5.06 | Masonry Vented Wall | Division 4 | 3.20 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 6.00 | Roofing, Gutters & Misc. Metals Sum | |||||||
| 6.01 | Steel Roof Panels Sum with fasteners in place, Prepainted 26 gage, Purchase and delivery, warranty | Divisions 05, 07 | 32.00 | Square Meter | - 0 | |||
| 6.02 | Shaped Metal Flashing installed with anchors at maximum 40cm spacing, Galvanized, primed and painted with 2 coats of synthetic enamel, Development Length 500mm | Divisions 05, 07 | - 0 | Meter | - 0 | |||
| 6.03 | Roof Gutter, 150mm UPVC | Divisions 05, 07 | - 0 | Meter | - 0 | |||
| 6.04 | PVC Roof Gutter Downspouts, 100mm UPVC | Divisions 05, 07 | - 0 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Doors & Windows | |||||||
| 7.01 | Door, Steel 800 x 2050mm D1 Installed with Fixtures, Primer plus 2 Coats of Oil-Based Paint | 05 50 00, Divisions 08, 09 | 4.00 | Pieces | - 0 | |||
| 7.04 | Door Frame, Steel F2 900 x 2100mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | 4.00 | Pieces | - 0 | |||
| 7.31 | Security Gate, Steel D2 900 x 2150-2300mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | - 0 | Pieces | - 0 | |||
| 7.32 | Security Gate Frame, Steel F4 1600 x 2300mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | - 0 | Pieces | - 0 | |||
| 7.33 | Security Gate Frame, Steel F5 1200 x 2150mm Installed with Fixtures, Caulking, Primer plus 2 Coats of Oil Based Paint | 05 50 00, Divisions 08, 09 | - 0 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| 8.00 | Finishing | |||||||
| 8.01 | Internal Wall Plastering, Two Coats Cement/Sand Mortar | 09 91 00 | 98.00 | Square Meter | - 0 | |||
| 8.04 | Floor Mortar Screed, Smooth with 2 Coats Plaster, 48mm Thick, Internal only | 09 91 00 | 26.00 | Square Meter | - 0 | |||
| 8.05 | Plastic Emulsion Paint, Three Coats (Interior) | 09 91 00 | 46.00 | Square Meter | - 0 | |||
| 8.06 | Two Coats Epoxy Paint in Stall and Urinal up to 1500mm above floor | 09 91 00 | 52.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 9.00 | Specialties | |||||||
| 9.01 | Signage, Aluminum Placard with Vinyl Cover and Lettering | 10 14 26 | 2.00 | Pieces | - 0 | |||
| 9.02 | Fire Extinguisher, 9 Kilogram Mounted with compatible bracket and "Fire Extinguisher" Signage. | 10 44 00 | 1.00 | Pieces | - 0 | |||
| 9.03 | Steel Handrail, Installed, Primed and Painted with 2-Coats of Synthetic Enamel paint | 05 50 00 | 2.00 | Meter | - 0 | |||
| 9.04 | Concrete Steps | 03 30 00 | 0.40 | Cubic Meter | - 0 | |||
| 9.05 | Specialty Concrete for Tanks and Troughs, Water Tight, Smooth-Troweled Finish with 3 Coats of Concrete Plaster | 03 30 30 | 1.50 | Cubic Meter | - 0 | |||
| 9.06 | Water Basin Cover, 2.0mm Steel, Primed and Painted with 2 Coats of Synthetic Enamel Paint | 05 50 00 | 1.00 | Pieces | - 0 | |||
| 9.07 | Stainless Steel Grab Bars | Division 22 | 3.00 | Pieces | - 0 | |||
| 9.08 | Robe Hook, Installed | 1.00 | Pieces | - 0 | ||||
| Sub-Total | - 0 | |||||||
| 11.00 | Plumbing | |||||||
| 11.01 | Squat Toilet Fixture with Cover | Division 22 | - 0 | Pieces | - 0 | |||
| 11.02 | Handicap Toilet Fixture with Cover, Including Masonry Pedestal | Division 22 | 2.00 | Pieces | - 0 | |||
| 11.03 | Pit Vent, 100mm UPVC | Division 22 | 8.00 | Meter | - 0 | |||
| 11.04 | Pit Vent Cap | Division 22 | 2.00 | Meter | - 0 | |||
| 11.05 | Handwash Spigot | Division 22 | 3.00 | Pieces | - 0 | |||
| 11.06 | Sanitary Drainage Pipe, 100mm UPVC | Division 22 | 4.00 | Meter | - 0 | |||
| 11.07 | Fittings, 90 Degree 100mm UPVC | Division 22 | 1.00 | Pieces | - 0 | |||
| 11.08 | Sanitary Drainage Pipe, 50mm UPVC | Division 22 | 5.00 | Meter | - 0 | |||
| 11.09 | Fittings, 50mm UPVC including, Bends and Sink Drain with Plug | Division 22 | 4.00 | Pieces | - 0 | |||
| 11.10 | Concrete Gully Box | Division 22 | 1.00 | Pieces | - 0 | |||
| Sub-Total | - 0 | |||||||
| SCHEDLE TOTAL | - 0 |
Sch F1
| Project: | SEED Rural Group 2 | BILL OF QUANTITIES | SCHEDULE F1 | |||||
| Bid Date: | ______________________________________________________ | MOBILIZATION AND SITE DEVELOPMENT | Chibweya | |||||
| Name of Bidder: | ______________________________________________________ | |||||||
| Bid Section | Bid Item | Description | Specification Section | Quantity | Unit | Unit Price | Extension | Section Subtotal |
| Mobilization | ||||||||
| 1.00 | Mobilization | |||||||
| 1.01 | Mobilization to the site for Facility and Site Construction and including all requirements of the Contract Documents and Specifications Division 1 | Division 01 | 1.00 | Lump Sum | - 0 | |||
| Sub-Total | - 0 | |||||||
| Site Work | ||||||||
| 2.00 | Site Clearing and Grading | |||||||
| 2.01 | Tree Clearing and Site Grubbing, disposal of off-site with no burning allowed | 02 41 16; 31 10 00 | 1.00 | Lump Sum | - 0 | |||
| 2.02 | Tree Seedling Planting to Replace Cleared Trees | 32 93 00 | 5.00 | Pieces | - 0 | |||
| 2.03 | Topsoil Stripping and wasted on-site as embankment slopes or berms where directed by USAID. | 31 20 00 | 2,000.00 | Cubic Meter | - 0 | |||
| 2.04 | Mass Excavation and placement as compacted embankment or suitably wasted on-site. | 31 20 00; 31 31 16; 31 50 00 | 3,130.00 | Cubic Meter | - 0 | |||
| 2.05 | Off-Site Select Material Borrow | 31 20 00 | - 0 | Cubic Meter | - 0 | |||
| 2.06 | Building Pad Preparation | 31 20 00 | 1,100.00 | Square Meter | - 0 | |||
| 2.07 | Site finish grading including earth driveways, earth walkways, swales and final surface shaping for drainage | 31 20 00 | 9,900.00 | Square Meter | - 0 | |||
| 2.08 | Gravel parking pad, 100mm crushed gravel, compacted and graded to drain | 33 41 00 | 120.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 3.00 | Concrete | |||||||
| 3.01 | Concrete paved site sidewalks, variable width, 100mm thickness, 20/25MPA concrete, width as detailed on the site drawings | 32 13 13 | 271.00 | Square Meter | - 0 | |||
| 3.02 | Concrete Steps with Reinforcing steel | 03 30 00 | - 0 | Cubic Meter | - 0 | |||
| 3.03 | Hand-Rail | 05 50 00 | - 0 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 4.00 | Site Drainage | |||||||
| 4.01 | Drainage Piping, 30cm PVC, Schedule 40 | 33 41 00 | 6.00 | Meter | - 0 | |||
| 4.02 | Roof Drainage Apron Discharge Piping, 15cm PVC with 0.5 M2 pitching at outlet end for erosion control | 33 41 00 | 52.00 | Meter | - 0 | |||
| 4.03 | Concrete or rock masonry drainage pipe Endwall | 33 41 00 | 4.00 | Pieces | - 0 | |||
| 4.04 | Drainage Piping, 60cm HDPE, RCP or Corrigated Steel Pipe | 33 41 00 | 8.00 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 5.00 | Site Erosion Control | |||||||
| 5.01 | Silt Fence | 02 27 00 | - 0 | Meter | - 0 | |||
| 5.02 | Stone Pitching | 02 27 00 | 13.00 | Square Meter | - 0 | |||
| 5.03 | Stone Check Dams | 02 27 00 | - 0 | Pieces | - 0 | |||
| 5.04 | Slope Sprigging for permanent erosion control with Vetiver (30cm on center) for Sardo Grass (10 cm on center) | 02 27 00 | - 0 | Square Meter | - 0 | |||
| 5.05 | Permanent diversion ditches with grass sprigging as indicated on the plans | 02 27 00 | - 0 | Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 6.00 | Soak Away Pit | |||||||
| 6.01 | Soak Away Pit Excavation, Waste on-site | 03 30 00 | 28.00 | Cubic Meter | - 0 | |||
| 6.02 | Soak Away Pit Gravel, 2 Meter diamter x 1.50 Meter deep, 0.3 Meter Topsoil Cover | 31 20 00 | 24.00 | Cubic Meter | - 0 | |||
| 6.03 | Non-woven Filter Fabric, 142g/m2 weight,with minimum 30cm overlap | 31 20 00 | 354.00 | Square Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Bore Hole | |||||||
| 7.01 | Bore Hole Diameter 20cm, PVC Casing Pipe, screen and packing providing minimum flow requirement of 0.2 lps. | 33 21 00 | 80.00 | Meter | - 0 | |||
| 7.02 | Development of the Borehole, installation of well head and pump, complete in accordance with Specifications and appropriate for the actual dynamic water level. | 33 21 00 | 1.00 | Lump Sum | - 0 | |||
| Sub-Total | - 0 | |||||||
| 7.00 | Shallow Pit Latrine when Specified in the Drawings | |||||||
| 8.01 | Structural Excavation | 03 30 30 | 120.00 | Cubic Meter | - 0 | |||
| 8.02 | Grade Beams, Reinforced Concrete, Class C-20/25 | 03 30 30 | 2.50 | Cubic Meter | - 0 | |||
| 8.03 | Structural Backfill, Select Material | 03 30 30 | 40.00 | Cubic Meter | - 0 | |||
| 8.04 | Reinforced Concrete in Bond Beams and Suspended Slabs, Class C-20/25 | 03 30 30 | 18.00 | Cubic Meter | - 0 | |||
| 8.05 | Formwork for Bond Beams and suspended slab and beams | 03 30 30 | 60.00 | Square Meter | - 0 | |||
| 8.06 | Hollow Core Concrete Block, Class AAA (5.0MPa), 200mm thickness | Div 4 | 12.00 | Square Meter | - 0 | |||
| 8.07 | Mortar in Hollow Core Block | 03 30 30 | 1.50 | Cubic Meter | - 0 | |||
| Sub-Total | - 0 | |||||||
| SCHEDULE TOTAL | - 0 |
Sch F2