This is an Invitation to Bid issued by Savannah State University for a construction project involving elevator replacement at the Colston Administration Building. The project, designated SSUMRR2504, is located at Savannah State University in Savannah, Georgia. Sealed bids must be physically delivered to the Bid Room at Evers Physical Plant, 3219 College Street, Savannah, GA 31404, no later than 1:00 PM Eastern Time on July 1, 2025, at which time bids will be publicly opened and announced. A mandatory pre-bid conference is scheduled for June 11, 2025, at 1:00 PM at the same location; attendance is required for all contractors intending to bid. Bidding documents may be obtained from the Design Professional, Cogdell & Mendrala Architects, at 912-234-6318 or Admin@cogdellmendrala.com. The contract will be awarded on a lump sum basis to the responsive and responsible bidder with the lowest bid within budget.

Bids must include a Bid Bond equal to not less than five percent of the bid amount. Upon contract award, the selected contractor must provide both a performance bond and a payment bond, each equal to 100 percent of the contract sum. No bid may be withdrawn for sixty days after the opening unless permitted under Georgia law. The Owner reserves the right to reject all bids, waive technicalities, and consider supplementing the budget or negotiating with the lowest responsive and responsible bidder if all bids exceed the established budget. Contractor responsibility will be evaluated based on debarment status, prior terminations or defaults on public works contracts, cash flow adequacy (Current Ratio of 1.0 or higher), workers' compensation safety record (Experience Modification Rate not exceeding an average of 1.2 over three years), and demonstrated ability to successfully complete comparable public works projects on time, within quality standards, and within cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBB Construction Contract PROJECT NO. SSUMRR2504 V. May, 2025

Bid-1

BID REQUIREMENTS

INVITATION TO BID

The Owner will receive sealed bids from Contractors in Evers Physical Plant, Savannah State University, 3219 College St.

Savannah, GA 31404. Bids must be physically on the table in the Bid Room by 1:00 PM o’clock, at the time legally prevailing in Atlanta, Georgia on July 1, 2025, for the construction of SSUMRR2504, COLSTON ADMINISTRATION BUILDING ELEVATOR

REPLACEMENT, located in SAVANNAH STATE UNIVERSITY, SAVANNAH, Georgia. At the time and place noted above, the bids will be publicly opened and announced.

Bidding Documents may be obtained at the office of the Design Professional, Cogdell & Mendrala Architects, Phone: 912-234- 6318 Email: Admin@cogdellmendrala.com. Applications for digital documents should be filed promptly with the Design Professional.

Bidders are cautioned that acquisition of Bidding Documents through any source other than the office of the Design Professional is not advisable. Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid.

There will be a pre-bid conference held on June 11, 2025, at 1:00 PM, at Evers Physical Plant, Savannah State University, 3219 College St. Savannah, GA 31404 (Address). Attendance at this conference is MANDATORY for any Contractor intending to bid on this project. Others may attend if they so desire.

Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract.

The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget.

The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following:

• Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;

• Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract;

• Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher;

• Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and

• Whether the bidder’s past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder’s contract obligations.

In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.