Attachment_4_-__USCG_HC-130H_and_HC-130J_Reference_List_-_Updated_04_Dec_2012.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- HC-130 PSI
- Solicitation number
- HSCG38-12-I-H00007
About this file
Updated Reference List
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HC-130 References Attachment 4 - USCG HC-130H and HC-130J Reference List
| REFERENCE DOCUMENTATION | REFERENCE TITLE | REVISION DATE | DISTRIBUTION STATEMENT | |
| AFTO 00-25-172 | GROUND SERVICING OF AIRCRAFT AND STATIC GROUNDING/BONDING | 19-Jul-12 | DISTRIBUTION STATEMENT A | |
| AFTO 1-1-24 | FIBERGLASS AIRBORNE RADOMES - MAINTENANCE REPAIR AND ELECTRICAL REQUIREMENTS | 1-Jun-10 | DISTRIBUTION STATEMENT X | |
| AFTO 1-1-3 | AIRCRAFT INTEGRAL TANKS AND FUEL CELLS - INSPECTION AND REPAIR | 4-Feb-12 | DISTRIBUTION STATEMENT A | |
| AFTO 1-1-690 | GENERAL, ADVANCED COMPOSITE REPAIR - PROCESSES MANUAL | 28-Mar-07 | DISTRIBUTION STATEMENT C | |
| AFTO 1-1-691 | CLEANING AND CORROSION PREVENTION AND CONTROL - AEROSPACE AND NON-AEROSPACE EQUIPMENT | 11-May-11 | DISTRIBUTION STATEMENT A | |
| AFTO 1-1-8 | APPLICATION AND REMOVAL OF ORGANIC COATINGS / AEROSPACE AND NON-AEROSPACE EQUIPMENT | 16-Jun-11 | DISTRIBUTION STATEMENT A | |
| AFTO 1-1A-14 NAVAIR 01-1A-505-1 | INSTALLATION AND REPAIR PRACTICES VOLUME 1 AIRCRAFT ELECTRIC AND ELECTRONIC WIRING | 15-Sep-09 | DISTRIBUTION STATEMENT A | |
| AFTO 1-1A-8 | STRUCTURAL HARDWARE - AIRCRAFT AND MISSILE ENGINEERING / REPAIR MANUAL | 1-Jan-12 | DISTRIBUTION STATEMENT C | |
| AFTO 13A20-35-2 | TOILET ASSEMBLY - MAINTENANCE INSTRUCTIONS WITH ILLUSTRATED PARTS BREAKDOWN (INTERMEDIATE MAINTENANCE) | 1-May-09 | DISTRIBUTION STATEMENT C | |
| AFTO 13A6-91-2 | PILOT / COPILOT SEATS - MAINTENANCE INSTRUCTIONS | 25-Apr-07 | DISTRIBUTION STATEMENT D | |
| AFTO 13A6-91-4 | PILOT / COPILOT SEATS - ILLUSTRATED PARTS BREAKDOWN | 26-May-11 | DISTRIBUTION STATEMENT D | |
| AFTO 13A6-92-2 | FLIGHT ENGINEER / NAVIGATOR SEAT ASSEMBLY - MAINTENANCE INSTRUCTIONS | 3-Apr-12 | DISTRIBUTION STATEMENT D | |
| AFTO 13A6-92-4 | FLIGHT ENGINEER/ NAVIGATOR SEAT - ILLUSTRATED PARTS BREAKDOWN | 24-May-11 | DISTRIBUTION STATEMENT D | |
| AFTO 13C10-4-1 | AIRCRAFT CARGO HANDLING SYSTEM - OPERATION, SERVICE AND REPAIR INSTRUCTIONS | 19-Apr-12 | DISTRIBUTION STATEMENT C | |
| AFTO 15A4-113-3 | HEAT EXCHANGER - OVERHAUL INSTRUCTIONS WITH ILLUSTRATED PARTS BREAKDOWN / DEPOT MAINTENANCE | 15-Jan-12 | DISTRIBUTION STATEMENT C | |
| AFTO 16C1-4-23-3 | EMERGENCY WING FLAP BRAKE - OVERHAUL INSTRUCTIONS WITH ILLUSTRATED PARTS BREAKDOWN | 1-Mar-12 | DISTRIBUTION STATEMENT X | |
| AFTO 16W14-12-3 | C-130 QUICK ENGINE CHANGE KIT (QEC) - OVERHAUL INSTRUCTIONS WITH ILLUSTRATED PARTS BREAKDOWN | 1-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130A-17 | STORAGE OF AIRCRAFT - USAF SERIES C-130 AIRCRAFT | 27-Apr-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130A-23 | SYSTEM PECULIAR CORROSION CONTROL - USAF ALL C-130 SERIES AIRCRAFT | 15-May-12 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130A-3 | STRUCTURAL REPAIR INSTRUCTIONS - USCG SERIES HC-130H AIRCRAFT | 1-Mar-12 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130A-36 | NONDESTRUCTIVE INSPECTION PROCEDURES - USCG SERIES HC-130H AIRCRAFT | 15-Apr-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130A-6 | AIRCRAFT SCHEDULED INSPECTION AND MAINTENANCE INSTRUCTIONS - ALL C-130 AIRCRAFT (EXCEPT C-130J) | 15-Apr-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130A-6WC-10 | PREFLIGHT INSPECTION WORKCARDS - ALL USAF SERIES C-130 AIRCRAFT | 15-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130A-6WC-12 | BASIC POSTFLIGHT INSPECTION WORKCARDS - ALL USAF SERIES C-130 AIRCRAFT | 15-Feb-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-1 | FLIGHT MANUAL - USAF SERIES C-130H AIRCRAFT | 3-Dec-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-00GE-00-1 | C-130 GENERAL EQUIPMENT MANUAL - ORGANIZATIONAL MAINTENANCE | 1-Mar-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-05JG-00-1 | C-130 GROUND HANDLING / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-07JG-00-1 | C-130 GROUND HANDLING / JACKING - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jun-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-08JG-00-1 | C-130 GROUND HANDLING / LEVELING AND WEIGHING - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Dec-08 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-09JG-10-1 | C-130 GROUND HANDLING / TOWING - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Jun-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-12JG-10-1 | C-130 GROUND HANDLING / FUEL SYSTEM SERVICING AND CONCURRENT SERVICING - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-12JG-10-2 | C-130 GROUND HANDLING / AIRPLANE SERVICING - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jun-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-12JG-20-1 | C-130 GROUND HANDLING / LUBRICATION - JOB GUIDE ORGANIZATIONAL MAINTENANCE | 1-Jul-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21GS-00-1 | C-130 AIR CONDITIONING SYSTEM - GENERAL SYSTEM / ORGANIZATIONAL MAINTENANCE | 1-Jun-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21JG-00-1 | C-130 AIR CONDITIONING GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Aug-09 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21JG-10-1 | C-130 AIR CONDITIONING / BLEED AIR SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jun-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21JG-30-1 | C-130 AIR CONDITIONING / PRESSURIZATION SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jul-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21JG-50-1 | C-130 AIR CONDITIONING COOLING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE (AIRCRAFT SER. NO. AF74-01658 AND UP) | 1-Jun-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21JG-50-2 | C-130 AIR CONDITIONING COOLING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE (ALL C-130 AIRCRAFT PRIOR TO AF74-01658) | 1-Jun-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-21JG-60-1 | C-130 AIR CONDITIONING / TEMPERATURE CONTROL - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Aug-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-23JG-00-1 | COMMUNICATION SYSTEM GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jul-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-24JG-20-1-1 | C-130 ELECTRICAL SYSTEM / AC POWER - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 5-Apr-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-24JG-30-1 | C-130 ELECTRICAL SYSTEM / DC POWER - JOB GUIDE ORGANIZATIONAL MAINTENANCE | 1-Nov-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-25GS-00-1 | C-130 EQUIPMENT AND FURNISHINGS - GENERAL SYSTEM / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-25JG-00-1 | C-130 EQUIPMENT AND FURNISHINGS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Mar-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-26JG-10-1 | C-130 FIRE PROTECTION / FIRE DETECTION SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-26JG-20-1 | C-130 FIRE PROTECTION / FIRE EXTINGUISHING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-0ct-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27FI-00-1 | C-130 MECHANICAL FLIGHT CONTROLS- FAULT ISOLATION / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-00-1 | C-130 FLIGHT CONTROLS SYSTEM / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Sep-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-10-1 | C-130 FLIGHT CONTROLS / AILERON CONTROL SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Oct-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-10-2 | C-130 FLIGHT CONTROLS / AILERON TRIM SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-20-1 | C-130 FLIGHT CONTROLS / RUDDER CONTROL SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Sep-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-20-2 | C-130 FLIGHT CONTROLS / RUDDER TRIM SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-30-1 | FLIGHT CONTROLS / ELEVATOR CONTROL SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jun-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-30-2 | C-130 FLIGHT CONTROLS / ELEVATOR TRIM SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-50-1-1 | C-130 FLIGHT CONTROLS / FLAP CONTROL SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Oct-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-50-1-2 | C-130 FLIGHT CONTROLS / FLAP CONTROL SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Mar-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-27JG-50-2 | C-130 FLIGHT CONTROLS / FLAP ASYMMETRY SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Apr-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-28JG-00-1 | C-130 FUEL SYSTEM / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Apr-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-28JG-10-1 | C-130 FUEL SYSTEM / STORAGE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-28JG-20-1 | C-130 FUEL SYSTEM DISTRIBUTION - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-28JG-30-1 | C-130 FUEL SYSTEM / DUMP - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Aug-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-28JG-40-1 | C-130 FUEL SYSTEM / INDICATION - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Oct-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-29JG-00-1-1 | C-130 HYDRAULIC SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Apr-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-29JG-00-1-2 | C-130 HYDRAULIC SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Apr-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-30JG-00-1-1 | C-130 ICE AND RAIN PROTECTION SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Oct-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-32JG-00-1 | C-130 LANDING GEAR SYSTEM / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-09 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-32JG-10-1 | C-130 LANDING GEAR SYSTEM / MAIN GEAR AND DOORS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-32JG-10-2 | C-130 LANDING GEAR SYSTEM / MAIN GEAR / EMERGENCY EXTENSION AND ELECTRICAL - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-32JG-20-1 | C-130 NOSE LANDING GEAR SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Aug-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-32JG-40-1 | C-130 MAIN LANDING GEAR BRAKES AND ANTI-SKID SYSTEM - JOB GUIDE ORGANIZATIONAL MAINTENANCE | 5-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-32JG-50-1 | C-130 NOSE LANDING GEAR STEERING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-33JG-00-1-1 | C-130 LIGHTING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Jun-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-33JG-00-1-2 | C-130 LIGHTING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-34JG-00-1 | C-130 NAVIGATION SYSTEM / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Aug-09 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-34JG-20-2 | C-130 NAVIGATION SYSTEM / AIR FORCE STANDARD FLIGHT DIRECTOR - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-34JG-50-1 | C-130 NAVIGATION SYSTEM / AN/ARN-118 TACAN, AN/ARN-139 TACAN, AN/ARN-147 VOR/ILS/MB, AN/ARA-25/50 DIRECTION FINDER, AND DF-206/206A AUTOMATIC DIRECTION FINDER - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Mar-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-35JG-00-1 | C-130 OXYGEN SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-49JG-00-1-1 | C-130 AUXILIARY POWER UNIT SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-49JG-00-1-2 | C-130 AUXILIARY POWER UNIT SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Oct-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-51JG-00-1 | C-130 STRUCTURES - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-May-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-00-1 | C-130 STRUCTURAL DOORS / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Aug-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-10-1 | C-130 STRUCTURAL DOORS / CREW DOOR - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Aug-10 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-10-2 | C-130 STRUCTURAL DOORS / PARATROOP DOORS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-20-1 | C-130 STRUCTURAL DOORS / EMERGENCY EXIT DOORS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 30-Apr-99 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-30-1 | C-130 STRUCTURAL DOORS / AFT CARGO DOORS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-30-2 | C-130 STRUCTURAL DOORS / CARGO RAMP - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-52JG-70-1 | C-130 STRUCTURAL DOORS / DOOR WARNING SYSTEM - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Aug-09 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-56JG-00-1 | C-130 WINDOWS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Oct-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-61JG-10-1 | C-130 PROPELLERS / PROPELLER ASSEMBLY - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-71JG-00-1 | C-130 POWER PLANT / OPERATING LIMITS AND CHECKLISTS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 1-Jan-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-71JG-00-2 | -130 POWER PLANT / GENERAL MAINTENANCE - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-2-76JG-00-1 | C-130 POWER PLANT / ENGINE CONTROLS - JOB GUIDE / ORGANIZATIONAL MAINTENANCE | 15-Jun-11 | DISTRIBUTION STATEMENT D | |
| AFTO 1C-130H-4-00-1 | INDEX / USAF SERIES C-130 AIRCRAFT - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-11-1 | PLACARDS AND MARKINGS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Oct-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-15-1 | GROUND HANDLING EQUIPMENT - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Sep-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-21-1 | AIR CONDITIONING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Sep-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-22-1 | AUTOMATIC FLIGHT CONTROL SYSTEM E-4, AP-105 AUTO PILOT SYSTEM, AND AN/AYW-1(V) - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Dec-11 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-23-1 | COMMUNICATIONS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Sep-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-24-1 | ELECTRICAL SYSTEM - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Mar-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-25-1 | EQUIPMENT AND FURNISHINGS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-26-1 | FIRE PROTECTION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-27-1 | FLIGHT CONTROLS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Sep-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-28-1 | FUEL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Mar-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-29-1 | HYDRAULIC SYSTEM - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-30-1 | ICE AND RAIN PROTECTION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Aug-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-31-1 | INDICATING AND RECORDING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-32-1 | LANDING GEAR - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Mar-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-33-1 | LIGHTING SYSTEM - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 18-Sep-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-34-1 | NAVIGATION SYSTEM - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Apr-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-35-1 | OXYGEN - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-May-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-49-1 | APU / GTC - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Apr-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-51-1 | STRUCTURES - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-52-1 | STRUCTURAL DOORS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-May-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-56-1 | WINDOWS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Apr-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-61-1 | PROPELLERS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Aug-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-71-1 | POWER PLANT / GENERAL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-May-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-73-1 | POWER PLANT FUEL / TEMPERATURE DATUM CONTROL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Dec-11 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-75-1 | POWER PLANT / ENGINE AIR - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jan-08 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130H-4-76-1 | POWER PLANT / ENGINE CONTROLS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Dec-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-77-1 | POWER PLANT / ENGINE INDICATING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Apr-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-79-1 | POWER PLANT / ENGINE OIL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 15-Sep-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-80-1 | POWER PLANT / ENGINE STARTING AND IGNITION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Mar-10 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130H-4-84-1 | POWER PLANT / ASSISTED TAKEOFF - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Oct-07 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-1 | C-130J AIRCRAFT FLIGHT MANUAL | 15-Jun-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-10 | C-130J AIRCRAFT POWER PACKAGE - BUILD-UP INSTRUCTIONS | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-1-CL2 | LOADMASTER'S FLIGHT CREW CHECKLIST | 15-Jun-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-00GV-00-1 | C-130J - GENERAL VEHICLE MANUAL | 4-Apr-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-00JG-00-1 | C-130J GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-00WD-00-1 | C-130J AIRPLANE WIRING DIAGRAMS - WIRING MANUAL | 11-Apr-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-07JG-10-1 | GROUND HANDLING / JACKING - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-09JG-10-1 | GROUND HANDLING / TOWING - JOB GUIDE | 6-Dec-11 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-12JG-10-1 | AIRPLANE SERVICING / FUEL SYSTEM - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-12JG-10-2 | AIRPLANE SERVICING (EXCLUDING FUEL SYSTEM) - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-12JG-20-1 | AIRPLANE SERVICING / LUBRICATION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-13JG-00-1 | PRESERVATION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-15JG-00-1 | SUPPORT EQUIPMENT - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-21GS-00-1 | AIR CONDITIONING SYSTEM - GENERAL SYSTEM | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-21JG-00-1 | AIR CONDITIONING SYSTEM / GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-21JG-20-1 | AIR CONDITIONING SYSTEM / DISTRIBUTION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-21JG-30-1 | AIR CONDITIONING SYSTEM / PRESSURIZATION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-21JG-50-1 | AIR CONDITIONING SYSTEM / COOLING - JOB GUIDE | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-22JG-10-1 | DIGITAL AUTOPILOT / FLIGHT DIRECTOR SYSTEM - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-23JG-20-1 | COMMUNICATION / AN/ARC-190 HF RADIO - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-23JG-50-1 | COMMUNICATION / AUDIO INTEGRATING - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-24JG-30-1 | ELECTRICAL SYSTEM / DC POWER - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-25JG-00-1-1 | EQUIPMENT AND FURNISHINGS - JOB GUIDE | 20-Jun-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-25JG-00-1-2 | EQUIPMENT AND FURNISHINGS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-26GS-00-1 | FIRE PROTECTION SYSTEMS - GENERAL SYSTEM | 1-Jan-07 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-26JG-10-1 | FIRE PROTECTION / FIRE DETECTION - JOB GUIDE | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-26JG-20-1 | FIRE PROTECTION / FIRE EXTINGUISHING - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-27JG-00-1 | FLIGHT CONTROLS / GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-27JG-10-1 | FLIGHT CONTROLS / AILERON CONTROL - JOB GUIDE | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-27JG-10-2 | FLIGHT CONTROLS / AILERON TRIM - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-27JG-20-1 | FLIGHT CONTROLS / RUDDER CONTROL - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-27JG-20-2 | FLIGHT CONTROLS / RUDDER TRIM - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-27JG-30-1 | FLIGHT CONTROLS / ELEVATOR CONTROL - JOB GUIDE | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-27JG-30-2 | FLIGHT CONTROLS / ELEVATOR TRIM - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-27JG-30-3 | FLIGHT CONTROLS / STALL WARNING - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-27JG-50-1-1 | FLIGHT CONTROLS / FLAP CONTROL - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-27JG-50-1-2 | FLIGHT CONTROLS / FLAP CONTROL - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-27JG-50-2 | FLIGHT CONTROLS / FLAP ASYMMETRY - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-28GS-00-1 | FUEL SYSTEM - GENERAL SYSTEM | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-28JG-00-1 | FUEL SYSTEM / GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-28JG-10-1 | FUEL SYSTEM / STORAGE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-28JG-20-1 | FUEL SYSTEM / DISTRIBUTION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-28JG-40-1 | FUEL SYSTEM / INDICATION - JOB GUIDE | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-29JG-10-1 | HYDRAULIC SYSTEMS / BOOSTER AND UTILITY - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-23 | CORROSION PREVENTION AND CONTROL MANUAL - TECHNICAL MANUAL | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-30JG-00-1 | ICE AND RAIN PROTECTION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-00-1 | LANDING GEAR / GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-10-1 | LANDING GEAR / MAIN GEAR AND DOORS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-20-1 | LANDING GEAR / NOSE GEAR AND DOORS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-30-1 | LANDING GEAR / NORMAL EXTENSION AND RETRACTION - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-30-2 | LANDING GEAR / NORMAL EXTENSION AND RETRACTION - JOB GUIDE Pt 2 | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-40-1 | LANDING GEAR / BRAKES, ANTI-SKID, TIRES, AND WHEELS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-32JG-50-1 | LANDING GEAR / NOSE GEAR STEERING - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-33JG-00-1 | LIGHTING SYSTEM - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-35JG-00-1 | OXYGEN SYSTEM - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-36JG-00-1 | PNEUMATICS - JOB GUIDE | 1-Jul-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-38JG-30-1 | WATER/WASTE SYSTEM / TOILET AND URINALS - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-49JG-00-1 | AUXILIARY POWER UNIT - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-52JG-00-1 | STRUCTURAL DOORS / GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-52JG-10-1 | STRUCTURAL DOORS / CREW DOOR - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-52JG-10-2 | STRUCTURAL DOORS / PARATROOP DOORS - JOB GUIDE | 1-Jan-11 | DISTRIBUTION STATEMENT C | |
| AFTO 1C-130J-2-52JG-20-1 | STRUCTURAL DOORS / EMERGENCY EXITS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-52JG-30-1 | STRUCTURAL DOORS / CARGO DOOR - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-52JG-30-2 | STRUCTURAL DOORS / CARGO RAMP - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-52JG-70-1 | STRUCTURAL DOORS / DOOR WARNING - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-53JG-00-1 | FUSELAGE STRUCTURE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-55JG-00-1 | STABILIZER STRUCTURE - JOB GUIDE | 20-Apr-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-56JG-00-1 | WINDSHIELDS AND WINDOWS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-57JG-00-1 | WING STRUCTURE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-61JG-00-1 | PROPELLERS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-71JG-00-1 | POWER PLANT / OPERATING LIMITS AND RUN CHECKLISTS - JOB GUIDE | 4-Apr-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-71JG-00-2 | POWER PLANT / GENERAL MAINTENANCE - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-72JG-00-1 | POWER PLANT / BASIC ENGINE - JOB GUIDE | 30-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-2-76JG-00-1 | POWER PLANT / ENGINE CONTROLS - JOB GUIDE | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-3 | C-130J SERIES AIRCRAFT - STRUCTURAL REPAIR MANUAL | 10-Apr-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-36 | C-130J SERIES AIRCRAFT - NONDESTRUCTIVE INSPECTION MANUAL | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-00-1 | INDEX - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-11-1 | PLACARDS AND MARKINGS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-21-1 | AIR CONDITIONING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-22-1 | AUTO FLIGHT - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-23-1 | COMMUNICATIONS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-24-1 | ELECTRICAL POWER - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-25-1 | EQUIPMENT AND FURNISHINGS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-26-1 | FIRE PROTECTION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-27-1 | FLIGHT CONTROLS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-28-1 | FUEL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-29-1 | HYDRAULICS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-30-1 | ICE AND RAIN PROTECTION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-31-1 | INDICATING AND RECORDING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-32-1 | LANDING GEAR - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-33-1 | LIGHTING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-34-1 | NAVIGATION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-35-1 | OXYGEN - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-36-1 | PNEUMATICS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-38-1 | WATER / WASTE - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-46-1 | SYSTEM INTERGRATION AND DISPLAY - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-48-1 | COMMUNICATION / NAVIGATION / IDENTIFICATION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-49-1 | AUXILIARY POWER UNIT - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-52-1 | STRUCTURAL DOORS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-53-1 | FUSELAGE - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-54-1 | NACELLES AND PYLONS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-55-1 | STABILIZERS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-56-1 | WINDOWS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-57-1 | WINGS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-61-1 | PROPELLERS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-71-1 | POWER PLANT - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-72-1 | BASIC ENGINE - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Oct-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-73-1 | ENGINE FUEL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-74-1 | ENGINE IGNITION - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-75-1 | ENGINE AIR - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-76-1 | ENGINE CONTROLS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-77-1 | ENGINE INDICATING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-78-1 | ENGINE EXHAUST - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-79-1 | ENGINE OIL - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Oct-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-4-80-1 | ENGINE STARTING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 1-Jul-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-6CF-1 | ALL USAF C-130J SERIES AIRCRAFT - ACCEPTANCE OR FUNCTIONAL CHECK FLIGHT PROCEDURES | 1-Jan-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-6WC-10 | PREFLIGHT / THRUFLIGHT / POSTFLIGHT / COMBINED PREFLIGHT/ POSTFLIGHT INSPECTION - WORK CARDS | 14-May-12 | DISTRIBUTION STATEMENT E | |
| AFTO 1C-130J-9 | ALL USAF C-130J SERIES AIRCRAFT - CARGO LOADING MANUAL | 6-Feb-12 | DISTRIBUTION STATEMENT E | |
| AFTO 2G-GTCP85-41-1 | PNEUMATIC AND SHAFT POWER GAS TURBINE ENGINE - DEPOT OPERATION AND SERVICE INSTRUCTIONS | 27-Mar-12 | DISTRIBUTION STATEMENT C | |
| AFTO 2G-GTCP85-71-1 | GTCP85-185L[A] GAS TURBINE ENGINE - DEPOT OPERATION AND SERVICE INSTRUCTIONS | 27-Oct-10 | DISTRIBUTION STATEMENT C | |
| AFTO 2J-1-18 | PREPARATION FOR SHIPMENT AND STORAGE OF GAS TURBINE ENGINES | 1-Sep-10 | DISTRIBUTION STATEMENT D | |
| AFTO 2J-T56-56 | TURBOPROP ENGINES - INTERMEDIATE MAINTENANCE MANUAL | 1-Mar-12 | DISTRIBUTION STATEMENT C | |
| AFTO 33B-1-2 | GENERAL PROCEDURES AND PROCESS CONTROLS - NONDESTRUCTIVE INSPECTION | 15-Mar-12 | DISTRIBUTION STATEMENT C | |
| AFTO 3H1-18-2 | VARIABLE PITCH AIRCRAFT PROPELLER - FIELD MAINTENANCE MANUAL | 15-Feb-12 | DISTRIBUTION STATEMENT D | |
| AFTO 42B6-1-1 | AVIATOR'S BREATHING OXYGEN - QUALITY CONTROL MANUAL | 6-Mar-12 | DISTRIBUTION STATEMENT A | |
| AFTO 44B-1-2 | AIRFRAME ANTIFRICTION BEARINGS - GENERAL MAINTENANCE INSTRUCTIONS | 5-Mar-10 | DISTRIBUTION STATEMENT B | |
| AFTO 44B-1-3 | AIRCRAFT WHEEL ANTIFRICTION BEARINGS, AIRCRAFT WHEEL BEARING CUPS AND GREASE SEALS - GENERAL MAINTENANCE INSTRUCTIONS | 12-Jan-09 | DISTRIBUTION STATEMENT A | |
| AFTO 4BA8-5-3 | WING FLAP EMERGENCY BRAKE - OVERHAUL MANUAL WITH ILLUSTRATED PARTS BREAKDOWN | 1-Jun-12 | DISTRIBUTION STATEMENT X | |
| AFTO 4T-1-3 | AIRCRAFT TIRES AND INNER TUBES - INSPECTION, STORAGE, DISPOSITION AND MAINTENANCE INSTRUCTIONS | 28-Dec-11 | DISTRIBUTION STATEMENT B | |
| AFTO 4W3-4-363 | NOSE LANDING GEAR CONVERTIBLE WHEEL ASSEMBLY - OVERHAUL MANUAL WITH ILLUSTRATED PARTS BREAKDOWN | 21-Apr-10 | DISTRIBUTION STATEMENT B | |
| AFTO 9H2-2-80-3 | CYLINDER ASSEMBLY / DRAG STRUT ACTUATING, NOSE LANDING GEAR - OVERHAUL INSTRUCTIONS WITH PARTS BREAKDOWN | 19-Mar-10 | DISTRIBUTION STATEMENT B | |
| CGTO 1C-130H-1 | FLIGHT MANUAL USCG SERIES C-130H AIRCRAFT | 22-Jun-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-2-13 | USCG MODEL HC-130H AIRCRAFT - WIRING MANUAL | 1-Mar-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-2-8 | RADIO COMMUNICATION AND NAVIGATION SYSTEMS USCG MODEL HC-130H - AVIONICS MAINTENANCE MANUAL | 1-Sep-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-11-1 | PLACARDS AND MARKINGS - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 23-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-21-1 | AIR CONDITIONING - ILLUSTRATED PARTS BREAKDOWN / ORGANIZATIONAL MAINTENANCE | 24-Feb-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-22-1 | AUTOFLIGHT / USCG MODEL C-130H AIRCRAFT (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 15-Dec-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-23-1 | COMMUNICATION / USCG C-130H AIRCRAFT (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 15-Sep-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-24-1 | ELECTRICAL POWER / USCG MODEL C-130H AIRCRAFT (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 1-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-25-1 | EQUIPMENT / FURNISHINGS - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 6-Apr-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-26-1 | FIRE PROTECTION / USCG HC-130H AIRCRAFT | |||
| - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 21-Sep-12 | DISTRIBUTION STATEMENT D | ||
| CGTO 1C-130H-4-27-1 | FLIGHT CONTROLS / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 5-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-28-1 | FUEL / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 3-Jan-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-29-1 | HYDRAULIC SYSTEM - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 16-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-30-1 | ICE AND RAIN PROTECTION / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 10-Nov-08 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-31-1 | INDICATING / RECORDING SYSTEMS / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 23-Jul-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-32-1 | LANDING GEAR - ILLUSTRATED PARTS BREAKDOWN (PRELIMINARY) | 13-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-33-1 | LIGHTING SYSTEM / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 6-Feb-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-34-1 | NAVIGATION - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 11-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-35-1 | OXYGEN - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 23-Jun-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-38-1 | WATER/WASTE / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 10-Nov-08 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-49-1 | GAS TURBINE COMPRESSOR / AUXILIARY POWER UNIT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 1-May-09 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-52-1 | DOORS / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 3-Jan-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-53-1 | FUSELAGE - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 1-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-54-1 | NACELLE AND PYLONS - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 15-Jan-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-55-1 | STABILIZERS / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 9-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-56-1 | WINDOWS - USCG MODEL C-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 6-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-57-1 | WINGS / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 10-Sep-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-61-1 | PROPELLERS / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 1-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-71-1 | POWERPLANT / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 20-Feb-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-73-1 | ENGINE FUEL AND CONTROL - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 27-Jun-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-75-1 | ENGINE AIR / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 22-Oct-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-76-1 | ENGINE CONTROLS / USCG MODEL C-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 15-Sep-07 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-77-1 | ENGINE INDICATING - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 31-May-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-79-1 | ENGINE OIL / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 19-Oct-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-4-80-1 | ENGINE STARTING / USCG MODEL HC-130H AIRCRAFT - (PRELIMINARY) ILLUSTRATED PARTS BREAKDOWN | 1-Oct-08 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130H-6CF | ACCEPTANCE AND/OR FUNCTIONAL CHECK FLIGHT (ACF/FCF) PROCEDURES USCG C-130H SERIES AIRCRAFT | 1-Nov-05 | DISTRIBUTION STATEMENT C | |
| CGTO 1C-130J-1 | FLIGHT MANUAL - USCG SERIES HC-130J AIRCRAFT | 1-Jan-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-1-CL2 | FLIGHT OPERATION HANDBOOK - USCG HC-130J AIRCRAFT | 7-Apr-10 | DISTRIBUTION STATEMENT B | |
| CGTO 1C-130J-2-00WD-00-1 | USCG HC-130J AIRCRAFT - WIRING MANUAL | 1-Jul-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-2-34JG-56-1 | NAVIGATION SYSTEMS DF-430 DIRECTION FINDER - JOB GUIDE | 31-Jan-08 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-00-1 | USCG MODEL HC-130J AIRCRAFT - ILLUSTRATED PARTS BREAKDOWN | 14-Sep-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-00-2 | USCG MODEL HC-130J AIRCRAFT - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 15-Jun-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-11-1 | PLACARDS AND MARKINGS - ILLUSTRATED PARTS BREAKDOWN | 16-Feb-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-21-1 | AIR CONDITIONING - ILLUSTRATED PARTS BREAKDOWN | 17-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-22-1 | AUTOFLIGHT - ILLUSTRATED PARTS BREAKDOWN | 16-Feb-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-23-1 | COMMUNICATIONS - ILLUSTRATED PARTS BREAKDOWN | 30-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-23-2 | COMMUNICATIONS - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 31-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-24-1 | ELECTRICAL POWER - ILLUSTRATED PARTS BREAKDOWN | 1-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-24-2 | ELECTRICAL POWER - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 1-Nov-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-25-1 | EQUIPMENT AND FURNISHINGS - ILLUSTRATED PARTS BREAKDOWN | 1-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-25-2 | EQUIPMENT AND FURNISHINGS - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 1-Nov-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-26-1 | FIRE PROTECTION - ILLUSTRATED PARTS BREAKDOWN | 29-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-27-1 | FLIGHT CONTROLS - ILLUSTRATED PARTS BREAKDOWN | 14-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-28-1 | FUEL - ILLUSTRATED PARTS BREAKDOWN | 29-Jun-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-29-1 | HYDRAULICS - ILLUSTRATED PARTS BREAKDOWN | 15-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-30-1 | ICE AND RAIN PROTECTION - ILLUSTRATED PARTS BREAKDOWN | 24-May-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-31-1 | INDICATION AND RECORDING - ILLUSTRATED PARTS BREAKDOWN | 1-May-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-32-1 | LANDING GEAR - ILLUSTRATED PARTS BREAKDOWN | 10-Aug-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-33-1 | LIGHTING - ILLUSTRATED PARTS BREAKDOWN | 24-Aug-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-33-2 | LIGHTING - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 1-Dec-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-34-1 | NAVIGATION - ILLUSTRATED PARTS BREAKDOWN | 13-Dec-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-34-2 | NAVIGATION - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 1-Nov-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-35-1 | OXYGEN - ILLUSTRATED PARTS BREAKDOWN | 7-Dec-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-36-1 | PNEUMATICS - ILLUSTRATED PARTS BREAKDOWN | 26-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-38-1 | WATER/WASTE - ILLUSTRATED PARTS BREAKDOWN | 28-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-43-1 | STAFF COMMUNICATIONS - ILLUSTRATED PARTS BREAKDOWN | 24-Feb-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-46-1 | SYSTEM INTEGRATION AND DISPLAY - ILLUSTRATED PARTS BREAKDOWN | 19-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-48-1 | COMMUNICATION / NAVIGATION / IDENTIFICATION - ILLUSTRATED PARTS BREAKDOWN | 15-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-48-2 | COMMUNICATION / NAVIGATION / IDENTIFICATION - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 14-Oct-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-49-1 | AUXILIARY POWER UNIT - ILLUSTRATED PARTS BREAKDOWN | 23-Nov-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-52-1 | STRUCTURAL DOORS - ILLUSTRATED PARTS BREAKDOWN | 5-Jul-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-52-2 | STRUCTURAL DOORS - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 1-Nov-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-53-1 | FUSELAGE - ILLUSTRATED PARTS BREAKDOWN | 20-Mar-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-53-2 | FUSELAGE - ILLUSTRATED PARTS BREAKDOWN - MISSIONIZATION | 1-Nov-10 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-54-1 | NACELLES AND PYLONS - ILLUSTRATED PARTS BREAKDOWN | 30-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-55-1 | STABILIZERS - ILLUSTRATED PARTS BREAKDOWN | 30-Nov-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-56-1 | WINDOWS - ILLUSTRATED PARTS BREAKDOWN | 17-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-57-1 | WINGS - ILLUSTRATED PARTS BREAKDOWN | 29-Jun-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-61-1 | PROPELLERS - ILLUSTRATED PARTS BREAKDOWN | 1-May-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-71-1 | POWERPLANT - ILLUSTRATED PARTS BREAKDOWN | 7-Oct-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-72-1 | ENGINE - ILLUSTRATED PARTS BREAKDOWN | 1-Jun-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-73-1 | ENGINE FUEL - ILLUSTRATED PARTS BREAKDOWN | 3-Apr-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-74-1 | ENGINE IGNITION - ILLUSTRATED PARTS BREAKDOWN | 3-Apr-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-75-1 | ENGINE AIR - ILLUSTRATED PARTS BREAKDOWN | 6-Sep-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-76-1 | ENGINE CONTROLS - ILLUSTRATED PARTS BREAKDOWN | 19-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-77-1 | ENGINE INDICATING - ILLUSTRATED PARTS BREAKDOWN | 3-Apr-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-78-1 | ENGINE EXHAUST - ILLUSTRATED PARTS BREAKDOWN | 22-Feb-11 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-79-1 | ENGINE OIL - ILLUSTRATED PARTS BREAKDOWN | 24-Aug-12 | DISTRIBUTION STATEMENT D | |
| CGTO 1C-130J-4-80-1 | ENGINE STARTING - ILLUSTRATED PARTS BREAKDOWN | 17-Oct-12 | DISTRIBUTION STATEMENT D | |
| CGTO PG-85-00-10-A | ACMS USER'S - PROCESS GUIDE | 21-Feb-12 | DISTRIBUTION STATEMENT D | |
| CGTO PG-85-00-110-A | AERONAUTICAL ENGINEERING MAINTENANCE MANAGEMENT - PROCESS GUIDE | 15-Feb-12 | DISTRIBUTION STATEMENT D | |
| CGTO PG-85-00-170-A | AVIATION FUEL HANDLING PROCEDURES - PROCESS GUIDE | 19-Jan-12 | DISTRIBUTION STATEMENT A | |
| CGTO PG-85-00-180 | AIRCRAFT WEIGHT AND BALANCE - PROCESS GUIDE | 15-Dec-08 | DISTRIBUTION STATEMENT A | |
| CGTO PG-85-00-310-A | AVIATION LIFE SUPPORT EQUIPMENT SYSTEMS - PROCESS GUIDE | 20-Jan-12 | DISTRIBUTION STATEMENT D | |
| LOCKHEED DRAWING 3328580 | SUPPORT INSTALLATION - AFT TOILET | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT B | |
| LOCKHEED DRAWING 338941 | BRACKET - NLG FWD DOOR HINGE | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT B | |
| LOCKHEED DRAWING 354626 | FITTING - ELEVATOR TORQUE TUBE ADAPTER | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT C | |
| LOCKHEED DRAWING 368185 | BULKHEAD - FUS STA 93.0 LOWER, ASSY OF | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT C | |
| LOCKHEED DRAWING 372300 | ICE SHIELD INSTL - FUSELAGE RH FUS STA | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT C | |
| LOCKHEED DRAWING 372306 | ICE SHIELD INSTL - FUSELAGE LH FUS STA | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT C | |
| LOCKHEED DRAWING 373144 | PANEL - FLOORBOARD, FLIGHT DECK, FWD | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT D | |
| NAVAIR 01-1A-20 | ORGANIZATIONAL, INTERMEDIATE AND DEPOT MAINTENANCE AVIATION HOSE AND TUBE MANUAL | 30-Sep-11 | DISTRIBUTION STATEMENT A | |
| NAVAIR 01-1A-22 | MAINTENANCE INSTRUCTIONS ORGANIZATIONAL, INTERMEDIATE, AND DEPOT - AIRCRAFT RADOMES AND ANTENNA COVERS | 1-Mar-09 | DISTRIBUTION STATEMENT C | |
| NAVAIR 01-1A-35 | MAINTENANCE INSTRUCTIONS ORGANIZATIONAL, INTERMEDIATE, AND DEPOT AIRCRAFT FUEL CELLS AND TANKS | 26-Sep-11 | DISTRIBUTION STATEMENT C | |
| NAVAIR 01-1A-503 | MAINTENANCE OF AERONAUTICAL ANTIFRICTION BEARINGS FOR ORGANIZATIONAL, INTERMEDIATE AND DEPOT MAINTENANCE LEVELS | 15-Nov-09 | DISTRIBUTION STATEMENT A | |
| NAVAIR 01-1A-505 (series) | INSTALLATION AND REPAIR PRACTICES VOLUME 1 AIRCRAFT ELECTRIC AND ELECTRONIC WIRING | 14-Jul-11 | DISTRIBUTION STATEMENT A | |
| NAVAIR 01-1A-509 (series) | CLEANING AND CORROSION CONTROL, VOLUME I, CORROSION PROGRAM AND CORROSION THEORY | 1-Mar-05 | DISTRIBUTION STATEMENT A | |
| NAVAIR 13-1-6.4-1 | AVIATION-CREW SYSTEMS OXYGEN SYSTEMS (AIRCRAFT EQUIPMENT, MASKS, AND OTHER SYSTEMS) | 1-Aug-11 | DISTRIBUTION STATEMENT C | |
| USCG COMDT MANUAL CIM 13020.3 | CONTRACTORS FLIGHT AND GROUND OPERATIONS | 3/1/07 | NONE | |
| USCG ALC ENG SPEC GEN 13081.8C | U.S. COAST GUARD AIRCRAFT PAINTING: MATERIALS, PREPARATION, AND PROCEDURES | 26-Jan-11 | DISTRIBUTION STATEMENT D | |
| USCG ALC ENG SPEC GEN 13410.03 | PROCEDURES FOR FLUORESCENT PENETRANT INSPECTION | 20-Mar-05 | DISTRIBUTION STATEMENT D | |
| USCG ALC ENG SPEC GEN 13410.04 | CAUSTIC ETCH FOR CLEANING OF ALUMINUM ALLOYS IN PREPARATION FOR FLUORESCENT PENETRANT INSPECTION. | 17-May-04 | DISTRIBUTION STATEMENT D | |
| USCG ALC ENG SPEC GEN 13410.09A | EDDY CURRENT (ET) INSPECTION OF COMPONENTS | 31-Aug-11 | DISTRIBUTION STATEMENT D | |
| USCG ALC INSTRUCTION 13020.1B | ALC AIRCRAFT MAINTENANCE QUALIFICATION PROCEDURES MANUAL | 8/15/08 | DISTRIBUTION STATEMENT A | |
| USCG ALC INSTRUCTION 13020.2J | MAINTENANCE RELEASE, CARRIED FORWARD, AND PARTS PENDING APPROVAL FOR ALC AIRCRAFT | 5/22/12 | DISTRIBUTION STATEMENT A | |
| USCG ALC INSTRUCTION 13020.8F | COAST GUARD FOREIGN OBJECT DAMAGE CONTROL PROGRAM | 8/8/12 | DISTRIBUTION STATEMENT A | |
| USCG ALC INSTRUCTION 4200.3A | ALC SPARE PARTS BREAKOUTINEW PRODUCT DEVELOPMENT | 1/27/11 | DISTRIBUTION STATEMENT A | |
| USCG ALC INSTRUCTION 4855.2I | AIRCRAFT QUALITY INSPECTION PROGRAM | 8/12/10 | DISTRIBUTION STATEMENT A | |
| USCG ALC INSTRUCTION 5213.1E | SUPPLY ITEM CHANGE RECORD (SICR) PREPARATION AND ROUTING PROCEDURE | 11/12/08 | DISTRIBUTION STATEMENT A | |
| USCG ALC/LRS PRODUCT LINE INSTRUCTION LRS-001 | REQUEST FOR STRUCTURAL ENGINEERING, ALC/LRS PL | 10/16/10 | DISTRIBUTION STATEMENT A | |
| USCG COMDTINST 13020.1 | AERONAUTICAL ENGINEERING MAINTENANCE MANAGEMENT MANUAL | 11-Apr-11 | DISTRIBUTION STATEMENT D | |
| USCG DRAWING 400-534-1 | HC-130H DIRECTION FINDING SYSTEM DF-430 INSTALLATION DETAILS | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT D | |
| USCG DRAWING 400-193 | HC-130 STIFFENER INSTALLATION NOSE GEAR DOOR | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT D | |
| USCG PAINT DRAWING 300-14-2 | HC-130H PAINT AND DETAIL MARKINGS EXTERIOR PAINT | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT D | |
| USCG PAINT DRAWING 400-511-7 | HC-130H INTERIOR FLIGHT DECK PAINT AND DETAIL MARKINGS | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT D | |
| USCG PAINT DRAWING 400-71-4 | HC-130H INTERIOR MARKINGS DECALS | LATEST REVISION UPON REQUEST | DISTRIBUTION STATEMENT D | |
| USCG SCTO 130-957080 | NO 2 & 3 DRYBAY INSPECT | 29-Mar-01 | DISTRIBUTION STATEMENT C | |
| USCG SCTO T34450 | DF-430F DIRECTION FINDER | 11-Oct-07 | DISTRIBUTION STATEMENT D | |
| USCG TCTO 130-T38000 | CHEMICAL TOILET | 1-Jun-07 | DISTRIBUTION STATEMENT D | |
| USCG TCTO 130-T55010 | HORIZONTAL STABILIZER TIP DRAIN | 14-Dec-05 | DISTRIBUTION STATEMENT D | |
| USCG TCTO 130-T57201 | LOWER SURFACE CENTER WING | 3-Dec-09 | DISTRIBUTION STATEMENT D |
&P of &N
File details come from the government source that posted it. Updated .