IFB_250301_Mispah_Parking_Lot_Replacement_Bid_Form.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Mispah Parking Lot Replacement - Rebid
- Solicitation number
- IFB 250301
- Issued by
- Miramar Beach CDP, Florida
About this file
This is an Invitation for Bid (IFB) No. 250301 for the Mispah Parking Lot Replacement - Rebid, issued by a Florida government agency for the Mispah-Simmons Apartment Complex. The project involves demolishing and replacing existing parking lots at two apartment locations: Simmons Apartments and Mispah Apartments. The bid includes comprehensive parking lot renovation work comprising demolition of existing concrete, subgrade preparation, installation of 6" limerock base, 1 1/2" SP-9.5 asphalt paving, concrete curbing, striping, and bumpers. The base bid covers parking lot work at Simmons Apartments (675 square yards) and Mispah Apartments (600 square yards), with an additional additive option for Mispah Apartments that includes removing grass and expanding the parking area by 445 square yards.
The bid form indicates this is a unit price contract with line-item costs for various construction components. While no specific unit prices are filled in on the submitted document, the bid is structured to allow contractors to provide pricing for each discrete element of the parking lot replacement project. The additive option provides flexibility for the agency to potentially expand the scope of work at Mispah Apartments beyond the base bid, depending on available funding and project requirements. The document suggests a competitive bidding process where contractors can submit detailed pricing for the comprehensive parking lot renovation project across two apartment complexes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB NO. 250301 - Mispah Parking Lot Replacement - Rebid | |||||
| Item | Description | Estimated Quantity | Unit of Measure | Unit Cost | Extended Cost |
| SIMMONS APARTMENTS | |||||
| 1 | DEMOLIITION OF EXISTING CONCRETE | 1 | LS | $ - 0 | $ - 0 |
| 2 | SUBGRADE FOR NEW BASE / PAVING | 675 | SY | $ - 0 | $ - 0 |
| 3 | 6" LIMEROCK BASE GRADED AND COMPACTED | 675 | SY | $ - 0 | $ - 0 |
| 4 | 1 1/2" SP-9.5 ASPHALT | 675 | SY | $ - 0 | $ - 0 |
| 5 | CONCRETE CURB | 140 | LF | $ - 0 | $ - 0 |
| 6 | STRIPING AND BUMPERS | 1 | LS | $ - 0 | $ - 0 |
| 7 | MOBILIZATION/SUPERVISION | 1 | LS | $ - 0 | $ - 0 |
| TOTAL - SIMMONS APARTMENTS | $ - 0 |
| MISPAH APARTMENTS | |||||
| 1 | DEMOLIITION OF EXISTING CONCRETE | 1 | LS | $ - 0 | $ - 0 |
| 2 | SUBGRADE FOR NEW BASE / PAVING | 600 | SY | $ - 0 | $ - 0 |
| 3 | 6" LIMEROCK BASE GRADED AND COMPACTED | 600 | SY | $ - 0 | $ - 0 |
| 4 | 1 1/2" SP-9.5 ASPHALT | 600 | SY | $ - 0 | $ - 0 |
| 6 | STRIPING AND BUMPERS | 1 | LS | $ - 0 | $ - 0 |
| 7 | MOBILIZATION/SUPERVISION | 1 | LS | $ - 0 | $ - 0 |
| TOTAL - MISPAH APARTMENTS | $ - 0 | ||||
| TOTAL BASE BID AMOUNT | $ - 0 |
| ADDITIVE OPTION- MISPAH APARTMENT | |||||
| 1 | REMOVE GRASS | 445 | SY | $ - 0 | $ - 0 |
| 2 | SUBGRADE FOR NEW BASE / PAVING | 445 | SY | $ - 0 | $ - 0 |
| 3 | 6" LIMEROCK BASE GRADED AND COMPACTED | 445 | SY | $ - 0 | $ - 0 |
| 4 | 1 1/2" SP-9.5 ASPHALT | 445 | SY | $ - 0 | $ - 0 |
| 6 | STRIPING AND BUMPERS | 12 | EACH | $ - 0 | $ - 0 |
| 7 | MOBILIZATION/SUPERVISION | 1 | LS | $ - 0 | $ - 0 |
| ADDITIVE OPTION TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .