J-2_EPSE_III_TO1_QASP_attachment_-_Objective,_Measures_and_Expectations.docx

DOCX document 37 KB Posted

Attached to
Enterprise Product Support Engineering III Federal contract opportunity
Solicitation number
ID05170030
Issued by
GSA Federal Acquisition Service

About this file

J-2 QASP Attachment

View the file

Other files for this federal contract opportunity

Other files attached to Enterprise Product Support Engineering III, newest first.
File Type Posted
EPSE_III_RFP_-_Amendment_3.docx DOCX document
Questions_and_Answers_June_5.docx DOCX document
Questions_and_Answers_June_4_-_updated.docx DOCX document
EPSE_III_RFP_-_Amendment_2.docx DOCX document
Questions_and_Answers_June_4.docx DOCX document
EPSE_III_RFP_-_Amendment_1.docx DOCX document
Questions_and_Answers_-_May_23.docx DOCX document
J-4_EPSE_III_TO2_QASP_attachment_-_Objective,_Measures_and_Expectations.docx DOCX document
EPSE_III_RFP.docx DOCX document
J-3_EPSE_III_TO2_PWS_(PMB_and_Lasers).docx DOCX document
J-4_EPSE_III_TO2_QASP_attachment_(PMB_and_Lasers).xlsx XLSX spreadsheet
J-2_EPSE_III_TO1_QASP_attachment.xlsx XLSX spreadsheet
J-2_EPSE_III_TO1_QASP.docx DOCX document
J-1_EPSE_III_TO1_PWS.docx DOCX document
J-4_EPSE_III_TO2_QASP.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITSS Solicitation # ID05170030001 Condition-Based Maintenance Plus QASP OEM Page 2 of 3

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

SURVEILLANCE OBJECTIVES, MEASURES, AND EXPECTATIONS

PERFORMANCE OBJECTIVE

The overall objective of this effort is to implement CBM+ within the KC-135 weapon system support activities. To execute this Task Order, both technical and managerial activities shall be required. The Contractor shall consider program management requirements, environmental and safety requirements/savings, readiness factors, return on investment benefits, and sustainment/maintenance needs. The Contractor shall provide program schedules, program objectives, and final data results, analysis, tools, and algorithms.

PERFORMANCE MEASURES

Contractor performance will be evaluated using the following measures.

Completeness of Work: Using this measure, the Government will assess the degree to which the Contractor identifies, includes, addresses and/or performs all pertinent aspects of the work or all pertinent elements of delivered items, data, or services. Using this measure, the Government will also assess the degree to which the Contractor performs all stipulated or planned activities and captures the results of those activities in the various documents that are to be delivered.

Effectiveness: Using this measure, the Government will assess the degree to which the Contractor’s resources, methods, best practices, techniques, and/or tools are successful in meeting all goals and objectives established in the PWS. Effectiveness includes the Contractor’s ability to ensure that all team players perform as expected and that all efforts are appropriately coordinated to ensure that the work is performed as planned and prescribed in the PWS.

Format & Clarity: Using this measure, the Government will assess the design, flow, matrix, and/or layout used by the Contractor to present data (whether presented physically, orally, or electronically). This assessment will focus on the degree of clarity and logical organization with which the data is presented and whether or not the format facilitates easy review and use of the material. Using this measure, the Government will assess the degree to which material presented in documents (narrative, tables, diagrams, footnotes, photographs, etc.) are easy to understand by the intended audience.

Quality: Using this measure, the Government will assess the degree to which the work performed and items or documents delivered achieve a standard of excellence or adhere to rules established by a recognized authority as a standard of performance. For example, documents will be assessed to determine the degree to which they are technically sound and free of typographical, grammatical, mathematical, and conceptual errors. Using this measure, the Government will also evaluate the degree to which the required document(s) is suitable for assessing the impacts of all reasonable alternatives and how well the recommended system will meet its intended purpose. Using this measure, the Government will assess the level of professionalism exhibited by the Contractor staff in interactions with Government and other personnel in connection with work being performed under this task order.

Reliability: Using this measure, the Government will assess degree to which the Contractor furnished systems or services are or remain fully functional during the period of times specified in the task order. This assessment will include the degree to which the Contractor is able to produce continuous output or service support, minimizing down-time and service interruptions.

Timeliness: Using this measure, the Government will assess degree to which the Contractor meets or exceeds the delivery schedule.

Viability: Using this measure, the Government will assess the degree with which the Contractor’s recommendations apply to Government’s needs, solve the Government’s problems, are appropriate to the situation, or meet government’s requirements.

PERFORMANCE EXPECTATIONS AND EVALUATION

The COR or other Government representative responsible for evaluating Contractor performance shall provide their evaluation on the PERFORMANCE EVALUATION REPORT.

image1.emf