This is an Addendum to Contract I-25-2014 issued by the Illinois State Toll Highway Authority for an Intelligent Transportation System (ITS) project along the Tri-State Tollway (I-294) between Mile Post 33.6 and Mile Post 40.0 in Cook County, Illinois. The document involves multiple parties including the Illinois Tollway, potential contractors, third-party fiber optic owners like Zayo, and various equipment and infrastructure providers. The addendum includes pre-bid meeting minutes, responses to potential bidder questions, and modifications to the original contract specifications.

The contract covers comprehensive ITS infrastructure installation, including fiber optic communications, ATM systems, vehicle detection systems, CCTV cameras, ITS device installations, power and communication equipment, and removal of existing infrastructure. The project has a Disadvantaged Business Enterprise (DBE) goal of 15% with a contract value that includes multiple allowance items totaling $335,000 (such as $100,000 for additional ITS work, $55,000 for railroad flagging, and $165,000 for the contractor's quality program). The project timeline spans from September 15, 2025 (anticipated Notice-to-Proceed) to April 12, 2027 (contract completion), with substantial completion targeted for March 22, 2027. Key technical components include installing new fiber optic cables, network switches, and integrating various communication and transportation monitoring systems along the tollway.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois State Toll Highway Authority Contract No. I-25-2014 Addendum No. 1 Page 1 of 4 6/13/2025

ADDENDUM NO. 1

TO

CONTRACT REQUIREMENTS

FOR CONTRACT I-25-2014

ILLINOIS STATE TOLL HIGHWAY AUTHORITY

Date: 6/13/2025

For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, June 20, 2025

NOTICE OF REVISION TO CONTRACT

NOTES:

1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-6R and P-7R which have been revised and included as part of the Schedule of Prices.

2. The following revised Special Provision pages are included in the Contract with this Addendum: iiR, iiiR, ivR, J-4R, J-30R, J-235R, J-349R, 365R, J-367R, J-381R, D1-2R.

3. The following new Special Provision pages are included in the Contract with this Addendum: J-348A thru J-348H.

4. The following revised Contract Drawings are included in this Addendum:

Volume 1– Drawings 73 thru 84, 154, 166, 173, 174, 187, 191, 216, 217, 221, 222 of 230.

5. Revised Contract Drawings 5 of 230 will be issued to the successful Bidder. The revised drawings will reflect the quantity changes shown in the “Summary of Revisions to Pay Item Quantities” table included in this addendum.

6. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on May 28, 2025 are included in this Addendum.

7. Responses to Request for Information received from the Plan Holders are included in this Addendum.

Addendum No. 1 Page 2 of 4 6/13/2025

CHANGES TO THE CONTRACT REQUIREMENTS

CHANGES TO THE SCHEDULE OF PRICES

SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES

SP.

PROV.

PAY ITEM

NO.

DESCRIPTION UNIT

ORIGINAL

QUANTITY

CHANGE

NEW

QUANTITY

* JT132830 FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY EACH 21 -2 19

* JT160226

SINGLE MODE FIBER OPTIC CABLE REMOVAL, NO

SALVAGE

FOOT 27,100 10,000 37,100

* Denotes Special Provision

Change #1 Contract Requirements, Volume I, page P-6 and P-7 replaced with page P-6R and P-7R. This replacement contains the following revisions (attached):

1.1. Quantities updated for pay items JT132830 and JT160226.

CHANGES TO THE CONTRACT SPECIAL PROVISIONS

Change #2 Contract Requirements, Volume II, replace page ii with page iiR. This replacement contains the following revisions (attached):

2.1. Revised Section S.P.TOC: deleted “(ILLINOIS TOLLWAY)”

Change #3 Contract Requirements, Volume II, replace pages iii and iv with page iiiR and ivR. This

3.1. Revised Section S.P.TOC: REMOVED “ILLINOIS TOLLWAY”

3.2. Revised Section S.P.TOC: added “FIBER OPTIC CONNECTION HARDWARE”

3.3. Revised Section S.P.TOC: added “FIBER OPTIC CABLE, SINGLE MODE, ARMORED, 864 FIBERS, ZAYO”

3.4. Revised Section S.P.TOC: added “INSTALL FIBER OPTIC CABLE, SINGLE MODE, NON-ARMORED, 72

FIBERS,

3.5. Revised Section S.P. TOC Moved TRAFFIC CONTROL PLAN and PUBLIC CONVINIENCE AND SAFETY (D1) from page iiiR to page ivR.

Change #4 Contract Requirements, Volume II, replace page J-4 with page J-4R. This replacement contains the following revisions (attached):

4.1. Revised Section S.P. 102 Details: deleted TC-09 Traffic Control Details for Freeway Single & Multi-Lane Weave.

Change #5 Contract Requirements, Volume II, replace page J-30 with page J-30R. This replacement contains the following revisions (attached):

5.1. Revised Section S.P. 121 ELECTRONIC DATA FILES AVAILABLE information revised.

Change #6 Contract Requirements, Volume II, replace page J-235 with page J-235R. This replacement

6.1. Revised Section S.P.ITS POLE MOUNTED ENCLOSURE, ITS ASSEMBLY (CCTV OR MVDS) removed “Illinois

Tollway”, removed Effective and Revised Dates.

Addendum No. 1 Page 3 of 4 6/13/2025

Change #7 Contract Requirements, Volume II, added pages J-348A thru J-348H. This replacement/addition

7.1. Revised Section Added S.P. FIBER OPTIC CONNECTION HARDWARE.

Change #8 Contract Requirements, Volume II, replace pages J-349 and J-365 with pages J-349R and J-

365R. This replacement contains the following revisions (attached):

8.1. Revised Section Remove S.P. INSTALL FIBER OPTIC CABLE SINGLE MODE and replace with S.P. INSTALL

FIBER OPTIC CABLE, SINGLE MODE, NON-ARMORED, 72 FIBERS.

Change #9 Contract Requirements, Volume II, replace pages J-367 and J-381 with pages J-367R and J-381R. This

9.1. Revised Section Remove S.P. FIBER OPTIC CABLE SINGLE MODE and replace with S.P. FIBER OPTIC

CABLE, SINGLE MODE, ARMORED, 864 FIBERS, ZAYO.

Change #10 Contract Requirements, Volume II, replace page J-389 with page J-389R. This replacement

10.1. Revised Section S.P. INSTALL ELECTRIC CABLE IN CONDUIT: Materials text added “within a 10-mile radius of the job site”

Change #11 Contract Requirements, Volume II, replace page D1-2 with page D1-2R. This replacement

Revised Section S.P. TRAFFIC CONTROL PLAN: Details: deleted TC-09 Traffic Control Details for Freeway Single &

Multi-Lane Weave.

CHANGES TO THE CONTRACT DRAWINGS

Change #12 Contract Plans, Volume 1, Drawing 5. SUMMARY OF QUANTITIES. This drawing contains the following revisions and will be issued to the successful bidder:

12.1. Quantities updated for pay items JT132830 and JT160226.

Change #13 ZAYO FIBER INSTALLATION PLAN These drawings contain the following revisions (attached):

13.1. Drawing 73 thru 84. Revised Sheets. The note or notes included on the plan sheet have been updated to reflect the existing or proposed duct bank condo/lease conduit that the new ZAYO fiber optic cable is to be installed in. Many of the conduit/fiber callouts that refer to these notes have also been updated.

13.2. Drawing 80 and 81. Revised Sheets. From STA 2006+49 to STA 2021+02, the new ZAYO replacement fiber optic cable will be installed in an alternate, but still existing, duct bank as shown on the plans.

13.3. Drawing 81 thru 84. Revised Sheets. From STA 2028+79 to STA 2061+85, the new ZAYO replacement fiber optic cable will be installed in the proposed duct bank installed as part of this project and shown on plan sheets.

Change #14 Contract Plans, Volume 1, Drawing 154. FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY –

TYPICAL INSTALLATION DETAIL This drawing contains the following revisions (attached):

14.1. Revised Sheet. Table detailing 12-strand FOC pigtail lengths for the ATM/DMS locations has been updated to remove the 12-strand FOC pigtail for the ATM cabinet at I-294 SB M.P. 35.6 and for the ATM cabinet at I-294 SB M.P.

36.0.

Change #15 Contract Plans, Volume 1, Drawing 166. COMMUNICATIONS NETWORK DIAGRAM This drawing

15.1. Revised Sheet. The overall communications network diagram has been updated to reflect the elimination of the proposed ATM cabinet (and network switch) at I-294 SB M.P. 35.6 and for the ATM cabinet at I-294 SB M.P. 36.0. These

ATM gantries will be managed from the ATM cabinet (and network switch) at I-294 NB M.P. 35.6 and the ATM cabinet

(and network switch) at I-294 NB M.P. 36.0, respectively.

Addendum No. 1 Page 4 of 4 6/13/2025

Change #16 Contract Plans, Volume 1, Drawing 173 and 174. FIBER OPTIC CABLE – SINGLE LINE DIAGRAM This drawing contains the following revisions (attached):

16.1. Revised Sheet. The fiber optic cable single line diagrams have been revised to reflect the elimination of the proposed ATM cabinet at I-294 SB M.P. 35.6 and the ATM cabinet at I-294 SB M.P. 36.0. These ATM gantries will be managed from the ATM cabinet located at I-294 NB M.P. 35.6 and the ATM cabinet located at I-294 NB

M.P. 36.0, respectively.

Change #17 Contract Plans, Volume 1, Drawing 187. HANDHOLE STA 1878+06 – BACKBONE CABLE SPLICE This

17.1. Revised Sheet. The splice detail has been revised to reflect the elimination of the proposed 12 SM FOC lateral to the ATM cabinet at I-294 SB M.P. 35.6.

Change #18 Contract Plans, Volume 1, Drawing 191. HANDHOLE STA 1898+60 – BACKBONE CABLE SPLICE This

18.1. Revised Sheet. The splice detail has been revised to reflect the elimination of the proposed 12 SM FOC lateral to the ATM cabinet at I-294 SB M.P. 36.0

Change #19 Contract Plans, Volume 1, Drawing 216. ATM CABINET TERMINATION DIAGRAM – STA 1876+60 This

19.1. Revised Sheet. The cabinet termination diagram has been revised to show it will connect to the NB and

SB ATM gantry located on I-294 at M.P. 35.6.

Change #20 Contract Plans, Volume 1, Drawing 217. ATM CABINET TERMINATION DIAGRAM – STA 1880+00 This

20.1. Revised Sheet. Plan sheet has been removed.

Change #21 Contract Plans, Volume 1, Drawing 221. ATM CABINET TERMINATION DIAGRAM – STA 1901+24 This

21.1. Revised Sheet. The cabinet termination diagram has been revised to show it will connect to the NB and

SB ATM gantry located on I-294 at M.P. 36.0.

Change #22 Contract Plans, Volume 1, Drawing 222. ATM CABINET TERMINATION DIAGRAM – STA 1902+68. This

22.1. Revised Sheet. Plan sheet has been removed.

END OF ADDENDUM CHANGES

S.P.

PAY ITEM

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

* 66900530 SOIL DISPOSAL ANALYSIS EACH 3

* X7010216 TRAFFIC CONTROL AND PROTECTION, (SPECIAL) L SUM 1

* JI669016

REGULATED SUBSTANCES MONITORING AND FIELD

SCREENING

CAL DAY 18

** JS120100

TRAILER MOUNTED FULL MATRIX PORTABLE CHANGEABLE

MESSAGE SIGNS

EACH 2

** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 300

** JS670B00 FIELD OFFICE, TYPE B CAL MO 18

** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1

* JS701010 MAINTENANCE OF TRAFFIC L SUM 1

** JS814002 HEAVY-DUTY HANDHOLE, TOLLWAY EACH 6

* JS819002 TRENCH AND BACKFILL FOR ELECTRICAL WORK (SPECIAL) FOOT 2,550

* JT130759

ELECTRICAL CONNECTION WORK, EXISTING INTERMEDIATE

POWER DISTRIBUTION AND COMMUNICATION FACILITY

L SUM 1

* JT130776 DIGITAL SURVEY QL-A FOOT 2,000

* JT130777 DIGITAL SURVEY QL-B FOOT 1,000

* JT130790 REMOVE SOLAR GENERATOR ASSEMBLY EACH 4

* JT130822 VIDEO POWER JUNCTION BOX MODEL A, NEMA 1 EACH 2

* JT131316 BLUETOOTH VEHICLE DETECTION ASSEMBLY EACH 8

* JT132046 DYNAMIC MESSAGE SIGN - TYPE 2W EACH 4

* JT132056 DYNAMIC MESSAGE SIGN - TYPE 2W (TRAINING) L SUM 1

* JT132066 DYNAMIC MESSAGE SIGN - TYPE 2W (SPARE PARTS) EACH 4

* JT132090 ATM LANE CONTROL SIGN - TYPE 1 EACH 10

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

Contract I-25-2014 P - 5 May 16, 2025June 13, 2025 Addendum No. 1

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

* JT132091 ATM LANE CONTROL SIGN - TYPE 1 (SPARE PARTS) EACH 10

* JT132092 ATM LANE CONTROL SIGN - TYPE 2 EACH 63

* JT132093 ATM LANE CONTROL SIGN - TYPE 2 (SPARE PARTS) EACH 63

* JT132098 ATM LANE CONTROL SIGN (TRAINING) L SUM 1

* JT132099

ATM TEST GANTRY WITH LANE CONTROL SIGNS AND DMS

TYPE 2

EACH 2

* JT132623 DMS ELECTRICAL WORK - TYPE 2W EACH 4

* JT132699 FURNISH COMMUNICATIONS SYSTEM UPGRADE EACH 1

* JT132792

INSTALL ITS MONOPOLE CLOSED CIRCUIT TELEVISION (CCTV)

CAMERA TOWER ASSEMBLY, 100FT

EACH 1

* JT132800 REMOVE ITS POLE MOUNTED ENCLOSURE EACH 4

* JT132810 ITS POLE MOUNTED ENCLOSURE (CCTV OR MVDS) EACH 12

* JT132820 CCTV CAMERA, ITS ASSEMBLY EACH 13

* JT132822 ITS SECURITY CCTV CAMERA EACH 2

* JT132830 FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY EACH

* JT132845

MICROWAVE VEHICLE DETECTION SYSTEM (MVDS), ITS

ASSEMBLY

EACH 13

* JT132856 INSTALL ITS DISCONNECT SWITCH ASSEMBLY EACH 11

* JT134037 ITS ELEMENT SITE GROUNDING - POLE MOUNTED ASSEMBLY EACH 11

* JT135006 REMOVE MICROWAVE VEHICLE DETECTION ASSEMBLY EACH 4

* JT135095 GANTRY ONLY ELECTRICAL WORK EACH 5

* JT135097 REMOVE CCTV CAMERA, POLE MOUNTED EACH 4

* JT160099

HANDHOLE FOR SINGLE MODE FIBER OPTIC CABLE, TORSION

ASSIST, 48"X72"X36"

EACH 14

Contract I-25-2014 P - 6 May 16, 2025

June 13, 2025

R

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

* JT160149 CABLE MARKER SIGN WITH POST FOR ELECTRIC CABLE EACH 6

* JT160217 LOCATE POST FOR FIBER OPTIC CABLE EACH 4

* JT160218

CABLE MARKER WARNING SIGN WITH POST FOR OPTIC

FIBER CABLE

EACH 6

* JT160226 SINGLE MODE FIBER OPTIC CABLE REMOVAL, NO SALVAGE FOOT

* JT160266 WOOD POLE REMOVAL, NO SALVAGE EACH 4

* JT160340 FIBER OPTIC CONNECTION HARDWARE, TYPE 1 EACH 13

* JT160345 FIBER OPTIC CONNECTION HARDWARE, TYPE 2 EACH 5

* JT160389

FIBER OPTIC CABLE, SINGLE MODE, ARMORED, 864 FIBERS,

ZAYO

FOOT 19,100

* JT160399

INSTALL TOLLWAY FURNISHED FIBER OPTIC CABLE, SINGLE

MODE, NON-ARMORED, 72 FIBERS

FOOT 1,320

* JT202009 NON-SPECIAL WASTE DISPOSAL,TYPE 1 CU YD 444

* JT810874

UNDERGROUND CONDUIT, COILABLE NONMETALLIC

CONDUIT, SDR 11, 1 1/2" DIA.

FOOT 20,160

* JT810876

UNDERGROUND CONDUIT, COILABLE NONMETALLIC

CONDUIT, SDR 11, 2" DIA.

FOOT 2,355

* JT810879

UNDERGROUND CONDUIT, COILABLE NONMETALLIC

CONDUIT, SDR 11, 4" DIA.

FOOT 1,680

* JT810881

UNDERGROUND CONDUIT, COILABLE NONMETALLIC

CONDUIT, SDR 11, 6" DIA.

FOOT 8,890

* JT810890 DUCT PACKAGE, CLSM ENCASED FOOT 2,550

* JT817751

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 10

FOOT 6,500

* JT817752

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 8

FOOT 13,000

* JT817753

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 4

FOOT 5,550

* JT817754

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 6

FOOT 6,000

* JT817755

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 2

FOOT 13,000

Contract I-25-2014 P - 7 May 16, 2025

37,100

June 13, 2025

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

* JT817756

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 1/0

FOOT 8,000

* JT817759

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C NO. 3/0

FOOT 5,000

* JT817760

INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)

1/C 250MCM

FOOT 23,500

* JT830102

INSTALL GROUND MOUNTED LIGHT POLE, GALVANIZED

STEEL, 50 FT., WITHOUT MAST ARM

EACH 11

* JT830220 INSTALL WALL MOUNTED LIGHT POLE EACH 9

* JT836018 ITS ELEMENT POLE FOUNDATION STEEL HELIX (10FT) EACH 2

* JT836028 ITS CONCRETE SERVICE PAD, TYPE B EACH 2

* JT901056 LOCATOR TRACER WIRE FOOT 13,330

* JT901057 LOCATOR TRACER WIRE, DIRECTIONAL BORE FOOT 840

TOTAL AMOUNT OF CORE WORK

* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $ 165,000 $ 165,000

* JT154008 UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC UNIT 50,000 $ 1.00 $ 50,000.00

* JT154032 CONTRACT ALLOWANCE FOR ADDITIONAL ITS WORK UNIT 100,000 $ 1.00 $ 100,000.00

* JT154067

CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS

APPRENTICES

UNIT 100,000 $ 1.00 $ 100,000.00

* JT154096

CONTRACT ALLOWANCE FOR MAINTAIN INTELLIGENT

TRANSPORTATION SYSTEMS

UNIT 30,000 $ 1.00 $ 30,000.00

* JT154103 ALLOWANCE FOR RAILROAD FLAGGING AND SERVICES UNIT 55,000 $ 1.00 $ 55,000.00

Contract I-25-2014 P - 8 May 16, 2025June 13, 2025

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

999NEG04

NON-COMPLIANCE WITH TOLLWAY MAINTENANCE OF

TRAFFIC PER TOLLWAY SUPPL. SPEC. 701.08(a)

INC/DAY (2,500.00)$

999NEG05

FAILURE TO RESPOND TO RE-ESTABLISH DEVICES PER

TOLLWAY SUPPL. SPEC. 701.08(b)

OCCUR (2,500.00)$

999NEG06

FAILURE TO REPAIR IMPACT ATTENUATORS, TEMPORARY

PER TOLLWAY SUPPL. SPEC. 701.08(c)

OCCUR (2,500.00)$

999NEG07

LOSS OR DAMAGE TO TOLLWAY OWNED DEVICES PER

TOLLWAY SUPPL. SPEC. 701.08(d)

SQ FT (100.00)$

999NEG08

FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC PER

TOLLWAY SUPPL. SPEC. 701.08(e)(a)

15 MINUTES (3,000.00)$

999NEG09

FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC PER

TOLLWAY SUPPL. SPEC. 701.08(e)(b)

15 MINUTES (5,000.00)$

999NEG20

DAMAGES TO ILLINOIS TOLLWAY'S OPERATIONAL FACILITIES

PER S.P. 115.5 - TRI-STATE

OCCUR (10,000.00)$

999NEG30

DAMAGES TO ILLINOIS TOLLWAY'S OPERATIONAL FACILITIES

PER S.P. 115.5 - ALL ROADWAYS OFF-PEAK

OCCUR (2,000.00)$

999NEG31

DAMAGE TO ELECTRICAL FACILITIES PER TOLLWAY SUPPL.

SPEC. 107.30 (b)

INC/DAY (1,000.00)$

999NEG32

LIQUIDATED DAMAGES FOR DELAY IN SUBMITTAL OF

PROGRESS SCHEDULE PER TOLLWAY SUPPL. SPEC. 108.02

(e)

DAY (300.00)$

999NEG33

NON-COMPLIANCE WITH EROSION AND SEDIMENT CONTROL

PER TOLLWAY SUPPL. SPEC. 280.02 (2) (1)

INC/DAY (1,000.00)$

999NEG34

NON-COMPLIANCE WITH RESPONSIBILITY FOR

CONSTRUCTION HAULING EQUIPMENT PER TOLLWAY SUPPL.

SPEC. 105.15

DAY (1,000.00)$

999NEG35

FAILURE TO RESPOND TO REGULATORY AGENCY REQUESTS,

PER TOLLWAY SUPPL. SPEC. 280.02 (2) (2)

OCCUR (25,000.00)$

999NEG36

FAILURE TO COMPLY WITH OCCUPANCY DATE OR PROVIDE

COMPLETE FACILITIES. FIELD OFFICE OR LAB PER TOLLWAY

SUPPL. SPEC. 670.01 (b)

DAY (500.00)$

999NEG44

LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.

105.1.1

CAL DAY (4,500.00)$

999NEG45

LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.

105.1.2

CAL DAY (7,500.00)$

999NEG46

LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.

105.1.3

CAL DAY (1,500.00)$

999NEG47

LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.

105.1.4

CAL DAY (3,000.00)$

999NEG48

LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.

105.1.5

CAL DAY (3,000.00)$

999NEG49 DAMAGE TO FIBER OPTIC UTILITIES PER S.P. 115.3 OCCUR (10,000.00)$

999NEG53

NON-COMPLIANCE WITH CONTRACTOR QUALITY PROGRAM

SPECIAL PROVISION

OCCUR (1,000.00)$

999NEG54

DAMAGE TO TOLLWAY MULTI-MODE CABLE, DMS SIGNS,

CAMERAS, TELECOMMUNICATION, CABLE, ELECTRICAL,

WATER AND SEWER PER S.P. 115.4

OCCUR (1,000.00)$

NEGATIVE

Contract I-25-2014 P - 9 May 16, 2025June 13, 2025

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

* 999ADJ45

CONSTRUCTIONWORKS APPRENCTICES WAGE RATE

PAYMENT

HOUR $ 15.00

* 999ADJ46 ARROW BOARD EACH $ 13.32

* 999ADJ47 ARROW BOARD (WINTER RATE) EACH $ 19.98

* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $ 1.00

* 999ADJ49 TYPE I OR TYPE II BARRICADE (WINTER RATE) EACH $ 1.50

* 999ADJ50 TYPE III BARRICADE EACH $ 2.35

* 999ADJ51 TYPE III BARRICADE (WINTER RATE) EACH $ 3.53

* 999ADJ52 PLASTIC DRUM EACH $ 1.25

* 999ADJ53 PLASTIC DRUM (WINTER RATE) EACH $ 2.34

* 999ADJ54 FLASHER LIGHT EACH $ 0.20

* 999ADJ55 FLASHER LIGHT (WINTER RATE) EACH $ 0.30

* 999ADJ56 STEADY BURN LIGHT EACH $ 0.30

* 999ADJ57 STEADY BURN LIGHT (WINTER RATE) EACH $ 0.45

* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH $ 1.70

* 999ADJ59 HI-INTENSITY LIGHT, SIGN MOUNTED (WINTER RATE) EACH $ 2.55

* 999ADJ60 CMS, SOLAR POWERED EACH $ 45.70

* 999ADJ61 CMS, SOLAR POWERED (WINTER RATE) EACH $ 68.55

* 999ADJ62 SIGNS, WORK ZONE EACH $ 2.00

* 999ADJ63 SIGNS, WORK ZONE (WINTER RATE) EACH $ 3.00

ADJUSTMENTS

Contract I-25-2014 P - 10 May 16, 2025June 13, 2025

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT I-25-2014

MILE POST 33.6 TO MILE POST 40.0

SCHEDULE OF PRICES

ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION

TRI-STATE TOLLWAY (I-294)

NORTH AVENUE TO BALMORAL AVENUE

* 999ADJ64 TEMPORARY MODULAR GLARE SCREEN (12.5 FT. SECTION) UNIT $ 0.60

* 999ADJ65 TEMPORARY CONCRETE BARRIER (12.5 FT. SECTION) UNIT $ 0.83

* 999ADJ66 TEMPORARY CONCRETE BARRIER (10.0 FT. SECTION) UNIT $ 0.50

* 999ADJ67

TEMPORARY CONCRETE BARRIER, CROSS BOLT

CONNECTION (12.5 FT. SECTION)

UNIT $ 1.47

* 999ADJ69

IMPACT ATTENUATOR, TEMPORARY (SEVERE USE, NARROW),

TEST LEVEL 3

EACH $ 18.33

* 999ADJ70

IMPACT ATTENUATOR, TEMPORARY (SEVERE USE, WIDE),

TEST LEVEL 3

EACH $ 18.33

* 999ADJ71

TEMPORARY INFORMATION SIGNING-GROUND MOUNTED, 24

SQ FT IN AREA OR LESS

SQ. FT. $ 0.25

* 999ADJ72

TEMPORARY INFORMATION SIGNING-GROUND MOUNTED,

GREATER THAN 24 SQ FT IN AREA

SQ. FT. $ 0.25

* 999ADJ73

TEMPORARY INFORMATION SIGNING-OVERHEAD, 24 SQ FT IN

AREA OR LESS

SQ. FT. $ 0.25

* 999ADJ74

TEMPORARY INFORMATION SIGNING-OVERHEAD, GREATER

THAN 24 SQ FT IN AREA

SQ. FT. $ 0.25

TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) $ 500,000.00

BID CREDIT

AWARD CRITERIA

S.P. COLUMN LEGEND

INDICATES SPECIAL PROVISION (PROJECT SPECIFIC OR TOLLWAY STANDARD) *

INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS **

INDICATES IDOT SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS ***

INDICATES IDOT BDE SPECIAL PROVISION BDE

INDICATES IDOT GBSP SPECIAL PROVISION GBSP

INDICATES DISTRICT 1 SPECIAL PROVISION D1

TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S

QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID

Contract I-25-2014 P - 11 May 16, 2025June 13, 2025

Contract I-25-2014 ii June 13, 2025

JURISDICTION LIMITS - TOLLWAY (ILLINOIS TOLLWAY) ................................................ J-31

JURISDICTION LIMITS - NON-TOLLWAY .......................................................................... J-32

WARRANTY (ILLINOIS TOLLWAY) ..................................................................................... J-33

CONTROL OF MATERIALS .................................................................................................. J-36

DISPOSAL OF REGULATED SUBSTANCES AND UNCONTAMINATED SOIL (ILLINOIS

TOLLWAY)…………………………………………………………………………………………. J-37

TRAFFIC CONTROL AND PROTECTION (SPECIAL)……………………………………… J-46

ITS DEVICE TESTING REQUIREMENTS (ILLINOIS TOLLWAY).................................... J-48

MAINTENANCE OF TRAFFIC .............................................................................................. J-51

EXTENDED MAINTENANCE OF TRAFFIC WORK AND EQUIPMENT RATES (ILLINOIS

TOLLWAY) ........................................................................................................................... J-55

TRENCH AND BACKFILL FOR ELECTRICAL WORK (SPECIAL)………………………………….J-58

ELECTRICAL CONNECTION WORK, EXISTING INTERMEDIATE POWER DISTRIBUTION

AND COMMUNICATION FACILITY .................................................................................... J-60

DIGITAL UTILITY AS-BUILT (ILLINOIS TOLLWAY)……………………………………………J-99

REMOVE SOLAR GENERATOR ASSEMBLY (ILLINOIS TOLLWAY)…………………… J-104

VIDEO POWER JUNCTION BOX (ILLINOIS TOLLWAY) ................................................. J-105

BLUETOOTH VEHICLE DETECTION ASSEMBLY (ILLINOIS TOLLWAY) ........................ J-112

DYNAMIC MESSAGE SIGN – WALK-IN (ILLINOIS TOLLWAY)………………………... J-120

ATM LANE CONTROL SIGN……………………………………………………………………...J-160

DYNAMIC MESSAGE SIGNS ELECTRICAL WORK (ILLINOIS TOLLWAY)…………….. J-190

FURNISH COMMUNICATIONS SYSTEM UPGRADE…………………………………………J-222

INSTALL MONOPOLE CLOSED CIRCUIT TELEVISION (CCTV) CAMERA TOWER

ASSEMBLY…………………….…………………………………………………………...J-224

REMOVE ITS ENCLOSURE (ILLINOIS TOLLWAY) ........................................................... J-234

ITS POLE MOUNTED ENCLOSURE, ITS ASSEMBLY (CCTV OR MVDS)

………………………………………………………………………………………………………J-235R

CLOSED CIRCUIT TELEVISION (CCTV) CAMERA, ITS ASSEMBLY (ILLINOIS TOLLWAY)

............................................................................................................................................ J-245

ITS SECURITY CLOSED CIRCUIT TELEVISION (CCTV) CAMERA (ILLINOIS

TOLLWAY)…………………………………………………………………………………………..J-253

FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY (ILLINOIS TOLLWAY) ................... J-261

MICROWAVE VEHICLE DETECTION SYSTEM (MVDS), ITS ASSEMBLY

(ILLINOIS TOLLWAY)………………………………………………………………………... J-269

INSTALL ITS DISCONNECT SWITCH ASSEMBLY………………………………………… J-279

ITS ELEMENT SITE GROUNDING (ILLINOIS TOLLWAY) ............................................... J-281

Contract I-25-2014 iii June 13, 2025

REMOVE MICROWAVE VEHICLE DETECTION ASSEMBLY (ILLINOIS

TOLLWAY)………………………………………………………………………………….….J-294

GANTRY ONLY ELECTRICAL WORK…………………………………………………………..J-295

REMOVE CCTV CAMERA (ILLINOISTOLLWAY) .............................................................. J-329

CONTRACT ALLOWANCES (ILLINOIS TOLLWAY) ........................................................ J-330

CONTRACT ALLOWANCE FOR ADDITIONAL ITS WORK (ILLINOIS TOLLWAY) ......... J-331

CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS APPRENTICES (ILLINOIS

TOLLWAY) .......................................................................................................................... J-332

CONTRACT ALLOWANCE FOR MAINTAIN INTELLIGENT TRANSPORTATION SYSTEMS

(ILLINOIS TOLLWAY)…………………………………………………………………………… J-335

ALLOWANCE FOR RAILROAD FLAGGING AND SERVICES (ILLINOIS TOLLWAY) .... J-339

CONTRACTOR’S QUALITY PROGRAM (ILLINOIS TOLLWAY) ........................................ J-340

HANDHOLE FOR FIBER OPTIC CABLE, TORSION ASSIST (ILLINOIS TOLLWAY)….. J-341

CABLE MARKER SIGN WITH POST FOR ELECTRICAL CABLE………………………… J-343

CABLE MARKER SIGN WITH POST FOR SINGLE MODE FIBER OPTIC CABLE (ILLINOIS

TOLLWAY) ……………………………………………………………………………………… J-344

REMOVE FIBER OPTIC CABLE (ILLINOIS TOLLWAY) .................................................... J-346

WOOD POLE REMOVAL, NO SALVAGE ....................................................................... J-348

FIBER OPTIC CONNECTION HARDWARE…………………………………………. ....J-348A

FIBER OPTIC CABLE, SINGLE MODE, ARMORED, 864 FIBERS, ZAYO………….J-349R

INSTALL FIBER OPTIC CABLE, SINGLE MODE, NON-ARMORED, 72 FIBERS

………………………………………………………………………………………….J-367R

UNDERGROUND CONDUIT, COILABLE NON-METALLIC CONDUIT, SDR 11

(ILLINOIS TOLLWAY)…………………………………………………………………………… J-383

DUCT PACKAGE………………………………………………………………………………… J-387

INSTALL ELECTRIC CABLE IN CONDUIT…………………………………………………………..J-389

INSTALL GROUND MOUNTED LIGHT POLE, GALVANIZED STEEL,

WITHOUT MAST ARM……………………………………………………………………… J-391

INSTALL WALL MOUNTED LIGHT POLE, GALVANIZED STEEL,

WITHOUT MAST ARM………………………………………………………………..…..... J-392

ITS ELEMENT POLE FOUNDATION STEEL HELIX (ILLINOISTOLLWAY)……………….J-394

CONCRETE SERVICE PAD (ILLINOIS TOLLWAY)…………………………………………..J-395

LOCATE/TRACER WIRE FOR OPTIC FIBER CONDUIT RACEWAYS (ILLINOIS TOLLWAY)

............................................................................................................................................ J-397

PORTLAND CEMENT CONCRETE (ILLINOIS TOLLWAY)………………………………… J-399

Contract I-25-2014 iv May 16, 2025

TRAFFIC CONTROL PLAN ................................................................................................. D1-1

PUBLIC CONVENIENCE AND SAFETY (D1) ...................................................................... D1-3

KEEPING ARTERIAL ROADWAYS OPEN TO TRAFFIC (LANE CLOSURES ONLY) ........ D1-4

TRAFFIC CONTROL FOR WORK ZONE AREAS ............................................................... D1-5

SPEED DISPLAY TRAILER ................................................................................................. D1-6

WORK ZONE TRAFFIC CONTROL DEVICES (BDE) ....................................................... BDE-1

TRAFFIC SPOTTERS (BDE) ............................................................................................. BDE-3

CHECK SHEET FOR RECURRING SPECIAL PROVISIONS…………………………….…REC-1

R June 13, 2025

Contract I-25-2014 J-4 May 16, 2025

[Type here]

Details

TC - 08 ENTRANCE AND EXIT RAMP CLOSURE DETAILS

TC - 10

TRAFFIC CONTROL AND PROTECTION FOR SIDE ROADS,

INTERSECTIONS, AND DRIVEWAYS

S.P. 103 CONTRACT COMPLETION DATE, SUBSTANTIAL AND INTERIM COMPLETION

DATES

S.P. 103.1 CONTRACT COMPLETION DATE

The Contractor shall complete all work under this Agreement for the performance of Contract I-25-2014 on or before 11:59 p.m. on April 12, 2027 and as specified in Article 108.05 of the Illinois Tollway Supplemental Specifications.

S.P. 103.2 SUBSTANTIAL COMPLETION DATE

The Contractor shall have completed all electrical and communication work at the IPDC and Plaza buildings, ATM gentry electrical and communication work, installation of Closed Circuit Television cameras (CCTV), Vehicle Detection Systems (VDS), Ramp Queue detection, all ITS poles with equipment cabinets, permanent power cables, fiber optic communication cable and network switches, and remove all existing ITS equipment on or before 11:59 p.m. on March 22, 2027.

S.P. 103.3 INTERIM COMPLETION DATE PRIORITY MATERIAL SUBMITTALS

The Contractor shall submit materials requiring lead times greater than two months for Material Submittal Review on or before 11:59 pm on November 19, 2025.

S.P. 103.4 INTERIM COMPLETION DATE ATM FACTORY ACCEPTANCE TESTING

The Contractor shall coordinate and complete Material Testing/Acceptance on or before 11:59 p.m. on September 1, 2026.

S.P. 103.5 INTERIM COMPLETION DATE

The Contractor shall coordinate and complete Material Testing/Acceptance and transfer Materials to their own facilities from Advance Construction Supplier Contract RR-21- 4599, SB ATM operational and CCTV operational on or before 11:59pm. on February 15, 2027.

Material List:

Contract I-25-2014 J-30 May 16, 2025

S.P. 120 OTHER AVAILABLE REPORTS OR AS-BUILT PLANS

The following is a listing of other reports, as-built plans that are available for review in the Illinois Tollway on-line plan room.

1. I-17-4339

2. I-19-4458

3. I-22-4873R

S.P. 121 ELECTRONIC DATA FILES AVAILABLE

Computer Aided Design & Drafting (CADD), Digital Terrain Model (DTM) and Triangulated Irregular Network (TIN) files developed for this project are available on the Illinois Tollway’s online plan room. The Illinois Tollway does not guarantee the accuracy of the below listed files, and the Contractor is responsible to perform all work according to the Plans, Special Provisions and the Standard Specifications. Upon downloading any of listed the electronic files from the online plan room the Contractor agrees the data is not a portion of the contract documents and are for information only, thus the Illinois Tollway shall not be liable for the completeness or accuracy of that data, and any discrepancies between these files and the contract documents are not grounds for claims for compensation or delays.

The Contractor agrees to defend, hold harmless and indemnify the Illinois Tollway, its officers, directors, employees, agents, and consultants from any and all claims resulting from, or in any way related to the use or modification of electronic data and files provided hereunder, by the Contractor, or by any third party obtaining the listed files.

File Name Description

4599-ITS-Model Proposed ITS

4599-Roadway Model Roadway Plan

4308-C01-MOD-BORDER-DEG.dgn Border

4458-MOD-ITS-EX.dgn Existing ITS plan

4339-MOD-ITS-EX.dgn Existing ITS plan

S.P. 122 COMMITMENTS

S.P. 123 CONTRACT BOND

NOT USED

S.P. 124 SUBLETTING OF ASSIGNMENT OF CONTRACT

S.P. 125 RESERVED

S.P. 126 QUALIFICATIONS AND CERTIFICATIONS

Contract I-25-2014 J-235 May 16, 2025

ITS POLE MOUNTED ENCLOSURE, ITS ASSEMBLY (CCTV OR MVDS)

Description. This work shall consist of furnishing, installing, calibrating and testing of the ITS Pole Mounted Enclosure (CCTV or MVDS) per the contract plans and as directed by the Engineer, and as part of a fully functional ITS site.

The work under this specification shall be in association with the installation of an ITS device pole, electrical service, grounding, CCTV Camera ITS Assembly, Microwave Vehicle Detection Assembly, and communications.

Materials. The main components of the system are as described below. All other ancillary connection cables, circuit breakers, brackets, and all other items required for the installation of a fully functional ITS Pole Mounted Enclosure, as shown on drawing(s).

• Enclosure o Enclosure Cabinet o Control Power Transformer o Grounding Bar System o Cisco Switch with Power Supply and software license (JT132810 only) o Surge Suppressors o Ethernet Relay o Single Mode Fiber Small Form-Factor Plug (SFP) Module (JT132810 only) o 24 VDC Power Supply

• Grounding System

The following are the specific materials for the system component described above:

• Enclosure. The Enclosure Cabinet shall be a NEMA 4X Stainless Steel, 36” H x 30” W x 12” D enclosure manufactured by Hoffman, model A36H3012SS6LP. The enclosure shall be ordered with a 33” x 27” panel manufactured by Hoffman, model A36P30.

o The enclosure shall be mounted using a threaded U-bolt and C-channel as shown on the drawing.

o The access door shall have its hinge installed vertically and on the left side of the enclosure so the door can open from right to left while facing the enclosure.

o The Control Power Transformer shall be a 1000 VA from a 208/240/480 to 120 volt power transformer manufactured by Square D model 9070 Type T1000D95 or equivalent.

o The Grounding Bar System shall be a Hoffman model PGS2K or equivalent o The Cisco Switch with Power Supply shall be a Cisco IE-3300-8T2S-E switch with

PWR-IE170W-PC- AC= power supply and IE3300-DNS-A-3Y IP services license (omit for ITS POLE MOUNTED ENCLOSURE, WITHOUT SWITCH) o The 120 VAC Surge Suppressor shall be manufactured by Cooper Crouse Hinds model MA15/D/1/SI.

Contract I-25-2014 J-366 June 13, 2025

FIBER OPTIC CONNECTION HARDWARE

Description. This work shall consist of furnishing Illinois Tollway approved fiber optic connection Hardware as directed in the project plans. Installing, splicing, and testing the fiber optic connection hardware as well as other ancillary components as required to complete the fiber optic cable installation as shown in the plans and as directed by the Engineer. All ancillary components shall be included in the cost of the fiber optic cable and will not be paid for separately.

All fiber optic cable splicing that must be performed on active Illinois Tollway fiber optic cables as part of this project must be performed by the Illinois Tollway fiber optic maintenance contractor.

All locations where fiber optic cable splicing will be performed on active Illinois Tollway fiber optic cables are designated in the plans as being performed by others.

Materials. Materials shall be in accordance with following.

Fiber Optic Connection Hardware. All fiber optic connection hardware (splice enclosures, organizers, cable end preparation tools etc.) and procedures shall be compatible with the fiber optic cable and shall be approved by the Engineer. Depending on the size of the fiber optic cables, two separate types of fiber optic connection hardware shall be used as follows:

Fiber Optic Connection Hardware, Type 1 shall be used when splicing fiber optic cables less than or equal to 288 fiber count. Type 1 fiber optic connection hardware setup shall include the following components:

• Splice Enclosure {TE Connectivity P/N FOSC450-D6-6-NT-0-D6V or approved equivalent) with (6) Splice Trays {TE Connectivity P/N FOSC-ACC-D-TRAY-48 or approved equivalent)

Fiber Optic Connection Hardware, Type 2 shall be used when splicing fiber optic cables greater than 288 fiber count. Type 2 fiber optic connection hardware setup shall include the following components:

• Splice Enclosure {TE Connectivity P/N FOSC600-D8-B-NT-0-D4V or approved equivalent) with (3) Splice Trays {TE Connectivity P/N FOSC-ACC-D-TRAY-

RIBN-24 or approved equivalent)

Splice enclosures and splice trays shall meet the following minimum requirements as below.

Splice Enclosures. All optical fiber splices in the field shall be contained within a splice enclosure. The enclosures provide storage for splices, fiber, and buffer tubes and restores the mechanical and environmental integrity of the fiber optic cable, encases the sheath opening in the cable, and organizes and stores optical fiber. All hinges and latching devices shall be stainless steel and the enclosure shall be airtight and prevent water intrusion. The splice enclosure shall be able to accommodate pressurization and the ability to be reentered without requiring specialized tools or equipment. The enclosure shall provide fiber and splice organizers including splice trays and strain relief. The splice enclosure shall be hermetically sealed to protect internal components from environmental hazards such as moisture, insects, and UV light.

J-348A

The splice enclosure shall provide space for future expansion equal to 100% of the initial utilization. Fiber optic cable penetration end caps shall be provided to accommodate a minimum installation of two trunk fiber optic cables and two fiber optic drop cables. The enclosure end caps shall be factory-drilled to the proper diameter to accept and seal the fiber optic cable entries. The cable entry locations shall be able to accommodate an assortment of cables with outside diameters ranging from 0.45 inches to 0.55 inches, plus

10%, without jeopardizing the waterproof characteristics of the enclosure. (All splice enclosures must be properly grounded as required to an accepted grounding bar or ground rod with green colored grounding wire of 4mm or #6 ground wire)

In addition, fiber optic splice enclosures shall meet the following requirements:

Mechanical

Resist compression deformation to a maximum of 400 pounds.

Withstand an impact energy to a maximum of 40 foot-pounds at 0oF.

Axial Tension: 100 pounds for 30 minutes.

Cable Torsion: ten 90-degree rotations.

Cable Flexing: ten 90-degree bends.

Environmental

Hydrostatic Pressure Head: Up to 70kPa (10 pounds per square inch).

Withstand 40 freeze/thaw temperature cycles.

Ultraviolet resistant during a maximum 30-day exposure in compliance with the requirements detailed in the ASTM B 117 standard.

Chemical

Withstand a 90-day exposure to solutions of 3% sulfuric acid, 0.2 normal of sodium hydroxide, 10% Igepal, kerosene, and be fungus resistant as required in the ASTM G21 standard.

Splice Trays. The splice trays shall be securely attached and accessible and provide sufficient storage for the fiber cable. The splice trays shall provide access to individual fibers without disrupting other fibers in the tray. The splice trays shall hold the buffer tubes rigidly in place and provide protection for fusion splices. The Contractor shall ensure that the raceway accommodates the minimum bend radius of the fiber. The splice trays shall allow visible inspection of the fiber and include a cover with a locking mechanism to hold it in place.

Cable Terminations. All fiber splicing shall be done at locations shown on the plans or as directed by the Engineer. No other splices in the field shall be allowed without written direction from the Illinois Tollway.

Fiber splicing in the field shall be done in in-ground splice enclosures specified in this document.

CONSTRUCTION REQUIREMENTS

J-348B

Experience Requirements. Personnel involved in the installation, splicing and testing of the fiber optic cables shall meet the following requirements:

• A minimum of three (3) years-experience in the installation of fiber optic cables, including fusion splicing, terminating and testing single mode fibers.

• Install two systems where fiber optic cables are outdoors in conduit and where the systems have been in continuous satisfactory operation for at least two years. The

Contractor shall submit as proof, photographs or other supporting documents, and the names, addresses and telephone numbers of the operating personnel who can be contacted regarding the installed fiber optic systems.

• One fiber optic cable system (which may be one of the two in the preceding paragraph), which the Contractor can arrange for demonstration to the Illinois

Tollway representatives and the Engineer, if required.

Installers shall be familiar with the cable manufacturer's recommended procedures for installing the fiber optic connection hardware. This shall include knowledge of splicing procedures for the fusion splicer being used on this project and knowledge of all hardware such as breakout (furcation) kits and splice closures. The Contractor shall submit documented procedures to the Engineer for approval and to be used during inspection.

Construction Documentation Requirements. The contractor shall submit the following documentation.

Installation Practices for Outdoor Fiber Optic Cable Systems. The Contractor shall examine the proposed cable plant design. At least one month prior to starting installation of the fiber optic cable plant, the Contractor shall prepare, and submit electronically to the Engineer for review and approval, the Contractor's "Installation Practices for Outdoor Fiber Optic Cable

Systems" manual. This manual shall address the Contractor's proposed practices covering all aspects of the fiber optic cable plant. This submittal shall include all proposed procedures, list of installation equipment, and splicing and test equipment. Test and quality control procedures shall be detailed as well as procedures for corrective action.

Operation and Maintenance Documentation. After the fiber optic cable plant has been installed, an electronic copy of the complete set of Operation and Maintenance

Documentation shall be provided. The documentation shall, at a minimum, include the following:

• Complete and accurate as-built diagrams showing the entire fiber optic cable plant including locations of all splices.

• Final copies of all approved test procedures

• Complete performance data of the cable plant showing the losses at each splice location and each terminal connector.

• Complete parts list including names of vendors.

Installation Testing Requirements. Upon completion of the cable installation, splicing, and termination, the Contractor shall test all fibers for continuity, events above 0.1 dB, and total attenuation of the cable. The test procedure shall be as follows:

J-348C

A Certified Technician utilizing an Optical Time Domain Reflectometer (OTDR) and Optical

Source/Power Meter shall conduct the installation test. The test equipment used shall have been calibrated within the year. Documentation shall be provided. The Technician is directed to conduct the test using the standard operating procedures defined by the manufacturer of the test equipment. All fibers installed shall be tested in both directions.

A fiber ring or fiber box, commonly known as a launch kit, shall be used to connect the OTDR to the fiber optic cable under test at both the launch and receive ends. The tests shall be conducted at 1310 and 1550 nm for all SMF fibers bi-directionally.

At the completion of the test, the Contractor shall provide copies of the documentation of the test results to the Engineer. All test results shall be provided on or the day following the test date. The Contractor shall tabulate the test results in a spreadsheet format and submit to the

Engineer and Illinois Tollway for final review and approval. Screenshots of the test results shall not be accepted. A minimum of 5 working (7 calendar) days shall be allowed for the

Illinois Tollway to review the test results.

Three (3) copies of the test documentation shall be submitted electronically, and shall include the following:

Cable & Fiber Identification:

• Cable ID

• Cable Location – beginning and end-point

• Fiber ID, including tube and fiber color

• Wavelength

• Date and Time

• Operator Name

• Setup Parameters

• Pulse width (OTDR)

• Refractory index (OTDR)

• Range (OTDR)

• Scale (OTDR) Setup Option chosen to pass OTDR “deadzone”

Test Results shall include:

• OTDR Test results - Including the raw test results file and the results in a .pdf format.

• Total Fiber Trace

• Measured Length (Cable Marking)

• Total Length (OTDR)

• Optical Source/Power Meter Total Attenuation (dB/km)

• Splice Loss/Gain

• Events> 0.10 dB

• OTDR Fiber Trace Viewer Software details

J-348D

Sample Power Meter Tabulation:

Power Meter Measurements (dB)

Location Fiber

No.

Cable Length

A to B B to A Bidirectional

Average

A B nm nm nm nm nm nm

Maximum Loss

Minimum Loss

A copy of the test equipment manufacturer's software to read the test files, OTDR and power, shall be provided to the Illinois Tollway. These results shall also be provided in tabular form, see sample below:

Sample OTDR Summary

Cable Designation:

TCF-IK-03

OTDR

Location:

Pump Sta. 67 Date: 111/00

Fiber

Number

Event

Type

Event

Location

Event Loss (dB)

1310 nm 1550 nm

1 Splice 23500 Ft. .082 .078

1 Splice 29000 Ft. .075 .063

2 Splice 29000 Ft. .091 .082

3 Splice 26000 Ft. .072 .061

3 Bend 27000 Ft. .010 .009

The following shall be the criteria for the acceptance of the cable:

The test results shall show that the dB/km loss does not exceed +3% of the factory test or

1% of the cable's published production loss. However, no event shall exceed 0.10 dB. If any event is detected above 0.10 dB, the Contractor shall replace or repair the fiber including that event point.

The total loss of the cable (dB), less events, shall not exceed the manufacturer's production specifications as follows: 0.4 dB/km at 1310 nm and 0.3 dB/km at 1550 nm.

If the total loss exceeds these specifications, the Contractor shall replace or repair the cable run at no additional cost to the Illinois Tollway, both labor and materials.

Splicing Requirements. All optical fiber splicing shall be performed using the fusion splicing technique, and according to the latest version of the manufacturer's cable installation procedures; industry accepted installation standards, codes, and practices; or as directed by the

Engineer. A fusion splice machine shall be used to splice all optical fiber. All splicing equipment shall be cleaned and calibrated according to the manufacturer's recommendations prior to each splicing session at each location.

J-348E

All splices shall match fiber and buffer tube colors unless shown otherwise in the Plans. Where a fiber cable is to be accessed for lateral or drop signal insertion, only the buffer tube containing the fiber to be accessed shall be opened and only the actual fiber to be accessed shall be cut.

If a fiber end is not intended for use, the fiber shall be cut to a length equal to that of the fiber to be used and neatly laid into the splice tray. Any fibers exposed during splicing shall be treated with a protective coating and placed in a protective sleeve or housing to protect the fiber from damage or contaminants.

All splicing shall be performed as shown on the plans. All splice locations must be identified in the Record Drawings. Fusion splices shall not be paid for separately and shall be included in the cost of fiber cable installation.

The splice loss for a SMF fusion splice shall not exceed a maximum bidirectional average of 0.1 dB per splice. Any splices that exceed allowable attenuation shall be repaired or replaced at no cost to the Illinois Tollway.

Any ancillary components required to complete installation include but not limited to:

• Fiber Optic Jumpers Cables/Patch Cords

• Fiber Optic Pigtails

• Fiber Optic Fusion Splices

• Buffer Tube Fan-Out Kits

• Moisture and Water Sealants

Transfer of Ownership for Fiber Optic Facilities. The Engineer shall follow the below procedure to request for the Tollway to resume beneficial use of the active fiber and accept locating & maintenance responsibilities from the contractor.

• The Engineer shall coordinate final walkthrough within 48 hours of splice completion and shall provide as-built/red line drawings for the complete fiber optic system construction within the Contract.

• Illinois Tollway Fiber Optic Maintenance Vendor (ITFOV) shall be allowed five (5) calendars days to schedule their representative on site for walkthrough and perform required testing.

• The Engineer shall ensure the contractor resolve (if any) issues identified during the walkthrough.

The Illinois Tollway will accept ownership and maintenance responsibilities of the fiber optic cable (FOC) system at the recommendation of the ITFOV.

Method of Measurement. Fiber optic connection hardware will be measured for payment per each in place installed and tested. Fusion splices will not be measured for payment.

Basis of Payment. This work will be paid for at the contract unit price per each for FIBER OPTIC CONNECTION HARDWARE of the type specified, installed, tested and accepted by the Illinois Tollway. Fusion splices will not be paid for separately and will be included in the cost of THE FIBER OPTIC CONNECTION HARDWARE. Payment will not be made until the FIBER OPTIC CONNECTION HARDWARE is installed, spliced, tested and accepted by the Illinois Tollway in compliance with these special provisions.

J-348F

Fiber optic connection hardware will be paid for at the contract unit price each for FIBER

OPTIC CONNECTION HARDWARE, TYPE1 and FIBER OPTIC CONNECTION

HARDWARE, TYPE 2 which will include all work described herein.

Pay Item

Number

Description Unit of

Measure

JT160340 FIBER OPTIC CONNECTION HARDWARE, TYPE 1 EACH

JT160345 FIBER OPTIC CONNECTION HARDWARE, TYPE 2 EACH

J-348G

J-348H

Contract I-25-2014 June 13, 2025

INSTALL FIBER OPTIC CABLE, SINGLE MODE, NON-ARMORED, 72 FIBERS

Description. This work shall consist of installing, splicing, and testing the fiber optic cable as well as other ancillary components as required to complete the fiber optic cable installation as shown in the plans and as directed by the Engineer. All ancillary components shall be included in the cost of the fiber optic cable and will not be paid for separately.

As part of this effort, the Contractor will be responsible for installation and testing of the cable until acceptance by the Illinois Tollway. The Illinois Tollway’s Fiber Maintenance Contractor will provide the splicing work. The Contractor shall coordinate closely with the Illinois Tollway’s Fiber Maintenance Contractor to make sure all work is installed and delivered within the project schedule.

Materials. Materials shall be in accordance with following.

Fiber optic cable has been procured under Contract I-22-4837R and stored at a designated storage, Contractor to pick up procured material. Other materials required to complete the work shall be in accordance with Section 817 of the Illinois Tollway Supplemental Specifications.

The Contractor shall verify the fiber optic cable meets the requirements stated below and is acceptable for installation and testing prior to taking ownership of the cable. Any portions of the fiber optic cable the Contractor finds unacceptable must be submitted to the Engineer for approval, including the reason for rejection, within 60 days prior to taking ownership of the cable.

Fiber Optic Cable. Ensure that the optical fiber used conforms to the requirements of the United States Department of Agriculture Rural Utilities Service (RUS) standard 7 CFR

1755.900 and this Specification.

The provided fiber optic cable shall:

• Be armored, dry-filled, loose-tube, dispersion-unshifted, single-mode fiber (SMF) with low water peak, gel free, and suitable for…