GFMS IBM09B0002-A001.pdf

PDF 123 KB Posted

Attached to
RECOVERY - Construct Banker Floodway North Levee Federal contract opportunity
Solicitation number
IBM09B0002
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

IBM09B0002 Amendment A001

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Construct Banker Floodway North Levee, newest first.
File Type Posted
00 31 21 Survey Information.pdf PDF
Div03.pdf PDF
00 31 43 Permit Application.pdf PDF
Div32.pdf PDF
00 31 24 EA Information.pdf PDF
Div05.pdf PDF
00 31 50R Other Project Info.pdf PDF
00 31 19 Existing Condition Information.pdf PDF
Div33.pdf PDF
Div01.pdf PDF
Div31.pdf PDF
00 31 26 Existing Hazardous Material Information.pdf PDF
00 01 10 Table of Contents.pdf PDF
00 01 01 Project Title.pdf PDF
Div02.pdf PDF
DEC_Drawings-Addendum1.pdf PDF
Div11.pdf PDF
Div35.pdf PDF
00 01 20 List of Schedules.pdf PDF
00 00 00 Div00 Cover.pdf PDF
00 01 15 List of Drawings.pdf PDF
00 31 32 Geotechnical Data.pdf PDF
Div07.pdf PDF
NBFL Final Report.zip ZIP file
1975 - Banker Floodway As-Built Plans.zip ZIP file
J-11 SF 1413.pdf PDF
J-15 North Banker Floodway Levee Bench Mark Location.pdf PDF
J-10 IBWC Form 108.pdf PDF
J-4 IBWC Form 116.pdf PDF
J-13 Plans North Banker Floodway Levee Improvements.pdf PDF
J-8 SF 28.pdf PDF
J-14 Hidalgo Levee Horizontal and Vertical Control Report.pdf PDF
J-12 Specifications.pdf PDF
J-2 IBWC Form 117.pdf PDF
J-5 SF 24.pdf PDF
J-3 IBWC Form 110.pdf PDF
J-6 SF 25.pdf PDF
RECOVERY IBM09B0002.pdf PDF
J-1 General Decision TX829.pdf PDF
J-7 SF 25A.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

A001

3. EFFECTIVE DATE

07/16/2009

4. REQUISITION/PURCHASE REQ. NO.

See Lines

5. PROJECT NO. (If applicable)

IBWC_CODE

International Boundary and Water Commission

(IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

Colleen Elliott

NAME

TEL.

elliottc@state.gov

EMAIL

6. ISSUED BY IBWC_CODE

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

IBM09B0002

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

06/04/2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __two__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__two__X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. The deadline for receipt of bids is hereby extended to Monday, July 20, 2009 at 4:00 p.m. local time. Block 13 on the SF 1442 is also changed to reflect this date and time.

B. This solicitation amendment A001 is revised as attached. Please note that all items in the Bid Schedule contained in Section B are 'estimated' quantities.

C. See Section J, and J.12 and J.13 for a complete listing of specificationd and plan changes.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Colleen Elliott

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

IBM09B0002

Summary Info Continuation Page

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs B.2 Taxes -- IBWC (May 2009) 52.211-18 Variation in Estimated Quantity (Apr 1984)

C Descriptions/Specifications/Statement of Work C.1 Specifications and Plans

D Packaging and Marking D.1 Packaging and Marking

E Inspection and Acceptance 52.246-12 Inspection of Construction (Aug 1996) E.1 52.252-02 Clauses Incorporated by Reference (Feb 1998)

F Deliveries or Performance 52.242-14 Suspension of Work (Apr 1984) F.1 52.252-02 Clauses Incorporated By Reference (Feb 1998) F.3 Actual Damages--Construction 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

G Contract Administration Data G.1 Contracting Officer -- IBWC (May 2009) G.2 Designation of Conracting Officer -- IBWC (May 2009) G.3 Contracting Officer's Representative -- IBWC (May 2009) G.4 Contractor's Contract Administrator -- IBWC (May 2009)

H Special Contract Requirements H.1 52.236-04 Physical Data (Apr 1984) H.2 Performance and Payment Bonds -- IBWC (May 2009 H.3 Compensation and Liability Insurance--IBWC(May 2009) H.4 Builders Risk Insurance--IBWC (May 2009) H.5 Brand Name or Equal -- IBWC (May 2009) H.6 Technical Data Submittal Requirements -- IBWC (May 2009) H.7 Accident Prevention and Pre-Planning -- IBWC (May 2009) H.8 Construction Prgoram -- IBWC (May 2009) H.9 Construction Safety Standards -- IBWC (May 2009) H.10 Equipment Ownership and Operating Expense Schedule -- IBWC (May 2009) H.11 Cultural Resources -- IBWC (May 2009) H.12 Work Schedule -- IBWC (May 2009) H.13 Utility and Telephone Services -- IBWC (May 2009) H.14 Administration of Default (Fixed-Price Construction) -- IBWC (May 2009) H.15 Time Exentsion for Unusually Severe Weather -- IBWC (May 2009) H.16 Change Orders & Contract Modifications: Limitation on Markups - IBWC (May 2009)

I Contract Clauses 52.202-1 Definitions (July 2004) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (Apr 1984) 52.203-7 Anti-Kickback Procedures (Jul 1995) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (Jan 1997) 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity (Jan 1997) 52.203-12 Limitation On Payments To Influence Certain Federal Transactions (Sept 2007) 52.203-14 Display of Hotline Poster(s) (Dec 2007) 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Mar 2009) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (Aug 2000) 52.204-7 Central Contractor Registration (Apr 2008) 52.204-11 American Recovery and Reinvestment Act--Reporting Requirements (Mar 2009) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment (Sept 2006) 52.214-26 Alt I Audit and Records--Sealed Bidding (Mar 2009) Alt I (Mar 2009) 52.214-27 Price Reduction for Defective Cost or Pricing Data - Modifications - Sealed Bidding (Oct 1997) 52.214-28 Subcontracting Cost or Pricing Data--Modifications--Sealed Bidding (Oct 1997)

52.214-29 Order of Precedence--Sealed Bidding (Jan 1986) 52.215-2 Alt I Audit and Records--Negotiation (Jun 1999) - Alternate I (Mar 2009) 52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications (Oct 1997) 52.215-13 Subcontractor Cost or Pricing Data--Modifications (Oct 1997) 52.215-14 Integrity of Unit Prices (Oct 1997) 52.215-21 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data--Modifications (Oct 1997) 52.219-3 Notice of Total HUBZone Set-Aside (Jan 1999) 52.219-8 Utilization of Small Business Concerns (May 2004) 52.219-14 Limitations on Subcontracting (Dec 1996) 52.219-28 Post-Award Small Business Program Rerepresentation (Apr 2009) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation (July 2005) 52.222-6 Davis Bacon Act (July 2005) 52.222-7 Withholding of Funds (Feb 1988) 52.222-8 Payrolls and Basic Records (Feb 1988) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (July 2005) 52.222-12 Contract Termination-Debarment (Feb 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (Feb 1988) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (Feb 1988) 52.222-21 Prohibition of Segregated Facilities (Feb 1999) 52.222-26 Equal Opportunity (Mar 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (Feb 1999) 52.222-29 Notification of Visa Denial (June 2003) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era and Other Eligible Veterans (Sept 2006) 52.222-36 Affirmative Action for Workers with Disabilities (June 1998) 52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) 52.222-50 Combating Trafficking in Persons (Feb 2009) 52.222-54 Employment Eligibility Verification (Jan 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(Dec 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (Aug 2003) 52.223-6 Drug Free Workplace (May 2001) 52.223-14 Toxic Chemical Release Reporting 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.227-1 Authorization and Consent (Dec 2007) 52.227-4 Patent Indemnity--Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance - Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (Feb 1992) 52.228-12 Prospective Subcontractor Requests for Bonds (Oct 1995) 52.228-14 Irrevocable Letter of Credit (Dec 1999) 52.228-15 Performance and Payment Bonds--Construction (Nov 2006) 52.229-3 Federal, State and Local Taxes (Apr 2003) 52.232-5 Payments under Fixed-Price Construction Contracts (Sept 2002) 52.232-17 Interest (Oct 2008) 52.232-23 Assignment Of Claims (Jan 1986) 52.232-27 Prompt Payment for Construction Contracts (Oct 2008) 52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration (Oct 2003) 52.233-1 Disputes (July 2002) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984)

52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Alt I Accident Prevention (Nov 1991)- Alternate I (Nov 1991) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-16 Quantity Surveys (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.243-4 Changes (June 2007) 52.248-3 Value Engineering--Construction (Sept 2006) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (May 2004) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials (Mar 2009) 52.236-1 Performance of Work by the Contractor (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-4 Alterations in Contract (Apr 1984)

J List of Attachments J.1 Department of Labor General Wage Decision TX 080029 J.2 iBWC Form 117, Statement of Attendance at Pre-Bid Conference and Site Inspection J.3 IBWC Form 110, Certification of Authority for Signing Bids/Contracts J.4 IBWC 116 Statement of Equipment J.5 SF 24 Bid Bond J.6 SF 25 Performance Bond J.7 SF 25A Payment Bond J.8 SF 28 Affadivit of Individual Surety J.10 IBWC Form 108 Release on Contract J.11 SF 1413 Statement and Acknowledgment J.12 Specifications J.13 Plans J.14 Appendix A to Specifications - Survey Control J.15 Appendix B - Bench Mark Location J.16 Geotechnical Engineering Report J.17 1975 As-Built Drawings

K Representations, Certifications, and Other Statements of Offerors or Respondents 52.236-28 Preparation of Proposals--Construction (Oct 1997) K.1 52.252-01 Solicitation Provisions Incorporated by Reference (Feb 1998) K.2 Implementation of Online Representations and Certifications Application (ORCA) -- IBWC (May 2009) 52.204-8 Annual Representations and Certifications (Feb 2009) 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan--Certification (June 2008)

L Instructions, Conditions, and Notices to Offerors and Respondents 52.214-3 Amendments to Invitations for Bids (Dec 1989) 52.214-4 False Statements in Bids (Apr 1984) 52.214-5 Submission of Bids (Mar 1997) 52.214-6 Explanation to Prospective Bidders (Apr 1984) 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) 52.214-18 Preparation of Bids-Construction (Apr 1984) 52.214-19 Contract Award-Sealed Bidding-Construction (Aug 1996) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for

Construction (Feb 1999) L.1 52.252-01 Soliciation Provisions Incorporated by Reference (Feb 1998) L.8 Pre-Bid Conference - IBWC (May 2009) L.9 Qualifications of Bidders --IBWC (May 2009) L.10 Bid Guarantee -- IBWC (May 2009) 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards, and Commercial Item Descriptions (June 1988) 52.216-1 Type of Contract (Apr 1984) 52.222-5 Davis-Bacon Act -- Secondary Site of the Work (July 2005) 52.233-2 Service of Protest (Sept 2006) 52.236-27 Alt I Site Visit (Construction) (Feb 1995)- Alternate I (Feb 1995)

M Evaluation Factors for Award M.1 Award M.2 Mandatory Pre-Bid Conference and Site Visit

001 MOBILIZATION/DEMOBILIZATION, SPECIFICATION

SECTION 01 70 00

1.00 0.00

1.00 LS

Doc Ref No: 93094201277A Delivery Date FOB:

Destination

002 TEMP EROSION CONTROL (FILTER FABRIC FENCE),

SPECIFICATION SECTION 01 57 00

17,481.00 0.00

17,481.00 LF

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

003 TEMP EROSION CONTROL (CONST EXIT/ENTR),

SPECIFICATION SECTION 01 57 00

2.00 0.00

2.00 EA

Doc Ref No: 93094201277A Delivery Date FOB:

Destination

004 EXCAVATE AND RECOMPACT (EXIST LEVEE

EMBANKMENT)(BENCH EXCAVATION),

SPECIFICATION SECTION 31 31 50

5,822.00 0.00

5,822.00 CD

Doc Ref No: 93094201277A Delivery Date FOB:

Destination

005 PREPARATION OF RIGHT OF WAY, SPECIFICATION

SECTION 31 10 00

NOTE: ACTUAL UNIT DESCRIPTION IS 'STA' FOR

STATION; HOWEVER, FOR THIS BID SCHEDULE 'EA'

FOR EACH IS USED TO MEAN THE SAME UNIT.

86.00 0.00

86.00 EA

Doc Ref No: 93094201277A Delivery Date FOB:

Destination

006 EMBANKMENT, SPECIFICATION SECTION 31 33 00 38,842.00

0.00

38,842.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

007 EXCAVATE, STOCKPILE, AND RESTABLISHED (EXIST

TOPSOIL) (4-6 IN), SPECIFICATION SECTION 31 91 10

6,165.00 0.00

6,165.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

008 TOPSOIL (NEW), SPECIFICATION SECTION 31 91 10 1,122.00

0.00

1,122.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

009 EXCAVATE AND STOCKPILE (EXIST FLEX BASE)

(CALICHE) (4-8 IN) (MAINTENANCE ROAD),

1,327.00 0.00

IBM09B0002

Line Item Summary

Solicitation Number:

IBM09B0002

Contract Number: Title: RECOVERY - N Banker FW Levee Improvements

Date of Solicitation:

07/16/2009

Line Item No. Description Quantity Unit Unit Price Total Cost

IFICATION SECTION 32 71 40 1,327.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

010 FLEXBASE (STOCKEPILED MATERIAL) (CALICHE) (TY

D GR6) (6 IN), SPECIFICATION SECTION 32 71 40

664.00 0.00

664.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

011 FLEXBASE (NEW) (CALICHE) (TY D GR6) (6 IN),

SPECIFICATION 32 71 40

2,108.00 0.00

2,108.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

012 HYDRO MULCH, SPECIFICATION SECTION 32 92 10 41,635.00

0.00

41,635.00 CD

Doc Ref No: 93094201277A

Delivery Date FOB:

Destination

013 GATEWELL ADJUST (4-FT X 4-FT), SPECIFICATION

SECTION 03 04 22

0.00 3.00

3.00 EA

Doc Ref No: 93094201372 Delivery Date FOB:

Destination

014 GATEWELL ADJUST (6-FT X 4-FT), SPECIFICATION

SECTION 03 04 22

0.00 1.00

1.00 EA

Doc Ref No: 93094201372 Delivery Date FOB:

Destination

015 GATEWELL ADJUST (7.5-FT X 4-FT), SPECIFICATION

SECTION 0304 22

0.00 1.00

1.00 EA

Doc Ref No: 93094201372 Delivery Date FOB:

Destination

016 GATEWELL ADJUST (9-FT X 6-FT), SPECIFICATION

SECTION 03 04 22

0.00 1.00

1.00 EA

Doc Ref No: 93094201372 Delivery Date FOB:

Destination

B.2 Taxes -- IBWC (May 2009) 05/29/2009

In accordance with FAR clause 52.229-3, incorporated by refrence at I.1 in Section I, prices set forth herein

IBM09B0002

Line Item Summary

Solicitation Number:

IBM09B0002

Contract Number: Title: RECOVERY - N Banker FW Levee Improvements

Date of Solicitation:

07/16/2009

Line Item No. Description Quantity Unit Unit Price Total Cost shall include all applicable federal, state, and local taxes.

52.211-18 Variation in Estimated Quantity (Apr 1984) 04/01/1984

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

(End of clause)

Section C - Descriptions/Specifications/Statement of Work

C.1 Specifications and Plans 05/29/2009

Refer to Section J, List of Documents, Exhibits and Other Attachments, Items J.12 and J.13. The North Banker Floodway Levee Improvements, Hidalgo County, Texas, project-specific documents conform to the Construction Specifications Institute (CSI) Master Format, 2004 edition.

J.14 Survey Control, J.15 Bench Mark Locations, J.16 Geotechnical Report, and J.17 1975 As-Built Drawings will also be pertinent to the plans and specifications.

NOTE: When the J.12 Specifications pdf file is opened, please turn on bookmarks to see whether, or not, a particular section is included. The specifications will be revised and provided by a subsequent solicitation amendment.

Section D - Packaging and Marking

D.1 Packaging and Marking 05/29/2009

This section is not used.

Section E - Inspection and Acceptance

Clauses By Reference Clause Title Date 52.246-12 Inspection of Construction (Aug 1996) 08/01/1996

E.1 52.252-02 Clauses Incorporated by Reference (Feb 1998) 05/29/2009

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will maker their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet.gov/far

Section F - Deliveries or Performance

Clause Title Date 52.242-14 Suspension of Work (Apr 1984) 04/01/1984

F.1 52.252-02 Clauses Incorporated By Reference (Feb 1998) 05/29/2009

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will maker their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet.gov/far

F.3 Actual Damages--Construction 05/29/2009

If the contractor fails to complete the work within the time specified in the contract, the contractor shall pay actual damages to the Government for each calendar day of delay until the work is completed or accepted. If the Government terminates the contractor's right to proceed, actual damages will continue to accrue until the work is completed. These actual damages are in addition to excess costs of repurchase under the termination clause incorporated by reference under Item 1 in Section I.

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 04/01/1984

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than two hundred and eighty (280) calendar days after the date the contractor receives the notice to proceed. Note: The flood control levee improvements, excluding seeding and maintenance of vegetation, shall be completed one hundred and eight calendar days (180) after the contractor receipt of the notice to proceed.* The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

Section G - Contract Administration Data

G.1 Contracting Officer -- IBWC (May 2009) 05/29/2009

"Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer within the limits of their authority as delegated by the Contracting Officer.

G.2 Designation of Conracting Officer -- IBWC (May 2009) 05/29/2009

The Contracting Officer for this contract is:

Name: Colleen Jaye Elliott Address: International Boundary & Water Commission, United States & Mexico (USIBWC) 4171 N Mesa, Suite C-100 El Paso, TX 79902-1441

Telephone: (915) 832-4714 Fax: (915) 832-4192 e-Mail: colleenelliott@ibwc.state.gov

G.3 Contracting Officer's Representative -- IBWC (May 2009) 05/29/2009

The Contracting Officer shall designate a technical representative to act for the Contracting Officer during the contract period. The Contracting Officer's Representative (COR) will act for the Contracting Officer only in technical matters and will not be authorized to commit the Government on any contract terms, conditions, or changes in unit price, total contract price, quantity, or quality, or delivery schedule. Any changes to the contract in unit price, total contract price, quantity, quality, or delivery schedule will be made only by the Contracting Officer by executed modification to the contract. The Contracting Officer's Representative will be located at the USIBWC Field Office, 325 Golf Course Road, Mercedes, TX 78570.

The Contracting Officer's Representative will be appointed in writing after contract award.

G.4 Contractor's Contract Administrator -- IBWC (May 2009) 05/29/2009

Offeror is requested to delegate a person to be contacted for prompt contract administration.

Name: ____________________________________________________ Address: ____________________________________________________

Telephone: __________________ Fax: __________________ Cell: __________________ e-Mail: _____________________________________

Section H - Special Contract Requirements

H.1 52.236-04 Physical Data (Apr 1984) 04/01/1984

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual survey, and the associated geotechnical data and reports identified in the Specifications, Division 00 Procurement and Contracting Requirements, Section 00.31.32 Geotechnical Data.

(b) Weather conditions as reported by http://www.weather.com on the Internet as follows:

Mercedes, Texas Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Average High (F)

69 73 80 85 89 93 95 96 92 86 78 71

Average Low (F)

48 51 57 64 70 73 74 74 71 64 56 50

Average Precipitation (in.)

1.40 1.40 1.00 1.40 2.70 2.90 2.20 2.60 4.7 2.50 1.30 1.20

(c) Transportation facilities: Access to the project site is unrestricted.

(d) The existing condition of the levee is addressed under Available Information, in the Specifications, Division 00, Procurement and Contracting Requirements, Section 00.31.19 Existing Condition Information and Section 00.31.50 Other Project Information.

H.2. Performance and Payment Bonds - IBWC (May 2009)

(a) For contracts that exceed $100,000, the Contractor shall, within fifteen (15) calendar days after award of contract, furnish to the Government bonds as follows:

(1) Performance bond. Performance bond with a surety or sureties approved by the Contracting Officer, securing performance and fulfillment of the Contractor's obligations under this contract, with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(2) Payment bond. Within fifteen (15) calendar days after award of contract, furnish to the Government a payment bond with a surety or sureties approved by the Contracting Officer, assuring payment as required by law to all persons supplying labor or materials in the prosecution of the work provided for in the contract with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(b) Costs. All costs of furnishing performance and payment bonds shall be included in the total lump sum bid in the schedule.

(c) Requirements for execution of surety bonds. Each surety company bond (performance or payment), that purports to have been executed by an agent or attorney in fact for the corporate surety, is required to have submitted with it a power of attorney to the signatory agency or attorney in fact, and (1) be executed by the corporate surety upon a date reasonably proximate to the date of the bond, or (2) the power of attorney shall be accompanied by a certification of the surety to the effect that the power of attorney was in full force and effect upon a date reasonable proximate to the date of the bond.

(d) Individual Sureties.

(1) If individual surety bonds are furnished for payment and performance bonds, the individual sureties must submit with their bonds proof of ownership and value of the assets which they claim in their net worth.

The Government's preferred method of proof is to have a statement of net worth prepared by a certified public accountant in accordance with generally accepted accounting principles. The statement of net worth on the SF 28, Affidavit of Individual Surety, is not in itself sufficient and will not be accepted absent of additional proof of value and ownership.

(2) Bidders are also cautioned that individual sureties must provide complete and detailed information in block 10 of the SF 28 concerning other contracts on which they have provided bonds. This information should include contract number, contract location, amount and type of bond and telephone number of the involved contracting officer.

(3) Failure to provide the proof and information requested above will cause delays to the start of construction for which the contractor must bear the responsibility, and may result in termination of contract for failure to provide adequate bonds.

H.2 Performance and Payment Bonds -- IBWC (May 2009 05/29/2009

(a) For contracts that exceed $100,000, the Contractor shall, within ten (10) calendar days after award of contract, furnish to the Government bonds as follows:

(1) Performance bond. Performance bond with a surety or sureties approved by the Contracting Officer, securing performance and fulfillment of the Contractor's obligations under this contract, with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(2) Payment bond. Within fifteen (15) calendar days after award of contract, furnish to the Government a payment bond with a surety or sureties approved by the Contracting Officer, assuring payment as required by law to all persons supplying labor or materials in the prosecution of the work provided for in the contract with a penal amount of not less than 100 percent of the price of the contract at the time of award.

(b) Costs. All costs of furnishing performance and payment bonds shall be included in the total lump sum bid in the schedule.

(c) Requirements for execution of surety bonds. Each surety company bond (performance or payment), that purports to have been executed by an agent or attorney in fact for the corporate surety, is required to have submitted with it a power of attorney to the signatory agency or attorney in fact, and (1) be executed by the corporate surety upon a date reasonably proximate to the date of the bond, or (2) the power of attorney shall be accompanied by a certification of the surety to the effect that the power of attorney was in full force and effect upon a date reasonable proximate to the date of the bond.

(d) Individual Sureties.

(1) If individual surety bonds are furnished for payment and performance bonds, the individual sureties must submit with their bonds proof of ownership and value of the assets which they claim in their net worth.

The Government's preferred method of proof is to have a statement of net worth prepared by a certified public accountant in accordance with generally accepted accounting principles. The statement of net worth on the SF 28, Affidavit of Individual Surety, is not in itself sufficient and will not be accepted absent of additional proof of value and ownership.

(2) Bidders are also cautioned that individual sureties must provide complete and detailed information in block 10 of the SF 28 concerning other contracts on which they have provided bonds. This information should include contract number, contract location, amount and type of bond and telephone number of the involved contracting officer.

(3) Failure to provide the proof and information requested above will cause delays to the start of construction for which the contractor must bear the responsibility, and may result in termination of contract for failure to provide adequate bonds.

H.3 Compensation and Liability Insurance--IBWC(May 2009) 05/29/2009

The Contractor shall within fifteen (15) calendar days after award of contract provide and maintain minimum insurance as follows:

(a) General Liability Insurance for bodily injury and property damage with minimum limits $500,000 each occurrence with an aggregate of $1,000,000.

(b) Automobile Liability for bodily injury and property damage with minimum of $250,000 for injury to or death of any one (1) person, $500,000 each accident or occurrence for bodily injury, and $100,000 for each accident or occurrence for property damage liability.

(c) Worker's Compensation Insurance for all labor employed on the project who may come within the protection of workers' compensation laws and Employers General Liability with minimum limits of $100,000 each accident, bodily injury by disease $100,000 each employee, $500,000 aggregate.

In every case the insurance coverage shall amount to at least the limits stated above. However, where the Financial Responsibility Compulsory Insurance Law of the State in which the project is located requires higher limits, the Automobile Liability Insurance Policy shall provide coverage of at least those limits required by State law.

The insurance obtained by the Contractor must (1) be effective for the term of the contract and (2) must name both the United States of America by and through the United States Section of the International Boundary and Water Commission, United States and Mexico, and Hidalgo Improvement District # 3, as additionally insured. Although the requirement for naming the United States of America as an additional insured does not apply to Worker's Compensation Insurance, it does apply for Hidalgo Improvement District #3.

Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor's written certification shall be accompanied by either a Certificate issued by the insurer or photocopies of the insurance policies which reflect that the cancellation/change provisions of this contract have been met.

The Contractor shall insert the substance of this clause including this paragraph in subparagraphs under this contract and shall require subcontractors to provide and maintain the same limits.

At least five days prior to each such subcontractor's personnel commencing work on this project, the Contractor shall furnish (or ensure that there has been furnished) to the Contracting Officer a current Certificate of Insurance meeting the requirements as stated above.

H.4 Builders Risk Insurance--IBWC (May 2009) 05/29/2009

(a) The Contractor is responsible for losses suffered prior to Government acceptance of the work. Therefore, the Contractor is responsible for protection of the work and repair of damages. For the protection of the Contractor and the Government, the Contractor is required to obtain Builder's Risk Insurance with the maximum level of coverage available in the project locality and no less than 100% of the contract price.

(b) The Contractor shall not commence work under this contract until he has obtained all the insurance required and such insurance has been approved by the Contracting Officer, nor shall the Contractor allow any subcontractor to commence work on his subcontract until the insurance required of the subcontractor has been so obtained and approved.

(c) The Contractor shall procure within fifteen (15) calendar days after award of contract, and maintain during the life of this contract, Builder's Risk Insurance based on 100 percent (100%) of the completed value of the insurable portion of the project.

(d) The Contractor shall furnish the Contracting Officer with certificates showing the type, amount, class of operations covered, effective dates and dates of expiration of policies. Such certificates shall also contain substantially the following statement: "The insurance covered by this certificate will not be canceled or materially altered, except after thirty (30) days written notice has been received by the Contracting Officer."

(e) The insurance obtained by the Contractor must (1) be effective for the term of the contract and (2) must name the United States of America by and through the United States Section of the International Boundary and Water Commission, United States and Mexico, as an additional insured.

H.5 Brand Name or Equal -- IBWC (May 2009) 05/29/2009

(As used in this clause, the term "brand name" includes identification of products by manufacturer, make, and/or model.)

If items called for by this Invitation for Bids have been identified in the specifications by a "brand name or equal" description, such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be satisfactory (Reference Section I, FAR Clause 52.236-05 entitled Material and Workmanship). The determination as to equality of a product shall be the responsibility of the Government and will be based on information furnished during the submittal process (Reference Specifications, Division 01 General Requirements, Section 01 33 00 Submittals).

H.6 Technical Data Submittal Requirements -- IBWC (May 2009) 05/29/2009

(a) Technical data required to be provided to the government are described in the paragraph entitled “Submittal Requirements” in the Specifications, Division 01 General Requirements, Section 01 33 00 Submittals.

(b) If the Contractor fails to provide required technical data within the time(s) specified in this contract, or any extension, such failures shall be considered to demonstrate unsatisfactory progress and:

(1) There shall be retained from the progress or other payments under this contract such amount(s) as the Contracting Officer considers adequate protection to the Government therefore.

(2) The Contractor and its sureties shall be liable to and assessed by the Government for all damages caused by such failure.

(3) The Contractor’s right to proceed with the work that has been delayed may be terminated for default.

(c) In the event the Contractor provides submittals prior to Notice to Proceed, the Government may review the submittals prior to the Notice to Proceed. The Contractor shall not seek compensation for efforts spent on the preparation of submittal documents submitted prior to the Notice to Proceed.

(d) The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

(e) The Government will expedite the review of submittals. However, for specific submittals the Government will require up to the amount of time specified in Section 01 33 00 for review of submittals or re-submittals.

H.7 Accident Prevention and Pre-Planning -- IBWC (May 2009) 05/29/2009

With reference to the requirements of FAR clause 52.236-13 (Alternate I) for an overall safety program, the Contractor will:

(a) Submit a detailed plan for performing each major phase of work.

(b) Require Subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(c) Be prepared to discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of work.

Plans will include all pertinent information, such as methods of providing safety measures for personnel performing required work. The plan for accomplishing work will be submitted prior to commencing operations.

H.8 Construction Prgoram -- IBWC (May 2009) 05/29/2009

(a) The Contractor shall submit a schedule of construction in accordance with the requirements set forth in the Specifications, Division 01 General Requirements, Section 01 32 00 Construction Progress Documentation. The Contractor shall account for in the assigned workday calendar, seasonal weather conditions, and other constraints considered in the planning and scheduling of all work to ensure the completion within the allotted contract time. The schedule shall be of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule. Until such time as the submitted schedule is approved as the official schedule of the project, the Contracting Officer may withhold approval of progress payments.

(b) If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

H.9 Construction Safety Standards -- IBWC (May 2009) 05/29/2009

(a) Offerors shall obtain and review the current Construction Industry "OSHA Safety and Health Standards (29 CFR 1926)" and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated September 15, 2008 (see Specifications, Division 01 General Requirements, Section 01 39 00 Safety), prior to submitting offers and preparing required safety program. Offerors shall utilize these standards in preparing required safety programs.

(b) The Contractor shall comply with all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated September 15, 2008. This pamphlet is available from:

http://www.usace.army.mil/CESP/Pages/EM385-1-1,28008NEW!.aspx.

(c) In the event there is a conflict between the requirements contained in OSHA Safety and Health Standards (29 CFR 1926), U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), specifications paragraphs, Contractor's approved safety program, or referenced safety and health standards, the more stringent requirement will prevail.

H.10 Equipment Ownership and Operating Expense Schedule -- IBWC (May 2009) 05/29/2009

(a) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data when the Government can determine both ownership and operating costs for each piece of equipment or equipment groups of similar serial and series from the Contractor's accounting records. When both ownership and operating costs cannot be determined from the Contractor's accounting records, equipment costs shall be based upon the applicable provisions of EP 1110 1 8, "Construction Equipment Ownership and Operating Expense Schedule," Region VI July 31, 2004 edition, Errata #1 September 10, 2007 (available online at http://140.914.76.129/publications/eng-pamphlets/ep1110-1-8(vol6)/toc.htm). Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retrospective pricing, the Schedule in effect at the time for the work was performed shall apply.

(b) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(11) and FAR 31.205 36, substantiated by certified copies of paid invoices. Rates for equipment rented from an organization under common control, lease purchase or sale leaseback arrangements will be determined using the schedule except that rental costs leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated leases are allowable. Costs for major repairs and overhaul are unallowable.

H.11 Cultural Resources -- IBWC (May 2009) 05/29/2009

In accordance with the National Historic Preservation Act of 1966 (16 U.S.C. 470), the following procedures are implemented to ensure historic preservation and fair compensation to the Contractor for delays attendant to cultural resources investigations.

In the event potential historical, architectural, archaeological, or cultural resources (herein after cultural resources) are discovered during subsurface excavations at the site of construction, the following procedures shall be instituted:

(1) The Contracting Officer shall issue a “Stop Work Order” directing the Contractor to cease all construction operations at the location of such potential cultural resources find.

(2) Such “Stop Work Order” shall be effective until such time as a qualified archaeologist can be called to assess the value of these potential cultural resources and make recommendations to the State Historical Preservation Officer. Any “Stop Work Order” shall contain the following:

(a) A clear description of the work to be suspended;

(b) Any instructions regarding issuance of further orders by the Contractor for material services;

(c) Guidance as to action to be taken on subcontracts;

(d) Any suggestions to the Contractor as to minimization of his costs;

(e) Estimated duration of the temporary suspension.

If the archaeologist determines that the potential find is a bonafide cultural resource, at the direction of the State Historical Preservation Officer, the Contracting Officer shall extend the duration of the “Stop Work Order” in writing, and the Contractor shall suspend work at the location of the find.

Equitable adjustment of the construction contract shall be made in the following manner:

(1) Time Extension. If the work temporarily suspended is on the “critical path,” the total number of days for which the suspension is in effect shall be added to the number of allowable contract days.

If a portion of work at the time of such suspension is not on the “critical path,” but subsequently becomes work on the critical path, the allowable contract time will be computed from the date such work is classified as on the critical path.

(2) Additional Compensation. If, as a result of a suspension of the work, the Contractor sustains a loss which could not have been avoided by his judicious handling of forces, equipment, and (plant) or redirection of forces or equipment to perform other work on the contract, there shall be paid to the Contractor an amount as determined by the Contracting Officer to be fair and reasonable compensation for the Contractor’s actual loss in accordance with the following:

(a) Idle Time of Equipment. Compensation for equipment idle time will be determined on a force account (time and materials) basis, and shall include the cost of extra moving of equipment and rental loss.

(b) Idle Time of Labor. Compensation for idle time of workers will be determined by the Contracting Officer as “Labor” less any actual productivity factor of this portion of the work force.

(c) Increased Costs of Labor and Materials. Increased costs of labor and materials will be compensated only to the extent such increase was in fact caused by the suspension as determined by the Contracting Officer.

Compensation for actual loss due to idle time of either equipment or labor shall not include markup for profit.

The hours for which compensation will be paid will be the actual normal working time during which such delay condition exists, but will in no case exceed eight hours in any one day.

The days for which compensation will be paid shall be full or partial calendar days, excluding Saturdays, Sundays, and legal holidays, during the existence of such delay.

The State Historical Preservation Officer, Debra Beene, is located at 1511 Colorado, Austin, TX 78701. Ms.

Beene may be reached by e-mail at debra.beene@thc.state.tx.us, by telephone at 515-463-5865, or by mail at the Texas Historical Commission, PO Box 12276, Austin, TX 78711-22786. If unable to contact Ms. Beene, the main telephone number is 512-463-6100.

H.12 Work Schedule -- IBWC (May 2009) 05/29/2009

Normal working hours for the Contractor will be between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday. If the Contractor wishes to work during periods other than that above, additional Government inspection forces will be required. The Contractor shall notify the Contracting Officer’s Representative (COR) three (3) days in advance of his desire to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines that the additional inspection force is reasonably available. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days; however, if inspectors are required to perform in excess of their normal duty hours/days, the actual cost of the overtime inspection at overtime rates will be charged to the Contractor and will be deducted from the final payment of the contract amount.

H.13 Utility and Telephone Services -- IBWC (May 2009) 05/29/2009

The U.S. Section, International Boundary and Water Commission will not provide utility (water, gas and electricity) and telephone services to the Contractor . The Contractor shall, at his own expense and in a competent manner satisfactory to the Contracting Officer, install and maintain all necessary temporary connections and distribution lines, and he shall remove the same prior to final acceptance of the work

H.14 Administration of Default (Fixed-Price Construction) -- IBWC (May 2009) 05/29/2009

(a) Notwithstanding paragraph (b)(a)(xi) of the Default (Fixed-Price Construction) clause, the Contractor shall not be excused for delays, and shall be liable for any excess costs for failure to perform, if the subcontracted or purchased supplies or services were obtainable from other sources…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .