ITB_OPD260249_Real_Time_Crime_Center_Renovation_-_Exhibit_C-HVAC.pdf

PDF 136 KB Posted

Attached to
Real Time Crime Center Renovation
Solicitation number
ITB# OPD/260249
Issued by
Marion County, Orlando City, Florida

About this file

This is an HVAC Plans exhibit (Exhibit C) supporting the Real Time Crime Center Renovation invitation to bid (ITB# OPD/260249) issued by the City of Ocala, Florida. The project involves the construction buildout of a Real Time Crime Center located at 402 South Pine Avenue, Ocala, FL 34471. A mandatory pre-bid meeting and site visit is scheduled for Monday, December 15, 2025, at 9:00 a.m. at the project location, with attendance required for bid participation. The scope of work requires experienced contractors to provide all labor, materials, and equipment necessary to complete the renovation per the project exhibits, including the Scope of Work (Exhibit A), Building Plans (Exhibit B), HVAC Plans (Exhibit C), and Photos (Exhibit D).

The HVAC Plans exhibit provides detailed technical specifications and layouts for the heating, ventilation, and air conditioning systems within the facility. The plans depict the physical arrangement of HVAC components including hot air return and cold air deployment systems, electrical panels, a 100KW UPS system, network racks, and cable management infrastructure. Dimensions are noted throughout the plans, including measurements such as 15'7½", 12'4", and 13'2¼" for various room or section lengths, with multiple HVAC zones and rack configurations marked for specific areas within the Real Time Crime Center. The technical drawings serve as the basis for HVAC-related bid proposals and construction implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I L_

--------- 15' 7 1/2" 1◄2'4" ► ◄13'21/4"►I .. "'' n• ..

A

ItElectrical Panels co ... ..,l)l

100KW UPS

I Netwo� Network Arial hung wire Ira• KaCKS KaCKS

HVAC Hot AIR return

HVAC Cold AIR deploy

◄ 23 5/8" ► ◄ 23 5/8" ►◄ 23 5/8" ► ◄ 23 5/8" ► ◄ 23 5/!

front OPD OPD OPD AV AV

Rae� !"Rad f Rack _-'RAC� !RA( I Arial hung w11 I:! tray �

IX) IX) � :::: ::::

N N N N

'St -st- 'St

◄ 115 bac rt6"►

240v 30amp A (0 ...

HVAC Hot AIR return (") ...

r-

◄ �3 5/8" ► ◄ 23 5/8" ►◄ 23 5/8" ► ◄ 23 5/8" ► ◄ 23 5/!

back OPD OPD OPD OPD OF Rack • Rack • Rack • Rack • Ra

I Ana1 nung w1 � tray

◄ 11 V16" ►ron

A 0 HVAC Cold AIR deploy�

◄ 3'.0" ►

I N

WiJiow ., 15' 7 1/2"

A

C

<O al io

N l> C:

(0

:!E

D ck

I

Exhibit C

File details come from the government source that posted it. Updated .