00 01 15 List of Drawings.pdf
PDF 31 KB Posted
- Attached to
- RECOVERY - Construct Banker Floodway North Levee Federal contract opportunity
- Solicitation number
- IBM09B0002
About this file
IBM09B0002 A001 Div 0001 15
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lower Rio Grande Flood Control Project North Banker Floodway Levee Improvements Project Hidalgo County, Texas
LIST OF CONTRACT DRAWINGS
USIBWC Contract No.: IBM09B0002 Page 00.01.15 - 1
INTRODUCTORY INFORMATION 00.01.15
The Contract Drawings applicable to this Contract are entitled: “2008 North Banker Floodway Levee Improvements Project (IWO No. 3) (Sta. 93+53 to 253+06)”, Dannenbaum Engineering Corporation, November 7, 2008. An index of sheets is identified on Plan Sheet No. G01-02, and includes the following:
INDEX OF SHEETS
SHEET NO. DESCRIPTION
No Number TITLE SHEET
G01-02 INDEX OF SHEETS
G01-03 SYMBOLS, LEGENDS, & ABBREVIATIONS
G01-04 GENERAL NOTES
G02-01 PROJECT LOCATION MAP
G02-02 BENCHMARK LOCATION MAP
G02-03 GEOTECHNICAL BOREHOLE LOCATION MAP
G03-01 HORIZONTAL CONTROL LAYOUT & DATA
G03-02 HORIZONTAL CONTROL LAYOUT & DATA
C01-01 EXISTING TYPICAL SECTION STA. 93+53.00 TO STA. 253+06.00
C02-01 PROPOSED LEVEE TYPICAL SECTIONS STA. 167+00.00 TO STA.
253+06.00
C03-01 PLAN & PROFILE STA. 93+53.00 TO STA. 102+00.00
C03-02 PLAN & PROFILE STA. 102+00.00 TO STA. 114+00.00
C03-03 PLAN & PROFILE STA. 114+00.00 TO STA. 126+00.00
C03-04 PLAN & PROFILE STA. 126+00.00 TO STA. 138+00.00
C03-05 PLAN & PROFILE STA. 138+00.00 TO STA. 150+00.00
C03-06 PLAN & PROFILE STA. 150+00.00 TO STA. 162+00.00
C03-07 PLAN & PROFILE STA. 162+00.00 TO STA. 174+00.00
C03-08 PLAN & PROFILE STA. 174+00.00 TO STA. 186+00.00
C03-09 PLAN & PROFILE STA. 186+00.00 TO 198+00.00
USIBWC Contract No.: IBM09B0002 Page 00.01.15 - 2
C03-10 PLAN & PROFILE STA. 198+00.00 TO 210+00.00
C03-11 PLAN & PROFILE STA. 210+00.00 TO STA. 222+00.00
C03-12 PLAN & PROFILE STA. 222+00.00 TO STA. 234+00.00
C03-13 PLAN & PROFILE STA. 234+00.00 TO STA. 246+00.00
C03-14 PLAN & PROFILE STA. 246+00.00 TO STA. 253+06.00
C05-01 CROSS SECTION STA. 93+00.00 TO STA. 95+00.00
C05-02 CROSS SECTION STA. 96+00.00 TO STA. 103+00
C05-03 CROSS SECTION STA. 104+00.00 TO STA. 111+00
C05-04 CROSS SECTION STA. 112+00 TO STA. 119+00
C05-05 CROSS SECTION STA. 120+00 TO STA. 127+00
C05-06 CROSS SECTION STA. 128+00 TO STA. 135+00
C05-07 CROSS SECTION STA. 136.00 TO STA. 143+00
C05-08 CROSS SECTION STA.144+00 TO STA. 151+00
C05-09 CROSS SECTION STA. 152+00 TO STA. 159+00
C05-10 CROSS SECTION STA. 160+00.00 TO STA. 166+00.00
C05-11 CROSS SECTION STA. 167+00.00 TO STA. 174+00.00
C05-12 CROSS SECTION STA. 175+00.00 TO STA. 182+00.00
C05-13 CROSS SECTION STA. 183+00.00 TO STA. 190+00.00
C05-14 CROSS SECTION STA. 191+00.00 TO STA. 198+00.00
C05-15 CROSS SECTION STA. 199+00.00 TO STA. 206+00.00
C05-16 CROSS SECTION STA. 207+00.00 TO STA. 214+00.00
C05-17 CROSS SECTION STA. 215+00.00 TO 222+00.00
C05-18 CROSS SECTION STA. 223+00.00 TO STA. 230+00.00
C05-19 CROSS SECTION STA. 231+00.00 TO STA. 238+00.00
C05-20 CROSS SECTION STA. 239+00.00 TO STA. 246+00.00
C05-21 CROSS SECTION STA. 247+00.00 TO STA. 252+00
USIBWC Contract No.: IBM09B0002 Page 00.01.15 - 3
S01-01 STANDARD GATEWELL EXTENSION DETAILS
EC01-01 STORMWATER POLLUTION PREVENTION DETAILS
EC01-02 STORMWATER POLLUTION PREVENTION DETAILS
EC01-03 STORMWATER POLLUTION PREVENTION DETAILS
File details come from the government source that posted it. Updated .