Solicitation Amendment HSFE20-16-R-0009 A00001 (corrected)
View the file
Other files for this federal contract opportunity
Show all 50
Training Delivery Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 26
A00001 04-19-2016
Department of Homeland Security/FEMA OCPO/Preparedness Section Building D - Acquisition 16825 South Seton Avenue Emmitsburg MD 21727
Department of Homeland Security/FEMA OCPO/Preparedness Section Building D -- Acquisition 16825 South Seton Avenue Emmitsburg MD 21727
To all Offerors/Bidders HSFE20-16-R-0009
03-16-2016 X
X X
The purpose of this amendment is as follows:
1) Revise specified sections of RFP # HSFE20-16-R-0009.
2) Revise and add new attachments to the RFP.
3) Provide Vendor posed Questions and Answers.
4) Provide a list of Site Visit attendees.
5) Extend the proposal submission date.
The proposal submission date is hereby extended to 4:00 pm Eastern, May 12, 2016.
See CONTINUATION PAGE
Gary P. Topper Contracting Officer
CONTINUATION PAGE
Request for Procurement # HSFE20-16-R-0009, Amendment A00001 incorporates all of the following:
1. Revised RFP Section B.2 COST/PRICE SCHEDULE. (see below, changes highlighted in yellow)
2. Revised RFP Section G.1 BILLING INSTRUCTIONS (JUN 2014) (see below, changes highlighted in yellow)
3. Revised RFP Section I.6 52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013) (see below, changes highlighted in yellow)
4. Revised RFP Section I.9 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015) ALTERNATE II
(OCT 2001). (see below, changes highlighted in yellow)
5. Revised RFP Section I.19 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY
DATA ALTERNATE I. (see below, changes highlighted in yellow)
6. Revised RFP Section J LIST OF ATTACHMENTS. (see below, changes highlighted in yellow)
7. Revised RFP Section L.1. NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE.
(see below, changes highlighted in yellow)
8. Revised RFP Section L.8.A. INSTRUCTIONS TO OFFERORS, GENERAL INSTRUCTIONS, revised to clarify Volume
2, Item # 7. (see below, changes highlighted in yellow)
9. Revised RFP Section L.8.B. INSTRUCTIONS TO OFFERORS, TECHNICAL PROPOSAL
INSTRUCTIONS/CONTENT (VOLUME 1), revised Section 5 Experience to specify the requirement for the number of experience examples, 3 to 5 experiences. (see below, changed section highlighted in yellow)
10. Revised RFP Section L.8.B. INSTRUCTIONS TO OFFERORS, TECHNICAL PROPOSAL INSTRUCTIONS/CONTENT (VOLUME 1), revised Section 6 Past Performance to remove requirement for listing options not exercised. (see below, changed section highlighted in yellow)
11. Revised RFP Section M.4 TECHNICAL EVALUATION CRITERIA, TECHNICAL EVALUATION FACTORS, revised Factor 6 Past Performance to remove requirement for listing options not exercised. (see below, changed section highlighted in yellow)
12. Attachment 1 – Performance Work Statement, dated 4/18/2016. (see attachment, changes in red)
13. Attachment 2 – QASP, dated 4/12/2016. (see attachment, changes in red.)
14. Attachment 20 – POI List Two, Chg 1 (see attachment)
15. Attachment 21 – POI List Three, Chg 1 (see attachment)
16. Attachment 23 – POI List Five, Chg 1 (see attachment)
17. Attachment 30 – Nonresident Training Data, Chg 1 (see attachment)
18. Attachment 43 – CDP Safety Plan (COBRATF) (see attachment)
19. Attachment 47 – Hazardous Materials. (see attachment)
20. Attachment 48 – POI List Seven (see attachment)
21. Questions and Answers # 1. (see attachment)
22. List of Site Visit Attendees. (see attachment)
23. The proposal submission date and time is hereby extended to 4:00 pm (Eastern), May 12, 2016. Please see the revised
RFP Section L.8.E. below.
B.2 COST/PRICE SCHEDULE
The price, estimated cost, and fixed fee is set forth in the Contract Line Item Numbers (CLIN) below. Firm-Fixed-Priced (FFP) CLINs below will be paid on a twice monthly basis in installments based on the schedule shown below. Cost-Reimbursement CLINs will be paid on a twice monthly basis and in accordance with FAR 52.216-7. For Fixed-Fee CLINs, the fixed fee will be paid in installments on a twice monthly basis, and subject to the withholding provisions of this contract (FAR 52.216-8). The Phase-In Transition period will be Cost-Plus-Fixed-Fee (CPFF) CLINs, and will be paid as a single installment for the entire phase-in period. Travel costs included in Estimated Cost shall not be subject to fee. All overtime labor, including overtime labor associated with FFP performance, will be paid from the CPFF CLINs.
CLIN
Price/Cost
Type Description Unit Quantity Unit Price Total
Price/Cost
PHASE-IN TRANSITION (1 MONTH, 8/1/2016- 8/31/2016)
0001 CPFF Estimated Cost Lot 1 0002 CPFF Fixed Fee Lot 1
TOTAL ESTIMATED COST & FIXED FEE FOR PHASE-IN
BASE PERIOD (11 MONTHS, 9/1/2016 – 7/31/2017)
0003 FFP
Project Management - PWS 6.0, 7.7, and 8.0
Lot 22
0004 FFP
Course Delivery Management –
PWS 7.1
Lot 22
0005 FFP COBRATF – PWS
7.3 Lot 22
0006 FFP
Equipment Management –
PWS 7.5
Lot 22
0007 FFP
Safety Operations and Management –
PWS 7.6
Lot 22
0008 CPFF
Estimated Costs - Instructors, Logistical Support, Overtime and Other Direct Costs - PWS 7.1, 7.4 and 7.5
Lot 1
0009 CPFF
Instructors, Logistical Support and Other Direct Costs - Fixed Fee
Lot 22
0010 CPFF
Estimated Costs - External Agency Support – PWS 7.2
Lot 1
0011 CPFF
External Agency Support – Fixed Fee
Lot 22
TOTAL PRICE, ESTIMATED COST, AND FIXED FEE FOR BASE PERIOD (11
MONTHS)
OPTION PERIOD 1 (12 MONTHS, 8/1/2017 – 7/31/2018)
1001 FFP
Project Management - PWS 6.0, 7.7, and 8.0
Lot 24
1002 FFP
Course Delivery Management –
PWS 7.1
Lot 24
1003 FFP COBRATF – PWS
7.3 Lot 24
1004 FFP
Equipment Management –
PWS 7.5
Lot 24
1005 FFP
Safety Operations and Management –
PWS 7.6
Lot 24
1006 CPFF
Estimated Costs - Instructors, Logistical Support, Overtime and Other Direct Costs - PWS 7.1, 7.4 and 7.5
Lot 1
1007 CPFF
Instructors, Logistical Support, and Other Direct Costs - Fixed Fee
Lot 24
1008 CPFF
Estimated Costs - External Agency Support – PWS 7.2
Lot 1
1009 CPFF
External Agency Support – Fixed Fee
Lot 24
TOTAL PRICE, ESTIMATED COST, AND FIXED FEE FOR OPTION PERIOD 1
OPTION PERIOD 2 (12 MONTHS, 8/1/2018 – 7/31/2019)
2001 FFP
Project Management - PWS 6.0, 7.7, and 8.0
Lot 24
2002 FFP
Course Delivery Management –
PWS 7.1
Lot 24
2003 FFP COBRATF – PWS
7.3 Lot 24
2004 FFP
Equipment Management –
PWS 7.5
Lot 24
2005 FFP
Safety Operations and Management –
PWS 7.6
Lot 24
2006 CPFF
Estimated Costs - Instructors, Logistical Support, Overtime and Other Direct Costs - PWS 7.1, 7.4 and 7.5
Lot 1
2007 CPFF
Instructors, Logistical Support, and Other Direct Costs - Fixed Fee
Lot 24
2008 CPFF
Estimated Costs - External Agency Support – PWS 7.2
Lot 1
2009 CPFF
External Agency Support – Fixed Fee
Lot 24
TOTAL PRICE, ESTIMATED COST, AND FIXED FEE FOR OPTION PERIOD 2
OPTION PERIOD 3 (12 MONTHS, 8/1/2019 – 7/31/2020)
3001 FFP
Project Management - PWS 6.0, 7.7, and 8.0
Lot 24
3002 FFP
Course Delivery Management –
PWS 7.1
Lot 24
3003 FFP COBRATF – PWS
7.3 Lot 24
3004 FFP
Equipment Management –
PWS 7.5
Lot 24
3005 FFP
Safety Operations and Management –
PWS 7.6
Lot 24
3006 CPFF
Estimated Costs - Instructors, Logistical Support, Overtime and Other Direct Costs - PWS 7.1, 7.4 and 7.5
Lot 1
3007 CPFF
Instructors, Logistical Support, and Other Direct Costs - Fixed Fee
Lot 24
3008 CPFF
Estimated Costs - External Agency Support – PWS 7.2
Lot 1
3009 CPFF
External Agency Support – Fixed Fee
Lot 24
TOTAL PRICE, ESTIMATED COST, AND FIXED FEE FOR OPTION PERIOD 3
OPTION PERIOD 4 (12 MONTHS, 8/1/2020 – 7/31/2021)
4001 FFP
Project Management - PWS 6.0, 7.7, and 8.0
Lot 24
4002 FFP
Course Delivery Management –
PWS 7.1
Lot 24
4003 FFP COBRATF – PWS
7.3 Lot 24
4004 FFP
Equipment Management –
PWS 7.5
Lot 24
4005 FFP
Safety Operations and Management –
PWS 7.6
Lot 24
4006 CPFF
Estimated Costs - Instructors, Logistical Support, Overtime and Other Direct Costs - PWS 7.1, 7.4 and 7.5
Lot 1
4007 CPFF
Instructors, Logistical Support and Other Direct Costs - Fixed Fee
Lot 24
4008 CPFF
Estimated Costs - External Agency Support – PWS 7.2
Lot 1
4009 CPFF
External Agency Support – Fixed Fee
Lot 24
TOTAL PRICE, ESTIMATED COST, AND FIXED FEE FOR OPTION PERIOD 4
TOTAL PRICE, ESTIMATED COST, AND FIXED FEE (BASE & ALL OPTIONS)
G.1 BILLING INSTRUCTIONS (JUN 2014)
Contractors will use Standard Form 1034 (Public Voucher for Purchases and Services Other Than Personal) located at http://www.gsa.gov/portal/forms/type/SF when submitting a payment request. A payment request means any invoice or request for contract financing payment requesting reimbursement for supplies or services rendered. The Contractor shall not be paid more frequently than on a twice monthly basis.
Contractors shall submit vouchers electronically in pdf format to the FEMA Finance Center at:
FEMA-Finance-Vendor-Payments@fema.dhs.gov AND
Contractors shall also submit an electronic pdf copy to the Center for Domestic Preparedness at:
CenterforDomesticPreparedness-FinanceOffice@fema.dhs.gov.
A copy of the voucher must be submitted electronically to the contracting officer identified within this contract. The submission of vouchers electronically will reduce correspondence and other causes for delay to a minimum and will facilitate prompt payment to the Contractor. Paper vouchers mailed to the finance center will not be processed for payment. If the Contractor is unable to submit a payment request in electronic form, the contractor shall submit the payment request using a method mutually agreed to by the Contractor, the Contracting Officer, and the payment office.
G.2 DEFECTIVE OR IMPROPER INVOICES (JUN 2014)
I.6 52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)
(a) Invoicing.
mailto:FEMA-Finance-Vendor-Payments@fema.dhs.gov mailto:CenterforDomesticPreparedness-FinanceOffice@fema.dhs.gov
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) Subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the 30th day after the designated billing office receives a proper payment request. In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs.
(1) For the purpose of reimbursing allowable costs (except as provided in paragraph (b)(2) of this clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term “costs” includes only—
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for—
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made—
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor’s payment request to the Government;
(B) Materials issued from the Contractor’s inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless—
(i) The Contractor’s practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor’s indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor’s expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates.
(1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2031_2.html#wp1095552 https://www.acquisition.gov/sites/default/files/current/far/html/52_232.html#wp1152998 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_7.html#wp1084577 extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor’s actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor’s proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General organizational information and limitation on allowability of compensation for certain contractor personnel.
See 31.205-6(p). Additional salary reference information is available at http://www.whitehouse.gov/omb/procurement_index_exec_comp/.
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year’s submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year’s submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph (G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
https://www.acquisition.gov/sites/default/files/current/far/html/52_241_244.html#wp1128814 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2031_2.html#wp1095659 http://www.whitehouse.gov/omb/procurement_index_exec_comp/
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify (i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.
(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may—
(A) Determine the amounts due to the Contractor under the contract; and
(B) Record this determination in a unilateral modification to the contract.
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the
Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates—
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either party’s request, to prevent substantial overpayment or underpayment.
(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor’s invoices or vouchers and statements of cost audited. Any payment may be—
(1) Reduced by amounts found by the Contracting Officer not to constitute allowable costs; or
(2) Adjusted for prior overpayments or underpayments.
(h) Final payment.
(1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractor’s compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_7.html#wp1084721 allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer.
Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver—
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except—
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor’s indemnification of the Government against patent liability.
I.9 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015) ALTERNATE II (OCT
2001)(DEVIATION)
(a) This clause does not apply to small business concerns.
(b) Definitions. As used in this clause— “Alaska Native Corporation (ANC)” means any Regional Corporation, Village Corporation, Urban Corporation, or Group
Corporation organized under the laws of the State of Alaska in accordance with the Alaska Native Claims Settlement Act, as amended (43 U.S.C. 1601, et seq.) and which is considered a minority and economically disadvantaged concern under the criteria at 43 U.S.C. 1626(e)(1). This definition also includes ANC direct and indirect subsidiary corporations, joint ventures, and partnerships that meet the requirements of 43 U.S.C. 1626(e)(2).
“Commercial item” means a product or service that satisfies the definition of commercial item in section 2.101 of the Federal Acquisition Regulation.
“Commercial plan” means a subcontracting plan (including goals) that covers the offeror’s fiscal year and that applies to the entire production of commercial items sold by either the entire company or a portion thereof (e.g., division, plant, or product line).
“Electronic Subcontracting Reporting System (eSRS)” means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.
“Indian tribe” means any Indian tribe, band, group, pueblo, or community, including native villages and native groups (including corporations organized by Kenai, Juneau, Sitka, and Kodiak) as defined in the Alaska Native Claims Settlement Act (43 U.S.C.A. 1601 et seq.), that is recognized by the Federal Government as eligible for services from the Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned economic enterprises that meet the requirements of 25 U.S.C. 1452(e).
“Individual contract plan” means a subcontracting plan that covers the entire contract period (including option periods), applies to a specific contract, and has goals that are based on the offeror’s planned subcontracting in support of the specific contract, except that indirect costs incurred for common or joint purposes may be allocated on a prorated basis to the contract.
“Master plan” means a subcontracting plan that contains all the required elements of an individual contract plan, except goals, and may be incorporated into individual contract plans, provided the master plan has been approved.
http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t43t44+2+43++%2843%29%20%20AND%20%28%2843%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t43t44+2+43++%2843%29%20%20AND%20%28%2843%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t43t44+2+43++%2843%29%20%20AND%20%28%2843%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%202_1.html#wp1145508 http://www.esrs.gov/ http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t43t44+2+43++%2843%29%20%20AND%20%28%2843%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t21t25+4254+34++%2825%29%20%20AND%20%28%2825%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t21t25+4254+34++%2825%29%20%20AND%20%28%2825%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20
“Subcontract” means any agreement (other than one involving an employer-employee relationship) entered into by a Federal Government prime Contractor or subcontractor calling for supplies or services required for performance of the contract or subcontract.
(c) Proposals submitted in response to this solicitation shall include a subcontracting plan that separately addresses subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. If the offeror is submitting an individual contract plan, the plan must separately address subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns, with a separate part for the basic contract and separate parts for each option (if any). The plan shall be included in and made a part of the resultant contract. The subcontracting plan shall be negotiated within the time specified by the Contracting Officer. Failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract.
(d) The offeror’s subcontracting plan shall include the following:
(1) Goals, expressed in terms of percentages of total planned subcontracting dollars, for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. The offeror shall include all sub-contracts that contribute to contract performance, and may include a proportionate share of products and services that are normally allocated as indirect costs.
In accordance with 43 U.S.C. 1626:
(i) Subcontracts awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size or Small Business Administration certification status of the ANC or Indian tribe.
(ii) Where one or more subcontractors are in the subcontract tier between the prime contractor and the ANC or Indian tribe, the ANC or Indian tribe shall designate the appropriate contractor(s) to count the subcontract towards its small business and small disadvantaged business subcontracting goals.
(A) In most cases, the appropriate Contractor is the Contractor that awarded the subcontract to the ANC or Indian tribe.
(B) If the ANC or Indian tribe designates more than one Contractor to count the subcontract toward its goals, the ANC or Indian tribe shall designate only a portion of the total subcontract award to each Contractor. The sum of the amounts designated to various Contractors cannot exceed the total value of the subcontract.
(C) The ANC or Indian tribe shall give a copy of the written designation to the Contracting Officer, the prime Contractor, and the subcontractors in between the prime Contractor and the ANC or Indian tribe within 30 days of the date of the subcontract award.
(D) If the Contracting Officer does not receive a copy of the ANC’s or the Indian tribe’s written designation within 30 days of the subcontract award, the Contractor that awarded the subcontract to the ANC or Indian tribe will be considered the designated Contractor.
(2) A statement of—
(i) Total dollars planned to be subcontracted for an individual contract plan; or the offeror’s total projected sales, expressed in dollars, and the total value of projected subcontracts to support the sales for a commercial plan;
(ii) Total dollars planned to be subcontracted to small business concerns (including ANC and Indian tribes);
(iii) Total dollars planned to be subcontracted to veteran-owned small business concerns;
(iv) Total dollars planned to be subcontracted to service-disabled veteran-owned small business;
(v) Total dollars planned to be subcontracted to HUBZone small business concerns;
(vi) Total dollars planned to be subcontracted to small disadvantaged business concerns (including ANCs and Indian tribes); and
(vii) Total dollars planned to be subcontracted to women-owned small business concerns.
(3) A description of the principal types of supplies and services to be subcontracted, and an identification of the types planned for subcontracting to—
(i) Small business concerns;
(ii) Veteran-owned small business concerns;
http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t43t44+2+43++%2843%29%20%20AND%20%28%2843%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20
(iii) Service-disabled veteran-owned small business concerns;
(iv) HUBZone small business concerns;
(v) Small disadvantaged business concerns; and
(vi) Women-owned small business concerns.
(4) A description of the method used to develop the subcontracting goals in paragraph (d)(1) of this clause.
(5) A description of the method used to identify potential sources for solicitation purposes (e.g., existing company source lists, the System for Award Management (SAM), veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce, or small, HUBZone, small disadvantaged, and women-owned small business trade associations). A firm may rely on the information contained in SAM as an accurate representation of a concern's size and ownership characteristics for the purposes of maintaining a small, veteran-owned small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, and women-owned small business source list. Use of SAM as its source list does not relieve a firm of its responsibilities (e.g., outreach, assistance, counseling, or publicizing subcontracting opportunities) in this clause.
(6) A statement as to whether or not the offeror included indirect costs in establishing subcontracting goals, and a description of the method used to determine the proportionate share of indirect costs to be incurred with—
(i) Small business concerns (including ANC and Indian tribes);
(ii) Veteran-owned small business concerns;
(iii) Service-disabled veteran-owned small business concerns;
(iv) HUBZone small business concerns;
(v) Small disadvantaged business concerns (including ANC and Indian tribes); and
(vi) Women-owned small business concerns.
(7) The name of the individual employed by the offeror who will administer the offeror’s subcontracting program, and a description of the duties of the individual.
(8) A description of the efforts the offeror will make to assure that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns have an equitable opportunity to compete for subcontracts.
(9) Assurances that the offeror will include the clause of this contract entitled “Utilization of Small Business Concerns” in all subcontracts that offer further subcontracting opportunities, and that the offeror will require all subcontractors (except small business concerns) that receive subcontracts in excess of $700,000 ($1.5 million for construction of any public facility) with further subcontracting possibilities to adopt a subcontracting plan that complies with the requirements of this clause.
(10) Assurances that the offeror will—
(i) Cooperate in any studies or surveys as may be required;
(ii) Submit periodic reports so that the Government can determine the extent of compliance by the offeror with the subcontracting plan;
(iii) Submit the Individual Subcontract Report (ISR) and/or the Summary Subcontract Report (SSR), in accordance with paragraph (l) of this clause using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov. The reports shall provide information on subcontract awards to small business concerns (including ANCs and Indian tribes that are not small businesses), veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns (including ANCs and Indian tribes that have not been certified by the Small Business Administration as small disadvantaged businesses), women-owned small business concerns, and for NASA only, Historically Black Colleges and Universities and Minority Institutions. Reporting shall be in accordance with this clause, or as provided in agency regulations;
(iv) Ensure that its subcontractors with subcontracting plans agree to submit the ISR and/or the SSR using eSRS;
(v) Provide its prime contract number, its DUNS number, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs, to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs; and http://www.esrs.gov/
(vi) Require that each subcontractor with a subcontracting plan provide the prime contract number, its own DUNS number, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans.
(11) A description of the types of records that will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan, including establishing source lists; and a description of the offeror’s efforts to locate small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns and award subcontracts to them. The records shall include at least the following (on a plant-wide or company-wide basis, unless otherwise indicated):
(i) Source lists (e.g., SAM), guides, and other data that identify small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.
(ii) Organizations contacted in an attempt to locate sources that are small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, or women-owned small business concerns.
(iii) Records on each subcontract solicitation resulting in an award of more than $150,000, indicating—
(A) Whether small business concerns were solicited and, if not, why not;
(B) Whether veteran-owned small business concerns were solicited and, if not, why not;
(C) Whether service-disabled veteran-owned small business concerns were solicited and, if not, why not;
(D) Whether HUBZone small business concerns were solicited and, if not, why not;
(E) Whether small disadvantaged business concerns were solicited and, if not, why not;
(F) Whether women-owned small business concerns were solicited and, if not, why not; and
(G) If applicable, the reason award was not made to a small business concern.
(iv) Records of any outreach efforts to contact—
(A) Trade associations;
(B) Business development organizations;
(C) Conferences and trade fairs to locate small, HUBZone small, small disadvantaged, and women-owned small business sources; and
(D) Veterans service organizations.
(v) Records of internal guidance and encouragement provided to buyers through—
(A) Workshops, seminars, training, etc.; and
(B) Monitoring performance to evaluate compliance with the program’s requirements.
(vi) On a contract-by-contract basis, records to support award data submitted by the offeror to the Government, including the name, address, and business size of each subcontractor. Contractors having commercial plans need not comply with this requirement.
(e) In order to effectively implement this plan to the extent consistent with efficient contract performance, the Contractor shall perform the following functions:
(1) Assist small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns by arranging solicitations, time for the preparation of bids, quantities, specifications, and delivery schedules so as to facilitate the participation by such concerns. Where the Contractor’s lists of potential small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business subcontractors are excessively long, reasonable effort shall be made to give all such small business concerns an opportunity to compete over a period of time.
(2) Provide adequate and timely consideration of the potentialities of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns in all “make-or-buy” decisions.
(3) Counsel and discuss subcontracting opportunities with representatives of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business firms.
(4) Confirm that a subcontractor representing itself as a HUBZone small business concern is identified as a certified HUBZone small business concern by accessing the SAM database or by contacting SBA.
(5) Provide notice to subcontractors concerning penalties and remedies for misrepresentations of business status as small, veteran-owned small business, HUBZone small, small disadvantaged, or women-owned small business for the purpose of obtaining a subcontract that is to be included as part or all of a goal contained in the Contractor’s subcontracting plan.
(6) For all competitive subcontracts over the simplified acquisition threshold in which a small business concern received a small business preference, upon determination of the successful subcontract offeror, the Contractor must inform each unsuccessful small business subcontract offeror in writing of the name and location of the apparent successful offeror prior to award of the contract.
(f) A master plan on a plant or division-wide basis that contains all the elements required by paragraph (d) of this clause, except goals, may be incorporated by reference as a part of the subcontracting plan required of the offeror by this clause; provided—
(1) The master plan has been approved;
(2) The offeror ensures that the master plan is updated as necessary and provides copies of the approved master plan, including evidence of its approval, to the Contracting Officer; and
(3) Goals and any deviations from the master plan deemed necessary by the Contracting Officer to satisfy the requirements of this contract are set forth in the individual subcontracting plan.
(g) A commercial plan is the preferred type of subcontracting plan for contractors furnishing commercial items. The commercial plan shall relate to the offeror’s planned subcontracting generally, for both commercial and Government business, rather than solely to the Government contract. Once the Contractor’s commercial plan has been approved, the Government will not require another subcontracting plan from the same Contractor while the plan remains in effect, as long as the product or service being provided by the Contractor continues to meet the definition of a commercial item. A Contractor with a commercial plan shall comply with the reporting requirements stated in paragraph (d)(10) of this clause by submitting one SSR in eSRS for all contracts covered by its commercial plan. This report shall be acknowledged or rejected in eSRS by the Contracting Officer who approved the plan. This report shall be submitted within 30 days after the end of the Government’s fiscal year.
(h) Prior compliance of the offeror with other such subcontracting plans under previous contracts will be considered by the Contracting Officer in determining the responsibility of the offeror for award of the contract.
(i) A contract may have no more than one plan. When a modification meets the criteria in 19.702 for a plan, or an option is exercised, the goals associated with the modification or option shall be added to those in the existing subcontract plan.
(j) Subcontracting plans are not required from subcontractors when the prime contract contains the clause at 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items, or when the subcontractor provides a commercial item subject to the clause at 52.244-6, Subcontracts for Commercial Items, under a prime contract.
(k) The failure of the Contractor or subcontractor to comply in good faith with—
(1) The clause of this contract entitled “Utilization Of Small Business Concerns;” or
(2) An approved plan required by this clause, shall be a material breach of the contract.
(l) The Contractor shall submit ISRs and SSRs using the web-based eSRS at http://www.esrs.gov. Purchases from a corporation, company, or subdivision that is an affiliate of the prime Contractor or subcontractor are not included in these reports.
Subcontract award data reported by prime Contractors and subcontractors shall be limited to awards made to their immediate next-tier subcontractors. Credit cannot be taken for awards made to lower tier subcontractors, unless the Contractor or subcontractor has been designated to receive a small business or small disadvantaged business credit from an ANC or Indian Tribe. Only subcontracts involving performance in the United States or its outlying areas should be included in these reports with the exception of subcontracts under a contract awarded by the State Department or any other agency that has statutory or regulatory authority to require subcontracting plans for subcontracts performed outside the United States and its outlying areas.
(1) ISR. This report is not required for commercial plans. The report is required for each contract containing an individual subcontract plan.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2019_7.html#wp1088749 https://www.acquisition.gov/sites/default/files/current/far/html/52_212_213.html#wp1203358 https://www.acquisition.gov/sites/default/files/current/far/html/52_241_244.html#wp1129139…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .