Attachment_2_-_Specifications.pdf

PDF 7 MB Posted

Attached to
Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for Repairs, Alterations, and/or Construction
Solicitation number
HSFLAR-14-R-00002
Issued by

About this file

Attachment 2 Technical Specifications

View the file

Other files

File Type Posted
HSFLAR-14-R-00002-000005_signed.pdf PDF
HSFLAR-14-R-00002-000004_signed.pdf PDF
HSFLAR-14-R-00002-000003_signed.pdf PDF
HSFLAR-14-R-00002-000002_signed.pdf PDF
HSFLAR-14-R-00002-000001_signed.pdf PDF
Attachment_10_FTC-SEM-17_Badge_Ap.pdf PDF
Attachment_4_-_Construction_FTC-FMD-66.pdf PDF
Attachment_19_Fraud_Hotline_Poster.pdf PDF
Attachment_16_-_SF_1444.pdf PDF
Attachment_6_SF_25A.pdf PDF
HSFLAR-14-R-00002_without_attachments.pdf PDF
Attachment_12_85P.pdf PDF
Attachment_8_Format_ILC.pdf PDF
Attachment_17_SF_24.pdf PDF
Attachment_18_SF_DISC_OF_LOBBY_ACT.pdf PDF
Attachment_15_-_SF1413.pdf PDF
Attachment_21_Sample_Transmittal_Letter.pdf PDF
Attachment_20_Past_Performance_Questionaire.pdf PDF
Attachment_22_Client_Authorization_Letter.pdf PDF
Attachment_1_-_DBWs.pdf PDF
Attachment_3_-_OF347.pdf PDF
Attachment_9_Format_FIN_INST_ILC_CONFIRM.pdf PDF
Attachment_11_-_OF_306.pdf PDF
Attachment_24_FMD-42_and_FMD-67.pdf PDF
Attachment_14_-_Security_Training_List.pdf PDF
Attachment_13_Security_Handout.pdf PDF
Attachment_5_-_SF_25.pdf PDF
Attachment_23_Questionaire_Tracking_Record.pdf PDF
Attachment_7_SF_28_Affidavit_Ind_Surety.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 01 14 00 Page 1

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Not used

1.2 NOT USED

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Identification Badges and Installation Access

Identification badges are required and will be furnished without charge.

Application for and use of badges will be as directed by the Contracting

Officer. Immediately report instances of lost or stolen badges to the

Contracting Officer. See Section H regarding lost badges. All badges must be immediately returned to the point of issue upon badge expiration, contract completion, firing or removal of employee, or at the request of the approving authority.

1.3.1.3 Employee List

The Contractor shall provide to the Contracting officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract.

1.3.1.4 Personnel Entry Approval

Failure to obtain entry approval will not affect the task order price or time of completion.

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

Section 01 14 00 Page 2

1.3.1.5 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installations under the cognizance of FLETC except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The

Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours shall consist of a 10 hour period established by the

Contracting Officer, between 7:00 a.m. and 5:00 p.m., Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 3 to 5 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied and Existing Buildings

The Contractor will be working in existing occupied buildings.

The existing buildings and their contents shall be kept secure at all times.

Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the building during the construction period.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and sprinkler shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruption shall be further limited to 8 hours. This time limit includes time for deactivation and reactivation.

ATTACHMENT #2 - SPECIFICATIONS

Section 01 14 00 Page 3

d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.4 SECURITY REQUIREMENTS

Refer to the basic contract for security requirements.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

-- End of Section --

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

Requirements of this Section apply to, and are component to, each section of the specifications.

The Government may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control Manager (QCM) to check and approve all items prior to submittal and stamp, sign, and date indicating action taken.

Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including

(but not limited to) catalog cuts, diagrams, operating charts or curves;

test reports; test cylinders; samples; O&M manuals (including parts list);

certifications; warranties; and other such required submittals.

Submittals requiring Government approval will be identified by each task order and are to be scheduled and made prior to the acquisition of the material or equipment covered thereby.

Submittals will be received from and returned to the Contractor electronically.

1.1 DEFINITIONS

1.1.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Certificates of insurance

Surety bonds

Qualifications, Certifications, Resumes, and Appointment Letters for

Quality Control Manager, Project Manager and Superintendent

List of proposed subcontractors and suppliers

Accident Prevention and safety plan

Quality Control(QC) plan

Environmental Protection and Waste Management plan

Indoor Air Quality Management Plan

These submittals are to be made a minimum of seven (7) days prior to the scheduled Preconstruction Conference and require Government approval prior to

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 2

Notice To Proceed and work commencement on site. See the related Division 1 specification sections such as Quality Control, Project Schedule, Environmental Controls/Management, Waste Management, Safety Requirements.

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the

Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 3

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

Text of posted operating instructions.

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.

Factory test reports.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment.

This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

This data is intended to be incorporated in an operations and maintenance manual or control system.

SD-11 Closeout Submittals

SECTION 01 33 00 Page 4

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a construction contract.

For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

1.1.2 Approving Authority

The QCM has approval authority for all submittals not specifically designated in Task Orders.

1.2 SUBMITTALS

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.3.1 Government Approved

Submittal is required in accordance with all contract requirements and prior to fabrication, delivery, and start of any related work activity. The

Government reserves the right to suspend work activities initiated without approved submittals. Government approval is required for submittals identified in each task order. Government approval is required for any deviations from the Accepted Proposal and other items as designated by the

Contracting Officer.

1.3.2 QCM Approved - Information Only

Submittals not requiring Government approval will be approved by the Quality

Control Manager and made available to the Government if requested for information only. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Government from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the

Contractor of the requirement to furnish samples for testing by the

Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.4 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL

1.4.1 Submittals Required from the Contractor

As soon as practicable after task order award, and before procurement of fabrication, forward electronic submittals outlined in each Task Order to the FMD PM.

The Government PM for each task order will review stamped submittals to verify submittals comply with the contract requirements.

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 5

1.4.1.1 O&M Data

The Government PM for each task order will review O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold progress payments until the O&M Data is submitted and approved.

1.5 PREPARATION

1.5.1 Transmittal Form

Transmit each submittal, except sample installations and sample panels to the FMD Project Manager. Transmit each copy of the submittal in the format of the Agency sample transmittal form to be provided by the COR. On the transmittal form identify Contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled "Identifying Submittals." Process transmittal forms to record actions regarding sample mock-ups, installations, panels.

Properly complete this form by filling out all the heading blank spaces and identifying each item submitted by section, submittal description (SD) number, and paragraph reference number. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item. Assign each submittal a transmittal number.

1.5.2 Identifying Submittals

When submittals are provided by a lower tier contractor the Prime Contractor is to prepare, review and stamp with Contractor's approval all specified submittals prior to submitting for Government approval.

Identify submittals, except sample installations and sample panels, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:

a. Task Order title and location.

b. Task Order number.

c. Date of the submittal.

d. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.

e. Section number of the specification section by which submittal is required.

f. Submittal description (SD) number of each component of submittal.

SECTION 01 33 00 Page 6

g. For resubmittals, add an alphabetic suffix on the submittal description, for example, submittal 18 would become 18A, to indicate resubmission.

h. Product identification and location in project.

i. Quality Control Manager's certification stamp.

1.5.3 Format for SD-02 Shop Drawings

a. Prepare drawings to accurate size, with scale indicated, unless other form is required. Drawings are to be suitable for reproduction and be of a quality to produce clear, distinct lines and letters with dark lines on a white background.

b. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."

c. Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location adjacent to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.

d. Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.

e. Include the nameplate data, size and capacity on drawings.

f. Reproductions of the task order drawings will not be accepted as shop drawings. Such submittals will be rejected.

1.5.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions

a. Present product data submittals for each section as a complete set.

Include table of contents, listing page and catalog item numbers for product data.

b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.

c. Provide product data in English dimensions.

d. Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, submit as specified for

SD-07 Certificates.

e. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International

(ASTM), National Electrical Manufacturer's Association (NEMA), ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 7

Underwriters Laboratories (UL), and Association of Edison

Illuminating Companies (AEIC), submit proof of such compliance.

The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the

Contracting Officer. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.

f. Collect required data submittals for each specific material, product, unit of work, or system into a single submittal and marked for choices, options, and portions applicable to the submittal.

Mark each copy of the product data identically.

g. Submit manufacturer's instructions prior to installation.

1.5.5 Format of SD-04 Samples

a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:

(1) Sample of Equipment or Device: Full size.

(2) Sample of Materials Less Than 2 by 3 inches: Built up to A4

8 1/2 by 11 inches.

(3) Sample of Materials Exceeding A4 8 1/2 by 11 inches: Cut down to A4 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.

(4) Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.

(5) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.

(6) Color Selection Samples: 2 by 4 inches. Where samples are specified for selection of color, finish, pattern, or texture, submit the full set of available choices for the material or product specified. Sizes and quantities of samples are to represent their respective standard unit.

(7) Sample Panel: 4 by 4 feet.

(8) Sample Installation: 25 square feet.

b. Samples Showing Range of Variation: Where variations in color, finish, pattern, or texture are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range. Mark each unit to describe its relation to the range of the variation.

SECTION 01 33 00 Page 8

c. Reusable Samples: Incorporate returned samples into work only if so specified or indicated. Incorporated samples are to be in undamaged condition at time of use.

d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final cleanup of project.

e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.

1.5.6 Format of SD-05 Design Data and SD-07 Certificates

Provide design data and certificates electronically.

1.5.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports

a. Provide reports electronically.

b. Indicate by prominent notation, each report in the submittal.

Indicate specification number and paragraph number to which it pertains.

1.5.8 Format of SD-10 Operation and Maintenance Data (O&M)

Comply with the requirements specified in Section OPERATION AND

MAINTENANCE DATA for O&M Data format.

1.5.9 Format of SD-01 Preconstruction Submittals and SD-11 Closeout

Submittals

a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.

b. Provide all dimensions in administrative submittals in English units.

1.6 QUANTITY OF SUBMITTALS

1.6.1 Number of Copies on SD-01 Preconstruction Submittals

Submit four copies of Preconstruction submittals.

1.6.2 Number of Samples SD-04 Samples

a. Submit three samples or sets of samples showing range of variation, of each required item. Two approved samples or sets of samples will be retained by approving authority and one will be returned to

Contractor.

b. Submit one sample panel or provide one sample installation where directed. Include components listed in technical section or as directed.

SECTION 01 33 00 Page 9

c. Submit one sample installation, where directed.

d. Submit three samples of non-solid materials.

1.6.3 Number of Copies of SD-10 Operation and Maintenance Data

Submit two hard copies of O&M Data to the Government for review and approval.

1.6.4 Number of Copies of SD-11 Closeout Submittals

Unless otherwise specified, submit two sets of Close-Out submittals.

1.7 VARIATIONS / SUBSTITUTION REQUESTS

Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.

1.7.1 Considering Variations

Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals.

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the

Government.

1.7.2 Proposing Variations

When proposing variation, deliver written request to the Contracting

Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

1.7.3 Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.7.4 Variations Review Schedule

When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.8 SUBMITTAL REGISTER

The Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

SECTION 01 33 00 Page 10

Coordinate the submittal dates with the related project activities to avoid any delay to work progress. Revise the submittal register when the progress schedule is revised and submit both for approval.

1.8.1 Use of Submittal Register

Verify that all submittals required for a task order are tracked in the submittal register.

1.9 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 7 working days for submittals for QC Manager approval and 7 working days for submittals for Government approval. Period of review for submittals with Government approval begins when the Government receives submittal from the QC organization.

c. Period of review for each resubmittal is the same as for initial submittal.

1.9.1 Reviewing, Certifying, Approving Authority

The QC organization is responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the QC Manager unless submittals are specifically identified in a task order. Request for submittals in a task order signifies the requirement for Government Approval for only those submittals identified.

1.9.2 Constraints

a. Conform to provisions of this section, unless explicitly stated otherwise by a task order.

b. Submit complete submittals for each definable feature of work.

Submit at the same time components of definable feature interrelated as a system.

c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.

d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 11

1.9.3 QC Organization Responsibilities

It is the responsibility of the QC manager to coordinate all submittals with subcontractors, manufacturers, suppliers, etc. to insure all submittals are complete and represent entire systems where multiple subcontractors, supplier, etc. combine to make up an operating system.

a. Note date on which submittal was delivered by Contractor on each transmittal.

b. Review each submittal; and check and coordinate each submittal with requirements of work and contract documents.

c. Review submittals for conformance with task order design concepts and compliance with contract documents.

d. Act on submittals, determining appropriate action based on QC organization's review of submittal.

e. Ensure that material is clearly legible. Submittals containing illegible materials will be entirely rejected.

f. Stamp each submittal with QC certifying statement or approving statement.

(1) QC organization will certify submittals forwarded to the

Government PM with the following certifying statement:

"I hereby certify that the equipment, material, article shown and marked in this submittal is that proposed to be incorporated with contract Number _____, is in compliance with the contract drawings and specification, can be installed in the allocated spaces, and is submitted for Government approval.

Certified by Submittal Reviewer _____________________, Date _______

(Signature when applicable)

Certified by QC Manager _____________________________, Date ______"

(Signature)

(2) When approving authority is QC Manager, QC Manager will use the following approval statement when returning submittals to

Contractor as "Approved" or "Approved as Noted."

"I hereby certify that the material, equipment, article shown and marked in this submittal and proposed to be incorporated with contract

Number _____, is in compliance with the contract drawings and specification, can be installed in the allocated spaces, and is approved for use.

Certified by Submittal Reviewer ______________________, Date ______

(Signature when applicable)

Approved by QC Manager _______________________________, Date _____"

(Signature)

SECTION 01 33 00 Page 12

g. Sign certifying statement or approval statement. The QC organization member designated in the approved QC plan is the person signing certifying statements.

Update submittal register as submittal actions occur and maintain the submittal register at project site until final acceptance of all work by Government.

h. Retain a copy of approved submittals at project site, including

Contractor's copy of approved samples.

1.10 GOVERNMENT APPROVING AUTHORITY

The Government will:

a. Note date on which submittal was received from QC Manager.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled "Submittal Actions" and with markings appropriate for action indicated.

1.10.1 Review Notations

Submittals will be returned with the following notations:

a. Submittals marked "approved" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

1.11 DISAPPROVED OR REJECTED SUBMITTALS

Contractor shall make corrections required by the Government. If the

Contractor considers any correction or notation on the returned submittals to constitute a change to the task order drawings or specifications; notice as required under the clause entitled, "Changes" is to be given to the

Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 13

1.12 APPROVED SUBMITTALS

The Government's approval or acceptance of submittals is not be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for verification of dimensions and the compliant construction of all work. After submittals have been approved or accepted by the

Government, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.13 APPROVED SAMPLES

Approval of a sample is not to be construed to change or modify any contract requirements. Before submitting samples, the Contractor is to assure that the materials or equipment will be available in quantities required in the project. No substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapproved any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.

Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

1.14 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained. No payment for materials incorporated in the work will be made if all required Government approvals have not been obtained. No payment will be made for any materials incorporated into the work for any conformance review submittals or information only submittals found to contain errors or deviations from the Contract.

1.15 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:

ATTACHMENT #2 - SPECIFICATIONS

SECTION 01 33 00 Page 14

| CONTRACTOR |

| (Firm Name) |

| _____ Approved |

| _____ Approved with corrections as noted on submittal data and/or |

| attached sheets(s) |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

Section 01 42 00 Page 1

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

08/10

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization, (e.g. ASTM B564 Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

38800 Country Club Drive

Farmington Hills, MI 48331

Ph: 248-848-3700

Fax: 248-848-3701

E-mail: bkstore@concrete.org

Internet: http://www.concrete.org

AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL (AMCA)

30 West University Drive

Arlington Heights, IL 60004-1893

Ph: 847-394-0150

Fax: 847-253-0088

E-mail: amca@amca.org

Internet: http://www.amca.org

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

2111 Wilson Blvd, Suite 500

Arlington, VA 22201

Ph: 703-524-8800

Fax: 703-528-3816

E-mail: fdietz@ahrinet.org

Internet: http://www.ahrinet.org

ALUMINUM ASSOCIATION (AA)

National Headquarters

1525 Wilson Boulevard, Suite 600

Arlington, VA 22209

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

../%22http:/www.concrete.org%22 ../%22http:/www.amca.org%22 ../%22http:/www.ahrinet.org%22

Section 01 42 00 Page 2

Ph: 703-358-2960

Fax: 703-358-2961

Internet: http://www.aluminum.org

AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)

1827 Walden Office Square

Suite 550

Schaumburg, IL 60173-5774

Ph: 847-303-5664

Fax: 847-303-5774

E-mail: webmaster@aamanet.org

Internet: http://www.aamanet.org

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

444 North Capital Street, NW, Suite 249

Washington, DC 20001

Ph: 202-624-5800

Fax: 202-624-5806

E-Mail: info@aashto.org

Internet: http://www.aashto.org

AMERICAN ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC)

1 Davis Drive

P.O. Box 12215

Research Triangle Park, NC 27709

Ph: 919-549-8141

Fax: 919-549-8933

E-mail: leonardc@aatcc.org

Internet: http://www.aatcc.org

AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)

2025 M Street, NW, Suite 800

Washington, DC 20036

Ph: 202-367-1155

Fax: 202-367-2155

E-mail: info@americanbearings.org

Internet: http://www.abma-dc.org

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

1330 Kemper Meadow Drive

Cincinnati, OH 45240

Ph: 513-742-2020 or 513-742-6163

Fax: 513-742-3355

E-mail: mail@acgih.org

Internet: http://www.acgih.org

AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)

2700 Prosperity Ave., Suite 250

Fairfax, VA 22031

Tel: 703-849-8888

Fax: 703-207-3561

E-mail: infonet@aiha.org

Internet http://www.aiha.org

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

One East Wacker Drive, Suite 700

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

../%22http:/www.aluminum.org%22 ../%22http:/www.aamanet.org%22 ../%22http:/www.aashto.org%22 ../%22http:/www.aatcc.org%22 ../%22http:/www.abma-dc.org%22 ../%22http:/www.acgih.org%22 ../%22http:/www.aiha.org%22

Section 01 42 00 Page 3

Chicago, IL 60601-1802

Ph: 312-670-2400

Fax: 312-670-5403

Publications: 800-644-2400

E-mail: pubs@aisc.org

Internet: http://www.aisc.org

AMERICAN IRON AND STEEL INSTITUTE (AISI)

1140 Connecticut Avenue, NW, Suite 705

Washington, DC 20036

Ph: 202-452-7100

Fax: 202-463-6577

E-mail: webmaster@steel.org

Internet: http://www.steel.org

AMERICAN LUMBER STANDARDS COMMITTEE (ALSC)

P.O. Box 210

Germantown, MD 20875-0210

Ph: 301-972-1700

Fax: 301-540-8004

E-mail: alsc@alsc.org

Internet: http://www.alsc.org

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

1819 L Street, NW, 6th Floor

Washington, DC 20036

Ph: 202-293-8020

Fax: 202-293-9287

E-mail: info@ansi.org

Internet: http://www.ansi.org/

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION

(AREMA)

10003 Derekwood Lane, Suite 210

Lanham, MD 20706

Ph: 301-459-3200

Fax: 301-459-8077

Internet: http://www.arema.org

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

1801 Alexander Bell Drive

Reston, VA 20191-4400

Ph: 703-295-6300 - 800-548-2723

Fax: 703-295-6333

E-mail: member@asce.org

Internet: http://www.asce.org

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

1791 Tullie Circle, NE

Atlanta, GA 30329

Ph: 800-527-4723 or 404-636-8400

Fax: 404-321-5478

E-mail: ashrae@ashrae.org

Internet: http://www.ashrae.org

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

HSFLAR-14-R-00002

../%22http:/www.aisc.org%22 ../%22http:/www.steel.org%22 ../%22http:/www.alsc.org%22 ../%22http:/www.ansi.org%22 ../%22http:/www.arema.org%22 ../%22http:/www.asce.org%22 ../%22http:/www.ashrae.org%22

Section 01 42 00 Page 4

1800 East Oakton Street

Des Plaines, IL 60018-2187

Ph: 847-699-2929

Fax: 847-768-3434

E-mail: customerservice@asse.org

Internet: http://www.asse.org

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

901 Canterbury, Suite A

Westlake, OH 44145

Ph: 440-835-3040

Fax: 440-835-3488

E-mail: info@asse-plumbing.org

Internet: http://www.asse-plumbing.org

AMERICAN WATER WORKS ASSOCIATION (AWWA)

6666 West Quincy Avenue

Denver, CO 80235

Ph: 800-926-7337

Fax: 303-347-0804

E-mail: smorrison@awwa.org

Internet: http://www.awwa.org

AMERICAN WELDING SOCIETY (AWS)

550 N.W. LeJeune Road

Miami, FL 33126

Ph: 800-443-9353 - 305-443-9353

Fax: 305-443-7559

E-mail: info@aws.org or customerservice@awspubs.com

Internet: http://www.aws.org

AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)

P.O. Box 361784

Birmingham, AL 35236-1784

Ph: 205-733-4077

Fax: 205-733-4075

E-mail: email@awpa.com

Internet: http://www.awpa.com

APA - THE ENGINEERED WOOD ASSOCIATION (APA)

7011 South 19th St.

Tacoma, WA 98466-5333

Ph: 253-565-6600

Fax: 253-565-7265

E-mail: help@apawood.org

Internet: http://www.apawood.org

ARCHITECTURAL WOODWORK INSTITUTE (AWI)

46179 Westlake Drive, Suite 120

Potomac Falls, VA 20165

Ph: 571-323-3636

Fax: 571-323-3630

E-mail: info@awinet.org

Internet: http://www.awinet.org

ARCNET TRADE ASSOCIATION (ATA)

HSFLAR-14-R-00002

../%22http:/www.asse.org%22 ../%22http:/www.asse-plumbing.org%22 ../%22http:/www.awwa.org%22 ../%22http:/www.aws.org%22 ../%22http:/www.awpa.com%22 ../%22http:/www.apawood.org%22 ../%22http:/www.awinet.org%22

Section 01 42 00 Page 5

E-M-mail: info@arcnet.com

Internet: http://www.arcnet.com/index.htm</URL

ASME INTERNATIONAL (ASME)

Three Park Avenue, M/S 10E

New York, NY 10016-5990

Ph: 800-854-7179 or 800-843-2763

Fax: 212-591-7674

E-mail: infocentral@asme.org

Internet: http://www.asme.org

ASSOCIATED AIR BALANCE COUNCIL (AABC)

1518 K Street, NW

Washington, DC 20005

Ph: 202-737-0202

Fax: 202-638-4833

E-mail: info@aabc.com

Internet: http://www.aabchq.com

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700

West Conshohocken, PA 19428-2959

Ph: 610-832-9585

Fax: 610-832-9555

E-mail: service@astm.org

Internet: http://www.astm.org

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

355 Lexington Avenue

15th Floor

New York, NY 10017

Ph: 212-297-2122

Fax: 212-370-9047

E-mail: assocmgmt@aol.com

Internet: http://www.buildershardware.com

CALIFORNIA ENERGY COMMISSION (CEC)

Media and Public Communications Office

1516 Ninth Street, MS-29

Sacramento, CA 95814-5512

Ph: 916-654-4287

Internet: http://www.energy.ca.gov/

CARPET AND RUG INSTITUTE (CRI)

P.O. Box 2048

Dalton, GA 30722-2048

Ph: 800-882-8846 or 706-278-3176

Fax: 706-278-8835

Internet: http://www.carpet-rug.com

CAST IRON SOIL PIPE INSTITUTE (CISPI)

5959 Shallowford Road, Suite 419

Chattanooga, TN 37421

Ph: 423-892-0137

Fax: 423-892-0817

Internet: http://www.cispi.org

../%22http:/www.arcnet.com/index.htm%22 ../%22http:/www.asme.org%22 ../%22http:/www.aabchq.com%22 ../%22http:/www.astm.org%22 ../%22http:/www.buildershardware.com%22 ../%22http:/www.energy.ca.gov%22 ../%22http:/www.carpet-rug.com%22 ../%22http:/www.cispi.org%22

Section 01 42 00 Page 6

CHEMICAL FABRICS & FILM ASSOCIATION (CFFA)

1300 Sumner Avenue

Cleveland OH 44115-2851

Ph: 216-241-7333

Fax: 216-241-0105

E-mail: cffa@chemicalfabricsandfilm.com

Internet: http://www.chemicalfabricsandfilm.com/

COMPOSITE PANEL ASSOCIATION (CPA)

19465 Deerfield Avenue, Suite 306

Leesburg, VA 20176

Ph: 703-724-1128

Fax: 703-724-1588

Internet: http://www.pbmdf.com

COMPRESSED GAS ASSOCIATION (CGA)

4221 Walney Road, 5th Floor

Chantilly, VA 20151

Ph: 703-788-2700

Fax: 703-961-1831

E-mail: cga@cganet.com

Internet: http://www.cganet.com

CONSUMER ELECTRONICS ASSOCIATION (CEA)

1919 South Eads St.

Arlington, VA 22202

Ph: 866-858-1555 or 703-907-7600

Fax: 703-907-7675

E-mail: cea@CE.org

Internet: http://www.CE.org

COPPER DEVELOPMENT ASSOCIATION (CDA)

260 Madison Avenue

New York, NY 10016

Ph: 212-251-7200

Fax: 212-251-7234

E-mail: questions@cda.copper.org

Internet: http://www.copper.org

EIFS INDUSTRY MEMBERS ASSOCIATION (EIMA)

513 West Broad St., Suite 210

Falls Church, VA 22046-3257

Ph: 800-294-3462

Fax: 703-538-1736

E-mail: lwidzowski@eima.com

Internet: http://www.eima.com

FLUID SEALING ASSOCIATION (FSA)

994 Old Eagle School Rd. #1019

Wayne, PA 19087

Ph: 610-971-4850

E-mail: info@fluidsealing.com

Internet: www.fluidsealing.com

FM GLOBAL (FM)

270 Central Avenue

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

../%22http:/www.chemicalfabricsandfilm.com%22 ../%22http:/www.pbmdf.com%22 ../%22http:/www.cganet.com%22 ../%22http:/www.CE.org%22 ../%22http:/www.copper.org%22 ../%22http:/www.eima.com%22 ../%22http:/www.fluidsealing.com%22

Section 01 42 00 Page 7

P.O. Box 7500

Johnston, RI 02919

Ph: 401-275-3000 ext. 1945

Fax: 401-275-3029

E-mail: servicedesk.myrisk@fmglobal.com

Internet: http://www.fmglobal.com

FOREST STEWARDSHIP COUNCIL (FSC)

212 Third Avenue North

Suite 280

Minneapolis, MN 55401

Ph: 612-353-4511

Fax: 612-208-1565

E-mail: info@fscus.org

Internet: http://www.fscus.org

GEORGIA DEPARTMENT OF NATURAL RESOURCES

2 Martin Luther King Jr. Drive, SE

Suite 1252, East Tower

Atlanta, GA 30334

Ph: 404-656-3500

Internet: <URL>http://www.gadnr.org</URL>

GLASS ASSOCIATION OF NORTH AMERICA (GANA)

2945 SW Wanamaker Drive, Suite A

Topeka, KS 66614

Ph: 785-271-0208

Fax: 785-271-0166

E-mail: gana@glasswebsite.com

Internet: http://www.glasswebsite.com

GREEN SEAL (GS)

1001 Connecticut Avenue, NW

Suite 827

Washington, DC 20036-5525

Ph: 202-872-6400

Fax: 202-872-4324

E-mail: greenseal@greenseal.org

Internet: http://www.greenseal.org

GREENGUARD ENVIRONMENTAL INSTITUTE (GEI)

2211 Newmarket Parkway, Suite 110

Marietta, GA 30067

Ph: 800-427-9681

Fax: 770-980-0072

E-mail: info@greenguard.org

Internet: http://www.greenguard.org/

GYPSUM ASSOCIATION (GA)

6525 Belcrest Road, Suite 480

Hyattsville, MD 20782

Ph: 301-277-8686

Fax: 301-277-8747

E-mail: info@gypsum.org

Internet: http://www.gypsum.org

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

../%22http:/www.fmglobal.com%22 ../%22http:/www.fscus.org%22 ../%22http:/www.glasswebsite.com%22 ../%22http:/www.greenseal.org%22 ../%22http:/www.greenguard.org%22 ../%22http:/www.gypsum.org%22

Section 01 42 00 Page 8

HARDWOOD PLYWOOD AND VENEER ASSOCIATION (HPVA)

1825 Michael Faraday Dr.

Reston, VA 20190

Ph: 703-435-2900

Fax: 703-435-2537

E-mail: hpva@hpva.org

Internet: http://www.hpva.org

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA)

120 Wall Street, 17th Floor

New York, NY 10005

Ph: 212-248-5000

Fax: 212-248-5018

E-mail: iesna@iesna.org

Internet: http://www.iesna.org

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

1901 North Moore Street

Arlington, VA 22209-1762

Ph: 703-525-1695

Fax: 703-528-2148

E-mail: isea@safety equipment.org

Internet: http://www.safetyequipment.org/

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

445 Hoes Lane or 2001 L Street, NW. Suite 700

Piscataway, NJ 08855-1331 or Washington, DC 20036-4910 USA

Ph: 732-981-0060 or 800-701-4333

Fax: 732-562-6380

E-mail: onlinesupport@ieee.org or ieeeusa@ieee.org

Internet: http://www.ieee.org

INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

P.O. Box 1568

Carrollton, GA 30112

Ph: 1 800 447 3352

Fax: 1 303 397 2599

E-mail: global@ihs.com

Internet: http://www.icea.net

INSULATING GLASS MANUFACTURERS ALLIANCE (IGMA)

27 N. Wacker Dr. Suite 365

Chicago, IL 60606-2800

Ph: 613-233-1510

Fax: 613-482-9436

E-mail: info@igmaonline.org

Internet: http://www.igmaonline.org

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

(IAPMO)

4755 E. Philadelphia St.

Ontario, CA 91761

Ph: 909-472-4100

Fax: 909-472-4150

E-mail: iampo@iampo.org

Internet: www.iampo.org

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

../%22http:/www.hpva.org%22 ../%22http:/www.iesna.org%22 ../%22http:/www.safetyequipment.org%22 ../%22http:/www.ieee.org%22 ../%22http:/www.icea.net%22 ../%22http:/www.igmaonline.org%22 ../%22http:/www.iampo.org%22

Section 01 42 00 Page 9

INTERNATIONAL CODE COUNCIL (ICC)

5360 Workman Mill Road

Whittier, CA 90601

Ph: 1-888-422-7233

Fax: 562-908-5524

E-mail: webmaster@iccsafe.org

Internet: www.iccsafe.org

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

3050 Centre Ave. Suite 102

Portage, MI 49024

Ph: 269-488-6382

Fax: 269-488-6383

E-mail: neta@netaworld.org

Internet: http://www.netaworld.org

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

1, ch. de la Voie-Creuse

Case Postale 56

CH-1211 Geneve 20 Switzerland

Ph: 41-22-749-01-11

Fax: 41-22-733-34-30

E-mail: central@iso.ch

Internet: http://www.iso.org

KITCHEN CABINET MANUFACTURERS ASSOCIATION (KCMA)

1899 Preston White Drive

Reston, VA 20191-5435

Ph: 703-264-1690

Fax: 703-620-6530

E-mail: info@kcma.org

Internet: http://www.kcma.org

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

127 Park Street, NE

Vienna, VA 22180

Ph: 703-281-6613

Fax: 703-281-6671

E-mail: info@mss-hq.com

Internet: http://www.mss-hq.com

MARBLE INSTITUTE OF AMERICA (MIA)

28901 Clemens Road, Suite 100

Cleveland, OH 44145

Ph: 440-250-9222

Fax: 440-250-9223

E-mail: info@marble-institute.com

Internet: http://www.marble-institute.com

MASTER PAINTERS INSTITUTE (MPI)

2800 Engleton Avenue

Burnaby, BC CANADA V5C 6G7

Ph: 604-298-7578

Fax: 604-298-7571

E-mail: info@paintinfo.com,jody@mpi.net,bgl@mpi.net

ATTACHMENT #2 - SPECIFICATIONS

HSFLAR-14-R-00002

../%22http:/www.iccsafe.org%22 ../%22http:/www.netaworld.org%22 ../%22http:/www.iso.ch%22 ../%22http:/www.kcma.org%22 ../%22http:/www.mss-hq.com%22 ../%22http:/www.marble-institute.com%22

Section 01 42 00 Page 10

Internet: http://www.paintinfo.com/mpi

METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)

1300 Sumner Avenue

Cleveland, OH 44115-2851

Ph: 216-241-7333

Fax: 216-241-0105

E-mail: mbma@mbma.com

Internet: http://www.mbma.com

MIDWEST INSULATION CONTRACTORS ASSOCIATION (MICA)

16712 Elm Circle

Omaha, NE 68130

Ph: 800-747-6422

Fax: 402-330-9702

E-mail: mica@tconl.com

Internet: http://www.micainsulation.org

NACE INTERNATIONAL (NACE)

1440 South Creek Drive

Houston, TX 77084-4906

Ph: 281-228-6200

Fax: 281-228-6300

E-mail: firstservice@nace.org

Internet: http://www.nace.org

NATIONAL ASSOCIATION OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .