I-25-2014_AddendumNo. 3_07112025.pdf
PDF 5 MB Posted
- Contract number
- 25-557THA-ENGCO-P-86553
- Issued by
- Illinois
About this file
The document is Addendum No. 3 to Contract No. I-25-2014 issued by the Illinois State Toll Highway Authority for the Tri-State Tollway (I-294) project. The addendum involves multiple parties including the Illinois Tollway, contractors, and various equipment and infrastructure vendors. It covers modifications to a previously established contract for an Intelligent Transportation Systems (ITS) installation project.
The contract involves the installation of Advanced Transportation Management (ATM) systems, ITS devices, and fiber optic infrastructure along the Tri-State Tollway between North Avenue and Balmoral Avenue. The project includes installing lane control signs, dynamic message signs, electrical cables, conduits, handhole systems, and associated equipment across multiple stations along the highway. The contract includes a total core work amount, contingency work allowance, and a contractor's quality program, with specific line items for various infrastructure components. The contract duration is set from May 10, 2027 to May 10, 2029, with potential renewal options for two additional one-year terms or one two-year term. The addendum addresses numerous technical clarifications, equipment placement details, and responds to contractor questions about implementation specifics.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. I-25-2014 Addendum No. 3 Page 1 of 4 7/11/2025
ADDENDUM NO. 3
TO
CONTRACT REQUIREMENTS
FOR CONTRACT I-25-2014
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 7/11/2025
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, July 18, 2025
NOTICE OF REVISION TO CONTRACT
NOTES:
1. The dates revised in Contract bond agreement for time of performance and contract expiration date. The Bidder’s attention is called to pages T-2R which have been revised and included as part of this addendum.
2. A complete set of schedule of prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidders attention is called to pages P-5R, P-8R and P-11R, which have been revised and included as part of the schedule of prices.
3. The following revised Special Provision pages are included in the Contract with this Addendum: iiR and J-390R.
4. The following new Special Provision pages are included in the Contract with this Addendum: J-36A thru J-36D.
5. The following revised Contract Drawings are included in this Addendum:
Volume 1 – Drawings 47, 49 thru 52, 55 thru 60, 99 thru 102 of 230.
6. Revised Contract Drawings 5 of 230 will be issued to the successful Bidder. The revised drawings will reflect the quantity changes shown in the “Summary of Revisions to Pay Item Quantities” table included in this addendum.
7. Responses to Request for Information received from the Plan Holders are included in this Addendum.
Addendum No. 3 Page 2 of 4 7/11/2025
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE ADVERTISEMENT FOR SEALED BID
Change #1 Contract Requirements, Volume I, Advertisement, replace page T-2 with page T-2R (attached). This replacement contains the following revision:
1.1. Revised the Time of performance date from April 12, 2027, to May 10, 2027.
1.2. Revised the Contract expiration date from April 12, 2029, to May 10, 2029.
CHANGES TO THE SCHEDULE OF PRICES
SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES
SP.
PROV.
PAY ITEM
NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY
CHANGE
NEW
QUANTITY
* 20100210 TREE REMOVAL (OVER 15 UNITS DIAMETER) UNIT 0 120 120
* X0327039 TEMPORARY ACCESS ROAD (SPECIAL) L SUM 0 1 1
** JS664305 RIGHT-OF-WAY FENCE, TYPE 1, 6’ FOOT 0 100 100
** JS664400 RIGHT-OF-WAY FENCE REMOVAL FOOT 0 100 100
* JT154032 CONTRACT ALLOWANCE FOR ADDITIONAL ITS WORK UNIT 100,000 200,000 300,000
* JT817760
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE
USE) 1/C 250MCM
FOOT 23,500 -23,500 0
* Denotes Special Provision
Change #2 Contract Requirements, Volume I, page P-5, P-8 and P-11 replaced with page P-5R, P-8R and P-11R.
This replacement contains the following revisions (attached):
2.1. Quantities updated for pay items JT154032 and JT817760.
2.2. Payitem added 20100210, X0327039, JS664305, and JS664400.
2.3. Revised unit price for pay item JT155001.
2.4. Revised Total amount of contingency work + Contractor’s Quality Program (CQP).
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #3 Contract Requirements, Volume II, replace page iiR with page iiRR. This replacement contains the following revisions (attached):
3.1. S.P added TREE AND STUMP REMOVAL (Illinois Tollway),
3.2. S.P added TEMPORARY ACCESS ROAD (SPECIAL)
Change #4 Contract Requirements, Volume II, added pages J-36A thru J-36D. This replacement contains the following revisions (attached):
4.1. New special provision pages listed in the Notice to Revision on Contract J-36A thru J-36D.
Change #5 Contract Requirements, Volume II, replace page J-390 with page J-390R. This replacement contains the following revisions (attached):
5.1. Revised S.P to remove pay item JT817760 from INSTALL ELECTRIC CABLE IN CONDUIT special provision.
Addendum No. 3 Page 3 of 4 7/11/2025
CHANGES TO THE CONTRACT DRAWINGS
Change #6 Contract Plans, Volume 1, Drawing 5. SUMMARY OF QUANTITIES. This drawing contains the following revisions and will be issued to the successful bidder:
6.1. Quantities updated for pay items JT154032 and JT817760.
6.2. Payitem added 20100210, X0327039, JS664305, and JS664400.
Change #7 Contract Plans, Volume 1, Drawing 47. ATM & DMS SCHEDULE This drawing contains the following revisions (attached):
7.1. Revised Sheet. Power feed changes from IPDC-15 to IPDC-14.
Change #8 Contract Plans, Volume 1, Drawing 49. ITS PROPOSED PLAN This drawing contains the following
8.1. Revised Sheet. Power tag K10 deleted.
Change #9 Contract Plans, Volume 1, Drawing 50. ITS PROPOSED PLAN This drawing contains the following
9.1. Revised Sheet. Power tag K10 deleted.
Change #10 Contract Plans, Volume 1, Drawing 51. ITS PROPOSED PLAN This drawing contains the following
10.1. Revised Sheet. Power tag K10 deleted.
Change #11 Contract Plans, Volume 1, Drawing 52. ITS PROPOSED PLAN This drawing contains the following
11.1. Revised Sheet. Power tag K10 deleted.
Change #12 Contract Plans, Volume 1, Drawing 55. ITS PROPOSED PLAN This drawing contains the following
12.1. Revised Sheet. Power tag K10 deleted.
12.2. ATM cabinet is shown.
Change #13 Contract Plans, Volume 1, Drawing 56. ITS PROPOSED PLAN This drawing contains the following
13.1. Revised Sheet. Power tag K10 deleted.
Change #14 Contract Plans, Volume 1, Drawing 57. ITS PROPOSED PLAN This drawing contains the following
14.1. Revised Sheet. Power tag K10 deleted.
Change #15 Contract Plans, Volume 1, Drawing 58. ITS PROPOSED PLAN This drawing contains the following
15.1. Revised Sheet. Power tag K10 deleted.
Change #16 Contract Plans, Volume 1, Drawing 59. ITS PROPOSED PLAN This drawing contains the following
16.1. Revised Sheet. Power tag K10 deleted.
16.2. ATM cabinet is shown
Addendum No. 3 Page 4 of 4 7/11/2025
Change #17 Contract Plans, Volume 1, Drawing 60. ITS PROPOSED PLAN This drawing contains the following
17.1. Revised Sheet. Power tag K10 deleted.
Change #18 Contract Plans, Volume 1, Drawing 99. SYSTEM SCHEMATIC DIAGRAM. This drawing contains the
18.1. Revised Sheet. Power tag K10 deleted.
18.2. SB side ATM cabinets deleted.
Change #19 Contract Plans, Volume 1, Drawing 100. SYSTEM SCHEMATIC DIAGRAM. This drawing contains the
19.1. Revised Sheet. Power tag K10 deleted.
19.2. SB side ATM cabinet deleted.
Change #20 Contract Plans, Volume 1, Drawing 101. SYSTEM SCHEMATIC DIAGRAM. This drawing contains the
20.1. Revised Sheet. Power tag K10 deleted.
20.2. NB side ATM cabinet deleted.
Change #21 Contract Plans, Volume 1, Drawing 102. SYSTEM SCHEMATIC DIAGRAM. This drawing contains the
21.1. Revised Sheet. Power tag K10 deleted.
21.2. NB side ATM cabinet deleted.
END OF ADDENDUM CHANGES
T-2
CONTRACT NO: I-25-2014
CONTRACT BOND AGREEMENT
The contractor shall simultaneously herewith furnish and deliver to the Tollway a Performance Bond, agreeing to perform the work in accordance with all of the provisions of the contract, as in said Performance Bond provided, and a Payment Bond, agreeing to pay not less than prevailing wages for the work to be performed in accordance with the contract and the laws of the State of Illinois and agreeing to pay all sums of money due for any labor, materials, apparatus, fixtures or machinery and transportation with respect thereto, as in said Payment Bond provided, each dated the same date as this Agreement, in the forms prescribed by the Tollway, and each in an amount equal to the contract price with a corporate surety or sureties acceptable to the Tollway authorized to do business in the State of Illinois.
The contractor agrees that said Bonds shall be maintained in full force and effect until final acceptance of the work by the Tollway and thereafter, as provided in Article 103.05 of the Tollway Supplemental Specifications.
The contractor agrees and will cause the surety to agree to be bound by each and every provision of all of the contract documents.
If any surety upon any bond furnished in connection with this contract becomes unacceptable to the Tollway, or if any such surety fails to furnish reports as to its financial condition from time to time as requested by the Tollway, the contractor shall promptly furnish such additional security as may be required from time to time to protect the interests of the Tollway and all persons supplying labor or materials in the prosecution of the work contemplated by this contract.
In the event the surety shall make any assignment for the benefit of creditors or commit any act of bankruptcy, or if it shall be declared bankrupt, or if it shall file a voluntary petition in bankruptcy, or shall in the opinion of the Tollway be insolvent, the Contractor agrees forthwith upon request of the Tollway to furnish and maintain other corporate surety with respect to said Bonds satisfactory to the Tollway.
DEFINITIONS
As used in this Agreement, the terms set forth shall have the meanings attributed to them in the Tollway Supplemental Specifications for The Illinois State Toll Highway Authority issued by the Tollway.
TIME OF PERFORMANCE
The duration of this contract shall commence upon the work commencement date identified in the Notice to Proceed letter and shall continue until in accordance with the contract book schedule.
CONTRACT EXPIRATION DATE
The contract expiration date is two (2) years from the contract completion date. Based on the completion date stated in the contract at the time of award the contract expiration date is
This contract maybe renewed for two (2) additional one (1) year terms or one (1) additional two (2) year term, the length of any renewal is to be determined and agreed upon by the Parties.
R
May 10, 2027, May 10, 2029.
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
** 20100210 TREE REMOVAL (OVER 15 UNITS DIAMETER) UNIT 120
* 66900530 SOIL DISPOSAL ANALYSIS EACH 3
* X0327039 TEMPORARY ACCESS ROAD (SPECIAL) L SUM 1
* X7010216 TRAFFIC CONTROL AND PROTECTION, (SPECIAL) L SUM 1
* JI669016
REGULATED SUBSTANCES MONITORING AND FIELD
SCREENING
CAL DAY 18
** JS120100
TRAILER MOUNTED FULL MATRIX PORTABLE CHANGEABLE
MESSAGE SIGNS
EACH 2
** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 300
** JS664305 RIGHT-OF-WAY FENCE, TYPE 1, 6’ FOOT 100
** JS664400 RIGHT-OF-WAY FENCE REMOVAL FOOT 100
** JS670B00 FIELD OFFICE, TYPE B CAL MO 18
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS814002 HEAVY-DUTY HANDHOLE, TOLLWAY EACH 6
** JS819002 TRENCH AND BACKFILL FOR ELECTRICAL WORK (SPECIAL) FOOT 2,550
* JT130759
ELECTRICAL WORK, INTERMEDIATE POWER DISTRIBUTION
AND COMMUNICATION FACILITY
L SUM 1
* JT130776 DIGITAL SURVEY QL-A FOOT 2,000
* JT130777 DIGITAL SURVEY QL-B FOOT 1,000
* JT130790 REMOVE SOLAR GENERATOR ASSEMBLY EACH 4
* JT130822 VIDEO POWER JUNCTION BOX MODEL A, NEMA 1 EACH 2
* JT131316 BLUETOOTH VEHICLE DETECTION ASSEMBLY EACH 8
* JT132046 DYNAMIC MESSAGE SIGN - TYPE 2W EACH 4
* JT132056 DYNAMIC MESSAGE SIGN - TYPE 2W (TRAINING) L SUM 1
* JT132066 DYNAMIC MESSAGE SIGN - TYPE 2W (SPARE PARTS) EACH 4
* JT132090 ATM LANE CONTROL SIGN - TYPE 1 EACH 10
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
Contract I-25-2014 Addendum No. 3 P - 5 July 11, 2025R
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
* JT132091 ATM LANE CONTROL SIGN - TYPE 1 (SPARE PARTS) EACH 10
* JT132092 ATM LANE CONTROL SIGN - TYPE 2 EACH 63
* JT132093 ATM LANE CONTROL SIGN - TYPE 2 (SPARE PARTS) EACH 63
* JT132098 ATM LANE CONTROL SIGN (TRAINING) L SUM 1
* JT132099
ATM TEST GANTRY WITH LANE CONTROL SIGNS AND DMS
TYPE 2
EACH 2
* JT132623 DMS ELECTRICAL WORK - TYPE 2W EACH 4
* JT132699 FURNISH COMMUNICATIONS SYSTEM UPGRADE EACH 1
* JT132792
INSTALL ITS MONOPOLE CLOSED CIRCUIT TELEVISION (CCTV)
CAMERA TOWER
ASSEMBLY, 100FT
EACH 1
* JT132800 REMOVE ITS POLE MOUNTED ENCLOSURE EACH 4
* JT132810 ITS POLE MOUNTED ENCLOSURE (CCTV OR MVDS) EACH 12
* JT132820 CCTV CAMERA, ITS ASSEMBLY EACH 13
* JT132822 ITS SECURITY CCTV CAMERA EACH 2
* JT132830 FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY EACH 19
* JT132845
MICROWAVE VEHICLE DETECTION SYSTEM (MVDS), ITS
ASSEMBLY
EACH 13
* JT132856 INSTALL ITS DISCONNECT SWITCH ASSEMBLY EACH 11
* JT134037 ITS ELEMENT SITE GROUNDING - POLE MOUNTED ASSEMBLY EACH 11
* JT135006 REMOVE MICROWAVE VEHICLE DETECTION ASSEMBLY EACH 4
* JT135095 GANTRY ONLY ELECTRICAL WORK EACH 5
* JT135097 REMOVE CCTV CAMERA, POLE MOUNTED EACH 4
* JT160099
HANDHOLE FOR SINGLE MODE FIBER OPTIC CABLE, TORSION
ASSIST, 48"X72"X36"
EACH 14
Addendum No. 3 P - 6 July 11, 2025R
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
* JT160149 CABLE MARKER SIGN WITH POST FOR ELECTRIC CABLE EACH 6
* JT160217 LOCATE POST FOR FIBER OPTIC CABLE EACH 4
* JT160218
CABLE MARKER WARNING SIGN WITH POST FOR OPTIC
FIBER CABLE
EACH 6
* JT160226 SINGLE MODE FIBER OPTIC CABLE REMOVAL, NO SALVAGE FOOT 37,100
* JT160266 WOOD POLE REMOVAL, NO SALVAGE EACH 4
* JT160340 FIBER OPTIC CONNECTION HARDWARE, TYPE 1 EACH 13
* JT160345 FIBER OPTIC CONNECTION HARDWARE, TYPE 2 EACH 5
* JT160389
FIBER OPTIC CABLE, SINGLE MODE, ARMORED, 864 FIBERS,
ZAYO
FOOT 19,100
* JT160399
INSTALL TOLLWAY FURNISHED FIBER OPTIC CABLE, SINGLE
MODE, NON-ARMORED, 72 FIBERS
FOOT 1,320
* JT202009 NON-SPECIAL WASTE DISPOSAL (TYPE 1) CU YD 444
* JT810874
UNDERGROUND CONDUIT, COILABLE NONMETALLIC
CONDUIT, SDR 11, 1 1/2" DIA.
FOOT 20,160
* JT810876
UNDERGROUND CONDUIT, COILABLE NONMETALLIC
CONDUIT, SDR 11, 2" DIA.
FOOT 2,355
* JT810879
UNDERGROUND CONDUIT, COILABLE NONMETALLIC
CONDUIT, SDR 11, 4" DIA.
FOOT 1,680
* JT810881
UNDERGROUND CONDUIT, COILABLE NONMETALLIC
CONDUIT, SDR 11, 6" DIA.
FOOT 8,890
* JT810890 DUCT PACKAGE, CLSM ENCASED FOOT 2,550
* JT817751
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 10
FOOT 6,500
* JT817752
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 8
FOOT 13,000
* JT817753
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 4
FOOT 5,550
* JT817754
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 6
FOOT 6,000
* JT817755
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 2
FOOT 13,000
Addendum No. 3 P - 7 July 11, 2025R
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
* JT817756
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 1/0
FOOT 8,000
* JT817759
INSTALL ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)
1/C NO. 3/0
FOOT 5,000
* JT830102
INSTALL GROUND MOUNTED LIGHT POLE, GALVANIZED
STEEL, 50 FT., WITHOUT MAST ARM
EACH 11
* JT830220 INSTALL WALL MOUNTED LIGHT POLE EACH 9
* JT836018 ITS ELEMENT POLE FOUNDATION STEEL HELIX (10FT) EACH 2
* JT836028 ITS CONCRETE SERVICE PAD, TYPE B EACH 2
* JT901056 LOCATOR TRACER WIRE FOOT 13,330
* JT901057 LOCATOR TRACER WIRE, DIRECTIONAL BORE FOOT 840
TOTAL AMOUNT OF CORE WORK
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $ 110,000 $ 110,000
* JT154008 UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC UNIT 50,000 $ 1.00 $ 50,000.00
* JT154032 CONTRACT ALLOWANCE FOR ADDITIONAL ITS WORK UNIT 300,000 $ 1.00 $ 300,000.00
* JT154067
CONTRACT ALLOWANCE FOR CONSTRUCTIONWORKS
APPRENTICES
UNIT 100,000 $ 1.00 $ 100,000.00
* JT154096
CONTRACT ALLOWANCE FOR MAINTAIN INTELLIGENT
TRANSPORTATION SYSTEMS
UNIT 30,000 $ 1.00 $ 30,000.00
* JT154103 ALLOWANCE FOR RAILROAD FLAGGING AND SERVICES UNIT 55,000 $ 1.00 $ 55,000.00
Addendum No. 3 P - 8 July 11, 2025R
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
999NEG04
NON-COMPLIANCE WITH TOLLWAY MAINTENANCE OF
TRAFFIC PER TOLLWAY SUPPL. SPEC. 701.08(a)
INC/DAY (2,500.00)$
999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH DEVICES PER
TOLLWAY SUPPL. SPEC. 701.08(b)
OCCUR (2,500.00)$
999NEG06
FAILURE TO REPAIR IMPACT ATTENUATORS, TEMPORARY
PER TOLLWAY SUPPL. SPEC. 701.08(c)
OCCUR (2,500.00)$
999NEG07
LOSS OR DAMAGE TO TOLLWAY OWNED DEVICES PER
TOLLWAY SUPPL. SPEC. 701.08(d)
SQ FT (100.00)$
999NEG08
FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC PER
TOLLWAY SUPPL. SPEC. 701.08(e)(a)
15 MINUTES (3,000.00)$
999NEG09
FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC PER
TOLLWAY SUPPL. SPEC. 701.08(e)(b)
15 MINUTES (5,000.00)$
999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S OPERATIONAL FACILITIES
PER S.P. 115.5 - TRI-STATE
OCCUR (10,000.00)$
999NEG30
DAMAGES TO ILLINOIS TOLLWAY'S OPERATIONAL FACILITIES
PER S.P. 115.5 - ALL ROADWAYS OFF-PEAK
OCCUR (2,000.00)$
999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER TOLLWAY SUPPL.
SPEC. 107.30 (b)
INC/DAY (1,000.00)$
999NEG32
LIQUIDATED DAMAGES FOR DELAY IN SUBMITTAL OF
PROGRESS SCHEDULE PER TOLLWAY SUPPL. SPEC. 108.02
(e)
DAY (300.00)$
999NEG33
NON-COMPLIANCE WITH EROSION AND SEDIMENT CONTROL
PER TOLLWAY SUPPL. SPEC. 280.02 (2) (1)
INC/DAY (1,000.00)$
999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY FOR
CONSTRUCTION HAULING EQUIPMENT PER TOLLWAY SUPPL.
SPEC. 105.15
DAY (1,000.00)$
999NEG35
FAILURE TO RESPOND TO REGULATORY AGENCY REQUESTS,
PER TOLLWAY SUPPL. SPEC. 280.02 (2) (2)
OCCUR (25,000.00)$
999NEG36
FAILURE TO COMPLY WITH OCCUPANCY DATE OR PROVIDE
COMPLETE FACILITIES. FIELD OFFICE OR LAB PER TOLLWAY
SUPPL. SPEC. 670.01 (b)
DAY (500.00)$
999NEG44
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.1
CAL DAY (4,500.00)$
999NEG45
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.2
CAL DAY (7,500.00)$
999NEG46
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.3
CAL DAY (1,500.00)$
999NEG47
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.4
CAL DAY (3,000.00)$
999NEG48
LIQUIDATED DAMAGES FOR NON-COMPLETION PER S.P.
105.1.5
CAL DAY (3,000.00)$
999NEG49 DAMAGE TO FIBER OPTIC UTILITIES PER S.P. 115.3 OCCUR (10,000.00)$
999NEG53
NON-COMPLIANCE WITH CONTRACTOR QUALITY PROGRAM
SPECIAL PROVISION
OCCUR (1,000.00)$
999NEG54
DAMAGE TO TOLLWAY MULTI-MODE CABLE, DMS SIGNS,
CAMERAS, TELECOMMUNICATION, CABLE, ELECTRICAL,
WATER AND SEWER PER S.P. 115.4
OCCUR (1,000.00)$
NEGATIVE
Addendum No. 3 P - 9 July 11, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
* 999ADJ45
CONSTRUCTIONWORKS APPRENCTICES WAGE RATE
PAYMENT
HOUR $ 15.00
* 999ADJ46 ARROW BOARD EACH $ 13.32
* 999ADJ47 ARROW BOARD (WINTER RATE) EACH $ 19.98
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $ 1.00
* 999ADJ49 TYPE I OR TYPE II BARRICADE (WINTER RATE) EACH $ 1.50
* 999ADJ50 TYPE III BARRICADE EACH $ 2.35
* 999ADJ51 TYPE III BARRICADE (WINTER RATE) EACH $ 3.53
* 999ADJ52 PLASTIC DRUM EACH $ 1.25
* 999ADJ53 PLASTIC DRUM (WINTER RATE) EACH $ 2.34
* 999ADJ54 FLASHER LIGHT EACH $ 0.20
* 999ADJ55 FLASHER LIGHT (WINTER RATE) EACH $ 0.30
* 999ADJ56 STEADY BURN LIGHT EACH $ 0.30
* 999ADJ57 STEADY BURN LIGHT (WINTER RATE) EACH $ 0.45
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH $ 1.70
* 999ADJ59 HI-INTENSITY LIGHT, SIGN MOUNTED (WINTER RATE) EACH $ 2.55
* 999ADJ60 CMS, SOLAR POWERED EACH $ 45.70
* 999ADJ61 CMS, SOLAR POWERED (WINTER RATE) EACH $ 68.55
* 999ADJ62 SIGNS, WORK ZONE EACH $ 2.00
* 999ADJ63 SIGNS, WORK ZONE (WINTER RATE) EACH $ 3.00
ADJUSTMENTS
Addendum No. 3 P - 10 July 11, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-25-2014
MILE POST 33.6 TO MILE POST 40.0
SCHEDULE OF PRICES
ATM SYSTEM, ITS DEVICE AND FIBER INSTALLATION
TRI-STATE TOLLWAY (I-294)
NORTH AVENUE TO BALMORAL AVENUE
* 999ADJ64 TEMPORARY MODULAR GLARE SCREEN (12.5 FT. SECTION) UNIT $ 0.60
* 999ADJ65 TEMPORARY CONCRETE BARRIER (12.5 FT. SECTION) UNIT $ 0.83
* 999ADJ66 TEMPORARY CONCRETE BARRIER (10.0 FT. SECTION) UNIT $ 0.50
* 999ADJ67
TEMPORARY CONCRETE BARRIER, CROSS BOLT
CONNECTION (12.5 FT. SECTION)
UNIT $ 1.47
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY (SEVERE USE, NARROW),
TEST LEVEL 3
EACH $ 18.33
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY (SEVERE USE, WIDE),
TEST LEVEL 3
EACH $ 18.33
* 999ADJ71
TEMPORARY INFORMATION SIGNING-GROUND MOUNTED, 24
SQ FT IN AREA OR LESS
SQ. FT. $ 0.25
* 999ADJ72
TEMPORARY INFORMATION SIGNING-GROUND MOUNTED,
GREATER THAN 24 SQ FT IN AREA
SQ. FT. $ 0.25
* 999ADJ73
TEMPORARY INFORMATION SIGNING-OVERHEAD, 24 SQ FT IN
AREA OR LESS
SQ. FT. $ 0.25
* 999ADJ74
TEMPORARY INFORMATION SIGNING-OVERHEAD, GREATER
THAN 24 SQ FT IN AREA
SQ. FT. $ 0.25
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) $ 645,000.00
BID CREDIT
AWARD CRITERIA
S.P. COLUMN LEGEND
INDICATES SPECIAL PROVISION (PROJECT SPECIFIC OR TOLLWAY STANDARD) *
INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS **
INDICATES IDOT SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS ***
INDICATES IDOT BDE SPECIAL PROVISION BDE
INDICATES IDOT GBSP SPECIAL PROVISION GBSP
INDICATES DISTRICT 1 SPECIAL PROVISION D1
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S
QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID
Addendum No. 3 P - 11 July 11, 2025R ii
JURISDICTION LIMITS - TOLLWAY (ILLINOIS TOLLWAY) ................................................ J-31
JURISDICTION LIMITS - NON-TOLLWAY .......................................................................... J-32
WARRANTY (ILLINOIS TOLLWAY) ..................................................................................... J-33
CONTROL OF MATERIALS .................................................................................................. J-36
TREE AND STUMP REMOVAL (Illinois Tollway).…………………………………………….J-36A
TEMPORARY ACCESS ROAD (SPECIAL)…………………………………………………….J-36C
DISPOSAL OF REGULATED SUBSTANCES AND UNCONTAMINATED SOIL (ILLINOIS
TOLLWAY)…………………………………………………………………………………………. J-37
TRAFFIC CONTROL AND PROTECTION (SPECIAL)……………………………………… J-46
ITS DEVICE TESTING REQUIREMENTS (ILLINOIS TOLLWAY).................................... J-48
MAINTENANCE OF TRAFFIC .............................................................................................. J-51
EXTENDED MAINTENANCE OF TRAFFIC WORK AND EQUIPMENT RATES (ILLINOIS
TOLLWAY) ........................................................................................................................... J-55
TRENCH AND BACKFILL FOR ELECTRICAL WORK (SPECIAL)………………………………….J-58
ELECTRICAL CONNECTION WORK, EXISTING INTERMEDIATE POWER DISTRIBUTION
AND COMMUNICATION FACILITY .................................................................................... J-60
DIGITAL UTILITY AS-BUILT (ILLINOIS TOLLWAY)……………………………………………J-99
REMOVE SOLAR GENERATOR ASSEMBLY (ILLINOIS TOLLWAY)…………………… J-104
VIDEO POWER JUNCTION BOX (ILLINOIS TOLLWAY) ................................................. J-105
BLUETOOTH VEHICLE DETECTION ASSEMBLY (ILLINOIS TOLLWAY) ........................ J-112
DYNAMIC MESSAGE SIGN – WALK-IN (ILLINOIS TOLLWAY)………………………... J-120
ATM LANE CONTROL SIGN……………………………………………………………………...J-160
DYNAMIC MESSAGE SIGNS ELECTRICAL WORK (ILLINOIS TOLLWAY)…………….. J-190
FURNISH COMMUNICATIONS SYSTEM UPGRADE…………………………………………J-222
INSTALL MONOPOLE CLOSED CIRCUIT TELEVISION (CCTV) CAMERA TOWER
ASSEMBLY…………………….…………………………………………………………...J-224
REMOVE ITS ENCLOSURE (ILLINOIS TOLLWAY) ........................................................... J-234
ITS POLE MOUNTED ENCLOSURE, ITS ASSEMBLY (CCTV OR MVDS)
………………………………………………………………………………………………………J-235R
CLOSED CIRCUIT TELEVISION (CCTV) CAMERA, ITS ASSEMBLY (ILLINOIS TOLLWAY)
............................................................................................................................................ J-245
ITS SECURITY CLOSED CIRCUIT TELEVISION (CCTV) CAMERA (ILLINOIS
TOLLWAY)…………………………………………………………………………………………..J-253
FIBER OPTIC COMMUNICATIONS, ITS ASSEMBLY (ILLINOIS TOLLWAY) ................... J-261
MICROWAVE VEHICLE DETECTION SYSTEM (MVDS), ITS ASSEMBLY
(ILLINOIS TOLLWAY)………………………………………………………………………... J-269
INSTALL ITS DISCONNECT SWITCH ASSEMBLY………………………………………… J-279
9R 9R July 11, 2025
Addendum No. 3
J-36A
TREE AND STUMP REMOVAL (Illinois Tollway)
Effective: April 1, 2016 Revised: November 1, 2024
Description. This work shall consist of the cutting, grubbing, removal, and disposal of trees and stumps in accordance with Section 201 of the Standard Specifications except as herein modified.
Add the following to 201.02:
Tree Stump shall be defined as any partial tree or tree cutoff, whether naturally occurring or previously removed by others.
Add the following to Article 201.03:
Mechanical equipment shall not be used in areas of standing water. Written permission from the Engineer is required prior to opening, lowering, or otherwise disturbing existing right-of-way fencing or other permanent fencing to access work.
Add the following to Article 201.04:
The Contractor shall comply with Illinois Department of Agriculture (IDOA) and the United States Department of Agriculture (USDA) quarantine requirements, guidance and restrictions for tree removal and disposal of vegetation.
The Contractor shall maintain vigilance to minimize the spread of Emerald Ash Borer (EAB), other pests and invasive weeds during removal, storage and disposal operations.
Refer to the Illinois Department of Agriculture website at https://www2.illinois.gov/sites/agr/Insects/Pests/EmeraldAshBorer/Pages/default.aspx for additional information on Emerald Ash Borer.
Tree removal cannot occur between April 1st and October 31st due to Tollway’s commitment to protecting bat pup season. Stump removal can occur between November 1st and March 31st, if approved by the Engineer.
Method of Measurement. Unit Diameter. Trees to be removed as a payment item, but not measured in acres, will be measured per unit of diameter where one unit is equal to 1 in. The diameter will be measured at a point 4.5 ft above the highest ground level at the base of the tree and will be determined by dividing the measured circumference of the tree by 3.1416. Stumps will be measured at the elevation of cut off. A multiple stem tree’s branches having a diameter of 6
in. or more at a point 4.5 ft above the highest ground level at the base of the tree will be measured for payment as individual trees. The accumulated total number of units will be the pay quantity.
Trees to be removed will be measured by the acre when included in the contract as a payment item and shown at definite locations on the plans or staked for removal by the Engineer. The entire area shown on the plans, and directed by the Engineer, will be used in computing the acres.
Any removal of bushes or saplings within such areas will not be measured separately for payment.
Basis of Payment.
July 11, 2025
This work will be paid for at the contract unit price per unit diameter for TREE REMOVAL
(OVER 15 UNITS DIAMETER).
J-36B
Pay Item Number
Designation Unit of
Measure
20100210 TREE REMOVAL (OVER 15 UNITS DIAMETER) UNIT
July 11, 2025
J-36C
TEMPORARY ACCESS ROAD (SPECIAL)
Description: This work includes the construction, maintenance, and removal of a temporary construction access road near the Irving Park Road ramps to facilitate access and work for installing handholes and conducting directional bores.
Materials: Materials provided for construction of the access road will be selected by the Contractor to provide good stability for the intended use.
Any materials that the Contractor may want to re-use in other areas of the project shall meet Illinois Tollway standards for the application, and shall be communicated to and approved by the Engineer prior to delivery to the site, to ensure agreement for the re-use and to avoid any additional costs to be incurred.
Construction: The Contractor shall provide a site plan to outline where the required access road is necessary to facilitate their work. Geotextile fabric may be needed between the stone and the ground line to minimize restoration work after removal. The access road shall not disrupt the natural flow of any waterway, including existing creeks or drainage, without mitigation measures that meet the approval of the Engineer.
Contractor is responsible for the stability and maintenance of the access road. Benching or other embankment foundation preparation may be required to ensure stability. The Contractor shall take extreme care to minimize disturbance beyond what is necessary for transporting materials and conducting the work.
If the Engineer determines that the Contractor’s activities are producing undue erosion of materials beyond the limit of the sediment control items, the Contractor shall stop the work and take corrective action before proceeding.
The contractor shall maintain the access road throughout its life by adding embankment to the side slopes, as required, and as directed by the Engineer. In the event of flooding, the Contractor shall immediately repair all damage caused by the floodwater after the storm event has passed at no additional cost to the contract.
Temporary facilities may not be constructed using dumped fill or any other erodible material.
Crushed concrete or reclaimed asphalt pavement shall be permitted for use of the access road.
Similarly, compacted earth may be permitted if ground conditions are suitable for driving without causing rutting or damage to the surroundings.
The Contractor shall assume all risk of damage to his equipment and the work caused by any inundation as a result of rainfall events. No extension of time or compensation will be granted as a result of natural occurrences.
Upon completion of relevant construction, the Contractor shall remove all portions of the access road and restore the area to original grades and conditions, to the satisfaction of the Engineer.
Method of Measurement: This work will be paid for payment as a single LUMP SUM item. All materials and appurtenances required for any and all of the proposed and/or required construction stages shall be included in the single LUMP SUM item.
J-36D
Basis of Payment: This work will be paid for at the contract LUMP SUM price for TEMPORARY ACCESS ROAD (SPECIAL), which shall include all labor, equipment, materials, maintenance, removal, cleanup, and restoration.
Pay Item Number Designation
Unit of Measure
X0327039 TEMPORARY ACCESS ROAD (SPECIAL) L SUM
1R July 11, 2025
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY6
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -1
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:4
:2
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
ENGINEERING GROUP
HM
ITS-15
04/03/2025
04/03/2025
ATM & DMS SCHEDULELOHII
SHEET NO.
STRUCTURE ID
GANTRY / SIGN
DEVICE ID ROUTE DIRECTION M.P STATION
(JT132090)
LCS TYPE 1
(JT132092)
LCS TYPE 2
(JT132046)
DMS TYPE 2W
POWER FEED
ITS-18 294NG61 294N033.9LCS001 I-294 NB 33.90 1791+47 1 6 IPDC-13
ITS-18 294SG60 294S033.9LCS001 I-294 SB 33.90 1791+47 1 7 IPDC-13
ITS-21 294NG65 294N034.5LCS001 I-294 NB 34.50 1822+75 1 7 IPDC-13
ITS-21 294SG64 294S034.5LCS001 I-294 SB 34.50 1822+75 1 7 IPDC-13
ITS-23 294SG66 294S035.1LCS001, 294S035.1DMS001 I-294 SB 35.10 1851+35 1 6 1 IPDC-14
ITS-23 294NG67 294N035.1LCS001, 294N035.1DMS001 I-294 NB 35.10 1851+35 1 7 IPDC-14
ITS-25 294SG68 294S035.6LCS001 I-294 SB 35.60 1878+75 8 IPDC-14
ITS-25 294NG69 294N035.6LCS001 I-294 NB 35.60 1878+75 1 5 1 IPDC-14
ITS-27 294SG70 294S036.0LCS001, 294S036.0DMS001 I-294 SB 36.00 1901+88 5 1
ITS-27 294NG71 294N036.0LCS001, 294N036.0DMS001 I-294 NB 36.00 1901+88 1 5 1
04/03/2025 I-25-2014
ADDENDUM #306/30/2025
IPDC-14
IPDC-14
2092304647
07/08/2025 ADDENDUM NO. 307/11/2025
J
.9
.1
J
E
E
E
J
55+00
20+00
1770+00 1769 1772 1771
30+00
1778 1777 1779 1774 1773 1776 1775+00
11 10+00
28 27 26
25+00
O N
L Y
R A
M P F
RAMP J
W
N O
R T
H A
V E
IL
-6
ENGINEERING GROUP
L A
K E
S
T
N O
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -1
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:1
:5
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
J
L ETA
A
Z
ZA
0 50 100 150
SCALE IN FEET
M A
T C
H
L
IN
E
S
T A
T
IO
N
PR ¡ TRI-STATE TOLLWAY I-294
L A
K E
S
T R
E E
T
N O
R T
H
A
V E
N U
E
TRI-STATE TOLLWAY I-294 (SB)
TRI-STATE TOLLWAY I-294 (NB)
J
P R
O
JE
C T
S
T A
R T
S T
A
CONDUIT / CABLE DESCRIPTION
ITS-17
ITS PROPOSED PLAN
STA 1766+00 to STA 1780+00
LOHII
HM
04/03/2025
C
H1
I1
F5 G1 M1
J1
D1
NOTES:
D1
STA 1764+90, 125' RT
EHH (ISHTA) (E)
STA 1764+70, 125' RT
CHH (CONDO/LEASED) (E)
STA 1764+60, 125' RT
CHH (AT&T) (E)
N3 2" DIA CNC UNDERGROUND (I) (JT810876)
STA 1764+65, 77' LT
D5
(S E
E
A
B O
V E
S T
A T
IO
N
M A
T C
H
L
IN
E
STA 1764+45, 123' RT
CHH (ZAYO) (E)
STA 1764+42, 123' RT
CHH (ZAYO) (E)
STA 1764+61, 121' RT
D2
2 6
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
1-1/C #10 (GRD) (JT817751)
2-1/C #8 (JT817752)
K12
04/03/2025
(S E
E
B
E L
O W
S T
A T
IO
N
M A
T C
H
L
IN
E
I-25-2014
STA 1764+80, 125' RT
SPLICE CLOSURE (E)
CHH (ISTHA) (E)
R A
M P F
RAMP J
3 ADDENDUM #307/02/2025
T
M A
T M
2092304849
A LT EA LT E
J
J
J
J J
C
M
E
E
T
T E
B T
ET
1791 1790+00 1793 1792 1789
1780+00 1786 1785+00 1788 1787
1782 1781 1784 1783
PPP
N F
R O
N T
G E R
O A
D
ENGINEERING GROUP
L A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -1
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:4
:3
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
T C
H
L
IN
E
S
T A
T
IO
N
M A
T C
H
L
IN
E
S
T A
T
IO
N
BLUETOOTH
NOTES:
(JT130754)
ELECTRICAL WORK (I)
IDPC-13 (E)
K12
K12
MP33-75
TRI-STATE TOLLWAY I-294 (SB)
TRI-STATE TOLLWAY I-294 (NB)
CONDUIT / CABLE DESCRIPTION
MP 33.80
K8
K8
ITS-18
ITS PROPOSED PLAN
STA 1780+00 to STA 1794+00
LOHII
HM
04/03/2025
04/03/2025
STA 1782+00, 140' RT
EHH (ISHTA) (E)
STA 1781+80, 152' RT
CHH (CONDO/LEASED) (E)
STA 1781+70, 158' RT
D1
D1
D1
D3
STA 1782+00
CHH (ISTHA) (E)
STA 1790+06
CHH (ISTHA) (E)
D3
P1
P3
K2
N3 2" DIA. CNC UNDERGROUND (I) (JT810876)
K1
400A, 120/240V, 1P, 3W
IPDC EXISTING ELECTRIC SERVICE
K12N3
(I) (JT132814)
DISCONNECT SWITCH
ATM CABLES (SEE NOTE 5)
STA 1791+06, 112' LT
CHH (ISTHA) (E)
STA 1790+72, 122' RT
CHH (ISTHA) (E)
STA. 1786+10
294N033.8BTH001
BTH (I) (JT131316) -
MEDIAN ITS POLE (I) (JT830220) -
P4-22.5' POLE
STA. 1792+60, 111' LT
- FOC, ITS ASSEMBLY (I) (JT132830)
WORK (I) (JT135095)
- (1) GANTRY ONLY ELEC.
ATM CABINETS (SEE NOTE 5)
STA. 1791+47
294N033.9LCS00X
- (1) LCS TYPE 1 (I) (JT132090)
- (6) LCS TYPE 2 (I) (JT132092)
ATM 61 (SEE NOTE 5)
IPDC-13
B T
A
1-1/C #8 (GRD) (JT817752)
2-1/C #6 (JT817753)
K8
1-1/C #2 (GRD) (JT817755)
2-1/C #3/0 (JT817759)
1-1/C #10 (GRD) (JT817751)
2-1/C #8 (JT817752)
K12
BY THE CONTRACTOR PER THE CONTRACT SPECIFICTIONS.
AND GANTRY SIGNS ARE NOT SHOWN BUT SHALL BE PROVIDED
FIBER OPTIC CABLES BETWEEN ATM GANTRY CABINET6)
ATM CABINETS.
POWER GOES TO ITS DISCONNECT SWITCH BEFORE ENTERING5)
POWER CONNECTIONS.
SEE ITS PROPOSED PLAN SHEETS ITS-17 TO ITS-28 FOR ALL4)
POWER AND COMMUNICATIONS WIRING DETAILS.
REFER TO SHEET DET-24 AND DET-25 FOR ATM GANTRY INTERNAL3)
REFER TO SHEET DET-22 TO DET-32 FOR ATM GANTRY DETAILS.2)
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
STA 1790+72, 146' RT
SEE NOTE 6
2 2
STA 1790+73, 113' LT
CHH (ISTHA) (E)
SEE NOTE 6
SEE NOTE 6
STA. 1786+00, 109' RT
294N033.8MVD001
294N033.8CAM001
- FOC, ITS ASSEMBLY (I) (JT132830)
- SITE GROUNDING (I) (JT134037)
- MVDS (I) (JT132845)
- CAM (I) (JT132820)
- ITS POLE MOUNTED ENCLOSURE (I) (JT132810)
- ITS POLE (I) (JT830102)
P3-50' POLE
I-25-2014
STA 1781+90, 146' RT
- FO SPLICE (BY OTHERS)
- FO CONNECTION HARDWARE, TYPE 1 (I) (JT160340)+
CHH (ISTHA) (E)
NORTHWEST AVE
COUNTY LINE RD
STA. 1791+47
294S033.9LCS00X
(1) LCS TYPE1 (I) (JT132090) -
(7) LCS TYPE2 (I) (JT132092) -
ATM 60 (SEE NOTE 5)
3 ADDENDUM #307/02/2025
3 3 3
209230 50
ALTE
H
ALTE
J
H
E
E
ET EC
B T
A
1807 1806
1795+00 1794 1797 1796
1803 1802 1805+00 1804
1799 1798 1801 1800+00
D M
S
28 27 30+00 29
35+00
32 31
O N
L Y
ENGINEERING GROUP
L A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -1
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:3
:5
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
T C
H
L
IN
E
S
T A
T
IO
N
M A
T C
H
L
IN
E
S
T A
T
IO
N
BLUETOOTH
K12
TRI-STATE TOLLWAY I-294 (SB)
TRI-STATE TOLLWAY I-294 (NB)
CONDUIT / CABLE DESCRIPTION
MP 34.10
ITS PROPOSED PLAN
STA 1794+00 to STA 1808+00
ITS-19
LOHII
HM
STA 1797+27, 96' RT
EHH (ISHTA) (E)
STA 1797+07, 97' RT
CHH (CONDO/LEASED) (E)
STA 1796+97, 97' RT
D1
STA 1802+06
CHH (ISTHA) (E)2
F1
K12K2
K2
N3
STA. 1798+25
294S034.1BTH001
- BTH (I) (JT131316)
MEDIAN ITS POLE (I) (JT830220)
P6-22.5' POLE
(JT132814)
DISCONNECT SWITCH (I)
04/03/2025
K2
1-1/C #8 (GRD) (JT817752)
2-1/C #6 (JT817753)
294N034.2DMS001
EXISTING DMS
STA 1803+45, 112' RT
CHH (ISTHA) (E)
STA 1803+55, 112' RT
EXISTING DMS CABINET
NOT SHOWN ON PLANS.
EX FIBER OPTIC CABLE BETWEEN DMS CABINET AND DMS IS 2)
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
SEE NOTE 2
STA. 1797+99, 110' RT
294N034.0MVD001
294N034.0CAM001
- FOC, ITS ASSEMBLY (I) (JT132830)
- SITE GROUNDING (I) (JT134037)
- MVDS (I) (JT132845)
- CAM (I) (JT132820)
- ITS POLE MOUNTED ENCLOSURE (I) (JT132810)
- ITS POLE (I) (JT830102)
P5-50' POLE
I-25-2014
STA 1797+17, 97' RT
FO SPLICE (BY OTHERS) -
FO CONNECTION HARDWARE, TYPE 1 (I) (JT160340) -
CHH (ISTHA) (E)
3 ADDENDUM #307/02/2025
2092305051
F L
A G
P O
L E
J
W V
W V W
ALTE
H
ALTE
J
H
M
V
V
E ET
ET
ET
V
V
C
1812 1811 1814 1813 1808 1810+00 1809 1820+00 1819 1821 1816 1815+00 1818 1817
D M
S
45+
40+00
51 50+00
P t a
.3
POT Sta 116+60.17
PT Sta 116+27.38
115+00 112 114 113
O N
L Y
O N
L Y
O N
L Y
ONLYONLY
ENGINEERING GROUP
L A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -2
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:5
:5
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
PR ¡ TRI-STATE TOLLWAY I-294
A
T C
H
L
IN
E
S
T A
T
IO
N
M A
T C
H
L
IN
E
S
T A
T
IO
N
K12
K6
D M
S TRI-STATE TOLLWAY I-294 (SB)
TRI-STATE TOLLWAY I-294 (NB)
CONDUIT / CABLE DESCRIPTION
MP 34.3
ITS-20
STA 1808+00 to STA 1822+00
ITS PROPOSED PLANLOHII
HM
04/03/2025
04/03/2025
M A
T C
H
L
IN
E
S
T A
T
IO
N
STA 1810+95, 80' RT
EHH (ISHTA) (E)
STA 1810+75, 80' RT
CHH (CONDO/LEASED) (E)
STA 1810+65, 80' RT
F3
D3 D2
2 2 3
F3D2
STA 1813+85, 80' RT
CHH (ISTHA) (E)
STA 1810+95, 80' RT
EHH (ISHTA) (E)
STA 1814+05
CHH (ISTHA) (E)
K12N3
DISCONNECT SWITCH (I) (JT132814)
NOTES:
STA. 1814+75
294S034.4DMS001
EXISTING DMS
K6
2-1/C #6 (JT817753)
1-1/C #4 (GRD) (JT817754)
2-1/C #1/0 (JT817756)
TRANSFORMER
EXISTING ELECTRIC SERVICE
100A, 480/240V, 1P, 3W
METER AND PEDESTAL
EXISTING ELECTRIC SERVICE
STA 1810+75, 113' LT
CHH (ISTHA) (E)
C H1 I1 F5 G1 M1 J1
STA 1815+03, 134' LT
D3
STA. 1815+79, 134' LT
AND DMS NOT SHOWN)
(EX FOC BETWEEN DMS CABINET
EXISTING DMS CABINET
D3SEE NOTE 2
D3SEE NOTE 3
AND GANTRY SIGNS ARE NOT SHOWN BUT SHALL BE PROVIDED
FIBER OPTIC CABLES BETWEEN ATM GANTRY CABINET3)
IS NOT SHOWN ON PLANS.
EXISTING FIBER OPTIC CABLE BETWEEN DMS CABINET AND DMS2)
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
STA. 1812+00, 110' RT
294N034.3MVD001
294N034.3CAM001
- FOC, ITS ASSEMBLY (I) (JT132830)
- SITE GROUNDING (I) (JT134037)
- MVDS (I) (JT132845)
- CAM (I) (JT132820)
- ITS POLE MOUNTED ENCLOSURE (I) (JT132810)
- ITS POLE (I) (JT830102)
P7-50' POLE
STA. 1812+10
294S034.3MVD002
- MVDS (I) (JT132845)
- MEDIAN ITS POLE (I) (JT830220)
P8-22.5' POLE
I-25-2014
STA 1810+85, 80' RT
FO SPLICE (BY OTHERS) -
FO CONNECTION HARDWARE, TYPE 1 (I) (JT160340) -
2092305152
24" RCP
A L
ET
ET
E
E
J
A L
ET
A L
ET
J
IPDCIPDC
B T
T E
TE
C
1862 1861 1864 1863 1858 1857 1860+00 1859 1856 1853 1852 1855+00 1854 1851 1850+00
86 85+00 88 87 82 81 84 83 89 95+00 94 91 90+00 93 92
ENGINEERING GROUP
L A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -2
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:3
:0
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
T C
H
L
IN
E
S
T A
T
IO
N
M A
T C
H
L
IN
E
S
T A
T
IO
N
BLUETOOTH
SERVICE
IPDC ELECTRIC
K12 K6
K6
K6
K3K8K6 K12
(JT130754)
ELECTRICAL WORK
IPDC-14 (E)
K8 K3K12
K8 K3
K12
TRI-STATE TOLLWAY I-294 (NB)
CONDUIT / CABLE DESCRIPTION
MP 35.30
K6
ITS-23
STA 1850+00 to STA 1864+00
ITS PROPOSED PLANLOHII
HM
04/03/2025
04/03/2025
STA 1858+70, 106' RT
EHH (ISHTA) (E)
STA 1858+50, 106' RT
CHH (CONDO/LEASED) (E)
STA 1858+40, 106' RT
STA 1850+10, 112' RT
CHH (ISTHA) (E)
STA 1850+05
STA 1850+05
CHH (ISTHA) (E)
STA 1852+63, 112' LT
TRI-STATE TOLLWAY I-294 (SB)
SEE NOTE 1, SHEET ITS-18
STA. 1852+45, 112' LT
- FOC, ITS ASSEMBLY (JT32830)
- (1) DMS ELECTRICAL WORK TYPE 2W (I) (JT132623)
- (1) GANTRY ONLY ELECTRICAL WORK (I) (JT135095)
ATM CABINETS (SEE NOTE 5)
STA. 1863+26
294N035.3BTH001
BTH (I) (JT131316) -
MEDIAN ITS POLE (I) (JT830220) -
P14-22.5' POLE
K3
1-1/C #6 (GRD) (JT817753)
2-1/C #4 (JT817754)
1-1/C #4 (GRD) (JT817754)
2-1/C #1/0 (JT817756)
K8
1-1/C #2 (GRD) (JT817755)
2-1/C #3/0 (JT817759)
AND GANTRY SIGNS ARE NOT SHOWN BUT SHALL BE PROVIDED
FIBER OPTIC CABLES BETWEEN ATM GANTRY CABINET6)
ATM CABINETS.
POWER GOES TO ITS DISCONNECT SWITCH BEFORE ENTERING5)
POWER CONNECTIONS.
SEE ITS PROPOSED PLAN SHEETS ITS-17 TO ITS-28 FOR ALL4)
POWER AND COMMUNICATIONS WIRING DETAILS.
REFER TO SHEET DET-24 AND DET-25 FOR ATM GANTRY INTERNAL3)
REFER TO SHEET DET-22 TO DET-32 FOR ATM GANTRY DETAILS.2)
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
STA 1858+80, 123 LT
CHH (ISTHA) (E)
STA. 1863+04, 118' RT
294N035.3MVD001
294N035.3CAM001
FOC, ITS ASSEMBLY (I) (JT132830) -
GROUNDING (I) (JT134037) -
MVDS (I) (JT132845) -
CAM (I) (JT132820) -
ITS POLE MOUNTED ENCLOSURE (I) JT132810) -
ITS POLE (I) (JT830102) -
P13-50' POLE
I-25-2014
STA 1858+60, 106' RT
- FO SPLICE (BY OTHERS)
TYPE 1 (JT160340)
- FO CONNECTION HARDWARE,
CHH (ISTHA) (E)
STA. 1851+35
294S035.1DMS001
294S035.1LCS00X
- (1) LCS TYPE1 (I) (JT132090)
- DMS TYPE 2W (I) (JT132046)
- (6) LCS TYPE2 (I) (JT132092)
ATM 66 (SEE NOTE 5)
STA. 1851+35
294N035.1DMS001
294N035.1LCS00X
- (1) LCS TYPE 1 (JT132090)
- (7) LCS TYPE 2 (JT132092)
ATM 67 (SEE NOTE 5)
3 ADDENDUM #307/02/2025
2092305455
A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -2
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:3
:1
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
E
L
A LTE
TE
L
T E
,6
"5 ,5
,6
,5
,8
"4
C
1875+00
400+00
402 405+00
1870+00 1869
5+00
95+
+00
T C
H
L
IN
E
S
T A
T
IO
N
M A
T C
H
L
IN
E
S
T A
T
IO
N
G R
A N
D
A
V E
N U
E
NORTHWEST AVE
K8
K8 K8 K3
K8 K3
TRI-STATE TOLLWAY I-29
4 (SB)
TRI-STATE TOLLWAY I-29
4 (NB)
CONDUIT / CABLE DESCRIPTION
MP 35.50
ITS-24
STA 1864+00 to STA 1876+00
ITS PROPOSED PLANLOHII
HM
STA 1867+89, 111' RT
EHH (ISHTA) (E)
STA 1867+69, 111' RT
CHH (CONDO/LEASED) (E)
STA 1867+59, 111' RT
B
STA 1871+50, 120' RT
EHH (ISHTA) (E)
STA 1871+30, 120' RT
CHH (CONDO/LEASED) (E)
STA 1874+29, 121'' RT
FUTURE DUPAGE COUNTY TIE-IN
STA 1868+99, 276' RT
CHH (ISHTA/CONDO/LEASE) (E)
STA 1872+69, 122' LT
CHH (ISHTA) (E)
D3
STA 1867+69, 125' RT
CHH (ISHTA/CONDO/LEASE) (E)
EXISTING THIRD PARTY TIE IN LOCATION
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
1-1/C #6 (GRD) (JT817753)
2-1/C #4 (JT817754)
K8
1-1/C #2 (GRD) (JT817755)
2-1/C #3/0 (JT817759)
K12
STA. 1872+91, 145' LT
294N035.5MVD001
294N035.5CAM001
- FOC, ITS ASSEMBLY (I) (JT132830)
- GROUNDING (I) (JT134037)
- MVDS (I) (JT132845)
- CAM (I) (JT132820)
- ITS POLE MOUNTED ENCLOSURE (I) (JT132810)
- ITS POLE (I) (JT830102)
P15-50' POLE
I-25-2014
STA 1867+79, 111' RT
FO SPLICE (BY OTHERS) -
- FO CONNECTION HARDWARE, TYPE 1 (JT160340) -
CHH (ISTHA) (E)
STA 1871+40, 120' RT
- FO SPLICE (BY OTHERS)
- FO CONNECTION HARDWARE, TYPE 1 (JT160340)
2092305556
W V
W V
E
TAL E
E
J
W V
W V
,5 ,5 ,7 ,7
1"
W V
W V
1880+00
1883 1882
1885+00
420+00
415+00 414
+00
315+00
ENGINEERING GROUP
L A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY7
U
S E
R N
A M
E
P L O
T D
A T E
P L O
T T E
D B
Y p w a e c o m -n a -p w .b e n tl e y .c o m :A
E C
O M
D
S
N A D o c u m e n ts -C e n tr a l T ri -S ta te D
C M W o rk P a c k a g e s I- -4
-M
S T -I
T S I T S
-4 D
G N S
H T -S
H T -I
T S -2
-D
E G .d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D
P L O
T D
R
IV
E R
P L T
D R
V L
P E
N T
A B
L E
P E
N T
B L L
P L O
T T
IM
E
:3
:5
P
M
PAGE SIZE:PLOT SCALE: 100.0000 ' / in. $SHEETSIZE$
REVISIONS
CONTRACT NO.
100%
TRI-STATE TOLLWAY I-294 (SB)
TRI-STATE TOLLWAY I-294 (NB)
SEE ITS DETAIL-23
STA. 1771+39
294S033.5RTSXXDXXX
294S033.SCAMXXDXXX
-FOC ASSEMBLY (1) (JT132830)
-WALL MOUNTED
-SERVICE PAD (JT836028)
-SITE GROUNDING - POLE MOUNTED ASSEMBLY (JT134037)
-DISCONNECT SWITCH ASSEMBLY (JT132814)
-MVDS (JT132845)
-CCTV CAMERA IST ASSEMBLY (JT135044)
-ITS CABINET (JT132820)
-ITS POLE (JT830070)
P112-50' POLE
CONDUIT / CABLE DESCRIPTION
ITS-25
STA 1876+00 to STA 1888+00
ITS PROPOSED PLAN
SEE ITS PROPOSED PLAN SHEETS ITS-XXX, FOR IPDC POWER ROUTE.5.
MOUNTED CABINET FOUNDATION DETAIL.
SEE SHEETS DET-XX TO DET-XX FOR ATM GROUND 4.
FOR BACKBONE FIBER AND POWER CONNECTIONS.
SEE ITS PROPOSED PLAN SHEET (ITS-XXX TO ITS-XXX)3.
POWER AND COMMUNICATIONS WIRING DETAIL.
SEE SHEET DET-XX AND DET-XX FOR GANTRY INTERNAL2.
SEE SHEET DET-XX FOR GANTRY SITE PLAN DETAIL.1.
LOHII
HM
04/03/2025
04/03/2025
RAMP S2
K8
K2
K2
K6
K6
STA 1878+16, 122' RT
EHH (ISHTA) (E)
STA 1878+46, 0' LT/RT
CHH (ISHTA) (E)
STA 1877+96, 122' RT
CHH (CONDO/LEASED) (E)
STA 1878+16, 122' RT
CHH (AT&T) (E)
FOC, SM, 48 FIBERS (IT) (JT160372)
FOC, SM, 72 FIBERS (ITS) (XXXXXX13)
1-1/C #2 (GRD) (JS817215)
2-1/C #3/0 (JS817218)
A
T C
H
L
IN
E
S
T A
T
IO
N
M A
T C
H
L
IN
E
S
T A
T
IO
N
2-1/C #6 (JT817753)
1-1/C #4 (GRD) (JT817754)
2-1/C #1/0 (JT817756)
K8
1-1/C #2 (GRD) (JT817755)
2-1/C #3/0 (JT817759)
BY THE CONTRACTOR PER THE CONTRACT SPECIFICTIONS.
AND GANTRY SIGNS ARE NOT SHOWN BUT SHALL BE PROVIDED
FIBER OPTIC CABLES BETWEEN ATM GANTRY CABINET6)
ATM CABINETS.
POWER GOES TO ITS DISCONNECT SWITCH BEFORE ENTERING5)
POWER CONNECTIONS.
SEE ITS PROPOSED PLAN SHEETS ITS-17 TO ITS-28 FOR ALL4)
POWER AND COMMUNICATIONS WIRING DETAILS.
REFER TO SHEET DET-24 AND DET-25 FOR ATM GANTRY INTERNAL3)
REFER TO SHEET DET-22 TO DET-32 FOR ATM GANTRY DETAILS.2)
CALLOUT DESIGNATIONS.
REFER TO SHEET ITS-14 FOR ITS LEGEND AND CONDUIT / CABLE1)
SEE NOTE 6
I-25-2014
STA 1878+06, 122' RT
- FO SPLICE (BY OTHERS)
- FO CONNECTION HARDWARE, TYPE 1 (JT160340)
CHH (ISTHA) (E)
SEE NOTE 1
STA. 1878+75
294N035.6LCS00X
- (1) LCS TYPE1 (I) (JT132094)
- (8) LCS TYPE2 (I) (JT132096)
ATM 68 (SEE NOTE 5)
SEE NOTE 1
STA. 1876+60, 126' RT
FOC, ITS ASSEMBLY (I) (JT132830) -
(1) DMS ELECTRICAL WORK TYPE 2W (I) (JT132623) -
(1) GANTRY ONLY ELECTRICAL WORK (I) (JT135095) -
ATM CABINETS (SEE NOTE 5)
STA. 1878+75
294N035.6LCS00X
- (1) DMS TYPS 2W (I) (JT132046)
- (1) LCS TYPE 1 (I) (JT132090)
- (5) LCS TYPE 2 (I) (JT132092)
ATM 69 (SEE NOTE 5)
2092305657
A LT E
E T
ETL
E
T
J
5",5"
4"
5",7" 5",8",9",10"
14"5",8",11",12",13"
5",5",6","12"
4",5"
6",8",8"
12",12",14",15",15"
6"
4",4",5",5",6",7",8"
5",7"
4",4"
8"
4"
12"
6"
6"5"
6"
9" 4"4"
4"5" 5"
5"
17"7"
8"
4",5",6"7"
4",4"
4",4" 6"5"
6"6"
5" 4"
14"
4",6",8",10",10"
12"
4",4",5"
B T
C C
C C
T
T
1895+00
1894 1893
1900+00
+00
425+00
310+00
ENGINEERING GROUP
L A
K E
R T
H
A
V E
WOLF
RD
G R
A N
D
A
V E
F R
A N
K L
IN
A
V E
KEY MAP
ITS-1
ITS-1
ITS-1
ITS-2
ITS-2
ITS-2
ITS-24 ITS-25
IT
S
I T S
I T S
ITS-2
2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE: THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .