Attachment_24_FMD-42_and_FMD-67.pdf

PDF 463 KB Posted

Attached to
Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for Repairs, Alterations, and/or Construction
Solicitation number
HSFLAR-14-R-00002
Issued by

About this file

Attachment 24 FTC-FMD 42 and FTC-FMD-67

View the file

Other files

File Type Posted
HSFLAR-14-R-00002-000005_signed.pdf PDF
HSFLAR-14-R-00002-000004_signed.pdf PDF
HSFLAR-14-R-00002-000003_signed.pdf PDF
HSFLAR-14-R-00002-000002_signed.pdf PDF
HSFLAR-14-R-00002-000001_signed.pdf PDF
Attachment_10_FTC-SEM-17_Badge_Ap.pdf PDF
Attachment_4_-_Construction_FTC-FMD-66.pdf PDF
Attachment_19_Fraud_Hotline_Poster.pdf PDF
Attachment_16_-_SF_1444.pdf PDF
Attachment_6_SF_25A.pdf PDF
HSFLAR-14-R-00002_without_attachments.pdf PDF
Attachment_2_-_Specifications.pdf PDF
Attachment_12_85P.pdf PDF
Attachment_8_Format_ILC.pdf PDF
Attachment_17_SF_24.pdf PDF
Attachment_18_SF_DISC_OF_LOBBY_ACT.pdf PDF
Attachment_15_-_SF1413.pdf PDF
Attachment_21_Sample_Transmittal_Letter.pdf PDF
Attachment_20_Past_Performance_Questionaire.pdf PDF
Attachment_22_Client_Authorization_Letter.pdf PDF
Attachment_1_-_DBWs.pdf PDF
Attachment_3_-_OF347.pdf PDF
Attachment_9_Format_FIN_INST_ILC_CONFIRM.pdf PDF
Attachment_11_-_OF_306.pdf PDF
Attachment_14_-_Security_Training_List.pdf PDF
Attachment_13_Security_Handout.pdf PDF
Attachment_5_-_SF_25.pdf PDF
Attachment_23_Questionaire_Tracking_Record.pdf PDF
Attachment_7_SF_28_Affidavit_Ind_Surety.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTC-FMD-42 (12/09) 1 of 2

CONTRACT NO. TITLE AND LOCATION DATE

REPORT NO.

CONTRACTOR (Prime or Subcontractor) NAME OF SUPERINTENDENT OR FOREMAN

WEATHER - A.M. TEMPERATURE - A.M. F

WEATHER - P.M. TEMPERATURE - P.M. F

EMPLOYER

DAILY REPORT TO INSPECTOR

LOCATION AND DESCRIPTION OF WORK

PERFORMED

(Use additional sheets if required)

PRIME CONTRACTOR / SUBCONTRACTOR WORKFORCE

NUMBER TRADE HOURS

INSPECTION AND / OR TESTING

PERFORMED TODAY - - FOLLOW

WITH REPORT

TOTAL WORK HOURS

ON JOB SITE THIS

DATE

CUMULATIVE TOTAL

OF HOURS FROM

PREVIOUS REPORT

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

REMARKS

RESULTS OF INSPECTIONS/

TESTING

LOCATION AND / OR

ELEMENT OF WORK

SPEC.PARA.

AND / OR

DRAWING NO.

EQUIPMENT / MATERIAL RECEIVED TODAY

TO BE INCORPORATED IN JOB

(Description, Sizes, Quantity)

SUBMITTAL NO. OR

CERTIFICATION

DATE

APPROVED

YES NO

ATTACHMENT 24 FMD-42 AND FMD-67

ATTACHMENT 24 FMD-42 AND FMD-67 Page 1 of 2

FTC-FMD-67 (12/09) 1 of 2

1. Contractor 2. Report No.

3. Contract No. Location 4. Sheet No.

A.M. Temper- A.M.

P.M. ature P.M.

7. CONTRACTOR

SUB-CONTRACTOR

CONTRACTOR'S QUALITY CONTROL DAILY REPORT

8. LOCATION & DESCRIPTION OF WORK PERFORMED THIS DATE

Short Title

Complete report in detail daily. If more space is needed, attach additional sheets. CQC REP to date and initial sheets. Attach test reports, delivery slips, references and Daily Report to Inspector per contract specification. Box 7 - Indicate contractor or trade responsible for work described in Box 8. Box 9 - as applicable. Box 11 - Note all deficiencies.

6. Date5. Weather

9. SPEC/PAR

AND/OR DWG. NO.

ATTACHMENT 24 FMD-42 AND FMD-67

ATTACHMENT 24 FMD-42 AND FMD-67 Page 2 of 2

File details come from the government source that posted it. Updated .