This invitation for bid solicits fixed-price construction services for renovations to Building 82 at Defense Logistics Agency Distribution Susquehanna. The solicitation includes repair, maintenance, and minor construction work across multiple contract line items. Repair work includes painting exterior walls, replacing windows and doors, and overhauling the steam and electrical systems. Maintenance involves painting exterior structures. Minor construction comprises building an equipment room and installing rapid roll-up doors. The renovation aims to upgrade the 50-year-old warehouse building for continued operations. The period of performance is estimated from September 2020 to March 2022. Bids are due on August 18, 2020, with award by September 8, 2020. The solicitation is set aside for small businesses and valued between $5-10 million.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
SP3300-20-B-5002
DLA DISTRIBUTION
ACQUISITION OPERATIONS (J7)
430 MIFFLIN AVENUE SUITE 3102A
NEW CUMBERLAND PA 17070-5008
USA
See Continuation Page(s)
DLA DISTRIBUTION
ACQUISITION OPERATIONS (J7)
430 MIFFLIN AVENUE SUITE 3102A
NEW CUMBERLAND PA 17070-5008
USA
Joshua Woodworth 717-770-4192
1 4207/16/2020
08/18/2020
02:00 PM
SECTION F
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 3 of 42
SP3300-20-B-5002
CONTINUED ON NEXT PAGE
GENERAL OVERVIEW
This acquisition is 100% set-aside for small businesses in accordance with FAR 52.219-
6. The resulting contract will be a firm fixed-price contract.
ELECTRONIC SOLICITATION
This solicitation, including all attachments, and any amendments, is only available electronically at the beta.SAM website, https://beta.sam.gov/ . Bidders are cautioned that it is their responsibility to access the website for any amendments that may be issued under the solicitation. There will be no advance notification of amendment issuance. Bidders are advised to consult the website frequently to check for any amendments since an amendment may be issued up until the bid opening date and time. Failure to acknowledge amendments may render our bid non-responsive and ineligible for award.
MAGNITUDE OF CONSTRUCTION
The estimated magnitude of construction is between $5,000,000 and $10,000,000.
SITE VISIT DATE, TIME AND LOCATION
Reference Section L, FAR Provision 52.236-27 for specific date, time and location. Due to security measures currently in place on this installation, anyone planning to attend the site visit needs to provide the following information to Joshua Woodworth at joshua.woodworth@dla.mil and Donna Kautz at donna.kautz@dla.mil.
This information must be submitted at least two (2) working days prior to the site visit date.
Failure to submit this information in the timeframe requested above may result in delays upon your arrival at the installation.
Company Name Employee Name Employee Date of Birth Employee Driver’s License Number and State of Driver’s License
On the date of the site visit, employee will need to present at least one form of photo identification, i.e., valid driver’s license. The employee will also need to present current vehicle registration and insurance for each vehicle entering the installation.
Camera passes will no longer be issued. The COR will coordinate all photography with the Public Affairs office.
BID SUBMISSION.
BIDS MUST BE SUBMITTED IN HARD COPY ONLY. ELECTRONICALLY SUBMITTED BIDS INCLUDING FACSIMILE AND TELEGRAPH WILL NOT BE ACCEPTED. BID SHALL BE SEALED IN AN ENVELOPE CLEARLY MARKED WITH THE BID SOLICITATION NUMBER, THE BID OPENING DATE AND TIME. ALL BIDS SHALL BE SUBMITTED TO:
DLA Distribution Acquisition Operations Attn: Joshua Woodworth 430 Mifflin Ave Suite 3102A New Cumberland PA 17070-5008
BID OPENING DATE, TIME AND LOCATION
Bid Opening will be held on August 18, 2020 at 2:00PM local time.
Bid Opening will be held at DLA Distribution, 430 Mifflin Ave Suite 3102A, New Cumberland, PA 17070.
ACCESS TO THE INSTALLATION FOR THE BID OPENING
Due to security measures in place on this installation, anyone planning to hand carry their bid to the bid opening must abide by the same procedures as set forth to gain access for the site visit. Failure to follow these procedures may result in you and your bid being late and therefore ineligible for award.
BIDS
Bidders must complete Blocks 14 through 20c on the Standard Form (SF) 1442, which includes total price of all CLINs in Block 17. Bidders must provide all information requested in Section K Representations, Certifications, and Other Statements of Offerors.
Bidders must fill in an amount for each CLIN under Schedule B. If there is not an amount for each CLIN, the bid will be found non-responsive and the bidder will be unable to receive the award.
https://beta.sam.gov/ mailto:joshua.woodworth@dla.mil mailto:donna.kautz@dla.mil
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 4 of 42
CONTINUED ON NEXT PAGE
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and—
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
(End of provision)
BID BOND
A bid bond is required. Failure to provide a bid bond for an adequate amount shall result in rejection of bid. Required amount for bid bond is twenty percent (20%). Reference Section L, FAR Provision 52.228-1.
PERFORMANCE AND PAYMENT BONDS
The successful bidder shall be required to furnish performance and payment bonds to the Contracting Officer as follows: (Reference Section I, FAR Clause 52.228-15)
(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
INSURANCE
Reference FAR Clause 52.228-5 Insurance-Work on a Government Installation located in this solicitation.
The minimum amount/kind of insurance required is shown below:
Workers’ Compensation and Employer’s Liability - $100,000 (except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.)
General Liability- $500,000 per occurrence Automobile Liability – Property damage $20,000 per occurrence, Bodily injury $200,000 per person and $500,000 per occurrence.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 5 of 42
CONTINUED ON NEXT PAGE
When requested by the Contracting Officer, the Contractor shall provide a copy of all subcontractors’ proofs of required insurance no later than five (5) days before each subcontractor commences work on the Government installation.
CLAUSES AND PROVISIONS
Clauses and provisions from the Federal Acquisition Regulation (FAR), the Department of Defense (DOD) FAR Supplement (DFARS), and the Defense Logistics Acquisition Directive (DLAD) are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
NOTICE TO ALL PROSPECTIVE BIDDERS
To receive an award resulting from this solicitation, your company must be registered in the System for Award Management (SAM) Database. Reference FAR provision 52.204-7. SAM website is https://www.sam.gov.
INVOICING
The Contractor shall submit payment requests and receiving reports using Wide Area Work Flow (WAWF). Instructions are found in Section G of this solicitation under DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions (MAY 2013)
SCHEDULE OF SUPPLIES/SERVICES
Note: The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.
PROJECT DESCRIPTION: Building 82 Renovation
Contractor to provide all necessary labor, material and/or equipment to perform all work associated with the following tasks, but is not intended to be limited to these tasks alone:
• Repair exterior of the building by repainting the exterior Concrete Masonry Unit (CMU) walls, downspouts, doors and frames, and associated exterior accessories providing a uniform and aesthetic appearance.
• Replace existing warehouse windows with translucent panels and louvers, or CMU infill.
• Install a new high speed roll-up door on the east and west ends of the building.
• Repair existing steam heat system and piping within the warehouse and Administration
Annex areas by replacement. These repairs include replacement of the following:
1. Unit Heaters
2. Piping
3. Ventilation Units and Ductwork
4. Building Automation System, etc.
5. Hot Water Natural Gas Boilers (2) with #2 Fuel Oil Back-up
• Construct new CMU block room on a portion of an existing warehouse dock to house new mechanical equipment.
• The Warehouse and Administration Areas shall remain fully operational during construction. Much of this area will be recarpeted. New drop ceiling will be installed throughout the annex building.
• New exhaust fans within the warehouse area will replace existing units at the same locations. New air rotation units will be installed in all bays.
• Update the electrical system so that the entire building is served by a single, new, centrally located electrical service and associated electrical gear. The new service entrance gear shall re-feed all existing service entrance gear, metering, transformers, distribution panel boards, etc. as required to maintain a complete and usable system. The new service entrance gear shall also be used to feed new electrical distribution gear associated with the additional building upgrades. Remove/replace obsolete electrical gear currently installed within and in the vicinity of the building.
• Repair existing fire protection piping and heads by replacement. These repairs include removal of existing fire protection piping and heads, and installation of new ESFR sprinkler systems. New systems will be one per bay replacing two systems per bay currently. New personnel access doors will be installed to provide Fire Department access to riser assemblies within the warehouse. A new PIV handwheel is to be installed that can be operated outside of the building. Remove existing fire alarm panels and install new fire alarm panels.
• Repair battery room exhaust fans by replacement. Provide new hydrogen monitoring system to provide alarm signal in the event of high hydrogen content.
https://www.sam.gov/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 6 of 42
CONTINUED ON NEXT PAGE
• Install a new branch line off of the gas main under “U” Avenue which was installed under the Building 83 Renovation project.
All work shall be performed complete and in accordance with the specifications, drawings and solicitation requirements.
HOURS OF WORK
Working hours will be 0700 to 1530, Monday through Friday, excluding Government holidays.
Construction Wage Determinations No: PA20200107 dated 06/05/2020and PA20200006 dated 05/15/2020 apply.
PERIOD OF PEFORMANCE ESTIMATES
The period of performance is estimated to be 9 September 2020 to 8 March 2022; however actual period of performance will be determined at time of award.
QUESTIONS
To avoid a delay in the procurement process, all questions regarding this IFB must be received by 3:00 P.M. eastern local time on 5 August 2020. Questions received after this date and time will not receive a response.
NOTE TO BIDDERS
*Bidders are not to contact the Designer of Record located on Attachments 10, 11 and 12 of the Project Specifications and Drawings, DLA Distribution is the only point of contact.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 7 of 42
SECTION B - SUPPLIES OR SERVICES AND PRICES
ITEM DESCRIPTION:
Provide the necessary labor, material and/or equipment to perform all work indicated in the contract documents to complete the following Building Maintenance work for Building 82 but not limited to:
• Maintain existing exterior painted concrete masonry walls (CMU) by painting.
• Maintain existing exposed painted steel structure and roof decking at underside of dock roofs by painting.
• Maintain existing man doors and overhead doors by painting.
• Other work as described in the contract documents.
PRICING TERMS: Firm Fixed Price
PERIOD OF PERFORMANCE: 09/08/2020 - 03/08/2022
Provide the necessary labor, material and/or equipment to perform all work indicated in the contract documents to complete the following Building Repair work for Building 82 but not limited to:
• Repair existing gutters by replacement.
• Repair existing north side single pane uninsulated warehouse windows by replacement with aluminum framed translucent panel & louver system.
• Repair antiquated steam unit heaters and piping by replacement with hot water unit heaters and piping.
• Repair Building Automation System (BAS) controls by replacement with current automation controls technology capable of reporting to the Utility Monitoring and Control System
(UMCS).
• Repair roof top ventilation units by replacement.
• Repair sprinkler pipe and heads by replacement.
• Repair existing steel columns damaged over time to ensure structural integrity.
• Repair interior electrical system for the majority of the components by replacement.
• Repair annex area finishes including carpet, drop ceilings, and paint by replacement and repainting, respectively.
• Repair annex roof by replacement including roof drain relocation.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Z2GZ-V00010014 1.000
Other Warehouse Buildings, REPAIR
OR ALT
JB $ ___________ $ _____________
0001 Z2GZ-V00010014 1.000
Other Warehouse
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 8 of 42
CONTINUED ON NEXT PAGE
Provide the necessary labor, material and/or equipment to perform all work indicated in the contract documents to complete the following Minor Construction work for Building 82 but not limited to:
• Installation of a new mechanical/electrical equipment room to support new hot water heating equipment (funded under Repair items above) including dual fuel option with #2 Fuel Oil.
• Install two (2) rapid up overhead door and custom frame at the northwest and northeast corner of the building (existing overhead doors to remain).
Provide the necessary labor, material and equipment to perform all work indicated in the contract documents to complete the following minor construction work for Overhead Electrical Service not directly associated with Building 82 (exterior work) but not limited to:
• Demolish overhead electric service cable currently utilized to provide separate electrical feeds into Building 82.
• Installation of new overhead service to new service pole in close proximity to new transformer.
documents to complete the following minor construction work for Transformers not directly associated with Building 82 (exterior work) but not limited to:
• Demolish two existing transformers currently utilized for multiple feeds to Building 82.
• Replace demolished transformers with one new transformer.
0005 Z2GZ-V00010014 1.000
Other Warehouse
0004 Z2GZ-V00010014 1.000
Other Warehouse
0003 Z2GZ-V00010014 1.000
Other Warehouse
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 9 of 42 documents to complete the following minor construction work for Underground electrical conduit and cabling not directly associated with Building 82 (exterior work) but not limited to:
• Demolish existing underground electric cabling to transformers being demolished.
• Install new underground cabling from transformer to switch gear in Building 82.
documents to complete the following minor construction work for Concrete Pads not directly associated with Building 82 (exterior work) but not limited to:
• Demolish two (2) existing transformer pads for two (2) demolished transformers.
• Construct one (1) new transformer pad sized to support new transformer.
documents to complete the following minor construction work for Sanitary Sewer not directly associated with Building 82 (exterior work) but not limited to:
• Install new sanitary sewer line from mechanical room to existing sewage main.
0008 Z2GZ-V00010014 1.000
Other Warehouse
0007 Z2GZ-V00010014 1.000
Other Warehouse
0006 Z2GZ-V00010014 1.000
Other Warehouse
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 10 of 42 documents to complete the following minor construction work for Steam Piping not directly associated with Building 82 (exterior work) but not limited to:
• Demolish existing underground steam piping from steam pit on west side of Building 83 (to remain) up and including all steam piping entering Building 82. This pipe is not being replaced.
documents to complete the following minor construction work for paving requirements not directly associated with Building 82 (exterior work) but not limited to:
• Provide new paving and repair paving as indicated on the contract drawings around Building
82.
documents to complete the following minor construction work for Natural Gas Piping not directly associated with Building 82 (exterior work) but not limited to:
• Install new natural gas branch line service from gas line main under “U” Avenue up to new gas meter to be installed by UGI.
0011 Z2GZ-V00010014 1.000
Other Warehouse
0010 Z2GZ-V00010014 1.000
Other Warehouse
0009 Z2GZ-V00010014 1.000
Other Warehouse
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 11 of 42
CONTINUED ON NEXT PAGE
SECTION C - SPECIFICATIONS
The following document is provided as part of the solicitation package and shall be used in the execution of work under this contract:
Building 82 Renovation
Specifications Volumes I and II
7 May 2019
Defense Logistics Agency DLA Distribution Susquehanna, PA
New Cumberland, PA
LOCATED AT SECTION J OF THIS SOLICITATION ATTACHMENT 10 and 11
(END OF SECTION C)
SECTION D - PACKAGING AND MARKING
This section is not used.
(END OF SECTION D)
SECTION E - INSPECTION AND ACCEPTANCE
FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
FAR 52.246-13 INSPECTION-DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)
FAR 52.246-21 -- WARRANTY OF CONSTRUCTION (MAR 1994)
DFARS 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(END OF SECTION E)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.211-13 TIME EXTENSIONS (SEP 2000)
FAR 52.242-14 SUSPENSION OF WORK (APR 1984)
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (DEVIATION)
The Contractor shall be required to
a. commence work under this contract upon receipt of the notice to proceed (NTP) according to the following schedule:
Complete the entire work ready for use within 545 calendar days after receipt of Notice to Proceed.
A pre-construction meeting will be scheduled no later than ten (10) days after the Notice to Proceed is issued. The Contractor shall provide all Pre-Construction submittal items indicated as "SD-01 Pre-Construction Submittals" in Section 01 33 00 of the Technical Specifications and on the Submittal Register (Form 4288) for this Section. All submittals not delivered to the Pre-Con Meeting shall be shown in the Form 4288 with scheduled dates of delivery. Exceptions to this Submittal delivery requirement may be granted for Shop Drawings that have a long lead-time, e.g., mechanical system, structural, sprinkler etc. Submittals for all specific definable features of work shall be received and approved before any work may commence. All manufacturer installation instruction manuals shall be included in the initial submittal package as well as in the close out O&Ms.
Special Note regarding submission of Pre-Construction Submittals:
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 12 of 42
CONTINUED ON NEXT PAGE
1. SD-01 Project Submittal Schedule - This schedule must be provided at the preconstruction meeting for all initial submittal register items not provided at the Preconstruction meeting.
2. Contractor must provide Non-Technical submittals as outlined in Section 01 3300.
b. Final Submittals:
Contractor shall provide the following submittal items, as applicable, within 30 calendar days after completion of the work and prior to Final Payment:
1. As-Built Drawings per Section 01 78 00 Closeout
2. Operation and Maintenance Manuals
3. Warranties / Guaranties
4. All Testing and Inspection Reports
(End of Clause)
FAR 52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $780.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(END OF SECTION F)
Section G – CONTRACT ADMINISTRATION DATA
DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) Definition. “Contracting officer's representative” means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
(End of clause)
(Revised October 21, 2016)
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)
(a) Definitions. As used in this clause—
“Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.
(1) Contract financing payments include—
(i) Advance payments;
(ii) Performance-based payments;
(iii) Commercial advance and interim payments;
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 13 of 42
CONTINUED ON NEXT PAGE
(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;
(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232- 25, Prompt Payment, is used.
(2) Contract financing payments do not include—
(i) Invoice payments;
(ii) Payments for partial deliveries; or
(iii) Lease and rental payments.
“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.
“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.
(1) Invoice payments include—
(i) Payments for partial deliveries that have been accepted by the Government;
(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;
(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.
(2) Invoice payments do not include contract financing payments.
“Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.
“Receiving report” means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.
(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.
(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:
(1) Electronic Data Interchange.
(2) Secure File Transfer Protocol.
(3) Direct input through the WAWF website.
(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when—
(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 14 of 42
CONTINUED ON NEXT PAGE
payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or
(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.
(e) Information regarding WAWF is available at https://wawf.eb.mil/.
(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests
(End of clause)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-material submit a cost voucher.
(ii) For fixed price line items -
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
___________N/A___________ https://wawf.eb.mil/ http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 15 of 42
CONTINUED ON NEXT PAGE
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
__________2 in 1 Invoice Type____
(iii) For customary progress payments based on cost incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
SL4701
Issue By DoDAAC
SP3300
Admin DoDAAC
SP3300
Inspect By DoDAAC
SB3222
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC)
SB3222
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment Request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 16 of 42
CONTINUED ON NEXT PAGE
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
N/A
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of Clause)
THE FOLLOWING LINK IS FOR GOVERNMENT USE ONLY (PAYMENT INSTRUCTIONS)
https://www.acq.osd.mil/dpap/dars/pgi/pgi htm/PGI204 71.htm#payment instructions
(END OF SECTION G)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
DEPOT REGULATIONS. Illegal drugs, guns or other contraband are not authorized on this Federal installation. It is the contractor's responsibility to ensure that its employees working on-site at this installation are U.S. citizens or legal aliens with no outstanding warrants. This installation is manned by a DoD Police Force who possesses apprehension authority, which includes holding suspects for local authorities. These officers can and will charge individuals with an established court appearance via the Federal Magistrate. This agency processes illegal aliens in accordance with INS instructions.
SECURITY PROCEDURES FOR CONSTRUCTION CONTRACTORS WORKING AT DLA DISTRIBUTION SUSQUEHANNA (DDSP), EMPLOYEES/PERSONNEL AND VISITORS
All persons, with the exception of delivery truck drivers, entering the installation must obtain an Identification Badge from DDSP Security, Pass and ID. All visitors and personnel expected to be on site for less than 90 days will receive a temporary badge. Personnel expected to be on site for longer than 90 days will be provided a permanent badge. The construction contractor shall follow the procedures below to obtain and renew Identification Badges for all direct hire and subcontractor employees and visitors:
1) Complete the attached New PERSONNEL NOTIFICATION form (Attachment “1”).
2) Complete the attached Identification Badge request form for each employee. Use the short form (Attachment “2”) for personnel expected to be on site less than 90 days. Use the long form (Attachment “3”) for personnel expected to be on site more than 90 days. (Note: Only employees with permanent badges will be permitted to escort delivery vehicles and new employees.)
3) Email NEW PERSONNEL NOTIFICATION form and Identification Badge request forms to the (COR) identified in the task order the day prior to arrival (day prior is the minimum, may be sent up to one week prior to arrival).
4) When new personnel arrive at Post 3 (DDSP entrance gate nearest the Eastern Distribution Center, Building 2001) security will notify the escort designated on the NEW PERSONNEL NOTIFICATION form. The escort will be required to meet the new personnel at Post 3 and escort same to Pass and ID for processing. If the contractor has completed step 3 in a timely manner, badge information will be entered into DDSP system prior to arrival and will be an aid to expedite processing.
5) When new personnel arrive at Pass and ID, they will be required to provide a valid photo identification card (Driver’s License preferred) and registration and proof of insurance for any vehicles that they will be driving on the installation. New personnel will then receive a DDSP photo ID badge and a “paper” temporary vehicle pass.
The prime contractor will be responsible for providing a weekly updated list of all badges issued by Pass and ID to the COR. Badge listing shall identify Project Name, Prime contractor name and any subcontractor names. This listing shall provide the employee’s/visitor’s name, badge number (only 90 day + duration badges are assigned a number), employer, date issued and date returned to Pass and ID. Failure to return all badges issued, including temporary and/or expired badges may delay progress and/or final contract payments. The COR will forward a copy to the DDSP Pass and ID section by fax for weekly reconciliation.
https://www.acq.osd.mil/dpap/dars/pgi/pgi%20htm/PGI204%2071.htm%23payment%20instructions
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 17 of 42
CONTINUED ON NEXT PAGE
BADGE RENEWAL OF EXPIRED OR EXPIRING BADGES
Complete a new long form badge application (Attachment “4”) and email to the COR identified in the task order 24 hours in advance of renewal application.
ENTRANCE INTO DDSP
Entrance of Contractor personnel with DDSP ID badges is determined by the type of vehicle they are driving:
Contractor with sedan Enter via Post 3 (EDC Gate) Contractor with empty pick-up truck Enter via Post 3 (EDC Gate) Contractor with pick-up containing tools or Enter via Post 4 (Truck Gate) Job site equipment or having a cap Contractor with utility vehicle or van Enter via Post 4 (Truck Gate)
DELIVERIES
All contractor deliveries shall enter the installation through Post 4 (DDSP Truck Gate).
To help avoid delays at the entrance, all deliveries should be scheduled after 8:00AM whenever possible. The construction contractor shall follow the following procedure for all deliveries (including pick-ups at the construction site):
1) Complete the attached CONTRACTOR’S DELIVERY NOTIFICATION form (Attachment “5”).
2) Email the completed CONTRACTOR’S DELIVERY NOTIFICATION form to the COR identified in the task order a minimum of one day prior to delivery.
3) When the delivery truck arrives at Post 4, DDSP will contact the delivery POC identified on the notification form. The POC will be required to escort the delivery truck from Post 4 to the construction site.
4) After delivery is completed, the delivery truck must be escorted from the construction site back to Post 4.
PHOTOGRAPHS
Camera passes will no longer be issued. The COR will coordinate all photography with the Public Affairs office.
THREAT CONDITIONS
Contractors are allowed to enter the installation when threat conditions are at:
ALPHA
BRAVO
CHARLIE
Contractors will not be allowed to enter the installation when the threat condition is at:
DELTA
To determine the threat level and any other restrictions concerning restrictions or delays to enter DDSP, contractors need to call the DDSP information line:
717-770-2866 (local calling area) 1-877-639-2012 (outside local area) Section DDSP – Option #2
CONTACTS
DDSP Security Desk Phone: 717-770-6270 Fax: 717-770-5480
DDSP Pass and ID Section Phone: 717-770-7111 Fax: 717-770-8146
DDSP Emergency Phone: 717-770-7777
DDSP Information Line Phone: 717-770-2866
DDSP Facilities Engineering Contracting Officer Representative (COR)
-will be determined at time of award
(END OF SECTION H)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 18 of 42
CONTINUED ON NEXT PAGE
SECTION I – CONTRACT CLAUSES
FAR 52.202-1 DEFINITIONS (NOV 2013)
FAR 52.203-3 GRATUITIES (APR 1984)
FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
FAR 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY
(MAY 2014)
FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (JUN 2020)
FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S) (JUN 2020)
FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)
FAR 52.204-2 ALT II SECURITY REQUIREMENTS (AUG 1996)
FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
FAR 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (DEC 2019)
FAR 52.208-9 CONTRACTOR USE OF MANDATORY SOURCES OF SUPPLY OR SERVICES (OCT 2018)
FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (JUN 2020)
FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2019)
FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
FAR 52.214-26 AUDIT AND RECORDS—SEALED BIDDING (OCT 2010)
FAR 52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA-
MODIFICATIONS-SEALED BIDDING (AUG 2011)
FAR 52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA – MODIFICATIONS- SEALED
BIDDING (AUG 2020)
FAR 52.214-29 ORDER OF PRECEDENCE – SEALED BIDDING (JAN 1986)
FAR 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 2020-O0008)
FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2020-O0008)
FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
FAR 52.222-3 CONVICT LABOR (JUN 2003)
FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT – OVERTIME COMPRENSATION (MAY 2018)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 19 of 42
FAR 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
FAR 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
FAR 52.222-8 PAYROLLS AND BASIC RECORDS (AUG 2018)
FAR 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
FAR 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
FAR 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
FAR 52.222-12 CONTRACT TERMINATION-DEBARMENT (MAY 2014)
FAR 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY
2014)
FAR 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
FAR 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
FAR 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
FAR 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)
FAR 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS-PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED
METHOD) (MAY 2014)
FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)
FAR 52.223-3 HAZARDOUS MATERIAL IDENITIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
FAR 52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL HYDROFLUOROCARBONS
(JUN 2016)
FAR 52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)
FAR 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2008)
FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020)
FAR 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
FAR 52.224-2 PRIVACY ACT (APR 1984)
FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014)
FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008)
FAR 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
(JUN 2020)
FAR 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)
FAR 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 20 of 42
FAR 52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
FAR 52.228-11 PLEDGES OF ASSETS (AUG 2018)
FAR 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
FAR 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (JUN 2020)
FAR 52.229-3 FEDERAL, STATE AND LOCAL TAXES (FEB 2013)
FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
FAR 52.232-17 INTEREST (MAY 2014)
FAR 52.232-18 AVAILABILITY OF FUNDS (APR 1984)
FAR 52.232-23 Alt I ASSIGNMENT OF CLAIMS (MAY 2014) ALTERNATE I (APR 1984)
FAR 52.232.27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2017)
FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
FAR 52.233-1 DISPUTES (MAY 2014)
FAR 52.233-3 PROTEST AFTER AWARD (AUG 1996)
FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
FAR 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
FAR 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
FAR 52.236-8 OTHER CONTRACTS (APR 1984)
FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 1984)
FAR 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
FAR 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
FAR 52.236-12 CLEANING UP (APR 1984)
FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)
FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
FAR 52.236-17 LAYOUT OF WORK (APR 1984)
FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
ALTERNATE I (APR 1984)
FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
FAR 52.242-13 BANKRUPTCY (JUL 1995)
FAR 52.243-4 CHANGES (JUN 2007)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 21 of 42
CONTINUED ON NEXT PAGE
FAR 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2020)
FAR 52.248-3 VALUE ENGINEERING – CONSTRUCTION (OCT 2015)
FAR 52.249-2 Alt I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012) ALTERNATE I (SEP 1996)
FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
DFARS 252.203-7001 PROHIBITION ON PERSONS…