Labor Categories GTMC.xls
XLS spreadsheet 33 KB Posted
- Attached to
- Guam Total Maintenance Services Federal contract opportunity
- Solicitation number
- HE1260-10-R-5001
- Issued by
- Department of Defense Education Activity
About this file
Attachment 2 - ELINs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A4-10-R-5001.pdf | ||
| QASP Chart.xls | XLS spreadsheet | |
| A3-10-R-5001.pdf | ||
| PMI KTRs-GTMC.xls | XLS spreadsheet | |
| A2-10-R-5001.pdf | ||
| Work Request Under 1 5K.pdf | ||
| A1-10-R-5001 Guam TMC.pdf | ||
| HE1260-10-R-5001 GTMC.pdf | ||
| Andersen MS Site And Floor Layout -OVERALL 2010.pdf | ||
| Andersen ES Site And Floor Layout-OVERALL 2010.pdf | ||
| McCool Site and Building Layout 2010.pdf | ||
| Price Breakdown - GTMC.xls | XLS spreadsheet | |
| Guam HS Site And Building Layout 2010 vs2.pdf | ||
| QASP Final-GTMC.doc | DOC document | |
| Guam TMC PWS - Draft3 Revised.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Rates
| Labor Category Hourly Rates - Exhibit Line Items (ELINs) | |||||||
| Item No. | *Labor Category/Trade | Unit of Issue | Base Year | Option 1 | Option 2 | Option 3 | Option 4 |
| E001 | Environmental Specialist/Engineer | Hourly | |||||
| E002 | Mechanical Engineer | Hourly | |||||
| E003 | Electrical Engineer | Hourly | |||||
| E004 | Civil Engineer | Hourly | |||||
| E005 | Structural Engineer | Hourly | |||||
| E006 | Engineering Technician | Hourly | |||||
| E007 | HVAC Mechanic | Hourly | |||||
| E008 | Electrician | Hourly | |||||
| E009 | Fire Extinguisher Repairer | Hourly | |||||
| E010 | Heavy Equipment Mechanic | Hourly | |||||
| E011 | Heavy Equipment Operator | Hourly | |||||
| E012 | Painter, Exterior | Hourly | |||||
| E013 | Painter, Interior | Hourly | |||||
| E014 | Pipefitter, Maintenance | Hourly | |||||
| E015 | Plumber, Maintenance | Hourly | |||||
| E016 | Sheet Metal Worker | Hourly | |||||
| E017 | Locksmith | Hourly | |||||
| E018 | Welder | Hourly | |||||
| E019 | Woodworker | Hourly | |||||
| E020 | General Laborer | Hourly | |||||
| E021 | Truckdriver, Light Truck | Hourly | |||||
| E022 | Truckdriver, Medium Truck | Hourly | |||||
| E023 | Landscape/Gardener | Hourly | |||||
| E024 | Concrete Mason | Hourly | |||||
| E025 | Carpenter | Hourly | |||||
| E026 | Carpet Layer | Hourly | |||||
| E027 | General Construction Worker | Hourly | |||||
| E028 | Equipment Operator | Hourly | |||||
| E029 | Fire Alarm System Technician | Hourly | |||||
| E030 | Roofer | Hourly | |||||
| E031 | Secretary | Hourly | |||||
| E032 | Computer Technician | Hourly | |||||
| E033 | Laborer | Hourly | |||||
| E034 | Drafter | Hourly | |||||
| E035 | Estimator | Hourly | |||||
| *Note: The Hourly Labor Rates proposed shall be fully burdened; fully loaded rates. The Hourly Labor Rates proposed on this ELIN will be Firm and Fixed rates and will be incorporated into the Awarded Contract. |
File details come from the government source that posted it. Updated .