J6 RUMPHI ESMP REPORT.pdf
PDF 17 MB Posted
- Attached to
- Secondary Education Expansion for Development (SEED) Rural Group 2 Activity Federal contract opportunity
- Solicitation number
- 72061222R00005
About this file
This solicitation requests proposals for the Secondary Education Expansion for Development (SEED) Rural Group 2 Activity to support increased access to secondary education in Malawi. USAID seeks to award up to four firm fixed price contracts to construct a total of 44 community day secondary schools across 18 districts in Malawi divided into four lots based on geography. Group A consists of two large lots of 19-20 schools each reserved for Malawian firms. Group B contains two smaller lots of six schools each open to full and open competition but only eligible to Malawian firms. Proposals are due by the closing date specified in Section L with construction to be completed within thirteen months of award and a twelve month warranty period following final completion.
View the file
Other files for this federal contract opportunity
Show all 50
Secondary Education Expansion for Development (SEED) Rural Group 2 Activity has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENVIRONMENT AND SOCIAL MANAGEMENT PLAN
FOR
THE CONSTRUCTION OF COMMUNITY DAY SECONDARY SCHOOLS IN RUMPHI
(BALE AND MATUNKHA)
Ministry of Education
Private Bag 328, Lilongwe 3.
December 23, 2021
I
TABLE OF CONTENTS
ACKNOWLEDGEMENTS .....................................................................................................V
CHAPTER ONE: INTRODUCTION
1.1 Background
1.2 Objectives and Rationale of the Project
1.3 Spatial Location and Land Size
1.4 Justification for the ESMP
1.5 Rationale and Objectives of the ESMP
1.6 Project Proponent
1.7 Potential Users of the ESIA
1.8 Approach and Methodology for Preparing the ESMP
1.7.1 Literature Review
1.7.2 Field Investigations
1.7.3 Stakeholder Consultations
1.7.4 Identification and Assessment of Impacts
1.7.5 Preparation of the Environment and Social Management Plan Report
1.7.6 Constraints and Limitation of the Study
CHAPTER TWO: PROJECT DESCRIPTION
2.1 Nature of the Project
2.2 Site Selection
2.3 Land Tenure
2.4 Project Duration and Estimated Cost
2.5 Project Activities
2.5.1 Construction Phase
2.5.1.1 Construction Materials and Equipment
2.5.1.2 Site Preparation
2.5.1.3 Classroom Blocks
2.5.1.4 Administration Space
256.1.5 Teachers Houses
2.5.1.6 Boreholes
2.5.1.7 Waste Management and Sanitation Infrastructure
II
2.5.1.8 Access Roads
2.5.1.9 Solid Waste Management
2.5.1.10 Employment
2.5.2 Demobilisation Phase
2.5.3 Operation and Maintenance Phase
CHAPTER THREE: POLICY AND LEGAL FRAMEWORK
3.1 Policy Framework
3.1.1 Constitution of Malawi (1995)
3.1.2 National Environmental Policy (2004)
3.1.3 National Land Policy (2002)
3.1.4 The National Water Policy (2005)
3.1.5 The National Gender Policy (2015)
3.1.6 HIV and AIDS Policy (2012)
3.1.7 National Sanitation Policy (2008)
3.1.8 National Education Policy (2012)
3.1.9 National Forestry Policy (2016)
3.1.10 Malawi COVID-19 Socio- Economic Recovery Plan (2021-2023)
3.1 Legal Framework
3.1.1 Environment Management Act (2017)
3.1.2 Occupational Safety, Health and Welfare Act (1997)
3.1.3 Land Act (2016)
3.1.4 Lands Acquisition and Compensation Regulations (2020)
3.1.5 Water Resources Act (2013)
3.1.6 Public Health Act (1948)
3.1.7 Forest Act (1997)
3.1.8 Education Act (2013)
3.1.9 Gender Equality Act (2013)
3.1.10 Local Government Act (1998)
3.1.11 Environmental Management (Waste Management and Sanitation) Regulation
(2008) 24
3.1.12 National Construction Industry Act (1996)
III
3.1.13 HIV and AIDS Prevention and Management Act (2018)
3.2 Statutory Approvals and Licenses Required for the Project
CHAPTER FOUR: BIOPHYSICAL AND SOCIOECONOMIC ENVIRONMENT
OF RUMPHI DISTRICT
4.1 Biophysical Environment
4.1.1 General Location
4.1.2 Existing Land Uses
4.1.3 Topography
4.1.4 Geology
4.1.5 Hydrology
4.1.6 Soils
4.1.7 Climate
4.1.8 Vegetation
4.1.9 Fauna
4.1.10 Energy
4.1.11 Water Supply
4.2 Socioeconomic Environment
4.2.1 Health
4.2.2 Population
4.2.3 Education
4.2.4 Security
4.2.5 Transportation
4.2.6 Waste Disposal and Management
4.2.7 Sanitation
4.2.8 Communication
4.2.9 Agriculture
4.2.10 Socio-Economic Activities
CHAPTER FIVE: IDENTIFICATION AND BRIEF ASSESSMENT OF
IMPACTS
5.1 Introduction
5.2 Methods for Impact Identification
5.3 Description of Identified Potential Positive and Negative Environmental Impacts .. 35
IV
5.4 Impact Evaluation and Scoring
5.5 Impact Significance Rating
CHAPTER SIX: ENVIRONMENT AND SOCIAL MANAGEMENT AND
MONITORING PLANS
6.1 Environment and Social Management Plan
6.2 Environment and Social Monitoring Plan
6.2.1 Monitoring
6.2.2 Monitoring Indicators, Institutions and Costs
CHAPTER SEVEN: CONCLUSION AND RECOMMENDATIONS
7.1 Conclusion
7.2 Recommendations
8.0 REFERENCES
ANNEXES
Annex 1: Terms of Reference for Environment and Social Management Plan
Annex 2: Mutual Land Agreement Between Chiefs, Local Communities and Project
Developer
Annex 3: Summary of Issues from National Stakeholder Consultations
Annex 4: Summary of Issues from Rumphi District Stakeholder Consultations
Annex 5: Summary of Issues from Rumphi Community Stakeholder Consultations142
Annex 6: List of Stakeholders Consulted at Community Level
Annex 7: Brief Resume for the Consultant
Annex 8: Topographic Maps and Site Layouts
V
ACKNOWLEDGEMENTS
The Consultant wish to sincerely thank the Tetra Tech for the support rendered to the Consultant during the preparation of this Environment and Social Management Plan especially in providing necessary project background information and facilitation of consultative meetings with communities, traditional leaders, officials at the district council those at Government Ministries and Departments at national level.
The Consultant would like to also extend sincere gratitude to all the people and institutions, without whose support this Environment and Social Management Plan could not have been accomplished. These institutions include USAID, Ministry of Education, Ministry of Natural Resources and Climate Change, MEPA, Rumphi District Council, Local Leaders, and communities. The information gathered during the various meetings but also from the various documentation provided was very useful and valuable to the preparation of this Environment and Social Management Plan.
A list of those consulted is attached as appendix 3, 4 and 6 of this report.
VI
LIST OF ACRONMYS
ADC Area Development Committee AIDS Acquired Immuno Deficiency Syndrome CDCS Country Development Cooperation Strategy CDSS Community Day Secondary School CHAM Christian Health Association of Malawi CLTS Community-Led Total Sanitation COVID-19 Corona Virus Disease DFO District Forestry Office ECD Early Childhood Education EDO Environmental District Officer ESMP Environmental and Social Management Plan EMA Environment Management Act EMMP Environmental Mitigation and Monitoring Plan ESCOM Electricity Supply Corporation of Malawi ESMP Environment and Social Management Plan GVH Group Village Headman HIV Human Immuno Deficiency Virus IEC Information, Education and Communication IMT Intermediate Means of Transport MEPA Malawi Environment Protection Authority MAREP Malawi Rural Electrification Programme MoLG Ministry of Local Government MTL Malawi Telecommunications Limited MW Malawi NAC National Aids Commission NSO National Statistical Office NWRA National Water Resources Authority ODF Open Defecation Free OSHWA Occupational Safety and Health Welfare Act SEED Secondary Education Expansion Development SEP Socioeconomic Profile SMC School Management Committee TA Traditional Authority TNM Telekom Networks USAID United States Agency for International Development VDC Village Development Committee VH Village Headman WPC Water Point Committees WASH Water, Sanitation and Hygiene
VII
EXECUTIVE SUMMARY
1.0 Introduction
The preparation of this Environment and Social Management Plan (ESMP) is in line with the Government of Malawi’s Guidelines for Environmental Impact Assessment and the Environment Management Act (EMA) (2017). This ESMP has been prepared to address environment and social issues that may emanate from the construction, demobilization, and operation and maintenance, of classroom blocks, teacher houses, latrines and water related facilities in Rumphi District. This is part of work under the Secondary Education Expansion Development (SEED) Project that is being implemented by the Ministry of Education (MoE) with financial assistance from the United States Agency for International Development (USAID) and U.S. President’s Emergency Plan for AIDS Relief (PEPFAR).
2.0 Project Objectives and Rationale
The objective of the SEED Rural project is to improve access to secondary education across all districts in Malawi. The justification for the project is in the percent of eligible graduating primary students who are not selected to a secondary school because there is no space available. Secondly, where space is available, the distance tends to be very far for the young person to attend school, in this case, either risking dangerous long -distance walking or costly boarding nearby the school. The SEED Rural construction services project, therefore, aims to improve the number of secondary schools available in Malawi providing a space for graduating primary students and reduce the distance between schools. The effect of having more secondary schools will also benefit young girls who may not be safe walking far distances to schools. The proposed school and hygienic sanitation facilities is intended to accommodate adolescent girls and encourage them to stay in school. Keeping young girls in secondary school is a by-product of the SEED Rural project with aim to increase access to secondary schools and build a school that is friendly to young girls.
3.0 Nature and Scope
The SEED Program plans to build up to 200 new CDSSs across Malawi, starting with 38 schools under Group 1 followed by 51 schools under Group 2, followed by Groups 3, and 4, funding permitting. The proposed structures to be constructed include a science classroom/administration, classroom blocks, teacher’s houses, staff and male/female student latrines and water facility. The main design elements and activities at each of the sites is typical of small-scale, single-storey building construction. Overall building construction will be carried out in a manner that will not jeopardize the physical and social well-being of its students, neighbouring communities, and the environment at large. The proposed project is anticipated to employ an estimated number of 20 to 50 workers per site during construction phase. The project will ensure that gender principles are considered during recruitment of workers. The total cost of the USAID SEED Program is estimated at US$90 Million, including multiple projects and support activities.
Construction work is likely to start in September 2022.
4.0 Rationale of the ESMP
This ESMP has been prepared to address environment and social issues that may emanate from the construction, demobilization, and operation and maintenance, of classroom blocks, teacher houses, latrines and water related facilities in Rumphi District.
The implementation of the ESMP will ensure that the construction and use of the secondary school learning and teaching infrastructure and WASH facilities will not result
VIII
in the degradation of the physical and social environment in any form in all the project sites. The ESMP will essentially guide the users in managing, minimizing, mitigating, and monitoring the environmental impacts that will emanate from the construction, demobilisation and operation phase of the project in all four new Community Day Secondary Schools in Rumphi District.
5.0 Methodology
The ESMP has been prepared after reviewing SEED project documents related to construction of secondary school infrastructure and associated WASH facilities which is line with the terms of references provided by Malawi Environment Protection Authority (MEPA) (refer to Annex 1). These documents include project brief, topographic maps, site plans and rapid assessment reports. Policies and legislations that have a bearing on construction and operation of teaching and learning facility were also reviewed. The development of the ESMP has also been informed by field investigations which were undertaken on biophysical aspects to describe the vegetation, fauna, and biodiversity within and around project site. Interviews were conducted with local community leaders and members who possessed knowledge of the area to understand land use and important environmental features. In addition, the development of the ESMP has been informed by national, district and community stakeholder consultations. Issues raised by different stakeholder during stakeholder consultations are provided in Annex 2, 3 and 4.
6.0 Project Impacts
The construction and operation of the teaching and learning facilities such as classroom blocks and other school related infrastructure such as teacher’s houses and WASH facilities will result in both positive and negative impacts, hence the development of this Environment and Social Management Plan (ESMP). The main positive impacts which are expected to emanate from the construction and use of the secondary school infrastructure and facilities and their enhancement measures include:
a) Increased number of students selected to go to secondary school The enhancement measure include:
o There is need for the MoE to prioritise selection of students from the surrounding areas and with community groups such as mother groups to increase girls’ enrolment in schools
b) Increased Job Opportunities The enhancement measures include:
o There is need for the contractor and the MoE and Building Contractor to employ people from communities surrounding the project areas during construction o MoE and Building Contractor should provide equal employment opportunities to men and women to ensure that they benefit from this project.
c) Increased market activities for construction related materials The enhancement measure include:
o There is need for the Building Contractor and the MoE to prioritise purchase of locally available materials where practically possible and purchase materials at better prices to ensure local businesses generate profits
IX
d) Reduced sexually transmitted disease infections The enhancement measures include:
o Maintenance of the Classroom blocks and WASH facilities o Maintain the qualified teachers employed in schools o Provide the relevant equipment to complement the additional classrooms provided o Sensitize the workers to avoid the sex trade (part of construction health and safety plan) o Strengthen advocacy through awareness training in HIV/AIDS and other STDs (MoH/CMC) o Encourage the use of preventive measures like condoms amongst workers
e) Reduced cases of early marriages The enhancement measures include:
o Maintenance of the Classroom blocks and WASH facilities o Maintain the qualified teachers employed in schools o Provide the relevant equipment to complement the additional classrooms provided o Sensitize the community on the need to go to school
f) Skills transfer The enhancement measures include:
o Employ people from communities surrounding the project area to the extent feasible based on skillset of people from the communities and contractor workplan o Pay the workers the recommended minimum wages by government o Provide equal employment opportunity to both men and women
The main negative impacts that are expected to occur due to the construction, operation, and maintenance of the secondary school related infrastructure and prescribed mitigation measures are as follows:
a) Air pollution The mitigation measure include:
o The contractor should consider application of water regularly to civil works and earth access roads to the premises to suppress dust.
b) Spread of HIV and AIDS and other sexually transmitted diseases The mitigation measures include:
o Ministry of Health and National AIDS Commission should sensitise workers and students on the dangers of HIV and AIDS and on all preventive measures
c) Spread of communicable diseases such as COVID-19 The mitigation measures include:
o The Contractor and Developer should carry out sensitization meetings for workers and the students on COVID-19; and
X o The Contactor and Developer should distribute information materials on COVID-19 to workers, students, and local residents.
d) Community and Occupational Health and Safety Risks The mitigation measures include:
o The Contractor should provide safety induction training to all workers before commencement of works, and provide them with personal protective equipment; and o The Contractor should enclose the construction sites using iron sheets or other fencing material that will demarcate construction limits and prevent access to the sites.
e) Increased soil erosion The mitigation measures include:
o The Contractor should install a silt fence/fabric that reduces sediment laden runoff passing to downstream water bodies; and o The Contractor should institute soil erosion control structures to manage storm water
f) Conflicts between workers and communities and Marriage disruptions The mitigation measures include:
o MoE and Contractors should sensitize the workers on the risks of indulging in extra-marital affairs to prevent marriage disruptions; and o provide marriage counselling services in liaison with relevant community institutions.
g) Conflicts on use of water resources The mitigation measures include:
o MoE and Tetra Tech should promote engagements between contactor and surrounding communities on use and protection of available water resources; and o MoE and Tetra Tech should institute catchment conservation measures and to provide adequate boreholes to support the demand for water both construction workers and surrounding local communities
7.0 Conclusion
The negative impacts from the operation of the secondary school infrastructure and facilities are localised and can easily be mitigated. MEPA and other relevant stakeholders identified in Chapter 6 of this ESMP will need to conduct inspection exercises regularly to check that the contractor and management of the schools are implementing this environment and social management plan to ensure that project implementation is done in an environmentally and socially sustainable manner.
8.0 Recommendations
The recommendations below have been developed based on the mitigation and enhancement measures for the potential negative and positive impacts for the proposed Community Day Secondary School development project:
XI
• The MoE and TETRA TECH should implement the proposed mitigation measures recommended in this report fully to avoid affecting the success of the project.
• The developer should be guided by this ESMP in implement the mitigation and enhancement stipulated in this document. However, the developer should be flexible to include other mitigation and enhancement measures as appropriate.
• Considering that the project will result in interactions between surrounding local communities and migrant workers, the MoE should pay more attention to relationships between them to avoid inequalities but maximize the benefits.
• Engineering related recommendations during construction works should be critically analysed for the success of the project.
• Enhancement measures such as employing of the local people and purchasing locally made materials should be considered; and
• Participation of locals in all the stages of the projects is key to success of the project.
CHAPTER ONE: INTRODUCTION
1.1 Background
Ministry of Education in Malawi is implementing a Secondary Education Expansion
Development (SEED) with financial assistance from the United States Agency for International
Development (USAID) and U.S. President’s Emergency Plan for AIDS Relief (PEPFAR). The
SEED Rural Construction Phase plans to build up to 200 new Community Day Secondary
Schools (CDSS) across Malawi, starting with 38 schools under Group 1 and 51 under Group 2 followed by Groups 3, and 4, funding permitting. In Group 2, Rumphi District has two proposed SEED CDSS sites. The sites are at Bale and Matunkha. Each school campus will include two classroom blocks with a total of four classrooms, a science classroom with administration space, two teacher’s houses with latrine, staff and student latrines, and a borehole. The administration space is located within the science classroom block and between each classroom in the classroom block. The administration space in the science classroom block is intended to be the headmaster or head teacher office. The science classroom block will be situated at the school entrance. The other administration space in each classroom block is intended for the teachers to use to best fit their needs. The total cost of the USAID SEED
Program is estimated at US$90 Million, including multiple projects and support activities. The proposed project is anticipated to employ an estimated 20 to 50 workers per site during construction phase.
1.2 Objectives and Rationale of the Project
The objective of the SEED Rural project is to improve access to secondary education across all districts in Malawi. The justification for the project is in the percent of eligible graduating primary students who are not selected to a secondary school because there is no space available.
Secondly, where space is available, the distance tends to be very far for the young person to attend school, in this case, either risking dangerous long -distance walking or costly boarding nearby the school. The SEED Rural construction services project, therefore, aims to improve the number of secondary schools available in Malawi providing a space for graduating primary students and reduce the distance between schools. The effect of having more secondary schools will also benefit young girls who may not be safe walking far distances to schools. The proposed school and hygienic sanitation facilities is intended to accommodate adolescent girls and encourage them to stay in school. Keeping young girls in secondary school is a by-product of the SEED Rural project with aim to increase access to secondary schools and build a school that is friendly to young girls.
1.3 Spatial Location and Land Size
All the sites identified for construction of two CDSS are spread across Rumphi District. The sites identified are largely under customary land hence there will be a need to change ownership status from customary to public land through lease application process to be initiated by the
MoE and facilitated by the Ministry of Lands. Tables 1.1 below provides location and size for the proposed sites in Rumphi. Figures 1.1 to 1.2 are topographic maps for the two Community Day
Secondary Schools in Rumphi District (Refer to Annex 8).
Table 1.1: Location and Size and for each School
Proposed School Location Latitude Longitude Size (Acres)
Bale Traditional Authority Mwamlowe
Village Headman Bwati, Group Village Headman Yalero
-10.818896 34.106413 14.8
Matunkha Traditional Authority Chikulamaye mbe
Village Headman Mukonongo Group Village Headman Mukonongo
-11.083663 33.697195 11.5
1.4 Justification for the ESMP
The proposed secondary school development project activities are bound to enhance significant changes to the environment and people around the project sites. Some project changes would generate benefits to communities and some negative externalities to the environment. This study was meant to document the potential impacts, sources, and recommended mitigation measures. The preparation of this Environment and Social Management Plan (ESMP) is in line with the Government of Malawi’s Guidelines for Environmental Impact Assessment and the
Environment Management Act (EMA) (2017) and according to the Terms of Reference provided by the Malawi Environment Protection Authority (Annex 1).
1.5 Rationale and Objectives of the ESMP
This ESMP is developed to provide an overview of the anticipated positive and negative environment and social impacts and their recommended tangible enhancement and mitigation measures for the identified impacts. The ESMP study also aims at ensuring that environment and social considerations are integrated into the project cycle to promote sustainable development by recommending appropriate strategies and actions for mitigating and monitoring of identified impacts. The ESIA study provides opportunity for stakeholder participation in identification of environment and social impacts, as well as mitigation of the identified negative impacts of the project.
This ESMP has been prepared to achieve the following specific objectives:
• To identify significant environment and social impacts associated with construction and operation of school infrastructure and related services.
• To prescribe measures to minimise, mitigate, and manage the identified impacts.
• To assign responsibilities and resources for the implementation of this ESMP; and
• To propose a monitoring programme, that will enable the review of the success of the
ESMP and the provision of such information to relevant institutions.
1.6 Project Proponent
The Project proponent is the Ministry of Education with funding from United States Agency for International Development (USAID). Tetra Tech has been engaged by USAID to provide services on designs and construction supervision of the project. The contact details for the developer are as follows:
Project Proponent: The Minister, Ministry of Education
Postal Address: P. Bag 328, Capital City, Lilongwe 3
Telephone: Cell: +265 1 789 422
1.7 Potential Users of the ESIA
This ESMP is targeted towards range of stakeholders involved in the implementation and operations of the proposed project. Particularly, MOE as project developer is responsible for implementing mitigation measures and ensuring resources are provided for the ESMP. The information on the potential environment and social impacts, suggested measures for addressing/reducing the negative impacts and suggested measures for enhancing potential positive impacts may be useful to:
• MoE, as compliance can protect the institution’s image.
• Investors, for reducing project risks that may result from non-compliance.
• Malawi Government, for ensuring the project does not present harm to the citizens and that the project delivers sustainable socioeconomic development; and
• Project employees, contractors, and suppliers, to avoid delays that may result from stop orders by construction and environment management regulators.
The ESMP also contains useful information on relevant approvals/licenses to be adhered to in project design and implementation modalities, information on the potential main environment and social impacts, and the suggested mitigation measures at various stages of the project implementation. Information provided herein will be useful in planning, budgeting of project components, implementation, and management of the project.
1.8 Approach and Methodology for Preparing the ESMP
The development of this ESMP has been undertaken in accordance with Part V of the
Environment Management Act, 2017 and in line with Guidelines of Environmental Impact
Assessment (1997) and the Terms of Reference (TORs) provided in Annex 1. Key tasks of the
ESMP development are described in the following sections.
1.7.1 Literature Review
The study for the development of the ESPM included project brief, topographic maps, site plans, ESMP TORs, District Socioeconomic Profile, and rapid assessment reports. Policies and legislations that have a bearing on construction and operation of teaching and learning facility were also reviewed. Desktop studies were intended to gain an in-depth understanding of the project and existing biophysical conditions of the district including socioeconomic conditions and relevant legal and policy requirements for the proposed project. A detailed list of documents during the preparation of this ESIA are included in section 8.0.
1.7.2 Field Investigations
Field investigations were conducted in October 2021 to get acquainted with the layout and setting of the project sites. Field investigations within the project site and surrounding areas were undertaken on biophysical aspects to describe the vegetation, fauna, and biodiversity within and around project site. Interviews were conducted with local community leaders and members who possessed knowledge of the area to understand land use and important environmental features. Aassessments of sensitive ecosystems against proposed project activities were undertaken during field investigation as well as preliminary assessment of impacts and changes that may be induced by development of the project, and identification of mitigation measures to avoid or minimize the negative impacts. The investigations facilitated data collection through observations, visual measurements of distances and quantification of flora, and discussions with representatives of the Developer, District Councils, and local communities.
1.7.3 Stakeholder Consultations
The purpose of the stakeholder consultation was to inform the community, district, and national level stakeholders about project plans, obtain the views of different people on the proposed project, to determine how the project will affect them and how best it can be implemented to minimize adverse environment and social impacts.
Stakeholder consultations were undertaken to elicit concerns and views on the potential impacts of the project and to inform mitigation and enhancement measures. Specifically, stakeholder engagement was carried out to:
a) Collect baseline social and community information specific to the project site.
b) Identify socioeconomic issues that need to be addressed during its implementation.
c) Capture expectations from stakeholders and elicit suggestions on ways to avoid or minimize adverse effects of the project.
d) Ensure that all appropriate measures are included in the ESMP; and
e) Ascertain compliance of the project to statutory regulation.
Consultations were conducted by both online and in-person meetings. The Consultant made an effort to engage stakeholders under COVID-19 preventative measures. Consultation was undertaken with stakeholder groups whose details are presented in Annexes 3, 4 and 5.
Each consultative meeting began with briefing the stakeholders at the different levels about the project information with regards to the proposed CDSS development project, size, scope of works, and main project activities. Afterwards, stakeholders were asked to provide their views regarding the potential positive and negative impacts of the project to the community socioeconomics and environment.
1.7.4 Identification and Assessment of Impacts
A comprehensive assessment of all environment and social impacts has been conducted based on the investigation of the potential changes associated with environmental aspects identified.
This included construction and operational impacts, as well as demobilisation and possible cumulative impacts. It also addressed impacts both, on-and off-site, as relevant. Impacts were evaluated using the criteria of magnitude, reversibility, severity, duration, scale of impact, to derive the significance of the various potential impacts. Identification of potential mitigation measures to avoid negative impacts or to reduce significance where avoidance was not possible was made, for inclusion in this ESMP.
1.7.5 Preparation of the Environment and Social Management Plan Report
The ESMP Report has been prepared by reviewing and analysing various data sources obtained from project documents including feasibility studies, documents sourced from government and public sources on biophysical and socioeconomic conditions of the sites, topographic maps, satellite images, policies and legislative acts. Field investigations on baseline conditions of the area provided supplementary information to assist in establishing, assessing, and evaluating impacts to be generated by project activities. The ESMP Report discusses the findings and recommendations of the study. The ESMP has been developed to guide management of mitigation and enhancement measures for the project sites based on baseline conditions to be impacted by specific project activities. This sub-task is based on expert knowledge and best practices from literature and lessons learnt from previous related projects.
1.7.6 Constraints and Limitation of the Study
The main constraint experienced during the study was unavailability of stakeholders to provide information during field investigations, largely due to COVID-19 preventative measures, which included working in shifts with others with underlying health conditions working from home.
Despite this challenge the consultant still managed to collect data necessary to meet requirements for preparing environment and social impact assessment as per TORs and guidelines for preparing ESIA report.
CHAPTER TWO: PROJECT DESCRIPTION
2.1 Nature of the Project
The SEED Program plans to build up to 200 new CDSSs across Malawi, starting with 38 schools under Group 1 followed by 51 schools under Group 2, followed by Groups 3, and 4, funding permitting. The proposed structures to be constructed include a science classroom/administration, classroom blocks, teacher’s houses, staff and male/female student latrines and water facility. The main design elements and activities at each of the sites is typical of small-scale, single-storey building construction. Overall building construction will be carried out in a manner that will not jeopardize the physical and social well-being of its students, neighbouring communities, and the environment at large. The proposed project is anticipated to employ an estimated number of 20 to 50 workers per site during construction phase. The project will ensure that gender principles are considered during recruitment of workers. The total cost of the USAID SEED Program is estimated at US$90 Million, including multiple projects and support activities. Construction work is likely to start in September 2022.
2.2 Site Selection
Tetra Tech conducted a site selection process that starts with a list of communities or primary schools across Malawi that were prioritized by the Ministry of Education and USAID for a
CDSS. The Tetra Tech team works in partnership with the Ministry of Education to work with the communities as they identify a plot of land for the new school, assess the land ownership and tenure conditions, and analyse where the site is physically adequate to build a SEED Rural school campus. Once a plot of land is accepted for its geographic location, resolved and clear land tenure conditions, and assessed for constructability and accessibility, the site passes to the design development phase
2.3 Land Tenure
The land identified for the proposed construction of Bale and Matunkha CDSS are pre-dominantly located on customary land. The land identified for the proposed construction of Bale and Matunkha CDSS fall under the jurisdiction of Traditional Authorities (TAs) Mwamlowe and
Chikulamayembe respectively in Rumphi District. In this regard, a mutual land surrendering agreement between the landowners and the developer were reached as indicated in Annex 2.
However, there is no arrangement that people who surrendered land will benefit directly from the project as a condition for surrendering land to the proposed project.
2.4 Project Duration and Estimated Cost
USAID has earmarked US$90M for the implementation of the SEED Program that includes site selection, design development, construction, and other support for up to 200 secondary schools in rural communities across Malawi. The construction phase of the classroom blocks, administration space, teacher houses and WASH facilities will commence once the Director General of MEPA approves this ESMP and USAID approves the construction contractors EMMP. The construction phase duration is anticipated to be 12 months followed by a 12-month warranty period.
2.5 Project Activities
The major activity under the SEED project will be the construction and use of classroom blocks, teacher houses and WASH facilities. The activities will be in three phases: construction, demobilization, and operation and maintenance.
2.5.1 Construction Phase
2.5.1.1 Construction Materials and Equipment
Construction works for the classroom blocks, administration blocks, teacher’s houses and
WASH facilities will include:
● Site preparations and excavations.
● Concrete casting for slab and construction of foundations using concrete hallow blocks.
● Construction of temporary access roads and parking area.
● Construction of surface water drainage systems.
● Construction of latrines and boreholes
The new schools will be constructed using hollow core block (cement masonry units), reinforced concrete, steel trusses, and corrugated metal roof panels. Most materials proposed under the SEED project are intended to be locally sourced as far as possible and construction methods used will be similar to those used and familiar by local construction contractors. The contractor is mandated to purchase these materials from registered and licensed suppliers.
The contractor will be required to use typical construction equipment and machinery to complete the work. Examples of construction equipment include concrete mixers, vibrators and pokers, hand tools for concrete work, saw cut, de-watering pump, and other equipment necessary to complete the work. The number or quantity of each piece of machinery and equipment will depend on the construction contractor’s means and methods to complete all the work under the timeframe and to the quality standards in the contract.
School building design will be done in a manner to improve natural lighting levels, passive ventilation, and sound attenuation which will improve the learning environment in the classrooms. Each classroom will have a seating capacity of 60 students. Overall building construction will be carried out in a manner that will not jeopardize the physical and social well-being of its students (if an existing primary school is nearby), neighbouring communities and the environment at large.
Machinery anticipated on the SEED Rural Group 2 Construction Services Project includes both manual labour and typical construction machinery and equipment such as excavators, graders, tippers, cutters, and bull dozers. Due to the low complexity of the project, it is anticipated most of the construction work will be manual. As the contractor is required to complete site clearing and grading to prepare for the school building foundations, the contractor may choose to use a grader or similar heavy machinery to clear the site.
Building foundation excavation is expected to be done by hand due to the small scale of construction at each site, however; the contractor may choose to use an excavator. Provision of materials to site will require a lorry or other transport vehicles to transfer cement, block, raw materials, steel, and other materials to site. Overall, the construction machinery at SEED school sites is anticipated to be minimal. The following are the codes to be used in the design.
2.5.1.1.1 International Building Code (IBC)
The International Buildings Code was principally used to ascertain buildings use and occupancy by providing guidance regarding, among others, accessibility, building heights and illumination.
These codes are essential guidance in the design and construction SEED schools in Malawi.
2.5.1.1.2 Malawi Standards (MS)
The Malawi Standards, produced by Malawi Bureau of Standards, are standard reference documents providing guidance and standards regarding implementation of various activities or products in different sectors including construction sector. Construction sector has a wide range of standards covering materials and design of infrastructure. Use is dependent on the need at hand. In the design and construction of SEED Schools, reference has been made to the following Malawi Standards:
• MS 820:2010; Code of practice for Design Loadings for buildings.
• MS 794-1:2011; Structural Use of Concrete Part 1: Design.
• MS 794-2:2014; Structural Use of Concrete Part 2: Materials and Execution of Work
• MS 793-1: 2013; Structural Use of Steel Part 1: Limit State Design of Hot Rolled Steelwork.
• MS 838:2011; Concrete Works-Code of Practice for Minor works.
• MS 842:2011; Aggregates from natural sources-Aggregates for concrete-Requirements and test methods.
• MS 71:2000; Concrete building blocks Specification
2.5.1.1.3 South African National Standards (SANS)
The South African principally covered steel work design and fabrication considering the major steel supply comes from South Africa. The major codes referenced in the design and construction of SEED Schools are:
• South African Standard (SANS) SANS 10160; Basis of Structural Design and Actions for Buildings and Industrial Action.
• South African Standard (SANS) SANS 10162-1:2005; Limit State of hot rolled steel work.
• South African Standard (SANS) SANS 10162-2:2010; Cold formed steel structures.
• SANS 2001-CS1-Construction Works, Part CS1: Structural Steel Work
2.5.1.2 Site Preparation
Site clearing and trench excavation will require erosion and sediment control measures to maintain excavated material and sediment on site and minimize erosion on site during rainfall events. Poor erosion and sediment control measures may result in sedimentation of downstream water sources or erosion of slopes on site. The contractor is required to implement an Environmental Mitigation and Monitoring Plan (EMMP) that includes erosion and sediment control and other measures aimed at minimizing and eliminating environmental risk.
Mature trees removed during construction will be replaced by planting five new saplings of trees at the site or within the community.
Occupational and safety precautionary measures will be specified in the contractor health and safety plan. The safety risks on the SEED project are typical to those of a construction site. The contractor will be required by contract to provide and ensure the use of Personal Protective Equipment (PPE), provide proper sanitation facilities, provide a first-aid kit for attending to emergencies on site and provide regular tool talks that highlight construction site risks and general site management to mitigate accidents and incidents.
2.5.1.3 Classroom Blocks
A total of five classrooms (4 classrooms and 1 science classroom) will be constructed on each school site. Each classroom will have a total floor space area of approximately 72 m2. The design includes ramps to improve access to physically challenged students in wheelchairs. Site drainage will be constructed round the blocks to manage water circulation especially during the rainy season, both away from the buildings and across the school yard. The size and design dimensions of classrooms are the same for all sites as indicated in table 2.1.
The science classroom is designed to accommodate a fully fitted laboratory, complete with gas and plumbing. However, the scope included in the current construction services contract is limited and only provides provisions for future gas, water, and plumbing installation. The design and construction of the gas, water, and plumbing stubs, and other provisions will allow the Ministry of Education to eventually expand upon the science classroom as their resources come available for both investment and sustaining consumables for the laboratory. The layout of the science classroom has been designed to be flexible to allow it to be used like a multi-purpose room and to allow instructors to re-arrange the room to teach different subjects. USAID will provide each school with a mobile lab demonstration table for the science classroom.
2.5.1.4 Administration Space
Administration spaces will be provided in each classroom block and in the science classroom block. Each administration space will cover an area of approximately 20m2.
256.1.5 Teachers Houses
Two teachers house with 3 bedrooms per house will be constructed at each school. Each house will cover an area of approximately 75m2. The size and design dimensions of teachers’ houses are the same for all sites as indicated in table 2.1.
A summary of the proposed buildings is found in Table 2.1 below shows the type of buildings proposed and approximate building footprint area. is summarized in the following table.
Table 2.1: Summary of type of building and approximate building area
Description Area
(approx.)
Quantity
Classroom 72m2 4
Science Classroom 72m2 1
Administration Space 20m2 Located in each classroom and science classroom block
Teacher Housing w/Bath (three bedrooms per house) 75m2 2
Housing Latrine (One per House) 20m2 2
Student Latrines (Four Stalls) 43m2 1 Male, 1 Female
Teacher Latrines (two stalls) 20m2 1 Male, 1 Female
Borehole with handpump pad and drainage channel)
As required
2.5.1.6 Boreholes
All schools will have access to portable and safe water supply. The project will construct 1 borehole and stand as required in the proposed project sites.
2.5.1.7 Waste Management and Sanitation Infrastructure
Latrines will be constructed for each school. The latrines will be categorised as:
● Housing latrine (one per house) covering an area of 20 m2 each
● student latrine blocks (four stalls each) covering an area of 43m2. One for the male and
1 for female students, including changing room space in the female latrine
● Teachers’ latrine (two stalls) covering an area of 20m2. One for male and 1 for female
These latrines will have concrete slab and pit lining, which strengthens the pit and prevents it from collapsing and a vent pipe which controls flies within the latrine. This will make the latrines more sanitary and safer. Construction of the latrines in this project is in line with the Occupation Safety, Health and Welfare Act (1997) which requires that separate toilets, washing facilities and change rooms be provided in workplaces which have both female and male employees.
One of the toilets, in both the female and male latrine, has been designed for use by physically challenged students. The access will have a ramp to allow access by wheelchair and a handrail to be used as support for those with walking difficulties. The SEED school latrines will include a hygiene changing space in the female latrine. The construction material required for these structures include hollow core block (cement masonry units), reinforced concrete, timber trusses, and corrugated metal roof sheets. Figures 2.1 and 2.2 are layouts of proposed classroom blocks, teacher houses, and toilet blocks for the proposed Community Day Secondary Schools (Refer to Annex 8).
2.5.1.8 Access Roads
The roads leading to the proposed school sites are earthen roads and pose difficulties to travel during the rainy season because of the mountainous terrain and slippery clay soils that dominate in the district. These roads will need continuous maintenance throughout the construction and operation of the schools. The project will construct an earthen road from the public road to the school site which will initially be used to provide construction access to the site during the construction phase and remain as the school access road after construction.
The access routes to the new school sites are typically existing roads, footpaths, or some already existing access route. For narrow paths, the contractor will widen so that construction machinery can access the sites and for future use by teachers. Landownership transfer documents were obtained for access roads that require construction work and these are part of the agreements included in Annex 2.
2.5.1.9 Solid Waste Management
Communities around the school rely on excavated rubbish pits. A rubbish pit will therefore be excavated within the school construction premises to be used during construction. The contractor and the school project management committee will be advised to improve in management of waste by having separate rubbish pits for biodegradable waste which can be used to produce compost manure. This will prevent them from excavating pits on new sites when the old ones fill up as is the current practice. No chemicals or equipment is anticipated to create hazardous waste during construction.
The contractor may engage private companies to collect and dispose of construction debris in consultation with the district public works department in Rumphi District Council.
2.5.1.10 Employment
The contractor may employ an estimated 15 to 20 workers per site during construction phase.
The contractor will adopt a gender equality approach recognising that women should be given equal opportunity to men when recruiting the workers for the project. Health and Safety measures are detailed in the construction EMMP compiled by the construction contractor.
There will be employment opportunities during the operation phase since these are new schools that will require staff for operations. The workers at the school buildings and WASH facilities in the operation phase will be provided (by the school authorities) with protective wear for safety, as is required by the Occupational Safety, Health and Welfare Act. These will include gloves, overalls, and heavy-duty boots. The workers will be trained in the safe use of the equipment and potential hazards, and the precautionary measures to be followed.
2.5.2 Demobilisation Phase
Demobilization of the construction contractor will take place after the school construction is complete and prior to handing over of the site the Ministry of Education. Demobilization will include dismantling and removal of temporary facilities such as project office, storage, and removal of materials and equipment. Demobilization will include removal of the perimeter construction fence and construction waste in accordance with the waste management plan. The demobilization plan will be approved by the client with the intent of handing over a clean and complete school campus to the Ministry.
2.5.3 Operation and Maintenance Phase
This phase will include all activities that will be carried out after the construction works of the community day secondary school. Some of these activities will include school infrastructure management, administration, teaching and learning. Once the school is handed over to the Ministry of Education upon completion of construction work, it is the Ministry’s responsibility of operate and maintain the new infrastructure. The SEED Rural project will provide training on managing the new school infrastructure, borehole repair, and other activities that will be summarized in a school standard operating procedure document.
2.5.3.1 Infrastructure Management
The developer will facilitate setting up of school project management committees in the different sites comprising of different stakeholders such as teachers, parents, and community leaders to coordinate school infrastructure management. The committees will work in collaboration with community police forums and government police officers to provide security to the school to safeguard the school property from theft and vandalism. Cleaners will also be employed to make sure that the property is regularly cleaned and managed.
2.5.3.2 Waste Management and Sanitation
The project will provide improved sanitation in the schools which will in turn create a conducive learning…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .