PMI KTRs-GTMC.xls
XLS spreadsheet 15 KB Posted
- Attached to
- Guam Total Maintenance Services Federal contract opportunity
- Solicitation number
- HE1260-10-R-5001
- Issued by
- Department of Defense Education Activity
About this file
Preventative Maintenance Contractors
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A4-10-R-5001.pdf | ||
| QASP Chart.xls | XLS spreadsheet | |
| A3-10-R-5001.pdf | ||
| A2-10-R-5001.pdf | ||
| Work Request Under 1 5K.pdf | ||
| A1-10-R-5001 Guam TMC.pdf | ||
| HE1260-10-R-5001 GTMC.pdf | ||
| Labor Categories GTMC.xls | XLS spreadsheet | |
| Andersen MS Site And Floor Layout -OVERALL 2010.pdf | ||
| Andersen ES Site And Floor Layout-OVERALL 2010.pdf | ||
| McCool Site and Building Layout 2010.pdf | ||
| Price Breakdown - GTMC.xls | XLS spreadsheet | |
| Guam HS Site And Building Layout 2010 vs2.pdf | ||
| QASP Final-GTMC.doc | DOC document | |
| Guam TMC PWS - Draft3 Revised.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Preventative Maintenance Contracts with DoDEA Schools Calendar 2010 | |||
| Name of Contractor | Type of PM | Locations | Inclusive Dates |
| Clean Shot | Hood & Duct Cleaning | Andersen Bldg 1603, McCool 4175 and GHS 401 | 1 Jan 10 to 31 Dec 10 |
| Ben Lujan Towing Inc | Grease Trap Pumping | School cafeterias Bldg 401, 4175, 1603 | 1 Jan 10 to 31 Dec 10 |
| Culligan | Water Softening | Andersen Schools 1600, 1601, 1602, 1603,1604 | 1 Jan 10 to 31 Dec 10 |
| Tech Plus | Fire Suppression System | School cafeterias Bldg 401, 4175, 1603 | 1 Feb 10 to 31 Dec 10 |
| Trane | Air Handling Unit | Andersen Schools 1600, 1601, 1602, 1603,1604 | 1 Jan 10 to 31 Dec 10 |
| Trane | 24-hour Service Call | Andersen Schools 1600, 1601, 1602, 1603,1604 | 1 Jan 10 to 31 Dec 10 |
| Trane | Chillers (3 each) | Andersen Schools 1600, 1601, 1602, 1603,1604 | 1 Jan 10 to 31 Dec 10 |
| DCK WW | AHU, Chillers, Cooling Towers | Guam High (Bldg 401) | 1 Feb 10 to 31 Dec 10 |
| DCK WW | AHU, Chillers, Cooling Towers | McCool E/M (Bldg 311) | 1 Feb 10 to 31 Dec 10 |
| Ecolab/Pacific Water Solutions | Water Treatment | Andersen (Bldg 1603) | 1 Jan 10 to 31 Dec 10 |
| Ecolab/Pacific Water Solutions | Water Treatment | Guam High (Bldg 401) | 1 Jan 10 to 31 Dec 10 |
| Ecolab/Pacific Water Solutions | Water Treatment | McCool E/M (Bldg 311) | 1 Jan 10 to 31 Dec 10 |
| Pacific Elevators | Elevator | McCool E/M (Bldg 311) | 1 Jan 10 to 31 Dec 10 |
| Pacific Elevators | Elevator | Guam High (Bldg 401) | 1 Jan 10 to 31 Dec 10 |
| Otis Elevators | Elevator | Andersen Schools (Bldg 1600, 1601 and 1604) | 6 Jan 10 to 31 Dec 10 |
| JWS Refrigeration | Kitchen Equipment Service | School cafeterias Bldg 401, 4175, 1603 Preventative Maintenance | 1 Jan 10 to 31 Dec 10 |
| JWS Refrigeration | Kitchen Equipment Service | All schools cafeterias 401, 4175, 1603 Corrective Maintenance | 1 Jan 10 to 31 Dec 10 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .